Duty calculation for import PO for a specific material group

Hi All,
As per company requirement, we need to do changes in duty calculation for import PO for a specific material group.
Current scenario :  Currently  duty calculating on MRP with abatement  35% ( We have ABTT condition @ 35% of MRP).
For example:
Material: ABC , Basic Price = 1000, MRP = 2000 and duty is 10%
Duty  Amt = 2000(MRP) - 700(35% ABTT) *10%(Duty) = 130
Cess 2 % = 2.6
Ecess 1 % = 1.3
Total duty =  133.9
This duty (133.9) paid to custom vendor and loads in material cost.
New Requirement:  For vendor payment purpose duty should be calculate as above but  for material cost should be calculated on Basic price.
For Example:    
Material: ABC , Basic Price = 1000, MRP = 2000 and duty is 10%
Duty  Amt = 1000(BP) *10%(Duty) = 100
Cess 2 % = 2
Ecess 1 % = 1
Total duty =  103 ( It should load in Material cost)
New Condition Diff Duty Amt = (1300-1000)*10% = 30
Cess 2 % = .6
Ecess 1 % = .3
Diff Duty Amt = 30.9 ( It should not be added in material Cost)
Paid to custom vendor = 103 + 30.9 = 133.9
Kindly suggest how to achieve this.
Regards
Jitendra

Hi,
   Please check whether the requirement is logical or not.  Did you check the requirement with your accounts team?
   If you have different duty calculation for MIGO and MIRO, how the GL accounts will get balanced? As of my understanding, the requirement is clearly not logical.
Regards,
AKPT

Similar Messages

  • Planned order is creating before planning bucket for a specific material.

    Planned order is creating before planning bucket for a specific material.
    Eg: Planning Bucket future: 12 months & Start date- 01/02/2012, but Planned order Availability/Requirement date is 12/23/2011.
    What causes this, how to fix it? Please suggest u2026
    Thanks
    Ravi

    Since your planning bucket start date is in the future, so this is normal that the system is trying to satisfy the demand in jan2012 bucket by creating a receipt on Dec23, 2011.
    Reasons for RECEIPT to be generated earlier is
    (1) There might be a FIRM HORIZON( SNP PROD HOR)
    OR
    (2) There might be a GR time and the system is considering that time
    In Customizing for Advanced Planning and Optimization -> Supply Chain Planning -> Supply Network Planning (SNP) -> Basic Settings -> Maintain Global SNP Settings, in the SNP:GR for Plnd Ords field, you have selected Processing Time.
    Blank out these times and see if it works, else do one of the following:
    (1) Set Period Factor(LOT SIZE TAB of PRODUCT MASTER) to 1, so that the receipts get created at the end of the bucket.
    OR
    (2) Create your demand at the end of the planning bucket period
    Thanks
    Kumar

  • Putaway Block in Storage Bin for any specific Material Code

    Hi Experts,
    We have a problem, we have allowed mix storage, addition to stock in the storage type, our requirement is this, that we want to block one bin aa-01-01 for some specific material code xxxxx, but we want to allow putaway other material codes to that bin.
    How can we achieve this. Can we use LS07 or some other solution. Please suggest at the earliest.
    Regards
    Ishu

    Hi,
    In standard system, you can block one specific bin for the specific material with Putaway strategy "Fixed bin" by maintaining this bin in material master. It is unclear that you set "allowed mix storage" and again required material specific putaway in bin.
    You can change "Mixed storage" indicator to blank. Which explains "___"  Mixed storage is not allowed
           All storage units in a storage bin must contain the same material and batch (one quant).
    If you don't want to change any of current setting you'll need to use the user exit and maintain custom table where you can maintain specific bin for the material for the warehouse. After determination of the bin to putaway in the standard code you can check if it is conflicting to the entry in your custom table.
    Hope this'll help.
    Regards,
    Sudhir

  • Disable forward scheduling for a specific material

    Hi experts.
    We have a requirement to disable forward scheduling for a specific material during ATP check in sales order and delivery processing. I played with some configurations in "Basic functions > Availability check and transfer of requirements" and "Basic functions > Delivery scheduling and transportation scheduling", but none could help.
    Notice: we use APO.
    Example:
    Material X - has 108 pieces in stock and a production order of 1000 pieces scheduled on Feb 11.
    If I place a sales order of 109 pieces with requested delivery date of Feb 8, I need the system to not confirm this quantity, instead of confirming the quantity on Feb 13, as of standard behavior.
    Regards,
    Fábio Scaravelli

    Unfortunately, I do not know much about APO. However, I had a quick look and saw the the function responsible for scheduling in APO is /SAPAPO/APO_SCHEDULING. Within this FM, there are two user exits called:
    EXIT_/SAPAPO/SAPLVCRM_001
    EXIT_/SAPAPO/SAPLVCRM_002
    I am unsure if these can be utilised to achieve the desired behaviour. However, they may be worth investigating.

  • Approve suppliers only for specific material groups

    Dear Experts,
    Current scenario: Our purchasers can buy products from all material groups from every boarded supplier. E.g. they can buy production materials from an office paper supplier.
    Target scenario: The moment a purchaser buys a material that's not part of the approved material group of that specific supplier, he get's an error.
    What is a practical way to achieve this?
    Thanks a lot,
    Steffen

    Normally we maintain Source lists,  which restrict the list of vendors from whom certain materials can be purchased. 
    Sometimes you can also create a Material group level contract, and then in the PO  specify the materials from that specific material group.
    but ideally you should go for source list, as it is the simplest and standard way to control approved suppliers for materials.  I know its not at material group level , but still its the best option.
    Last case, you can go for a development  , use the BADI ME PO PROCESS CUST i think it is.

  • Assign Source of supply is not working for contract with material group

    Dear Experts,
    I have searched all the threads and gone through before posting my query. So i would ask moderators to go through the thread properly before rejecting this.
    We have value contracts with respect to a particular material group without material and with item category W in the contract item, Please note that for the materials with this material group, the source determination is not set and source list is also not maintained.
    When we create PR for the material with this contract, and when we click on assign source of supply contracts used to get popped up, but recently from few days, when we click on assign source of supply we are getting an error " no source found for this item ".
    Can anybody help on this.
    Regards

    @ Biju,
    As mentioned earlier, we are not creating PR with reference to contract.
    first we are creating contract with item category W (material group), without material and plant details.
    we create PR with or without material with account assignment K and with the material group in the transaction ME51N, and after inputting all the fields, we click on assign source of supply, it was proposing the existing contracts with respect to material group earlier, but it is not happening for particular material group(it is working for all other material groups)
    Hope it is clear.
    @ Dev Patra,
    we are using DIEN-Service material types and we assign that particular material group to only service material type.
    we have not ticked, source list in the material master, we donot have any source list for the materials under that material group.( please check the note 457110- question number 14.)
    Regards

  • Default VAT 4 % for 1 particular material group

    My client wants to default VAT 4 % for 1 particular material group...It means if i create PO for that particular material belonging to that material group  it should fetch VAT  4 % default.
    How to map it?

    Hi,
    For the VAT condition type, maintain access sequence with the field material group and then create the tax condtion using FV11 for the said material group with 4% tax rate. All subseqent PO's created with that particular Material Group will automatically calculate VAT with 4% based on the conditon record, Pl check
    Regards
    Merwyn

  • Recreating duty calculations for PO for changed Net price of an item.

    Dear Friends,
    i am trying to simulate the duty values for a PO by calling the FM's in the below said order.
    it is working fine, when i am simply passing the actual value of the item via structure (gfl_komp) shown below.
    My requirement is like, i want to change the net price in the  item structure (gfl_komp) and recalculate based on the changed Net Price. But when i change the Net value, it is not getting reflected in the simulated value of FM 'Pricing_screen'.
    Is there anything i should pass to the  header structure (gfl_komk). Please help me out.
       CALL FUNCTION 'ME_FILL_KOMK_PO'
              EXPORTING
                i_ekko          = gfl_ekko
                i_ekpo          = gfl_ekpo_pass
               i_lfa1          = gfl_lfa1
                i_t001          = gfl_t001
               i_kalsm         = gfl_ekko-kalsm
               i_kappl         = 'M'
         I_EGIMP         = I_EGIMP
         I_LFM1          = I_LFM1
         I_T001W         = I_T001W
         I_TRTYP         = I_TRTYP
         I_WEDATEN       = I_WEDATEN
         I_KVORG         = I_KVORG
             IMPORTING
               e_komk          = gfl_komk
            CALL FUNCTION 'ME_FILL_KOMP_PO'
              EXPORTING
                i_ekpo                     = gfl_ekpo_pass
                i_t001w                    = gfl_t001w
                i_ekko                     = gfl_ekko
                i_komk                     = gfl_komk
           I_MT06E                    = I_MT06E
           I_EINE                     = I_EINE
           I_EINA                     = I_EINA
           I_PREISFINDUNGSMENGE       = I_PREISFINDUNGSMENGE
           I_UEBPO                    = I_UEBPO
             IMPORTING
               e_komp                     = gfl_komp
    Here i am trying to change the values of the actual PO values in gfl_komk and gfl_komp.
            CALL FUNCTION 'PRICING_SCREEN'
              EXPORTING
                comm_head_i            = gfl_komk
                comm_item_i            = gfl_komp
      COMM_TEXT              = ''
      DISPLAY_ONLY           = ''
      MATERIAL_TEXT          = ''
      TRTYP_I                = 'A'
      FPTYP_I                = ''
      CTRL_NO_DISPLAY        = CTRL_NO_DISPLAY
      REQUEST_POS1           = '-'
      REQUEST_POSM           = '-'
      REQUEST_POSP           = '-'
      REQUEST_POSL           = '-'
    IMPORTING
      COMM_HEAD_E            = COMM_HEAD_E
      COMM_ITEM_E            = COMM_ITEM_E
      CALCULATION_TYPE       = CALCULATION_TYPE
      FCODE_E                = FCODE_E
              TABLES
                tkomv                  = git_tkomv
      SVBAP                  = SVBAP
    CHANGING
      C_VFKOMV               = C_VFKOMV
        ENDCASE.
      ENDIF.
    Regards,
    Sandeep Sivan
    Edited by: sandeep sivan on Apr 13, 2010 11:32 AM
    Edited by: sandeep sivan on Apr 13, 2010 11:32 AM
    Edited by: sandeep sivan on Apr 13, 2010 11:37 AM
    Edited by: sandeep sivan on Apr 13, 2010 11:47 AM

    hi sirnivas..
    Thanq you for the points..these are the first i ever recieved..
    if you are working on peice of code which can get the price history do me a favour if you have finished the code just explain it to me who did u  do that...
    i have been working on an object from last two weeks to get the latest price...
    the thing is even though the price for condition items has been changed it wont get updated in the Sales orders unless new pricing fot the document is done...
    so i have to get all the sales orders who condition items price has been changed and display them in an ALV...so if you can get the exact old values...for the conditions i guess the opposite also can be done.....
    Here i have suggestion for you...in condition items there is a process called SCHEMA ( pricing Schema) which you can see using Condition Analysis button at the bottom of the condition item window...
    you can see all the price changes to the condition when you parse the tree structure of the procedure..EXAMPLE :- R0000 etc...
    so some Sales orders if the Schema has been changed all the existing condition are replaced by New ones from the changed Schema...so i guess that would play an important role in deciding the Price of Sales order...
    I know this is bit long but .....if you did finsish your program do let me know how you did it...
    Thankyou very much and good luck.

  • Tables for mm03 (specification-material assignment)

    Hi All,
    We have a need to find out which material masters are assigned to GCD (Global Chemical Database) specifications.what are the possibilities from Material master side.
    Specification information (in tab "Spec assignment") on material master side is on a structure RCGMMJIOT. can anybody help with the table name for the corresponding structure.
    Thanks in advance

    HI Vibhuti,
    More detailed information about EHS tables are as follows
    Description--> Table Name
    Specification Header     ESTRH
    Identifiers     ESTRI
    Identifier - Regulatory list assignment     ESTRL
    Referencing in specifications     ESTRR
    Specification  - Material assignment     ESTMJ
    Specification status assignment     ESTST
    Specification - Value Assignment Type Assignment (Property tree)     ESTVH
    Value assignment Item (e.g.  composition values)     ESTVP
    Shadow table for AUSP (Characteristic values)     ESTAUSP
    Additional Information: Value Assignment Assessment     ESTDR
    Additional Information: Value Assignment Source     ESTDS
    Additional Information: Value Assignment Usage     ESTDU
    Additional Information - User-Defined Text     ESTDF
    Value assignment table (Classes)     ESTVA
    I hope this complete list may will be helpful for you.
    Regards
    Amol

  • Define a Disk destination for a specific Protection group DPM 2012 R2

    Hi,
    I currently have a DPM 2012 R2 Server with some protection groups created. Just recently added a new disk to the storage pool. I wanted to see if I can define a specific disk to a specific protection group? 
    I found this command:  Set-DPMDatasourceDiskAllocation and this parameter -DestinationDiskPool
    But I'm not sure if that can help me out and how to use it with and existing protection group.
    Can someone give me an example maybe or guide the correct way to do this? Do I need to create another disk pool and move the disk there? Is that even possible? I'm quite lost here, any ideas are appreciated.
    Thanks!
    Eduardo Rojas

    Hi,
    I don't really recommend this, but the only way to specify a physical disk (volume) to use when protecting a new data source is to use custom volumes.
    Defining Custom Volumes
    http://technet.microsoft.com/en-us/library/ff399012.aspx
    How to Assign a Custom Volume for a Protection Group 
    http://technet.microsoft.com/en-us/library/bb809021.aspx
    There are pros and cons to either approach, but some can be partially mitigated quite easily.
    1) Using existing disk configuration – 2-disks in a hardware raid-1 – no dedicated disk for DPM.
         Pro - build in data integrity for the DPM storage pool and operating system.
         Pro – No need to buy / install / maintain additional hardware.
         Con – Using DPM Custom volumes on basic disks needs planning to get the volume sizes correct based on the retention range and data churn.
         Con – miscalculating makes it difficult to correct later because you cannot grow volumes on basic disks unless you have adjacent free space.
         Con – DPM cannot auto-grow custom volumes, so you will need to grow them manually if needed.
         How to mitigate – convert the disk to Dynamic disk so the custom volumes can be manually grown (even in discontinuous space) if you miscalculate the sizes.
    2)  Adding an additional disk so DPM can have its own dedicated storage pool disk.
          Pro – DPM can make the volumes automatically when adding data sources to protection.
          Pro- DPM can autogrow if necessary, so it’s more hands off.
          Con – Additional cost of hardware, installation and upkeep.
          Con – No data integrity should the DPM storage pool disk fail. 
    This is easily recoverable to get new disk to be used by DPM, but you will lose all backups.      
    Hope this helps frame the debate.
    Please remember to click “Mark as Answer” on the post that helps you, and to click “Unmark as Answer” if a marked post does not actually answer your question. This can be beneficial to other community members reading the thread. Regards, Mike J. [MSFT]
    This posting is provided "AS IS" with no warranties, and confers no rights.

  • PO Qty in SKU configuration for specific Material Group in PO

    Dear All,
    I face issue when I do MIGO, which is that unit measure KG can not covert to stockunitstock unit measure PC.
    After I checking, I found the following information in tab Qualities/Weights of PO:
    PO Quantity                     2 PC     Order Unit <-> Ord. Price Unit        PC  <->         KG
    PO Qty in SKU               0.000        Order Unit <-> SKU             0      PC  <-> 0
    What I can configure is "Order Unit <-> Ord. Price Unit        PC  <->         KG", but I can not conifgure "Order Unit <-> SKU" for PO to buy material group rather than sepcific material.
    Could anybody can tell me how to configure "PO Qty in SKU               0.000        Order Unit <-> SKU             0      PC  <-> 0" for PO to buy material group in ME21N?
    I am looking forward to your kind suggestion, which is really appreciated!
    Cheers!

    Does anyone face the same issue before? could you give me any tips if you have such problem? thanks in advance!

  • Authorizations for materials and material groups

    Hello experts,
    Is it possible to limit the authorization to make purchase requerisiton of some materials or material groups depending on the user?
    I heard that it is possible be able to update some materials using the authorization M_MATE_MAT and including them in the material master, material group and user. But this also works for the creation of purchasing documents (PR,PO,RFQ,...)? Do I have to include this authorization for all the materials? If they do not have I understand that works for every people.
    Thanks in advance for your help
    Best regards,

    Hi Madii,
                 actually Authorization works at the object level, i.s if you have provided the authorization for the user to makePR with certain Material Grp, then if you dont define that grp in the PO role, but still user will get the authorization from the PR role.
    why you want to allow the user to make the PR of certain Mtrl Grp for which he should not be making the PO.
    or let a different Body take care of the other mtrl Grp.
    Hope it helps.
    Regards,
    Yawar Khan

  • Create Userexit for MD01for particular material group

    Dear all,
    My requirement is : To execute MRP run for particular Material Group only.
    I create new userexit key by using OMIX  like  500.
    after that  in EXIT_SAPMM61X_001 -  double click in zxm61u01 and create object and write code, but it is not fired when execute tcode MD01.
    This procedure is correct or not.
    how to create user exit , MD01 execute  particular material groups only.
    Thanks in advance
    Regards,
    Chandu.

    Problem solved my self.
    Regards,
    V.Chandu
    Edited by: GoldMoon on Oct 15, 2009 9:56 AM
    Edited by: GoldMoon on Oct 15, 2009 9:56 AM
    Edited by: GoldMoon on Oct 15, 2009 9:57 AM

  • Derivation rule for Product from Material Group

    Dear All,
    Is it possible derive product from Material Group. The scenario is as below.
    We executed KE30 report (Classic Drill down) for Product, the we are able to see the profitability for different products, when we click on the list button (Find button) againist the product at the bottom we found not assigned, we selected that and we found there are some un assigned amounts (without product). when we see the line items for the same the line items are coming with out product ( product field is emply)
    Another observation is we created profitability assessment cycle (KEU5) in which cost center is the sender and material group is the receiver. when we run this cycle system is not distibuting the costs to the products, in the sender and receiver its executed with zero values.
    In derivation rule KEDR we gave the logic to derive product from material group.
    please guide the way which we are following is correct or not. can we derive product from material group.
    Thanks,
    Siva Reddy.S

    Hi
    Yes you can derive using "Derivation" method in KEDR and maintain a mapping of Mat Grp to Product... But that is not the right way
    You need to find out why some lines are posted w/o products.. They can be genuine cases....
    Also for assessment, either specify the Product as receiver or run KE28 Top Down Dist in order to allocate values from Mat group to Products..... Deriving Product from Mat group does not seem to be the nice way
    br, Ajay M

  • Multiple Local Product Categories for One ECC Material Group

    Hello experts,
    I have a question regarding Product Categories. I am using an Extended Classic Scenario and so, I retrieve Material Groups from the backend. Nevertheless, in order to have a more accurate split than ECC Material Groups in SRM, I would like to create local Product Categories which point on the same ECC Material Group. Eg. : 
    ECC Material Group
      - SRM Product Category 1
      - SRM Product Category 2
    I saw that I can create this kind of structure in COMM_HIERARCHY and I updated it in the PPOMA_BBP (I set * for backend and for SRM).
    Nevertheless, when I create a SC, I can not find the local Product Categories I created?
    Do you know how I could process?
    Thanks for your help
    Patrick

    Hi Patrick,
    Looks like you got confused in understanding the concept.
    You can not create a Local product category (material group) from a back end product category.
    You can have both backend R/3 material groups and local product categoris (material groups) parallelly.
    That means in COMM_HIERARCHY for R3MATCLASS hierarchy you have two nodes created under that, one for backend material groups and the other for local material groups.
    In stand alone scenario or de-coupled scenario you can use local product categories and not in Extended classic and Classic scenarios.
    For accessing a local product category you should have a local P.Org, local P.Group and the users should be assigned to these local P.Orgs or P.groups.
    If you have such a setting in your org. structure then you can create S.Cs for local Product categories and local materials.
    Hope this makes you more clear in understanding the issue.
    Clarifications are welcome.
    Award points for helpful answers.
    Rgds,
    Teja

Maybe you are looking for

  • Cannot convert string to date

    Hey Guys, I'm starting powershell and I'm having a headheck (I'm searching for hours) with a piece of code :) I'm trying to do that : $LogLines = (Get-Content -Path $LogPath) Foreach ($LogLine in $LogLines) { $LogSubString = $LogLine.Substring(21,15)

  • SAP APO DP/SNP (C_SCM3) certified

    Hai,         I got certified on <a href="http://www50.sap.com/useducation/certification/curriculum.asp?rid=251&vid=5">APO DP/SNP certification</a>. Just want to give some information to all those who want to take this exam: The duration of test is 2

  • Graphic designer haing trouble connecting an Epson 3880

    I recently purchased the Epson Stylus Pro 3880 and use an Airport Extreme to hard wire connect via ethernet 2 macbook pros and my Apple TV. I want to be able to network the printer so that I can print from either computer. There is an open USB 2.0 po

  • Here is how to enable full screen mode for AIR Mac Desktop Apps

    I just discovered that with a very simple native extension method, I can enable full screen mode for AIR Mac Desktop Applications. This gets you the full screen icon in the top right, and it works perfectly with no changes to my code. (Obviously only

  • ITunes 9.0 not letting me ctrl+click multiple artists?

    Before I updated from the previous version of iTunes, I could hold in ctrl and click various artists I wanted to play when I didn't want to make a playlist for them as I found several disadvantages to the playlist features, however now I've upgraded