E-recruitment - Text Changes - High Priority

Hi,
Which is the best way to change standard text accross the e-recruitment webdynpro applications.
Example: If the term requisition is to be rrenamed to XYZ. what is the best possible way to do the renaming, so that the changes appear in all the applications consistently
regards,
David

Hi,
the most efficient way here is creating customer contexts for the different standard OTR texts and replace the standard text. As the change is UI independent it is much faster than changig every web dynpro using the web dynpro configuration.
Rgds.
Roman
PS: don't forget to refresh the OTR buffer using /$OTR
PPS: overall I would not recomment replacing central standard terms of an application by customer ones. If you replace something like requisition you will probably get into trouble later as all SAP documentation will not be understandable to your project members and all communication between end users and developers or your company and SAP for bug repors will not be understandable if people are only used to their own terms instead of the standard ones.

Similar Messages

  • E-Recruiting: TEXT change through application configuration

    Hi,
    When i am replacing texts of different text elements through application configuration(Web dynpro context), I find the spaces preceding and following the text matter being ignored while displaying the same on the front end.
    Texts on different lines are shown in a continous  pattern, rather than showing in on different lines.
    I want to show them as i configure in the application configuration.
    Any help is apprreciated.
    Thanks,
    Suresh

    Hello Suresh,
    there are basically two ways of changing e-recruiting texts in web dynpro. As most texts are OTR texts, after implementing BAdI BTFR_CONTEXT, you can create customer contexts on the standard otr texts which will replace them in the ui. This was the only solution in BSP ui and is still very popular. The only restriction is that you can only have one alternative text.
    If you want to change the standard text in different customer texts as you want to have different descriptions for different target groups you can only use the web dynpro configuration. Unfortunately web dynpro configuration seems to change with every basis support package. At least in e-recruitng there are at 3 or more different ways to change the configuration for fields and roadmaps depending on the SP you use. I know that when we started with web dynpro for e-recruiting you could not change texts longer than ~40 characters and clearing an otr text resulted in the display of the technical name instead of an empty text.
    So far I did not met your problem in detail, but it could be a bug. So if you are on an older support package check the service marketplace. If you are on a current sp or cannot find a solution try to open a support message.
    If you need a quick fix, check if you can use the OTR context for a interim solution.
    Best regards
    Roman

  • How RequestDespatcher.include() method gets higher priority  ?

    Hi,
    I have three jsp pages named as A.jsp ,B.jsp and C.jsp respectively. In A.jsp , i include B.jsp using include directive and i include C.jsp using RequestDispatcher.include().
    But in output of A.jsp , The output of C.jsp comes as first and then output of B.jsp comes as second , eventhough i included B.jsp before C.jsp.
    I don't know why RequestDispatcher.include() gets higher priority than include directive of JSP.
    Just clear me.
    thanks in advance,
    nvseenu

    It has to do with when each cache is flushed.
    Each of these JSP pages will build up its output text into a buffer. When that buffer is full, or you flush it manually, the text gets written to the underlying output stream.
    The jsp:include uses the same buffer as its parent page. The output writer of the current page gets passed to it so that it can just append to the end.
    When you short-circuit things by using the RequestDispatcher manually, you only pass along the request/response. The page invoked then obtains the output stream, and wraps its own buffer around it.
    When a page is complete, it flushes its buffer to the output stream.
    So the order is:
    Page B completes and flushes its buffer. That result gets sent to A's buffer.
    Page C completes and flushes its buffer. That result gets sent straight to the underlying response output stream.
    Then page A finishes, flushes its buffer. All of its buffer (including what it got from B) now gets written to the outputstream.
    Solutions:
    You can manually flush the writer before you invoke the RequestDispatcher: ie out.flush(). If you try to forward/redirect after this though, it will raise an error.
    If you really want to get complicated, create a ResponseWrapper, and when you invoke the RequestDispatcher, pass it a response object with an outputstream/writer that gets added to the current buffer (ie what it does with a jsp:include)
    Or you can just use jsp:include.
    here is some code to play with.
    Try changing the flush attribute on the jsp:include to "true" and see what happens.
    Uncomment the out.flush() command to get it to print in the "correct" order.
    // includeOrder.jsp
    <html>
    <body>
    Ok, this is the main page of this little test.
    At this point we are going to <jsp:include> the second page:<br>
    <jsp:include page="includeOrder2.jsp" flush="false"/>
    <hr>
    And now we use requestDispatcher.include() to include the third page<br>
    <%-- out.flush();  --%>
    <% request.getRequestDispatcher("includeOrder3.jsp").include(request, response); %>
    <hr>
    And now we are done.
    </body>
    </html>
    // includeOrder2.jsp
    Here we are on page 2!
    // includeOrder3.jsp
    Beware of page 3!Cheers,
    evnafets

  • High Priority MMS

    My text messages come across to the recievers as Urgent/High Priority.  I have figured out how to change the priority on each individual text, but is there any way to change them where I dont have to change it on the individual message?

    Hi and wecome to the forums! 
    options-mms text-priority
    I only have sms text, but that's how to do it for my sms.
    IrwinII
    Please remember to "Accept as Solution" the post which solved your thread. If I or someone else have helped you, please tell us you "Like" what we had to say at the bottom right of the post.

  • Is it possible to change the priority of emails in my income folder?

    Hey everyone?!
    I want to change the priority of mails in my income folder.

    You could put a "flag" on it for high priority and then filter by flagged mails.  More generally, you can create a "smart mailbox" (Mailbox menu) and use it to filter the high priority messages.

  • How to change the priority level of message sent to market place.

    Hi to all gurus,
              I have rasied a query at market place. I raised the query with medium priority and now want to change it to high or very high priority as user is badly in need of the module for which the query is raised.
           How can i changed the priority of this message while I have not yet got reply for the same from SAP and the status is under process.
    Thanks and Regards

    Hello
    The hotline number of your local Support Customer Interaction can be found in SAP note 560499 - Global Support Customer Interaction.
    Either phone call or email and they will raise the priority accordingly.
    Regards
    Michael

  • EIM Auto pushback - requeue at higher priority?

    Hello,
    In our EIM 4.3.2(8) implementation (ICM Enterprise integrated queues and agents), all new and incomplete activites auto-pushback to queue after 8 hours (overnight generally). The problem with this is, they're getting pushed to the back of the queue. I'd like to have all auto-pushback emails queue at a higher priority so that during days of high email volume, we don't get stragglers that keep getting pushed to the end of the queue while newer emails get handled.
    I saw this:
    http://docwiki.cisco.com/wiki/Transferred_Emails_Get_Sent_To_End_of_Queue
    and thought maybe I could pull some Activity related column through to ICM to act on to change the priority... Not sure what I should use though. I considered looking at the "WHEN_CREATED" field and upping the priority in ICM if that's more than a day ago, but I wonder if there is a simpler way to do this.
    Any help you can provide would be greatly appreciated.

    New tasks are sent from EIM to ICM in order queue priority, activity priority and oldest - in that order. While sending new task there is no differentiation between new email first time in queue Vs email which is auto pushed back to queue, if queue and activity priority are same then oldest activity criteria will be honored.
    There is no other way in default EIM product to push auto pushed back emails ahead of others.

  • Is it possible in IOS to have two static routes for the same subnet, one a higher priority and "failover" between the 2?

    Hi All
    Is it possible in IOS to have for a particular subnet:
    a) Two static routes?
    b) Make one static route a higher priority than the other?
    c) If one static router "goes down", failover to the lower priority static route?
    We have a l2tp/vpdn connection to a supplier which can be accessed via two vlans/routes. I would like to make one route the preferred one but the "route" to failover if the preferred route goes down.
    Again, many thanks in advance for all responses!
    Thanks
    John

    Hi John,
    Hope the below explaination will help you...
    R1(config)# ip route 0.0.0.0 0.0.0.0 2.2.2.2
    R1(config)# ip route 0.0.0.0 0.0.0.0 3.3.3.3 10
    If you notice the Administrative Distance for the secondary route pointing to ISP2 is increased to 10 so that it becomes the backup link.
    The above configuration with just two floating static routes partially accomplishes our requirement as it will work only in the scenario where the routers interfaces connected to the WAN link are in up/down or down/down status. But in a lot of situations we see that even though the links remain up but we are not able to reach the gateway, this usually happens when the issue is at the ISP side.
    In such scenarios, IP SLAs becomes an engineer's best friend. With around six additional IOS commands we can have a more reliable automatic failover environment.
    Using IP SLA the Cisco IOS gets the ability to use Internet Control Message Protocol (ICMP) pings to identify when a WAN link goes down at the remote end and hence allows the initiation of a backup connection from an alternative port. The Reliable Static Routing Backup using Object Tracking feature can ensure reliable backup in the case of several catastrophic events, such as Internet circuit failure or peer device failure.
    IP SLA is configured to ping a target, such as a publicly routable IP address or a target inside the corporate network or your next-hop IP on the ISP's router. The pings are routed from the primary interface only. Following a sample configuration of IP SLA to generate icmp ping targeted at the ISP1s next-hop IP.
    R1(config)# ip sla 1
    R1(config)# icmp-echo 2.2.2.2 source-interface FastEthernet0/0
    R1(config)# timeout 1000
    R1(config)# threshold 2
    R1(config)# frequency 3
    R1(config)# ip sla schedule 1 life forever start-time now
    The above configuration defines and starts an IP SLA probe.
    The ICMP Echo probe sends an ICMP Echo packet to next-hop IP 2.2.2.2 every 3 seconds, as defined by the “frequency” parameter.
    Timeout sets the amount of time (in milliseconds) for which the Cisco IOS IP SLAs operation waits for a response from its request packet.
    Threshold sets the rising threshold that generates a reaction event and stores history information for the Cisco IOS IP SLAs operation.
    After defining the IP SLA operation our next step is to define an object that tracks the SLA probe. This can be accomplished by using the IOS Track Object as shown below:
    R1(config)# track 1 ip sla 1 reachability
    The above command will track the state of the IP SLA operation. If there are no ping responses from the next-hop IP the track will go down and it will come up when the ip sla operation starts receiving ping response.
    To verify the track status use the use the “show track” command as shown below:
    R1# show track
    Track 1
    IP SLA 1 reachability
    Reachability is Down
    1 change, last change 00:03:19
    Latest operation return code: Unknown
    The above output shows that the track status is down. Every IP SLAs operation maintains an operation return-code value. This return code is interpreted by the tracking process. The return code may return OK, OverThreshold, and several other return codes.
    Different operations may have different return-code values, so only values common to all operation types are used. The below table shows the track states as per the IP SLA return code.
    Tracking
    Return Code
    Track State
    Reachability
    OK or over threshold
    (all other return codes)
    Up
    Down
    The Last step in the IP SLA Reliable Static Route configuration is to add the “track” statement to the default routes pointing to the ISP routers as shown below:
    R1(config)# ip route 0.0.0.0 0.0.0.0 2.2.2.2 track 1
    R1(config)# ip route 0.0.0.0 0.0.0.0 3.3.3.3 10
    The track number keyword and argument combination specifies that the static route will be installed only if the state of the configured track object is up. Hence if the track status is down the secondary route will be used to forward all the traffic.
    Please rate the helpfull posts.
    Regards,
    Naidu.

  • Workflow: Setting the high priority flag

    Hi,
    Does any one know how to set the priority for the email notification?
    (Eg: In microsoft outlook red exclamatory mark for high priority)
    I tried the option priority in notification and message but its not giving the desired output(i.e Flag).

    I know you can set the priority on the task.
    If you click on the User step and go under Routes and Priority, you can change the priority and you will see a different icon in Workspace.
    I'm not sure this will change the priority on the email though.
    Jasmin

  • How can I give the "user interface thread" higher priority?

    We do alot of activex calls to front panels. We need to increase/decrease the priority of the user interface thread to resolve our thread problem. Anyone know how to do this?
    Chuck

    Hello,
    As P.M. was saying, you can adjust the thread priorities
    through the VI Properties dialogue. 
    Another place to modify the multithreading system in LabVIEW is a VI
    located at: [LabVIEW Directory]\vi.lib\Utility\sysinfo.llb\threadconfig.vi.  However I do not think this will remedy any
    problems you are having.
    From a Multithreading in LabVIEW tutorial (http://zone.ni.com/devzone/conceptd.nsf/webmain/d2e196c7416f373a862568690074c759)
    Priorities in the User Interface and
    Single-Threaded Applications
    Within the User Interface execution
    system, priority levels are handled in the same way for single-threaded and
    multithreaded applications.
    In single-threaded applications and
    in the User Interface execution system of multithreaded applications, the
    execution system queue has multiple entry points. The execution system places
    higher priority VIs on the queue in front of lower priority VIs.
    If a high-priority task is running and the queue contains only lower priority
    tasks, the high-priority VI continues to run. For example, if the execution
    queue contains two VIs of each priority level, the time-critical VIs share execution time exclusively until both finish.
    Then, the high priority VIs share execution
    time exclusively until both finish, and so on. However, if the higher priority
    VIs call a function that waits, the execution system removes higher priority
    VIs from the queue until the wait or I/O completes, assigning other tasks
    (possibly with lower priority) to run. When the wait or I/O completes, the
    execution system reinserts the pending task on the queue in front of lower
    priority tasks. Refer to the Synchronous/Blocking Nodes section for a list of
    asynchronous functions that wait.
    Also, if a high priority VI calls a lower priority subVI,
    that subVI is raised to the same priority level as the caller for the duration
    of that call. Consequently, you do not need to modify the priority levels of
    the subVIs that a VI calls to raise the priority level of the subVI.
    Thus changing the priority of your VI will change the
    priority of UI calls for that particular VI. 
    Again, I caution you because I suspect that if you are having problems
    with your application not running correctly, I do not believe that manipulating
    the thread priorities will resolve these issues.
    Hope this helps,
    Travis M
    LabVIEW R&D
    National Instruments

  • High priority notification without pop up

    Is there any way in workflow to send a high priority email notification to agent without the pop-up?

    thanks for the reply Viji
    I've done exactly as you guided but still in MSS inbox the notification is coming with Normal priority.
    Although when I checked the workflow instance, the step is showing High priority.
    I also tried to change the priority to Very High and Highest - Express but still inbox notification is showing normal priority, although everytime i can see in workflow instance that priority is changed to what I set, but its not reflecting in inbox.
    Plz help.

  • Give LAN higher priority than wireless / deactivate wireless if LAN is connected

    Hi.
    What I want to do is quite simple: Im my office there is a quite fast LAN connection and a rather poor wireless connection. Therefore, I want to tell my device: "If there is a LAN cable plugged in, just use LAN. Do not use Wifi in this case. If there is no LAN cable plugged in, try to connect to Wifi."
    It is really annoying to change that manually each time.
    I have already changed the network connection priority in Windows 7 as described here: http://support.microsoft.com/kb/2526067
    But to no avail.
    My notebook is E531.
    Wifi Device: Intel Centrino Wireless-N 2230
    Driver Date 30.09.2012
    Driver Version 15.3.1.2
    Solved!
    Go to Solution.

    Hi cis,
    do you by any chance have Access Connections installed on your system?  It is possible that the WLAN adapter is set to a higher priority than LAN in your location profile which is causing the behaviour.  If you don't have AC installed it may be a possible solution you could try. 
    Link to another thread on this subject;
    http://forums.lenovo.com/t5/ThinkVantage-Technologies/Access-Connections-disable-WiFi-on-Wired-Conne...
    Andy  ______________________________________
    Please remember to come back and mark the post that you feel solved your question as the solution, it earns the member + points
    Did you find a post helpfull? You can thank the member by clicking on the star to the left awarding them Kudos Please add your type, model number and OS to your signature, it helps to help you. Forum Search Option T430 2347-G7U W8 x64, Yoga 10 HD+, Tablet 1838-2BG, T61p 6460-67G W7 x64, T43p 2668-G2G XP, T23 2647-9LG XP, plus a few more. FYI Unsolicited Personal Messages will be ignored.
      Deutsche Community     Comunidad en Español    English Community Русскоязычное Сообщество
    PepperonI blog 

  • QoS on e4200 - High priority though my speed has halved! :(

    Hi there,
    I have a 100mbps connection at home and i've set up QoS to ensure my main PC gets the run of the bandwidth.
    However with my main PC set to high priority, I'm only getting just over 50mbps.
    Any ideas as to why this is?
    Thank you!

    Hi, Pizzimperfect. Try theMedia Prioritization Settings andmanually change the Downstream and Upstream Bandwidth to "0".

  • Change the priority of job SAPF100 Foreing exchange valuation

    Hi
    How can i change the priority of job for the programme SAPF100 (foreign exchange valuation)
    SAP version: 4.6C
    Pls suggest me
    Thanks
    Suresh

    Batch job priority (Job Class) can be set when creating a batch job using transaction SM36 or changed in SM37 before a job is active.  Job class can be set from C to A, where C is normal (low) and B (medium) and A (high) are higher priority.  Batch processes on the server are allocated based on job class.

  • How to assign higher priority for labview while running other applications.

    HI,
    I am performing 2 time critical counter operations. I am using software time due to the hardware limitation of PCI6013(I have tried all other options). My problem is that I get a erractic value when I use mouse, keyboard or change to other application.
    I found the following link providing a method to provide maximum priority to labview application.But even regular labview users are asked not to use this application. I am not even a regular LABview user.Is there any precaution that I should take to use this VI. I am in need of such an application very badly. Please Help.
    http://exchange.ni.com/servlet/ProcessRequest?RHIVEID=101&RPAGEID=135&HOID=506500000008000000F5880000&UCATEGORY_0=_1
    5_&UCATEGORY_S=0&USEARCHCONTEXT_TIER_0=0&USEARCHCONTEXT_TIER_S=0&USEARCHCONTEXT_QUESTION_0=priority&USEARCHCONTEXT_QUESTION_S=0

    "Is there any precaution that I should take to use this VI."
    Yes many,
    When you start to experiment with settings priorities in an attempt to avoid the affects of mouse clicks, then you should brace yourself for the application appearing hung. This would happen if LV had a higher priority than the mouse interupt service routine.
    Same applies to the other conditions you mentioned.
    If you go this route, backup before you experiment! Some strange things can happen to your file system.
    I have talked to you about this challenge of yours in another thread. This is what I recomend.
    1) If you can live with your readings being made on only one gear at a time, AND the sample rate being aperiodic, then you MAY be able to use DAQ Occurances and two session. I
    have not done this myself, and AM NOT SURE if it can be done or if you hardare supports it, but maybe;
    a) Open two references to your and configure A so it uses hardware timing (like you already said works good) to count gear A using the other counter as the gate. On the other session you are counting gear B.
    b) Configure both of the above to fire occurances when done.
    c)Start only session A.
    d) When A occurance fires start B.
    e) When B fires start A, etc.
    This will give you determinism on the counts and effectively shift the indeterminism to the update interval.
    If this is not good enough then there is another option. Can you get yourself a nice solid external reference that you can apply as an external gate to both counters? If so you will be using hardware timing and you should be on the right track.
    If these do not work out, you may end up having to go to different hardware.
    Just trying to help,
    Ben
    Ben Rayner
    I am currently active on.. MainStream Preppers
    Rayner's Ridge is under construction

Maybe you are looking for

  • Function module for creation of Installed base along with product

    Hi,         Function module for creation of installed based with product for the business partner.

  • HT201250 mac wont connect to time machine

    I was happily backing up my compouter to the time-capsule/time machine, and suddenly my computer wont back up or recognize my external harddrive. It wants me to reformat it and start as if it were new. I dont want to overwrite my content, so I am not

  • IconItemRenderer with alternating icon existence

    Hello, I have an IconItemRenderer in which some rows have icons (and decorators) and some do not. The ones that do not, align the labelDisplay as if they would and I wanted it to be left aligned. Is there something I'm missing, shouldn't a null icon

  • I can't find the port in other PC ??

    while I change the VI from my PC to another, my program (read serial port by using visa) can't find the port, I push refresh but nothing happens despite the 'COM' is installed.

  • Nokia 7230 -- Screen Saver Setup Issue

    Hi there, I have just bought a Nokia 7230 on which I have activated the screen saver in the form of a digital clock. However, after some seconds of not using the phone, the screen becomes dark-grey but no screen saver appears (NB: the phone is not of