EAM Maintenance Work Order Detail Report

Hello All,
I have a requirement to add new fields to the Maintenance Work Order Detail Report which is run from the web page. This report's RTF template works based on the fields which are defined in the seeded data definition. This seeded data defintion has an seeded XSD file with the fields in it. By the RTF template I got the standarad concurrent program name as Maintenance Work Order Detail Report.
I assumed the following process to happen when the Run button on the EAM work order page is clicked.
1. Concurrent program Maintenance Work Order Detail Report is submitted
Executable: PL/SQL Package EAM_WOREP_PUB.Work_Order_CP
Seeded Data Definition: Work Order Details -- This DD has a seeded XSD file EAMWOREPORT.xsd
2. So the RTF template based on the pl/sql package and the XSD file generates the report and displays.
Please correct if my assumptions are wrong.
I want to add new fields to this report. So I have customized the pl/sql package, modified the code with new fields and created a custom data defintion with a new XSD file with the new fields added in it. Also created a new template linked to new data defintion. After doing all this I am not able to see the new fields on the report generated they come as NULL.
My question is Is it feasible to add new fields to this Maintenance Work Order Detail Report or we can use only the fields which the seeded one gives?
Version: R12.1.2
I tried and tried but couldn't find a solution to it. If anyone has faced the same issue please let me know.
Thank You!!

IW47 should give you the required information.
Regards
Narasimhan

Similar Messages

  • Change Maintenance Work Order Detail Report in Print WO page

    Hello,
    I would like to ask you for your help. We would like to have different report in Print WO function than Maintenance Work Order Detail Report. I mean SSM responsibility > Search for WOs > click Print WO icon. We applied patch #9871500 (I found it there: Templates associated to datadefinitions other than 'EAMWRREP' are not shown in the Work Order Detail report in EAM [ID 1209703.1]). I did personalizations steps - I defined new data definition (for example TEST) and report with data definition TEST is shown in the option on Print WO page now... But how should I it define to have correct result? What should be defined in Executable, Concurrent Program, Data Definition and Data Template? I have RDF and RTF files for this report. We are using different SQL than it is used in the original report. How could be used our SQL defined in RDF?
    Thanks, Regards,
    Jitka

    Hi,
      1) You can choose to select and Print shop paper when you need.No enhancement is required.
    2) There is not an option in standard to say Print/Not print Long text . You will have to replace the standard form with a custom form and build the logic to print /Not Print long text based on your rules.
    Regards
    Narasimhan

  • How to Change Maintenance Work Order Report in EAM Maintenance Super User

    Hi,
    We like to change or create new costom report in place of Standrd EAM Maintenance work order details report in Maintenance super User Responsibility.
    When we go Maintenance Super User > Work Order > Print work order >Layout , In Template layout we find only one LOV called Maintenance report.
    We like to where this this Template LOV storing and Run button code where it's storing
    THANKS,
    Gana

    Hi,
    You could temporarly adjust the CUNI definition for TST so that it can be converted to seconds. Adjust the notifications to set a valid unit of measure.
    The alternative would be to update the field MAUEH in table QMIH with a valid breakdown unit of measure.
    -Paul

  • Maintenance work order-- Time confirmation report for work orders

    Could you please let me know how to pull actual time confirmation report for the maintenance work orders?
    regds
    Arun

    Use transaction IW43 or  IW47 for maintenance order confirmation ( inprocess & completed ) and refer [link|http://help.sap.com/saphelp_erp2005/helpdata/en/66/158661547611d182cc0000e829fbfe/frameset.htm]
    -S.N

  • Work Order Status report

    Hi,
    Any body have ideal?
    What are the work order summary report mean for?
    I am using T-code ZPM02 to view the report but the report display the work center according to the category CRTL,REL,PCNF,CNF,TECO and CLSD with each colunmn display the figure.
    What is mean for CRTL,REL,PCNF,CNF,TECO and CLSD?

    PeteA,
    Thank you for the information, the report is indeed a customized report.
    Could advice how to diffrentiaze between customize and standard report in SAP system?
    Can the IW39 list all orders with all the status in IW39?
    The reason being I am having problem with the customize report display (work order summary report)the status diffrence with the IW39 is the detail report.I am now looking for the SAP standard report for work order summary report to compare with the customize report to verify which report are display not correct.
    Do you have any ideal others than IW39 what others report in SAP system show the work order summary report?
    Many thanks.
    Karen

  • Goods return against maintenance work order exceeds goods issue

    Is there a way to prevent returning more quantity (262 movement type done within MB1A) than was issued (261 movement type done within MIGO_GI) against a maintenance work order component?
    Thanks in advance,
    Rick

    Hi,
    Movement Types 261 and 262 works in Planned as well as in Unplanned both ways.
    If you do Goods Issue w.r.t. Maintenance/Work Order (Movement Type - 261) then components and their quantity get defaulted from the reservation created automatically during order creation and system does not allow us to issue more that the quantity in reservation.
    Similarly when you cancel the Goods Issue Document then it hits Movement Type 262 automatically and does not allow to edit the quantity.
    The above two processes are planned ways.
    Now when you want to do extra consumption of components against Maintenance/Work Order then you do not do Goods Issue > Order, instead of this you do Goods Issue > Others and then specify all the necessary details manually (Like; material, quantity, etc...) and enter Maintenance/Work Order as an Account Assignment on which the cost is getting loaded.
    Similarly when you are receiving materials from Maintenance/Work Order using option Goods Receipt > Others then here also there is no control and you can receive any quantity from Maintenance/Work Order since here also Maintenance/Work Order is working as an account assignment not a control document.
    The above two processes are unplanned ways.
    So in short, there is not any control on this movement when it is unplanned.

  • PM Work Orders Details based on  Equipment number

    Hi Friends
    I need some help on finding BAPI or FM for
    Plant Maintenance <u>Work Orders list </u><b>AND</b> <u>Work Orders Details </u>based on  Equipment Number [ if i proved  the Equipment Number as input result is  Work Orders Details of  Equipment no ] any doc....
    Thanks in advance ,
    Regards
    Ram

    Hi,
    I think you can get from AFIH Table.
    Regards,
    Satish

  • WIP : Work Order Aging report

    Hello,
    Is there any standard program given by Oracle on WIP  as 'Work Order Aging report' ?
    I guess not.
    If its not, then is there any other program related to WIP Aging exists in Oracle?
    Thanks in advance.

    Hi,
    Can you please make Ship To also as Primary Business Purpose?
    Regards
    Raghavender K

  • Intercompny billing for maintenance work orders

    All,
    I have two scenarios dealing with intercompany activities for maintenance work orders. The first scenario involves a maintenance work order in Company B doing work on equipment also in Company B. The work order requires labor services and material from Company A. What is the most efficient way to consume the labor and material into the Company B work order? My client requires intercompany billing anytime labor services and/or material crosses into another company. So for this scenario, should I execute a cross-company labor confirmation and material consumption and then, create intercompany invoicing from this activity? Or, should Company B provide a purchase order to Company A for the labor and material and then, Company A executes intercompany billing to facilitate the correct intercompany financial postings?
    The second scenario requires a maintenance work order settlement from Company A to Company B. How should the intercompany billing be done for this? Should I settle to the cost object in company B and then do the intercompany billing? Or, should I settle to a sales document (i.e., debit memo) and then execute the intercompany billing?
    Pleases advise.
    Thanks!

    Alex,
      You should be able to use the List edit transaction iw38 to select and print Multiple Orders simultaneosuly. Once you have selected the orders in the Output screen, use the menu path ORDER > PRINT ORDER.
    Regards
    Narasimhan

  • Requirement assignment tab in Maintenance  Work order

    Hi Gurus,
    I have a query ..I want to know the customizing settings for Requiremnt assignment tab in internal operation tab for internal operations in maintenance work order .
    Thanks ,

    Hi sundar ,
    This Path is available in ECC 603 and we are using ECC6 . so not able to get the Path .
    Anyways Thanks for your Help .
    I have one more query  regarding this:
    When I assign one Resource to Reqmnt assignment tab and give any date of  friday then the date is automatically switches to Monday's date . the Work schedule for that person is from Monday to Friday but then also it shifts the date to Monday .
    Can you please suggest on this .
    thanks !!

  • Mass printing of maintenance work orders

    Hello All,
    I am configuring a preventive maintenance functionality where plans will kick out maintenance work orders at set intervals of time. Yesterday, I found about a requirement which requires functionality where a user can select many maintenance work orders and print shop papers for them from one screen. Are any of you aware of such functionality in SAP PM?
    Thank you for your help in advance.

    Alex,
      You should be able to use the List edit transaction iw38 to select and print Multiple Orders simultaneosuly. Once you have selected the orders in the Output screen, use the menu path ORDER > PRINT ORDER.
    Regards
    Narasimhan

  • Is there a process for moving costs from maintenance work orders to capital

    Is there a process for moving costs from maintenance work orders to capital projects?
    We have reversed the settlements on the work orders, and then trying to put the relevant NWA in , then receive error message :
    Rule for allocation of PM order to PS network is not maintained.

    hi
    check the allocation structure and the settlement related customization settings.

  • Function Module for TECO(technically complete) a maintenance work order

    Hi,
    Please let me know if there is any FM for TECO(technically complete) a maintenance work order.
    Regards,
    Vimal

    Is there any BAPI for the same as the FM STATUS_CHANGE_INTERN is doing TECO without considering other statuses which need to be done.
    I do technically complete in IW32 by going to ORDER-FUNCTIONS-Complete-Complete(Technically ). Once done Complete(Technically ) will be inactive and Cancel technical Completion will become active. But when i use this FM it does the teco but when i go to ORDER-FUNCTIONS-Complete-Complete(Technically ) it gives me following status information--System Status TECO is active. Also Complete(Technically ) remains active.
    Please help.
    Regards,
    Vimal
    Edited by: Vimal  kumar on Sep 16, 2008 11:10 AM

  • ERROR TECO a Plant Maintenance Work Order

    Hi Expert,
    I create a Plant maintenance work order. With two operation.
    Operation 1: Internal maintenance task with standard labor hour. Control Key is PM01.
    Operation 2 : Trigger of external PR. With control key PM02.
    Now I want to do TECO to settle the Work Order. Whit operation 1 didn't do confirmation. Operation 2 did not do PR next business. The system display a Error message as below:
    'ERROR When calculating costs for order XXXX' 
    How to do analysis?

    Hi
    in the work order itself from the menu options Extras>Log>Cost determination . and solve the analysis
    regards
    thyagarajan

  • Item text is not copied in PR created thru maintenance work order

    my colleague have done the config in MM (MM > Purchasing > PR > Text for PR > Define Copying Rules).  When i create a PR from ME51N, the item text and material PO text was copied.
    However, if i create a PR from a maintenance work order, only the material PO text is copied while item text is still empty.
    Is there some config i miss in PM side?

      Hi all
    for any one with similar issue, you can use Badi MD_CHANGE_MRP_DATA to solve the issue.
    check this thread.
    http://scn.sap.com/thread/979697
    Regards
    Kwame

Maybe you are looking for

  • Pdf links will not open in ie8 windows 7

    I have installed, uninstalled Adobe Reader 10 and Internet Explorer.  I have tried all the solutions listed in some other posts.  PDF links will not open the files on some web sites, Fidelity.com in particular. I have reset IE8 Advanced Options and A

  • Mapview not working in ipad 2 simulator

    Hello All Im trying to do an little coding with xcode and the mapkit. The thing is, when i run map apps in the iphone simulator the map of the world shows up fine. but if i use the ipad. i see only grey grids. Any one knows the reason that is happeni

  • Having Trouble Installing Visual Studio 2012 Update 3

    Hello. I have been attempting to install update 3 for Visual Studio 2012 Ultimate on Windows 7. I get this error: "Setup detected an issue during the operation. Please click below to check for a solution and help us to improve the setup experience."

  • My phone can't  make or receive calls when 3G is enabled

    Hello everyone, I just joined this forum because yesterday I started having a problem on my 2 months-old Iphone 4S. I can't make any calls, and when I try it beeps three times and I get a "Call Failed" message. People that try calling me get the same

  • Please, help with localization

    Hello, First of all i should apologize if do mistakes in English - Russian is my native. So the problem is: I've made a project and i want to use a widget to navigate between slides. Well i used a standart one that is called GoToSlide widget. I have