Earmarked funds during goods receipt (GR) is not inherited from PO.
Hi, Everybody u2026
We are using Earmarked Funds relevant for FM updating, but, during goods receipt (GR) and invoice receipt (IR) it is not inherited from purchase order (PO).
In ME21N the account assignment is F and the system ask us to enter the GL Account, Order and additional the Earmarked Funds. The system is deriving correctly the fund, the funds center and the commitment item from those entered in the Earmarked Funds.
However, during goods receipt and invoice receipt, the Earmarked Funds is not inherited from purchase order (PO) besides the others account assignments (order, fund, funds center and commitment item ) in the coding block.
Best regards,
Thanks
Hello,
I will provide some hints:
- If it is a service PO, please check the Note 972276 (Service Purchase orders only).
- If the posting is related to Asset, please kindly check:
a. Note 684659
b. Check if you have a derivation rule in FMDERIVE with the function module FMDT_READ_MD_ASSET.
c. Check in your FI-AA customizing if you have activated the account
assignment element but you have not specified an account assignment type for
account assignment object for APC balance sheet postings (see note 684659 for
details).
I hope it helps
Best Regards,
Vanessa Barth.
Similar Messages
-
PIR reduction during goods receipt for strategy 10
Hi Experts,
I am using the net requirement planning strategy. i.e strategy 10. My requirement is I wanted the PIRs to be reduced when do goods receipt for the production orders.
I know this is possible in strategy 11. But how how do it in strategy 10.
Regards
PrathibHi Ayethebing,
What you mentioned in correct. System may do the wrong net requirement calculation. Let me explain what is my requirement.
I have planning plant, where I get the sales orders and the PIR from Depots. And the production for all these quantities should be done in production plant. I need to do the goods receipt in the production plant itself first and do a plant to plant material transfer to planning plant.
But all the control of production should be with production plant. So I cant use the production in alternative plant because in this case i need to convert planned order in planning plant and while doing goods receipt the stock directly updates in planning plant.
So I was thinking of loading the PIRs in the production plant directly and use strategy 10. But since the sales orders wont come to production plant, the PIRs wont recduce at all. So thought of thinking about reducing PIR during goods receipt.
But I realized from what you explained, it would lead to wrong PIR calculation. Full mark to you.
Now Iam thinking the solution in a different way. Please give me your inputs
Iam creating a recusrive BOM in planning plant and I will assign special procurement key 70. i.e withdrawal from alternative plant. I will assign alternative plant as production plant.
So when I run MRP in planning plant for the main product, I will get dependant requirement created in the production plant for the main material as I created the recursive BOM in planning plant.
But Iam having only one issue to be resolved here as I understand. The planned order created in the planning plant during MRP is convertible. Can I make it non convertible some how even if Iam having bill of material?
Thanks in advance for your valuable inputs
Regards
Prathib -
Quantity related Scale pricing not considered during Goods receipt
Hello Group,
First thanks for looking into my issue. I tried to follow the solution in SAP Note 401941 on assessing the right unit price as it relates to the quantity received during Goods receipt, but my ABAP developers are very green at this time and they cannot figure out where to place this code fix and how it would work.
Background on issue.
From quantity of 1 to 99, I want the price to be 4.00 each
From quantity of 100 and above, I want the price to be 3.00 each.
When doing goods receipts for quantities that have not reached 100 yet, it is still assessing 3.00 each. I found the OSS note above that is really not helpful and was wondering if anyone else is using scale pricing and how their GRs are calculated for correct unit price.
Thanks all for your assistance.
SamanthaThe scale pricing cannot be used to influence price during goods receipt. Goods Receipt will pick up the price from the purchasing document.
Suppose you want to have that the price be determined based on the quantity received over a period of time, you need to use rebate agreement.
The OSS note mentioned in your question says that you can determine the price based on the schedule line quantity during GR (not quantity at the time of GR). It will not solve your requirement.
Lakshman -
Prevent quantity updating during Goods Receipt
Hi,
We have a particular requirement for a type of subcontracting process (not the standard SAP subcontracting) as mentioned below.
We create a Purchase Order for a material (without a standard cost) and giving an account assignment category in the PO. The Net price mentioned in the PO is the processing charges for the vendor (service charges). It does not indicate price for the material.
When we receive the finished material from the vendor, we perform a Goods receipt. The stock gets updated and accounting documents are created.
Our requirement is to stop this quantity updating during Goods Receipt. But, at the same time, we would like the accounting documents to be created as we need to pay the vendor.
Is there any way of achieving this?
Pl let me know. Any inputs would be appreciated.Hi,
Thanks for the response!
I understand that in the standard process, the parent item inforecord takes care of the processing charges. But this is process that has been customized differently as the client has SAP as well as legacy systems talking to each other.
Turning off the qty updating at the material type level will turn it off for all purchase orders created for the material at that particular plant which is something we would like to avoid.
We would basically like to turn it off for particular purchase order type. The reason for turning it off is that after the GR is done, there is a separate process that comes from the legacy system and updates the same quantity of finished product and also posts the consumption of components.
So, our basic requirement is , is it possible to turn off qty updating for the GR of a particular purchase order document type and yet create accounting document. Material is not a valuated material and has a standard cost zero.
Any inputs in this regard will be helpful.
Regards -
Automatic Creation of Purchase order during Goods Receipt
Hai Guys,
Can you please tell me is there any ways to get a Automatic PO during Goods Receipt???
Regards
Jino.Config
1.Automatic PO generation must be activated for the movment type in IMG>Inv Mgmt & Phy Inv> GR>Create PO automatically. ( Note that automatic PO is only possible for mvmt 101 & 161)
2. The plant you are working with must be assigned to a standard purchase organisation.
3. A default PO document type must be specified for the GR in IMG> MM>purchasing>specify default vaues for document types.
Master Data
1.In mateial master Auto PO is to be set.
2.in Vendor Master Auto PO generation or agreed with him an indicator is to be set.
3.Info-Record should exist with the combination of material,vendor and the auto PO flagged in info record. -
QA495 Error message during Good Receipt
Dear Gurus,
we would like to perform a good receipt with a custom movement (ZD1 as copy of 101) in order to do not activate QM inspection in certain cases. In OMJJ we flagged ZD1 as u201CQM not activeu201D but, since in the material master an Inspection type (with Lot Origin 01) is set, the following error during good receipt (MIGO) occur:
"Change the inspection stock of material RAP4829AA_AG in QM only
Error message QA495"
The problem can be that, in the material document that we are trying to save, the stock type is automatically set to u201C2 - Quality Inspectionu201D. If we change it manually, leaving it blank (unrestricted use), the good receipt is correctly performed, otherwise the QA495 error message appear.
The questions are:
Is not enough deactivate u201CQM activeu201D flag in OMJJ for a specific movement type?
Otherwise, how can we drive stock type (in MIGO) by the movement type?
Thanks a lot,
Regards
AleHi Anand,
as you told:
"As I understand your requirement, you want to carry out goods receipt with ZD1 movement type (which is a copy of 101) and for which you donu2019t want to generate any inspection lot."
Correct, but this is done simply deactivating QM at mov type level in OMJJ (flag "QM not active")
My requirement is also to perform good receipt putting stock automatically in unrestricted use, and not in QI
The inspection lot is not generated (if I perform GR changing manually stock type to unrestricted), but I would like that it will be automatically done, and we cannot understand what drives this field (stock type), despite of I removed lot origin (and all other reference to 101 mov type) from ZD1 custom movement.
I suppose is automatically inherits from PO, so the question is:
How can I drive/set "stock type" to make it Blank (unrestricted use) in good receipt or in purchase order??
Thanks for help
Ale -
Wrong shipment costs posting during good receipt
We are having a problem when we post a good receipt for an inbound delivery in the transaction MIGO. We have created some account keys in order to classify and post shipment costs -specified in a shipment cost document- on specific balance accounts. The balance accounts determined by the OBYC transaction are right but posted values during good receipt do not match to registered values in the shipment cost document.
The documents flow for this process is as follow:
1. It is created a purchase order (ME21N).
2. It is created an inbound delivery based on the purchase order (VL31N).
3. It is created a shipment document based on the inbound delivery (VT01N).
4. It is created a shipment costs document (VI01) for the shipment document where shipment costs are specified in its calculation schema
5. It is created a good receipt for the inbound delivery of the step 2. The balance accounts are determined correctly but values do not match to registered values in the shipment cost document.
Best Regards
GuillermoHi,
http://help.sap.com/saphelp_erp60_sp/helpdata/en/93/74413b546011d1a7020000e829fd11/frameset.htm
Kapil -
Document type during Goods Receipt in Intercompany Transfer flow
Hi,
We create a PO, Delivery and GI in company A
We do a Goods Receipt in company B.
Can we customize that FI document type ZZ is used during Goods Receipt in company B?
Document type ZZ may only be used in the Intercompany flow.
Where can I customize this setting?
Thank you in advance,
Best regards,
Eric van Zundert.Hi,
The following are the standard steps to create an accounting document type and assign it to a transaction.
1) In T-code OBF4, click on "Financial accounting document types" and create a new document type.
2)On the same T-code, Click on "Goods receipt document type" and assign the document type to the transaction.
3)On the same T-code, Click on "Financial accounting No range" and assign the number range for each document type based on company code and fiscal year.
Thanks and Regards,
Maheshwari -
Is there any way to record Tax entry during Goods Receipt itslef.
Hi Nishiraj......
Tax never gets calculated on Delivery or its Goods Return.
It always calculates on its Invoice level........
So you need to raise its Credit Memo based on Goods return......
Regards,
Rahul -
Automatic creation of po during goods receipt
Dear all,
po has not been created, but while receiving the material i want automatic generation of po. i have some knowledge about it but it is not working. Can some one send detailed information. with navigation details. Tips that are posted on the sdn is not working.
RegardsHi
Pl Make sure you have done following settings for the Automatic Creation of PO during GR:
1) In SPRO ---> Enterprise Structure ---> Assignment -
> Material Management ---> Assign Std. Purchase Org. to your Plant...
2) In Material Master -
> Purchasing View -
> Pl. Check. Automatic PO check Box and Maintain Purchasing Group....
3)Create your Vendor for oyur Company Code and Std. Pur. Org. combination and in that Vendor Master -> Purchasing Data View--- > Pl. Check Auto. PO Check Box...
4)For your Vendor -Material Master - Plant -Std. Pur. Org combination Maintain valid Info record...
5)In OLMB ---> Goods Receipt -
> Automatic Creation of PO ---> for the M.Type:101 pl. check Auto PO check Box
6) In OLMB ---> Movement types ---> Copy,Delete, Check M.Types ---> Choose the M.Type:101 and go into Details -
> Then goto allowed Fields for M.Types for M.Type:101 ---> there for the M.Type:101 make the field LIFNR as a Mandatoty field...
If you have done the above settings properly...then in MIGO ---> Choose Transaction GR and referance as Others
and do the GR....Make sure you are doing GR with M.Type:101....and yougive the Vendor's name during GR....
Now If you save the GR ...automatically PO will be created...
this you can see it by displaying the MIGO Document..
Reward if useful
Regards
S.baskaran -
Quality Management During Goods Receipt (Inspection Lot)
Hi all,
>>>>>>>>>>>>
REQUIREMENT
<<<<<<<<<<<<
I have a requirement that i need to write an interface program which will receive a file from external agency (manufacturer) and process goods receipt until inspection results. The following steps need to be taken care of;
1) Create a equipment (Utilities - It is an unique identifier for each unit of the material).
2) Do Goods Receipt for the PO with the equipment numbers created.
3) Create Inspection Lot for the material document created during the GR for each equipment number.
4) Execute Inspection Result.
>>>>>>>>>>>>
INFO NOW
<<<<<<<<<<<<
Inspection lot can be created from MIGO directly by SPRO config and MM master data maintenance.
>>>>>>>>>>>>
DONE
<<<<<<<<<<<<
Called BAPI to create Equipment.
Called BAPI to create Goods Receipt.
Inspection Lot Settings to create lots during MIGO
1) New Inspection Type Created as SG1 at SPRO->QM->Quality Inspection->Inspection Lot Creation->Maintain Inspection types. The maintenance is a copy of type 01.
2) Assign Inspection Type to Lot Origin at SPRO->QM->Quality Inspection->Inspection Lot Creation->Maintain Inspection Lot Origins and Assign Inspection Types. SG1 is maintained against lot origin 01 with variant 01.
3) Set Default values for SG1 at SPRO->QM->Quality Inspection->Inspection Lot Creation->Define Default Values for Inspection Type with parameters same as for 01.
4) In Material master for the record set the inspection setup in the quality management tab. put SG1 as active and preferred. Also set Post to insp Stock, Insp with task list, Auto Assign, Skips allowed, Serial Numbers poss, Control Insp lot as For each Material Doc Item.
I have to kow how to select the Inspection Plan for the lot and thus set the status of lot to released and get it ready for results.
I also have BAPI ready for Inspection Result.
>>>>>>>>>>>>
TESTING
<<<<<<<<<<<<
I have tested it and was working fine till last thursday. I have the above mentioned settings even now in the system. Can there be anything else which the functional consultants would have change that affected the process. Anyways now the inspection lot is not getting created for the Inspection during MIGO and I am really struggling to find the exact reason.
For your info, I am working mostly on Utilities and so do not have much idea about the quality management stuff.
>>>>>>>>>>>>
QUESTION
<<<<<<<<<<<<
Why the inspection lot is not getting created during MIGO for my scenarion?
How to select the inspection plan in the program?deleted
-
Error "FI 606 no commitment items selected" during Goods Receipt
Hi,
We use Fund Management and Material Ledger in ECC 6.0.
Posting goods receipt for material with price control S (Standard price) were successful, but whenever we post goods receipt for material with price control V (Moving average price), the following error comes up:
No commitment items selected
Message no. FI606
System Response
No commitment items selected
What might be the problem?
The account assignment in MIGO view are already filled with fund center and commitment item number automatically
We already assigned all that can be assigned in FMDERIVE (material to comm item, plant to comm item, gl to comm item, etc)
We also already check OSS notes: 939545, 148967, 1312483, 164077
Please help
ThanksHi,
Try putting a trace on the FMDERIVE and see what the results are.
Regards,
Eli -
Changes in Purchasing Document Account Assignment during Goods Receipt
Hi MM Gurus,
Good day!
I just wanted to check with you on something that I came up while tinkering with SAP. Say, I have a PO with account assignment F for Order 1. Then during GR, I realized that I placed the wrong account assignment object, which should be Order 2. Can I execute this change during GR or do I have to do it either at the PO or IV level? In the standard MIGO setup, the Account Assignment tab is set to display. I tried checking the details for F in OME9 and found the Account Assignment changeable field. I tried enabling it but I still came up with the same result. I understand the logic behind why is it setup that way, but I want to make sure if there is any workaround for this
Hope you can respond the soonest.
Regards,I our company (and many others I had contact to) the goods receipt is made by the porter or the warehouse people, in general from people different from the requestor. I mean the receipt is done at the central place where the goods arrive at the plant.
the internal distribution is made based on the GR slip which has all necessary information.
A warehouse guy, or even a porter (often from a external security service provider) should not be able to correct any financially relevant information.
A change of account assignment data may even be a conflict to existing approval strategies.
LIV is done by accountants, a totally different skill level compared with warehouse workers. -
Multilevel Batches during Goods receipt
Dear MM gurus,
I need your help to model following scenario.
There are two batch /lot numbers in Customer system & we need to model it in SAP. Here are steps.
- Good Receipt from Vendor will come with lot number which can be model as batch number in SAP.
- During save in customer system, it will create new object called Box number by dividing Qty/Qty per Box(Standard data)
- These box number are saved in the table & becomes main tracing number for subsequent issue to the shopfloor
- Barcode lable contains both lot number provided by vendor & Box number... Lot number provided by vendor is same for all boxes , but box numbers are different.
This seems like multiple batches/batch hierarchy , is there any way to model in SAP.
Thanks in advance for help,
JatinHi Ranganth
I can get into the MIGO, but unable to post the GR.
Kindly help me out. and error message as follows:
Check table TFBEFU_CR: entry 10 does not exist
Message no. M7001
Diagnosis
In table TFBEFU_CR the entry 10 is missing.
Procedure
Make sure your entries are correct.
If table has not been maintained correctly, please inform your systems administrator.
Thanks & Regards
Prasanna R -
Error during goods receipt of Finished goods for production order
hi friends
pls help me iam struggle this issue and mentioned the issue .
when i do goods receipt for production order system getting error like
No price could be determined for material/batch FG/ plant ZTP
Message no. CK 465
Diagnosis
The system could not calculate a price for material/batch FG/ in plant
ZTP for valuation view 0, because none of the valuation strategies in
valuation variant 007 was successful.
System Response
User-defined error management enables you to specify whether the message
is an error message, a warning message or an information message.
o If you have defined the message as a warning message or an
information message, the costing item will be entered in the cost
estimate with a value of zero.
If you have defined the message as an error message, the cost
estimate contains an error or errors.
- In the case of a material cost estimate, the system sets the
status KF.
- If it is a cost estimate without quantity structure, or base
object cost estimate (that is, a unit cost estimate), the
system cannot proceed with costing until you have corrected the
errors.
If the system issues a termination message, the cost estimate cannot
be processed, and processing is terminated.
procedure
o Check the master data for material/batch FG/ in plant ZTP.
o If you have authorization for Customizing, check the valuation
strategy for materials in valuation variant 007.
Note
If the message is a warning message or an information message, there is
a danger that materials with errors will be ignored by the system.
If, because of this, you issue a warning message and at the same time
include materials with a zero value in cost estimates, you can make the
following settings for these materials in the costing view of the
material master:
1. Enter a very low price in the planned price 1, 2 or 3 fields
manually, for instance 0.01 USD. These prices are used for costing
purposes only; they are not read by other applications.
2. Enter the highest price unit possible, for example 10000.
Note: If you enter a new price unit that is higher than the costing
lot size, the system increases the costing lot size accordingly.
3. Change the valuation strategy, such as strategy 4, where you could
enter the planned price field in which you entered the low price.
The system now costs as follows:
Using the valuation strategy, the system finds planned price 1, 2 or
3. Due to the low price and high price unit, the system rounds the
value to zero. However, the cost estimate still obtains status KA
(free of errors), and no error message is issued.
This procedure can be used for all materials that have caused error
message CK465 to be issued.
with regards
dinesh
Edited by: code acess on Nov 8, 2010 4:06 AMhi ragavendra,
this is dinesh .i maintained the costing view and planned price. but again i have same error.so please reply me where i missed the data
with regards
dinesh
Edited by: code acess on Nov 9, 2010 4:01 AM
Maybe you are looking for
-
How to share the music folder with multiple libraries efficiently?
Hi, Me and my husband use the same computer, but have our own seperate user account on it. We have setup iTunes such that for each user account iTunes points to the same central music folder (on a seperate large disc). So effectively we are sharing t
-
How can I transfer my iTunes account
I'd like to transfer my entire Itunes account from my pc to my mac, including the hundreds of songs I got off my cds. Is this possible, and how? Thanks.
-
I have a Prime account with Amazon. I've been watching some shows the past week with no problem through my 4S running 7.1. Last night the connection to Apple TV kept dropping. It must have happened at least six to eight times for no reason at all.
-
I had downloaded a Digital Copy of a film with extras on iTunes the other day. The movie is working fine, the extras met with downloading errors and won't work. I've tried clicking the download button but keep getting the same error message. I've alr
-
Error while installing NetWeaver 7.0 double stack with PI
Hi, we're installing NetWeaver 7.0 Java+ABAP with PI under Solaris 10 with an Oracle DB. The server has 16GB of RAM. In phase 21 (Start instance) we get the following error: ERROR 2007-08-15 13:18:55 CJS-30149 ABAP processes of instance <sid>/DVEBMG