Enabling Drill Through causing Essbase Integration Server hang.

During the automation process using olapicmd command and *.cbs we are enabling Drill Through which is causing Essbase Integration Server hang.
We don't get any error message in log file. Plus sometime its run successful , also when we run this manually going to EIS console, it run fine.
Thanks in advance
-Piyush

Hi Kishore,
Thanks for your prompt reply......
I have checked in before itself the Drill down option ......
I am not able to understand whats the issue we are able to drill through in EIS till last level but after improting in OBIEE we are not able to drill through to last level, in the last level it showing no results....
I am not able to find the solution any other suggestions ?
Regards,
Tarang Jain

Similar Messages

  • Enabling drill through from Essbase cube to drill through report

    The requirement is that I keep summary level information in the Essbase cube and detailed granular information (order level) in a relational table.I would like to enable drill through between the cube and the report.
    Please advise what would be the best approach considering the current system architecture that is outlined below.( Hyperion suite 11.1.2.1).
    Would also like to know drill thru vs hybrid analysis options.
    1) ASO/BSO cube is populated through Oracle Data Integrator
    2) The relational transactional table is also poulated through ODI.
    3) The cube would hold summary level info while thr drill through report should provide the order level details in the same context as chosen in the cube.
    Would appreciate guidance on the best way forward.
    Thanks & Regards,
    Anirban

    Incidentally we had been trying to use Essbase studio as an option.But there are 2 oints that we are trying to investigate.
    1) Can we bypass deployment of data and metadata everytime through Essbase studio after the initial outline is delpoyed? In the system architecture the relational tables are populated using ODI. We would like to load the data and metadata through ODI into the cube. Eeven then can we implement drill thru bypassing deployment through Essbase Studio?
    2) If Essbase studio is imperative for drill through then what are the batch automation options for deployment through Essbase studio? Ideally the option should be after the relational tables are populated through ODI then the Essbase deployment should be invoked and batch script should load the data and metadata through Essbase Studio.
    Please advise.
    Thanks,
    Anirban

  • OLAP Universe and drill through with Essbase

    Hi all
    Has anyone created an OLAP universe on top of Essbase that allows the user to drill through back to an Oracle database?
    If anyone has can you please let me know how you did this.
    Thank you and kind regards,
    Dean

    Hi,
    There is no way to activate drill-through from Essbase to any other database within OLAP universes.
    If you are using Web Intelligence you have 2 alternatives:
    <li> The first one is to create 2 data providers (1 on Essbase and 1 on Oracle) and synchronize them.
    This is not really a drill thorugh operation but you have both data sources in sync in the same document.
    <li> The second option is to create 2 Web Intelligence documents (1 on Essbase and 1 on Oracle) and then parameterize the Essbase document to use Opendoc capabilities (hyperlink) to dril-through on the Oracle document.
    Didier

  • To enable drill through in EISeveryleaf membe of dimensionis at samelevel

    Hi All,
    I a facing a drill through problem in EIS,to enable drill through feature in EIS,every leaf member of a dimension must be at same generation,is it correct?
    Plz guide me in this as it is very urgent.
    Thanks,
    Ravi

    This link will explain the difference between a Balanced, Unbalanced, and ragged hiearchy. It should help you to understand better.
    http://publib.boulder.ibm.com/infocenter/db2luw/v8/index.jsp?topic=/com.ibm.db2.udb.db2_olap.doc/cmdhierarchy.htm
    Hybrid Analysis requires hierarchy is balanced, relational drill thru does not.
    Are you planning to use Hybrid Analysis? If not, don't worry about balanced hierarchy.

  • How to drill through from Essbase to Oracle in BIEE?

    How to drill through from Essbase to Oracle in BIEE?
    Edited by: Aaron Zhong Zhenhua on Oct 21, 2008 11:19 AM

    Physical layer:
    - Create a complex join between the Essbase generation and your detail table. E.g.: Gen6,Market = ATTRIBS.CNTRY
    BMM layer:
    - Go to the logical table "Market" (for example) and drag the ATTRIBS.CNTRY column on to the Gen6,Market column.
    - Now pull over the other attributes from your Oracle table into the Market logical table...this will result in a second LTS within the sources.
    - Drag and drop the logical columns you just got from Oracle on the lowest level of the Market dimension hierarchy. In this example, onto Gen6,Market.
    - Alternatively, create levels below Gen6.
    - Make sure your LTS have the correct content levels set
    Presentation layer:
    - Pull your chagnes through to your presentation catalog(s).
    Should be all.
    Hth,
    C.

  • Enable drill through feature in a Financial Reporting Report

    Hi,
    my Hyperion system version is 9.3.1. I need to realize some Financial Reporting reports using the Drill Through feature but i don't know how activate this feature.
    Anybody can hel me?
    Thanks in advance.
    Stefano

    One way is related content, which drills to another report based on the intersection clicked on by the user:
    Check out the fr user guide (chapter 7) for more info:
    http://download.oracle.com/docs/cd/E10530_01/doc/nav/portal_4.htm
    For setting up drill-through, you need to define the Hybrid Analysis relational source in Integration Services Console, check out the Hyperion Essbase – System 9 Database Administrator's Guide from the following link:
    http://download.oracle.com/docs/cd/E10530_01/doc/nav/portal_3.htm
    Regards, Iain

  • Drill through report - Essbase Studio

    Hi,
    Need some help on drill through reports.
    I have created a drill through report in essbase studio. I am able to drill down to the source table in SmartView. But the problem is, when I drill, it is showing me all the records in the table instead of showing me the records only for the intersection that I am drilling.
    Regards,
    Ragav.

    You have to trick Studio into thinking the cube was built from Studio. In my session on Advanced Studio Tips and Tricks at the KScope conference at the end of June I detail a couple of ways to do this. It is too detailed to put into a post here

  • Enabling drill through using FR

    Hi Team ,
    We have configured Drill through in FDMEE and we are able to drill from web-forms and smart view to FDMEE . Please advise if we can drill to FDMEE from Hyperion reports also .
    Basically if i can drill through from web-forms for an intersection how can i enable drill from the same intersection from HFR .
    Regards,
    Roshin Rasheed

    It is possible .. Check below link for detailed explanation of how to enable that : http://www.oracle.com/technetwork/middleware/financial-management/tutorials/obe-fr-erpidrillthru-100179.html
    Cheers !

  • Oracle -Essbase - Integration Server Control

    I am using Essbase version 9.3.1 and want to create OLAP model with the Integration Services Console. I would be very grateful if you could help me to model the following secnario:
    I have a fact table with two columns (say ManagerId & EmployeeId) referenced to the same dimension table (say Employee table). How do I model this to create an OLAP model in Integration Service Console please?
    I could create a separate User Defined Table (copy of Employee table) and join fact table's ManagerID to this new table. But I am not sure how this would affect to the performance of the cube.
    Thank you in advance.

    Hi Scot
    Thank you very much for the answer. I am new to Essbase and my experience on OLAP comes from MS SSAS. I could model this scenario in SSAS without any problem. In SSAS I could create a different dimension based on an existing dimension. I would model above scenario by dragging the table second time (and give a different name) and join to fact table's second column. Let's see whether this would work. Once again thank you very much for your help & suggestion. Mean time if you have a better suggestion please do tell me.
    Thank you.
    Regards
    Chandra

  • Has anyone enabled Subversion through http with Lion Server?

    The method for enabling subversion with Leopard no longer works.
    Has anyone enabled Subversion under Lion Server?
    If so, please post a process or a link to one.  Thanks.

    You need to create the repository with 'svnadmin create'.  The PATH_TO_REPO in the example above equates to the path REPOS_PATH below.
    From a console:
    svnadmin help create
    create: usage: svnadmin create REPOS_PATH
    Create a new, empty repository at REPOS_PATH.
    Valid options:
      --bdb-txn-nosync         : disable fsync at transaction commit [Berkeley DB]
      --bdb-log-keep           : disable automatic log file removal [Berkeley DB]
      --config-dir ARG         : read user configuration files from directory ARG
      --fs-type ARG            : type of repository: 'fsfs' (default) or 'bdb'
      --pre-1.4-compatible     : use format compatible with Subversion versions
                                 earlier than 1.4
      --pre-1.5-compatible     : use format compatible with Subversion versions
                                 earlier than 1.5
      --pre-1.6-compatible     : use format compatible with Subversion versions
                                 earlier than 1.6

  • Does Hyperion Integration Server exist for AS400?

    I need drill through to AS400. I have IBM Data warehouse 7.1 y db2 olap 7.1 on AS400, but sql drill through come with Integration Server.There are any way to install integration server on AS400??

    Yes.. ShowCase is porting EIS 6.5 for the iSeries/AS400. It should be released by late Q3 2002. Check either with IBM or ShowCase (depending on where you got your DB2 7.1) for 8.1 availability

  • How to increase number of rows displayed in Essbase drill-through report?

    Hi
    By default, the maximum number of rows per Essbase drill-through report (via Integration Services) is set to 1000. Could anyone tell me how to change this limit please?
    Regards
    Chandra

    Is this for an EIS drill through report that drills through to get RDBMS data, using spreadsheet add-in for example? If so check and see if "Maximum rows per query" in EIS is currently set at 1000 and try to increase it. (I don't recall hitting a 1000 limit in the past, perhaps your report is set at that? or if this is through Web Analysis maybe WA is governing it)
    To set/change a query governor in EIS:
    1     In the Drill-Through Reports dialog box, select a report name.
    2     Click Edit to open the Report properties dialog box.
    3     In the Report properties dialog box, select the Governors tab.
    4     In the Maximum time per query (in seconds) text box, enter the maximum query time.
    For example, to stop a query that takes longer than 100 seconds, type 100.
    5     In the Maximum rows per query text box, enter the maximum number of rows to retrieve.
    For example, to stop a query that retrieves more than 200 rows, type 200.
    6     Click OK.

  • Essbase Studio Drill-through for Recursive Hierarchy - Generation 1

    I'm using Essbase Studio 11.1.2.3 to build an ASO cube. All my hierarchies are recursive (parent-child). I would like to define a drill-through report and I understand that I have to use the Advanced Settings option to specify my intersections. Now one of my dimensions is optional for the users - they don't have to specify a member (they can leave it at the highest level - dimension name on the spreadsheet). Under 'Advanced Settings' for DT report in Studio I have to specify a Generation value of 2 or greater than 2. How do I enable drill through in cells where one of the dimension is at Gen1 ? Specifying the level number didn't work. I think if you specify Level in 'Advanced Settings', drill through is allowed only if that specified level of the dimension is chosen, if Gen 2 is specified, then drill through is allowed as long as the dimension-members specified are at or above Gen2. But what about Gen1?

    Yep, this is a limitation. I suggest you create two reports one that takes your "optional" dimension out and a second one that has it in. if they don't need the dimension, select the first report and if they need the filter then the second. I m always a little leery with recursive hierarchies and Gen 2 or 3 sine they create a list of level 0 members under the selection in the query and there are limits to the number of members in an in clause and at high levels in the hierarchy it is easy to surpass it (In Oracle it is 1000  members)

  • Enable/Disable Drill-Through Reporting?

    Hi,
    We have a BSO app which has Drill-through reports (defined in EIS).
    Reports are working fine.
    Is there a way to disable/enable drill-through reporting on an App/DB using MAXL?
    Appreciate your thoughts.
    Thanks,
    Ethan.

    Glenn,
    Thank You for the response.
    I am not exactly able to understand how this whole drill-through reporting concept works technically.
    We define meta-outlines in EIS. Define Drill-through reports for Meta-outlines.
    We build the cubes in Essbase using the EIS Meta-outlines.
    Drill-through reports are available for these cubes from excel Add-in.
    I am clear till now, now starts my confusion...........
    I assume there will be a connection to EIS whenever user does a drill-through through Excel Add-in.
    When I rename the Application in Essbase, I see drill-through reports are still available.
    Are there any files/artifacts (like filters or scripts) on the Essbase app that correspond to drill-through reports?
    Is there a way to tell if the app is created using EIS or not, just by looking at the app in EAS?
    I believe I am asking the complete concept :).
    Appreciate your response.
    Thanks,
    Ethan.

  • Drill through using Ragged Hierrachy from Essbase

    Problem Description
    I have a requirement to provide the drill through functionality after drilling down to the lowest level for unbalanced ragged heirrachy but the issue was that
    the lowest level grain was shared across different level. This we overcame in RDBMS by introducing skipped ( jumping the all leaf level to the last column) or Psedo balanced
    ( repeating the leaf level till the last column) and then using the Action link and providing the leaf level member as the parameter.
    But now the problem is we need to do the drill through in Essbase sourced cube in obiee where the heirarchy is ragged unbalanced and I cannot change it to skipped / psedo balanced.
    Pls. suggest how to achieve the drill through after drilling down to teh leaf level as the leaf level is shared acros sdiffernet levels.
    Regds

    Hi Sasi
    Thanks for the response . Here I mean the heirarchy is ragged . See below the sample heirrachy where the leaf levels are E,X,Q ,S etc...
    Level1
    Level2
    Level3
    Level4
    Level5
    Level6
    Hierarchy_Id
    A
    B
    C
    D
    E
    null
    1
    A
    B
    X
    null
    null
    null
    2
    A
    N
    P
    Q
    null
    null
    3
    Z
    S
    null
    null
    null
    null
    4
    We have handles drill thorugh in obiee11g using RDBMS as data source by making this ragged heirarchy - a psedo balanced heirarchy by repeating the last level till the end. and then using the last level as the column for drill through parameter.
    Level1
    Level2
    Level3
    Level4
    Level5
    Level6
    Hierarchy_Id
    A
    B
    C
    D
    E
    E
    1
    A
    B
    X
    X
    X
    X
    2
    A
    N
    P
    Q
    Q
    Q
    3
    Z
    S
    S
    S
    S
    S
    4
    But the problem is we cannot do this essbase cube . Pls. suggest how tohandle this in cube where we cannot manipulate teh ragged heirarchy.
    Regds

Maybe you are looking for

  • "change" button is not visible in check status ?

    HI, We are under upgrade of SRM 4.0 to SRM 5.0 . In SRM 4.0 "change" button is visible in check status even if shopping cart is under approval state. But in SRM 5.0 "change" button is not visible in check status if Shopping cart is under approval sta

  • Why reciever idoc configuration?

    Why we require receiver idoc adapter configuration as communication channel ,as idoc adapter runs on Integration engine?

  • Backup and restore georaster table and rdt table by image id

    Hellow everyone, I want to backup my georaster table and rdt table by the Specified image id and also can use these georater rows to restore? How can I do? the geraster table structure is as follows: image_table id NUMBER, filename VARCHAR2(255), ras

  • Manual Re order point planning

    Hai Gurus, I have one doubt regarding manual re order point planning inputs in MRP view. CASE :1 1) MRP type = VB in MRP - 2 view 2) Lot size = EX 3) Re order point = 10 In this case if MRP or MPS is done on back ground daily , procurement proposal w

  • Losing parameter defaults

    I'm programmatically modifying some Crystal Reports and am running into an odd phenomenon. If I so much as simply open the report and then save it, I lose any default values set for the parameters. Even if I do something as innocuous as the code belo