Error actual price (T-CODE KSII)

Hi,
I'm calculating the actual price (T-CODE KSII), when I Go to / components, the values ​​per element not close to the values ​​that are in Class Cost T-CODE S_ALR_87013611 the report.
OKTZ the already checked and all classes are included cost.
What can be?
hugs,
Cristiane

It shows that you have not posted any Activities in that period , for which you want to do the price calculation. Please check your cost center line item (KSB1)report and check whether system has any Qty data for these activtiy type in that period.
regards
Ranjan

Similar Messages

  • Actual Price Calculation (KSII)

    hi,
    I am not able to get the actual prices for my production order.
    I maintained certain settings for actual price calculation in OKEQ.
    Does it is mandatory to run the MFN1 (Revaluation of actual prices) before the KSII.
    Srinivas

    Hi Sateesh,
    Please find below the process for calculation of Actual Activity Prices:
    1. Define Splitting structure, rules (method). I am sure you would have done this
    2. Assign the splitting structure to Cost Centers. I hope you would be done this as well
    3. Actual values (Costs and quantitative details) will get collected to cost centers in the following way:
         - Quantities will get collected to Cost Centers once the confirmation of activities are done for the        production order.  Please make sure that "Record Quantity" check box is selected for the relevant secondary cost elements. 
         - Values will get collected from FI to the primary cost elements
    you may check whether the values have been properly collected to the cost center using the cost center reports
    4. Execute cost Split using - KSS2
    5. Then calculate Actual activity unit price - KSII
    6. Once the prices are successfully calculated, you can check the prices in KP26
    7. after this process is completed then you can revaluate you production orders using the actual activity prices
    I hope i made is clear.
    Let me know if you need further details in this regard
    Surya

  • Revaluation of actual prices

    Dear experts,
                    Generally we do price calculation in KSII, that is standard price calculation. After planning in kp06 and kp26 we do this calculation. For actual confirmations also ( in  CO11N ), we use the same price ( that means standard price whatever we calculated in KSPI ). But i have some doubt regarding actual price calculation.  When we do actual price calculation in KSII? when we do actual price revaluation in CON2? what is the use of doing this one? At what point of time we do revaluation? immediately after doing confirmations? Please help me.
    Regards
    Jay

    Hi Jay Jay,
    Pls go through the following example to understand Plan Activity Price and Actual Activity Price:
    For Cost Center A, you do Cost Element Planning in KP06 (Ex. Rs.1,00,000). In KP26, you do the planned Activity Quantity (100 Hrs) - you will not update any price in KP26 screen usually . Now, to calculate the Planned Activity Price, you use the transaction code KSPI. The gives the result of Planned Activity Price of Rs.1000 per Hr.
    Now, when you confirm the activities in Production Order in CO11n, the activity cost on the Production Order is updated with the Planned Price of Rs.1000. So, by the end of the period, if total actual hrs confirmed is 60 Hrs. ie., total cost loaded onto Production Orders is Rs.60,000.
    Now, think of the actual cost that is booked to the Cost Center A (either through FI postings or distribution / assessment from other cost centers). If the actual cost that was posted to that cost center is only Rs.84,000. (Where as Planned Cost was Rs.1,00,000).
    Now, when you run KSII transaction code for actual activity price calculation, the system will calculate the actual activity price by 84,000 / 60 Hrs =1,333.33.
    This is the way how the system clearly shows and takes care of Under-Absorption / Over-Absorption in cost centers.
    Then you run the transaction code MFN1 / CON2 to revaluate your Production Orders with the Actual Price of Activity.
    After alll these steps only, you need to settle the Production Orders. If you settle Production Orders before revaluating with Actual Activity Price, then again there will be some loaded on to Production Orders, so, you have to do the settlement again.
    Revert back for further explanation...
    Srikanth Munnaluri

  • Actual Price Calculation Issues

    Hi,
    I need explanation on how the system calculates actual prices in KSII.
    In my cases i maintained Rs 1.00  as variable price for my activity type and cost center combination in KP26. My planned activity is 1000 Mins and actual activity is 3600. in KSII system is showing 2129.64 as actual price calculation. how the system is calculation as 2129.64. If i see cost center report it is showing that over absorption as -2600.
    Please guide me on the actual price calculation.

    HI,
    KSII - Actual Cost/Actual Qty.
    Please check what is your actual cost and Actual qty. in your cost center report and check. Planned qty. or Planned cost is not taken for consideration during KSII.
    Bye,
    Ramesh

  • Actual price calculation - acutal price indicator KSII

    Hi Friends
    I am trying to calculate actual price (KSII) and am getting the following message.
    All activity prices are manually entered
    Message no. KP211
    Diagnosis
    All activity prices in controlling area 1000, fiscal year 2009, and version 0 were determined and set as manually entered prices.
    In actual price calculation, all plan activity prices, meaning those calculated automatically (activity price indicator 1 and 2) and those set manually (activity price indicator 3), are treated as if they have been set manually.
    System Response
    The SAP System cannot calculate activity prices automatically.
    Processing is cancelled.
    Procedure
    Check your activity type planning. To calculate the activity price automatically, you must set the activity price indicator accordingly.
    Pl suggest what the actual price indicator should be in activity master data
    I am putting 5 there (after some actual data is posted) but it is not working. it is still giveing the above error and not calculating the actual price.
    Pl suggest the way out.
    Regards,

    Hi,
    In activity type creation check whether you maintained activity category as "1" and actual price indicator as"5"
    Regards,
    Sreekanth

  • Error the actual price could not be determined while executing CKMLCP

    Hi!
    we are facing the problem while executing CMLCP, the error message is "The actual price for 10VN000012/MHR could not be determined" ( error message number CKMLLA102).
    Our scenarios is as below:
    we have 4 activity types out of which activity type "MHR" are used only for Indirect activity allocaiton tracing factor that means all service costs from service cost centres will be distributed to production cost centres in the ratio of actual quantity confirmed for MHR activity type.
    for this activity type we will not have any actual cost distribution, so there will not be any actual cost for this activity type.
    So, as actual quantity is confirmed during production process and while executing CMLCP is expecting actual price for the same ( we are executing KSII for actual activity price calculation before costing run).  is there any enhancement to avoid this error, because our client don't want to allocate cost to this activity type.
    regs,
    ramesh

    Hi Ramesh,
    Message CKMLLA102 is standard system behaviour when the actual
    price of an activity is zero because cost center accounting does not
    allow actual prices to be zero.
    Unfortunately the system can't distinguish an actual activity price
    of zero from a not yet calculated activity price, so for activities
    with actual price zero the message CKMLLA 102 is sent.
    Have you check the SAP note 361379?. It provides you some options to overcome
    the issue.
    Best regards,
    MLM

  • CALCULATION OF ACTUAL PRICE CALCULATION  - KSII

    Dear Friends,
    We are using Make to Order scenario and NOT USING Sales order based costing, I would like to calculate Automatic activity price calculation and revaluate my production order with actual prices (MFN1), for this I need to create & assign splitting rules to cost centers & follow the t.codes KSS2, KSII, KBK7 (DISPLAY) and finally MFN1.
    For Calculation of KSS2, how Plan Quantity has to be decided, this because for calculating Operating rate system take the formula as below, whether the below formula is correct?
    Actual quantity/ Planned quantity * variable price
    If for a cost center, postings are happened in FI for 10000/- then how system calculate & segregate this?
    if possible with an small example, when checked in KSS2 it shows the amount of postings from FI with cost elements.
    But when we checked t.code KSII it was showing the some different Actual Activity and variable price. How system takes the Actual activity and Variable Price and is there any report to check this?
    please guide me
    Regards,
    Sandeep
    Edited by: sandeep jain jain on Nov 2, 2009 4:15 PM

    Hi Paolo,
    You were exactly right that it was rounding off.
    But still am not able to get the calculation working for me.
    In Cost Center Report Actual/ Plan it shows
    Debit Assessment Cost Element 10000
    Credit Machine Hour 458.16-
    Credit labour Hour 124.96-
    over/under Absorption 9,416.88
    This are all actual cost.
    When i run KSII the result is as below
    Oty  Object                        Name                    AUn              Activity Qty Total Price     Price(Fixed) PUnit
    ATY MBX273/L1                Testing CCTR         H                 1.666         3,001.20         3,001.20      1
    ATY MBX273/M1                Testing CCTR         H                 1.666         3,001.20         3,001.20      1
    I am not getting how this value  3,001.20  is calculating.
    Kindly help me to under stand this
    Edited by: lolu jo on Oct 28, 2011 3:57 PM

  • Revaluation of Actual Prices error- CON1

    Dear Experts,
    Im getting below error when I execute CON1 ( Rev of Actual Prices)
    Prior to the error ,  I maintained following  settings for activity type and planned Prices.
    Kindly let me know what addl config and actual data to be maintained for calculating actual prices 
    Currently I maintained Activity prices                          
    In KL01 (14xx) - I maintained Activity Unit - Min
                                       Cctr Categories - "1" Production
                                       AType Category - "1"
                                       Allocation Co Element - 95xxxx ( category -43)
    In KP26
    Cost Center - 111xxx
    Activity Type - 14xx                          
    Dis "2"
    Unit "MIN"
    Planned Variable costs  "100" Shillings
    Error   
    Revaluation at actual prices not possible in version 0, fiscal year 2011
    Message no. KI760
    Diagnosis
    A revaluation for actual prices is not possible since this function is not available in version 0 in fiscal year 2011.
    Procedure
    Maintain the corresponding indicator in your version.
    Advance Thanks
    Sanjai

    Dear Experts,
    Can someone explain me the procedure of CON1,
    For Ex: Actual Activity Price of Direct Labour is say $12 per hour and the planned activity prices is say $10 per hour.
    Query
    1. Where these actual activity price of $12 per diriect labour hour is entered ?  can the system calculate automatic actual prices? if yes what is the procedure
    2.  When CON1 is executed ,what is the entry that is posted to Product cost collector and the cost center .
    Kindly let me have your inputs
    Thanks
    Sanjai

  • Tcode CON2: Revaluation of Actual price

    Dear Experts
    At the time of running the transaction code CON2, it shows that "Processing completed with no errors",.
    But a list should be generated for the revaluated items, which is not getting generated
    kindly, help me out
    Regards
    Sudhir Poddar

    Hi Jay Jay,
    Pls go through the following example to understand Plan Activity Price and Actual Activity Price:
    For Cost Center A, you do Cost Element Planning in KP06 (Ex. Rs.1,00,000). In KP26, you do the planned Activity Quantity (100 Hrs) - you will not update any price in KP26 screen usually . Now, to calculate the Planned Activity Price, you use the transaction code KSPI. The gives the result of Planned Activity Price of Rs.1000 per Hr.
    Now, when you confirm the activities in Production Order in CO11n, the activity cost on the Production Order is updated with the Planned Price of Rs.1000. So, by the end of the period, if total actual hrs confirmed is 60 Hrs. ie., total cost loaded onto Production Orders is Rs.60,000.
    Now, think of the actual cost that is booked to the Cost Center A (either through FI postings or distribution / assessment from other cost centers). If the actual cost that was posted to that cost center is only Rs.84,000. (Where as Planned Cost was Rs.1,00,000).
    Now, when you run KSII transaction code for actual activity price calculation, the system will calculate the actual activity price by 84,000 / 60 Hrs =1,333.33.
    This is the way how the system clearly shows and takes care of Under-Absorption / Over-Absorption in cost centers.
    Then you run the transaction code MFN1 / CON2 to revaluate your Production Orders with the Actual Price of Activity.
    After alll these steps only, you need to settle the Production Orders. If you settle Production Orders before revaluating with Actual Activity Price, then again there will be some loaded on to Production Orders, so, you have to do the settlement again.
    Revert back for further explanation...
    Srikanth Munnaluri

  • Cost Center Report : Revaluation at actual prices - credit but positive sign

    Hi Experts,
    Great day!
    I just want to know the cause of the following unsual behavior of the system. The credit part of the cost center report is blank/zero and when  you double-click the actual line items, it shows that the revaluation at actual prices are positive sign. By clicking an item further, the report will direct me to the CO document to investigate what happened. I found out that the sender - Activity revaluates the price for the receiver - Production Order.
    I looked at the details of the sender - Activity and I found out that the debit/credit indicator is "C" but the sign is positive.
    Your immediate help will be rewarded.
    Thank you!
    Here's the cost center report:
    I am expecting the credit part to have a value right after I executed the "Actual Cost Splitting" at T-code: KSS2
    Here's the unsual behavior:
    Dr/Cr indicator is "C' but the value at Controlling Area Currency is in a positive sign.
    Again, thank you!

    Hi Dryan
    Revaluations are posted to CC after you do CON2 and not KSS2
    1. Did you do CON2 and revaluate the Prod orders with actual activity price?
    2. Ensure that revaluation is allowed in Plan Version 0 for FY 2014
    3. Also, check your activity price calculated in KSII... Revalaution is a result of the actual activity Price (x) Activity Hrs confirmed in Prod order
    4. Check the hrs confirmed in the Production order.. They should be +ve as well
    Br. Ajay M

  • Wrong actual price calculation

    Dear Sap Experts
    I'm running KSS2 to split costs into cost centers and getting a value of $ 12.461,66.
    Volume of activities is 83,94, according S_ALR_87013611 and KSII.
    Thing is that actual activity price given by the system is $ 151,56 and not $ 148,46 instead.
    Some idea you could provide in order to investigate it?
    Tks a lot, cheers
    Patricia

    Hi Sateesh,
    Pls go through the following example to understand Plan Activity Price and Actual Activity Price:
    For Cost Center A, you do Cost Element Planning in KP06 (Ex. Rs.1,00,000). In KP26, you do the planned Activity Quantity (100 Hrs) - you will not update any price in KP26 screen usually . Now, to calculate the Planned Activity Price, you use the transaction code KSPI. The gives the result of Planned Activity Price of Rs.1000 per Hr.
    Now, when you confirm the activities in Production Order in CO11n, the activity cost on the Production Order is updated with the Planned Price of Rs.1000. So, by the end of the period, if total actual hrs confirmed is 60 Hrs. ie., total cost loaded onto Production Orders is Rs.60,000.
    Now, think of the actual cost that is booked to the Cost Center A (either through FI postings or distribution / assessment from other cost centers). If the actual cost that was posted to that cost center is only Rs.84,000. (Where as Planned Cost was Rs.1,00,000).
    Now, when you run KSII transaction code for actual activity price calculation, the system will calculate the actual activity price by 84,000 / 60 Hrs =1,333.33.
    This is the way how the system clearly shows and takes care of Under-Absorption / Over-Absorption in cost centers.
    Then you run the transaction code MFN1 / CON2 to revaluate your Production Orders with the Actual Price of Activity.
    After alll these steps only, you need to settle the Production Orders.
    If you settle Production Orders before revaluating with Actual Activity Price, then again there will be some loaded on to Production Orders, so, you have to do the settlement again.
    Hope my explanation is clear...
    cheers....
    SRIKANTH MUNNALURI

  • XI - Call Adapter Error - HTTP client. Code 402 reason ICM_HTTP_TIMEOUT

    I am using HTTP adapter to post XML PO to vendor's site. We are having this problem with one of our vendor when PO's has more than 15 line items. XI server is getting error-"Call Adapter Error - HTTP client. Code 402 reason ICM_HTTP_TIMEOUT". Actually PO is posted good for the first time on vendor's site but XI is getting above error message and it keeps posting it again. Is there anyway to stop it otherthan manually stopping the XI message? Is there anyway to increase the wait time of the XI server to get the message.
    Thanks in advance.
    Mrudula Patel

    I'm getting the same issue "500 TIMEOUT error" in runtime work bench-->IE--->Test Message. When i manually trigger the file.
    The issue is basically from 01-01-2015 02:00 pm to 02-01-2015 01:am , File is picked from source ftp folder and places in archive but xml messages are not reflecting in SXMB_MONI.
    Today suddenly after 01:00 am messages are successfully processing.
    Please help on this issue. Many Thanks.

  • Use an alternative Exchange Rate Type for activity actual price

    Dear All,
    I try to use an alternative Exchange Rate (not M)  in controlling area version "0", I need to use a custom currency exchange rate like in planned price (here I create a new planned version with exchange rate "N").
    I find same notes and it seems that standard Sap use only Exchange Rate "M" for actual price but I notice that for example in transaction KB21N (activity allocation) system shows in additional info exchange rate "N" (input in version "0").
    Is not possibile to use other Exchange Rate for actual price, activity allocation, for confirmed activity in production order?
    Controlling area has currency type 30 (group currency EUR), this company has MXN.
    Thanks in advance for your support
    Daria

    In KB21N (activity allocation), system uses the exchange rate type you have maintained in controlling area version plan settings (transaction OKEQN). Activity allocation during the month always happen at the planned price maintained in KP26 at the exchange rate specified in plan version. During actual price calculation and revaluation during month end, it calculates actual activity price at (uses M rate to convert to controlling area currency) and revaluates consumption.
    I think you cannot use other exchange rate, see the coding in include LKSPIF00 that is used in KSII where currency type is hard coded to M, if this is plan price calculation it's picking tka07-kurst.
    Best Regards,
    Venkata Ganesh Perumalla

  • Authorization control for actual price calculation

    Dear all,
    I found that there is no authorization control for actual price calculation(KSII), this means user can calculate actual price for all cost centers, even this cost center belongs to other company. Is there a way to control this?
    Thanks,
    Ben

    Hi Ben,
    By SAP standard we do not have the control.  we also have the same situation.  We are venturing in to Realisation phase and we decided to have some kind of program (development) to control this.
    Please let me know if you find some better solution
    Best Regards
    Surya

  • Actual price calculation

    Hi Experts,
    We have this scenario:
    1. Activity prices are entered manually in KP26.(Activity type indicator=5)
    2. At the time of CO11N only POWER activity will confirm.
    3. Executing CPTA for overhead allocation.
    4. KSS2 for power activity
    5. No splitting for other cost elements
    6. KSII Actual price calculation
    7. MFN1 Revaluation of order
    After revaluatin of order when i am checking actul cost for activities only power cost is coming.
    Please find the enclosed print screens for same above process.
    Please guide me how to get the actual price calculation for other activities.
    KP26 :
    KSS2:
    KSII:
    CO03:
    Regards,
    Vivaan

    Hi Rajneesh,
    Yes Splitting rule is Activity only.
    Ex.
    1.Order Quantity = 1000
    2. I confirmed yeild 500 Qty & power activity 200 in CO11N.
    3. Now when i execute  CPTA for that order its calculating like below.
    4. KSS2:
    KSII:
    Now actual price is coming same for other activities except power.
    If i maintain no split structure that time in KSII only power actual price coming as print screens posted in original query posted.
    Please advise me on Actuall price calculation as per our business scenario.
    Regards,
    Vivaan
    Now my client is asking is as below
    Cost center report  xxxxxx
    Water GL cost = 60000
    Water Qautnity=1000(This is PO Total order quantity)
    Water actual price=60000/1000 =60
    Confirmed Quantity= 500
    Actual price  calculation for water = 500*60=30000
    same for other activities also.
    Please advise.
    Regards,
    Vivaan

Maybe you are looking for

  • Document Level JavaScript to turn off caching for a PDF?

    I have been trying to find a way to ensure that a fillable PDF leaves no trace of itself on a computer that was used to open it. For example, if a user acceses a fillable PDF via browser or Reader, once they are done and have closed the browser or Re

  • Why is the rendering process slowing right down?

    Hi, I'm rendering a 4 minute clip of Pro Res LT files, there's a few effect on it but right now I'm only rendering the video at 1/4 quality. It starts rendering fine. Then starts to slow down, and by the time it gets to about 99.35%, it takes hours t

  • SHOW STATUS BAR ON FORMS DISPLAYING ON OAS

    Hi when we worked with forms 6i an all of our forms we had the status bar at the bottom of the form that showed us any error that happend in the forms as the famous ora-xxxxxx. But when we migrated the forms to web we no longer see the status bar in

  • Run Web Service Action

    Can someone point me to any documentation for the Run Web Service action? I'm looking for simple field level syntax. I'm able to begin a session but can't seem to use it for anything. The XML-RPC provider requires login and key (password) and need to

  • LSMW for functional location address fields

    HI Folks, I'm loading functional location thru LSMW Direct input method. I coudn't able to see any structure relation for address fileds on functional location. I have mapped the IBIPFLOC for functional location but it doesn't have any address fields