Error after a scheduling a background job
Hi all,
I'm trying to schedule an interface program in background which reads data from application server and posts a document in Finance through a BAPI funtion module.But after scheduling the job in the immediate mode,its getting canceled showing the error
"Could not ascertain code page"
"Job cancelled after system exception ERROR_MESSAGE" in the job log.
Please help me with this...
thanks
Hi ,
To decode the reason behind job failure , use ST22 Tcode with Exception Name as ERROR_MESSAGE ( as that is what is given in the Job log ) and User - SAP Logon Id
This would give the system dump log and tell you where exactly the job failed .
Please note this applies for any background job and is not specific for your case .
Do have a look at the dump in future ...
Thanks
Similar Messages
-
Scheduling one background job inside another
Hi All,
Is it possible to Scheduling one background job inside another.? i.e In my Z program I am calling job_open, job_submit, job_close and to execute one standard report in background. And after that I am executing my Z program itself from SE38 as Program->Execute->Background->Execute Immediately. Is this logically correct? I am asking this because I am not getting the desired result
Thanks & Regards,
Neethu.HI,
Check the job steps in SM36.
First schedule the Standard job and in the job steps schedule the z report.
Schedule job in chain -
Hi All,
I have an urgent query here regarding the Bakcground job.
Let's say I need to schedule a background job on hourly basis to fetch the data.
If first job runs more than 60 minutes, then will the second job will fetch the data.
What will happen in this scenario?
Thanks
Neeraj ManochaMy question is............
Let's say, I have a SAP standard table. In which our transactional data stores. I have also maintained my our database and build a program (i.e. Ztest) to fetch the data from the SAP standard table and store into my own database.
So I schedule a background job for the program (Ztest) to fetch the data. I schedule this job on hourly basis.
once first job will be runnig it will create one more instance to run after one hour.
Here my question is...
What if first job schedule on 1pm and runs for more than 60 mins (let's say it takes 90 mins to complete)?
Till what time it will fetch data (either till 1pm or 1pm +90 mins)?
If it fetch the data till 1pm +90 mins, then when second job will start and from what time it will start to fetch the data.
Hope this clears.
Thanks
Neeraj Manocha -
How to schedule a background Job based on events
Hi,
We are on 4.6 C.
We have a background job that has two ABAP programs.
We need to start the 2nd ABAP program only after the first one has run successfully.
If the second ABAP program does not run, the the job should have a status "FINISHED".
Help appreciated.
Thanks
MalaHi,
How to schedule a background Job based on events,please refer to the follow SAP help:
You can use events that have already been defined, or you can create new events for scheduling background jobs.
If you wish to use new events, do the following to implement the event scheduling:
Define and transport the event as a user event with transaction SM62.
You must define only event IDs; event arguments are not defined in the R/3 System. Instead, you specify event arguments when you schedule a job to wait for an event and when you trigger the event.
If you define a new event, you must also transport it to your production systems. The event transaction does not have a connection to the transport system. Instead, you must create a transport request for the event yourself.
Do this to transport an event:
Create a transport request.
Start the editor in the transport request and enter the following:
R3TR TABU <table name> where table name is BTCSEV for a system event ID, BTCUEV for a user event ID.
Press F2 with the cursor on the table name to call up the screen for specifying the table entries to transport. In this screen, enter the event IDs that you have created.
Save and release the transport request. Ensure that it is imported into your production system(s).
To trigger an event, add:
the function module BP_EVENT_RAISE to your ABAP program, or
the program SAPEVT to your external script, batch file, or program.
When your programs execute these keywords, an event will be triggered in the R/3 background processing system. The event-based scheduler is started immediately. It in turn starts all jobs that were waiting upon the event, subject to normal background processing restrictions, such as the requirement that the job has been released to start.
Schedule the jobs that are to run when your events are triggered.
You can schedule jobs for one-time start or to be started whenever an event is triggered.
Regards,
collysun -
How to schedule a background job using the Event concept..?
Hi Folks,
I have a requirement that, I need a schedule a background job.
Once after the previous job successful only, new job should get triggered. How to go ahead with this..?
For Eg, I am scheduling a job called ZTEST periodically for 1 minute. If the job is not get completing with in 1 minute, I dont want to start my new job. Only after the success of my old job, I want my new job to run.
Waiting for ur replies.
Regards,
Savi.Hi,
You can use events that have already been defined, or you can create new events for scheduling background jobs.
If you wish to use new events, do the following to implement the event scheduling:
Define and transport the event as a user event with transaction SM62.
You must define only event IDs; event arguments are not defined in the R/3 System. Instead, you specify event arguments when you schedule a job to wait for an event and when you trigger the event.
If you define a new event, you must also transport it to your production systems. The event transaction does not have a connection to the transport system. Instead, you must create a transport request for the event yourself.
Do this to transport an event:
Create a transport request.
Start the editor in the transport request and enter the following:
R3TR TABU <table name> where table name is BTCSEV for a system event ID, BTCUEV for a user event ID.
Press F2 with the cursor on the table name to call up the screen for specifying the table entries to transport. In this screen, enter the event IDs that you have created.
Save and release the transport request. Ensure that it is imported into your production system(s).
To trigger an event, add:
the function module BP_EVENT_RAISE to your ABAP program, or
the program SAPEVT to your external script, batch file, or program.
When your programs execute these keywords, an event will be triggered in the R/3 background processing system. The event-based scheduler is started immediately. It in turn starts all jobs that were waiting upon the event, subject to normal background processing restrictions, such as the requirement that the job has been released to start.
Schedule the jobs that are to run when your events are triggered.
You can schedule jobs for one-time start or to be started whenever an event is triggered.
Regards,
Raj. -
How to Schedule SAP background job at OS Level
Hi All,
Can Anyone tell me how to Schedule SAP background job at OS Level (unix).
Regards,
AnilHi Anil,
I donu2019t know your requirements, anyway itu2019s possible to setup your SAP job in order to start after an event, and after that you can get the event triggered from the Operating System in the following way:
- log into you Operating System with the SIDadm user id (at the Operating System level) and go to directory /usr/sap/SID/SYS/exe/run
- Run the SAPEVT executable as follows:
sapevt YOUR_EVENT -t pf=/usr/sap/SID/SYS/profile/DEV_DVEBMGS00_server001 nr=01
This will raise the event, and cause the job scheduled within SAP to execute.
You can periodically execute this job with crontab.
Thanks,
Federico Biavati -
How to schedule the background job using current selection screen field val
Hello Friends,
How to schedule the background job using current selection screen field values.
after completion of the job the spool should be sent as a mail to SAP Inbox.
Is there any way to create the variant dynamically by reading the current selection screen values.
Thanks,
RaviHi,
To get the variant details you can use teh following FM.
'RS_VARIANT_CONTENTS'.
Regards,
Ankur Parab -
Reg: Error in Mail sending through background job in SCOT
Hello experts,
I am trying to schedule a background job through SCOT so as to send the mails present in SOST.
The job is running but it is giving error as "Invalid status for recipient" in SOST.
But when I am sending it directly from SOST it is delivered without any errors. The email address is maintained correctly and SMTP settings are also correct as while sending it directly from SOST it reaches the required recipient without any error.
This error is observed only through background job. I am using program RSCONN01 with variant SAP&CONNECTINT in background job.
Kindly suggest why I am getting the error "Invalid status for recipient" in background job.
Thanks & Regards
Meraz
+91 8894522860I am getting the exact same issue.
were you able to fix this in the last 3 weeks?
thanks. -
Exact Steps to schedule a background job a specific time daily :
Dear All,
Please let me know the whole process involved in schedule a background job a specific time daily. what is calender id. I could not understand what it has given in SM36.
Thanks in advance.
Rgds
Prem.Hi prem
this is complte procedure for ur requirment.
Scheduling Background Jobs
Use
You can define and schedule background jobs in two ways from the Job Overview:
Directly from Transaction SM36. This is best for users already familiar with background job scheduling.
The Job Scheduling Wizard. This is best for users unfamiliar with SAP background job scheduling. To use the Job Wizard, start from Transaction SM36, and either select Goto ® Wizard version or simply use the Job Wizard button.
Procedure
Call Transaction SM36 or choose CCMS ® Jobs ® Definition .
Assign a job name. Decide on a name for the job you are defining and enter it in the Job Name field.
Set the jobu2019s priority, or "Job Class":
High priority: Class A
Medium priority: Class B
Low priority: Class C
In the Target server field, indicate whether to use system load balancing.
For the system to use system load balancing to automatically select the most efficient application server to use at the moment, leave this field empty.
To use a particular application server to run the job, enter a specific target server.
If spool requests generated by this job are to be sent to someone as email, specify the email address. Choose the Spool list recipient button.
Define when the job is to start by choosing Start Condition and completing the appropriate selections. If the job is to repeat, or be periodic, check the box at the bottom of this screen.
Define the jobu2019s steps by choosing Step, then specify the ABAP program, external command, or external program to be used for each step.
Save the fully defined job to submit it to the background processing system.
When you need to modify, reschedule, or otherwise manipulate a job after you've scheduled it the first time, you'll manage jobs from the Job Overview.
pls give points if it is usefull
Regards
Saimedha -
Scheduling a background job depending on the output lenght.
Hi every one,
I have a small requirement. My client want me to run a program in a foreground if the output is small and should the program in background if the output is large.This has to be achieved through coding. The program downloads the netprices of products. The downloaded file is of .dat format. It is an urgent requirement.
Guys you would throughly rewarded for your help.
Thanks,
Kumar.9886185040.Hi Nag
that is not possible with codeing. To create a schedule a background job for the same program depending on its output is not possible.
being a programmer you need to decide, how long the code will take to execute.. accordingly you can either schedule or run in foreground. You can make some mandatory fields in the selection screen, so that the output is big mostly.
see the sample code for the Job scheduling using the fun modules
IF p_bjob = 'X'.
CONCATENATE sy-cprog sy-datum sy-uzeit
INTO jobname SEPARATED BY '_'.
CALL FUNCTION 'JOB_OPEN'
EXPORTING
jobname = jobname
IMPORTING
jobcount = jobcount
EXCEPTIONS
cant_create_job = 1
invalid_job_data = 2
jobname_missing = 3
OTHERS = 4.
CALL FUNCTION 'GET_PRINT_PARAMETERS'
IMPORTING
out_archive_parameters = arc_params
out_parameters = print_params
valid = valid
EXCEPTIONS
archive_info_not_found = 1
invalid_print_params = 2
invalid_archive_params = 3
OTHERS = 4.
IF valid = chk.
SUBMIT yREP WITH s_kunnr IN s_cust
AND RETURN
USER sy-uname
VIA JOB jobname
NUMBER jobcount
TO SAP-SPOOL
SPOOL PARAMETERS print_params
ARCHIVE PARAMETERS arc_params
WITHOUT SPOOL DYNPRO.
CALL FUNCTION 'JOB_CLOSE'
EXPORTING
jobcount = jobcount
jobname = jobname
strtimmed = 'X'
EXCEPTIONS
cant_start_immediate = 1
invalid_startdate = 2
jobname_missing = 3
job_close_failed = 4
job_nosteps = 5
job_notex = 6
lock_failed = 7
invalid_target = 8
OTHERS = 9.
IF sy-subrc 0.
* MESSAGE ID sy-msgid TYPE sy-msgty NUMBER sy-msgno
* WITH sy-msgv1 sy-msgv2 sy-msgv3 sy-msgv4.
ELSE.
MESSAGE i029 WITH jobname.
ENDIF.
ELSE.
MESSAGE s000 WITH text-003.
STOP.
ENDIF.
ENDIF.
Also,
Yes you can use job functions:
JOB_OPEN
JOB_SUBMIT
JOB_CLOSE
* You can add multiple steps into one job by using JOB_SUBMIT.
Regards
JJ -
Schedule a background job for a program using ABAP code.
Hi,
I have to write a program to schedule a background job for another program.
Need your help to understand how we can achieve this functionality.Any example of an abap code would be of great help.
Need it urgently.
Thanks in advance.
Sandeep.Hi Sandeep,
Here is the demo program regarding the BDC For the background job.
report zprprbdc1
no standard page heading line-size 255.
include bdcrecx1.
parameters: dataset(132) lower case.
*** DO NOT CHANGE - the generated data section - DO NOT CHANGE ***
* If it is nessesary to change the data section use the rules:
* 1.) Each definition of a field exists of two lines
* 2.) The first line shows exactly the comment
* '* data element: ' followed with the data element
* which describes the field.
* If you don't have a data element use the
* comment without a data element name
* 3.) The second line shows the fieldname of the
* structure, the fieldname must consist of
* a fieldname and optional the character '_' and
* three numbers and the field length in brackets
* 4.) Each field must be type C.
*** Generated data section with specific formatting - DO NOT CHANGE ***
***data: begin of itab occurs 0 ,
*** matnr(20) type c,
*** mbrsh(30) type c,
*** mtart(30) type c,
*** kzsel(20) type c,
*** maktx(40) type c,
*** meins(5) type c,
*** end of itab.
data: begin of record occurs 0,
* data element: MATNR
matnr_001(018),
* data element: MBRSH
mbrsh_002(001),
* data element: MTART
mtart_003(004),
* data element: XFELD
kzsel_01_004(001),
* data element: MAKTX
maktx_005(040),
* data element: MEINS
meins_006(003),
* data element: MTPOS_MARA
mtpos_mara_007(004),
end of record.
*** End generated data section ***
start-of-selection.
*perform open_dataset using dataset.
perform open_group.
**do.
**read dataset dataset into record.
**if sy-subrc <> 0. exit. endif.
call function 'GUI_UPLOAD'
exporting
filename = 'c:\jitu\bdc\10002.txt'
filetype = 'ASC'
has_field_separator = 'x'
* HEADER_LENGTH = 0
* READ_BY_LINE = 'X'
* DAT_MODE = ' '
* CODEPAGE = ' '
* IGNORE_CERR = ABAP_TRUE
* REPLACEMENT = '#'
* CHECK_BOM = ' '
* VIRUS_SCAN_PROFILE =
* NO_AUTH_CHECK = ' '
* IMPORTING
* FILELENGTH =
* HEADER =
tables
data_tab = record
* EXCEPTIONS
* FILE_OPEN_ERROR = 1
* FILE_READ_ERROR = 2
* NO_BATCH = 3
* GUI_REFUSE_FILETRANSFER = 4
* INVALID_TYPE = 5
* NO_AUTHORITY = 6
* UNKNOWN_ERROR = 7
* BAD_DATA_FORMAT = 8
* HEADER_NOT_ALLOWED = 9
* SEPARATOR_NOT_ALLOWED = 10
* HEADER_TOO_LONG = 11
* UNKNOWN_DP_ERROR = 12
* ACCESS_DENIED = 13
* DP_OUT_OF_MEMORY = 14
* DISK_FULL = 15
* DP_TIMEOUT = 16
* OTHERS = 17
if sy-subrc <> 0.
* MESSAGE ID SY-MSGID TYPE SY-MSGTY NUMBER SY-MSGNO
* WITH SY-MSGV1 SY-MSGV2 SY-MSGV3 SY-MSGV4.
endif.
loop at record .
perform bdc_dynpro using 'SAPLMGMM' '0060'.
perform bdc_field using 'BDC_CURSOR'
'RMMG1-MATNR'.
perform bdc_field using 'BDC_OKCODE'
'/00'.
perform bdc_field using 'RMMG1-MATNR'
record-matnr_001.
perform bdc_field using 'RMMG1-MBRSH'
record-mbrsh_002.
perform bdc_field using 'RMMG1-MTART'
record-mtart_003.
perform bdc_dynpro using 'SAPLMGMM' '0070'.
perform bdc_field using 'BDC_CURSOR'
'MSICHTAUSW-DYTXT(01)'.
perform bdc_field using 'BDC_OKCODE'
'=ENTR'.
perform bdc_field using 'MSICHTAUSW-KZSEL(01)'
record-kzsel_01_004.
perform bdc_dynpro using 'SAPLMGMM' '4004'.
perform bdc_field using 'BDC_OKCODE'
'=BU'.
perform bdc_field using 'MAKT-MAKTX'
record-maktx_005.
perform bdc_field using 'BDC_CURSOR'
'MARA-MEINS'.
perform bdc_field using 'MARA-MEINS'
record-meins_006.
perform bdc_field using 'MARA-MTPOS_MARA'
record-mtpos_mara_007.
perform bdc_transaction using 'MM01'.
**enddo.
endloop.
perform close_group.
*perform close_dataset using dataset.
&*****************Reward point if helpful************& -
How to submit a program after completion of a background job
Hi Experts,
I have a small issue. In my report program i am calling one transaction using call transaction it will trigger a background job. After completion of this background job i need to submit another program, Because the background job updating few values, using this value only the second program functionality will works.
Currently when i execute my report its calling 1st program and triggering the background job. Once the job started again the program triggering the next program. Here after competion of the background job only this program should submit next program. Anyone kindly suggest some clue.
CALL TRANSACTION 'ZSAPRCK60' USING zbdcdata
OPTIONS FROM g_s_options
MESSAGES INTO msg_tab.
SUBMIT SAPRCK10 VIA SELECTION-SCREEN
WITH kalaid = p-kalaid
WITH kaladat = sy-datum
WITH PARALLEL = 'X'
WITH SERVNUM = '10'
WITH backgr = 'X'
AND RETURN.
MohanaHi,
There is one function module there which gives you the job status .. if the job is finished then the value will be 'F'.I don't exactly remember the FM but then you can search with BDLSTATUS or BDSTATUS in SE37..
do.
call fm BD****STATUS
IF STATUS (IMPORT PARAMTER) eq 'F'.
exit.
endif.
enddo.
Regards,
Nagaraj -
How to schedule the background job if report have Presentation server files
Hi All,
I have searched the forums and found , the way for the scheduling the background job if report selection screen have the presentation server file input.
1. Using the Open data set method.
And my client is not OK with Open dataset way, it there any other way to do this, As we are using the EXCEL file.
Thanks and Regards,
BharaniHi,
As said above it is generally not possible. Since your client most obviously doesn't like graphical background I would recomend storing data as till now, but show it with your own report in more userfriendly way. For example:
- as ALV Grid
- in excel with use of OLE either as embedded in SAP or new window (check transaction OLE for example)
- with use of webdynpro
BR
Marcin Cholewczuk -
How to schedule a background job in realtime
Hi,
Can you tell me how to schedule a background job in realtime.
give some example scenerios in scheduling the background jobs in realtime.
Thanks.
sam.And also.....
There are two ways for you to handle,
one manually setting up the job through SM36 which is better and convinient,
secondly through program using FM's JOB_OPEN, SUBMIT, JOB_CLOSE.
Find below steps in doing both:
Procedure 1:
1. Goto Trans -> SM36
2. Define a job with the program and variant if any
3. Click on start condition in application tool bar
4. In the pop-up window, click on Date/Time
5. Below you can see a check box "Periodic Job"
6. Next click on Period Values
7. Select "Other Period"
8. Now give '15' for Minutes
9. Save the job
Procedure 2 via Program:
Below is a sample code for the same. Note the ZTEMP2 is the program i am scheduling with 15mins frequency.
DATA: P_JOBCNT LIKE TBTCJOB-JOBCOUNT,
L_RELEASE(1) TYPE c.
CALL FUNCTION 'JOB_OPEN'
EXPORTING
JOBNAME = 'ZTEMP2'
IMPORTING
JOBCOUNT = P_JOBCNT
EXCEPTIONS
CANT_CREATE_JOB = 1
INVALID_JOB_DATA = 2
JOBNAME_MISSING = 3
OTHERS = 4.
IF SY-SUBRC 0.
MESSAGE ID SY-MSGID TYPE SY-MSGTY NUMBER SY-MSGNO
WITH SY-MSGV1 SY-MSGV2 SY-MSGV3 SY-MSGV4.
ENDIF.
SUBMIT ZTEMP2 VIA JOB 'ZTEMP2' NUMBER P_JOBCNT
TO SAP-SPOOL WITHOUT SPOOL DYNPRO
WITH DESTINATION = 'HPMISPRT'
WITH IMMEDIATELY = SPACE
WITH KEEP_IN_SPOOL = 'X' AND RETURN.
CALL FUNCTION 'JOB_CLOSE'
EXPORTING
JOBCOUNT = P_JOBCNT
JOBNAME = 'ZTEMP2'
STRTIMMED = 'X'
PRDMINS = 15
IMPORTING
JOB_WAS_RELEASED = L_RELEASE
EXCEPTIONS
CANT_START_IMMEDIATE = 1
INVALID_STARTDATE = 2
JOBNAME_MISSING = 3
JOB_CLOSE_FAILED = 4
JOB_NOSTEPS = 5
JOB_NOTEX = 6
LOCK_FAILED = 7
INVALID_TARGET = 8
OTHERS = 9.
IF SY-SUBRC 0.
MESSAGE ID SY-MSGID TYPE SY-MSGTY NUMBER SY-MSGNO
WITH SY-MSGV1 SY-MSGV2 SY-MSGV3 SY-MSGV4.
ENDIF.
Hope the above helps you.
***********reward points,if found useful -
How to schedule the background job daily twice?
Hi,
How to schedule the background job daily twice? any conditions?
Regards,
Srihithasee the step by step procedure.
Scheduling Background Jobs:
1. Background jobs are scheduled by Basis administrators using transaction SM36.
2. To run a report in a background, a job needs to be created with a step using the report name
and a variant for selection parameters. It is recommended to create a separate variant for each
scheduled job to produce results for specific dates (e.g. previous month) or organizational units (e.g.
company codes).
3. While defining the step, the spool parameters needs to be specified
(Step-> Print Specifications->Properties) to secure the output of the report and help authorized users
to find the spool request. The following parameters needs to be maintained:
a. Time of printing: set to Send to SAP spooler Only for now
b. Name abbreviated name to identify the job output
c. Title free form description for the report output
d. Authorization a value defined by Security in user profiles to allow those users to access
this spool request (authorization object S_SPO_ACT, value SPOAUTH). Only users with matching
authorization value in their profiles will be able to see the output.
e. Department set to appropriate department/functional area name. This field can be used in
a search later.
f. Retention period set to Do not delete if the report output needs to be retained for more
than 8 days. Once the archiving/document repository solution is in place the spool requests could
be automatically moved to the archive/repository. Storage Mode parameter on the same screen
could be used to immediately send the output to archive instead of creating a spool request.
Configuring user access:
1. To access a report output created by a background job, a user must have at
least access to SP01 (Spool requests) transaction without restriction on the user
name (however by itself it will not let the user to see all spool requests). To have
that access the user must have S_ADMI_FCD authorization object in the profile with
SPOR (or SP01) value of S_ADMI_FCD parameter (maintained by Security).
2. To access a particular jobs output in the spool, the user must have
S_SPO_ACT object in the profile with SPOAUTH parameter matching the value used
in the Print Specifications of the job (see p. 3.d above).
3. Levels of access to the spool (display, print once, reprint, download, etc) are
controlled by SPOACTION parameter of S_SPO_ACT. The user must have at least
BASE access (display).
On-line reports:
1. Exactly the same configuration can be maintained for any output produced
from R/3. If a user clicks Parameters button on a SAP Printer selection dialog, it
allows to specify all the parameters as described in p. 3 of
Scheduling background jobs section. Thus any output created by an online report
can be saved and accessed by any user authorized to access that spool request
(access restriction provided by the Authorization field of the spool request
attributes, see p. 3.d of Scheduling background jobs section).
Access to reports output:
1. A user that had proper access (see Configuring user access above) can
retrieve a job/report output through transaction SP01.
2. The selection screen can be configured by clicking Further selection
criteria button (e.g. to bring Spool request name (suffix 2) field or hide other
fields).
3. The following fields can be used to search for a specific output (Note that
Created By must be blank when searching for scheduled jobs outputs)
a. Spool request name (suffix 2) corresponds to a spool name in p. 3.b in
Scheduling background jobs section above).
b. Date created to find an output of a job that ran within a certain date range.
c. Title corresponds to spool Title in p. 3.c in Scheduling background jobs
section above).
d. Department - corresponds to spool Department in p. 3.e in Scheduling
background jobs section above).
4. Upon entering selection criteria, the user clicks the Execute button to
retrieve the list of matching spool requests.
5. From the spool list the user can use several function such as view the
content of a spool request, print the spool request, view attributed of the spool
request, etc. (some functions may need special authorization, see p.3 in
Configuring user access)
a. Click the Print button to print the spool request with the default attributes
(usually defined with the job definition). It will print it on a printer that was
specified when a job was created.
b. Click the Print with changed attributed button to print the spool request
with the different attributes (e.g. changing the printer name).
c. Click the Display contents button to preview the spool request contents. A
Print and Download functions are available from the preview mode.
Maybe you are looking for
-
Dear DBA's, Database = 11.2.0.3.0 Operating System : Solaris 11 sparc 64. applying PSU patch : 16619892 I am trying to apply patch 16619892 on 11.2.0.3.0 to upgrade it to 11.2.0.3.7. I hope this is a straight forword stuff i beleive, but i am getting
-
Can Solaris 8 be installed on a Sparc 20? And if so, where can I find that information on this website? Also, what firmware upgrades will be needed? Much Thanks, Randall
-
SRM MDM Catalog - one repository for service, one for goods?
Hi, We are installing SRM MDM 2.0 Catalog and we will use catalog for finding both service and goods items. In one view only services should be displayed and in the other - only goods. Should I then create 2 catalogs (2 repositories) or should I simp
-
After update to be iOS 6.0.1, Wi-Fi is not connected automatically. I have to reconnect or join my known network manually all the time. How can I solve this problem? It is so tedious.
-
Software Update Won't Shut Off
I'm running 10.5.6 and I'm having a problem with Software Update. (The problem occurred in past versions of 10.5 as well). I don't want the system to automatically check for updates. I would rather do it my self whenever I feel is the right time. I g