Error msg: ZFI999:Maintain price for the material 254600254 in plant 1000

Hi gurus
18.02.2009 i created one STO PO. but material price in the accounting view the price was "Zero" in plant 1000. In plant 2000 the price has already maintained.
But today i updated the material price like Rs 200/- through MR21 for plant 1000.
After that while i transport the material through MB1B (351 mvt type) plant 1000 to 2000, i got the following error msg.
"ZFI999:Maintain price for the material 254600254 in plant 1000".
Regards
Amsi

Hi Amsi
the message no is not standard i think there has been a new message created. please check with your ABAPer about the message.
just want some clarification. you are doing STO from plant 1000 to 2000. the price should be picked for that material maintained in plant 2000.
in case of queries please revert back
Adwait Bachuwar

Similar Messages

  • Trying to copy a 10gb file to a memory stick but theres an error msg file to large for the file format of the stick. is there a way around this

    trying to copy a 10gb file to a memory stick but there's an error msg, file to large for the file format of the stick. is there a way around this

    If you use 'Disc Utility' you can format the stick (this will erase its contents) to be exFat which will still work with Mac and Windows but allow a larger file sizes to be placed onto the stick.
    Disc Utility > Click the drive on the left > Erase (tab) > Change format to ExFat > Erase > Try putting the file on to the stick again.

  • Error in MIRO - Moving Average price for the Material is negative?

    Hi,
    While doing Invoicing, the following error is coming:
    Moving average price for material is negative: 13070106001 1000 NEW
    Message no. M8783
    Please note that all the Material Qty has been sold out
    Please help.
    Regards,

    Hi,
    Still, I am not able to get the Solution.
    The actual problem is that at the time of PO creation, we entered ADC value as 106.350,70 USD (which was actually 106.350,70 INR).
    MIGO - FI Document
    Local Tradeable Good     94.000,00
    GR/IR-clearing - ext     54.000,00-
    ADC Clearing     106.350,70-
    ADC recoverable     106.350,70
    Clearing Charges A/C     40.000,00-
    FI Document on simulation
    SILINK HOLDINGS LIMITED /      106.351,00-
    ADC Clearing     5.237.771,98
    Additional Duty     2.252.693,81-
    Price dif. Gain - Trading     2.878.727,17-
    Now we are doing MIRO for 106.350,70 INR and the System is giving the following error:
    Moving average price for material is negative: 13070106001 1000 NEW
    Message no. M8783
    Current Stock Status:
    Total Stock          4.390
    Total Value          929.695,90
    Moving price         211,78
    Price Control        V
    Please help!
    Regards,

  • Moving average price for the material is negative

    Dear ALL,
    While doing the MIRO (invoice posting), one of the user getting this error "Moving average price for material is negative :CWM006070c73 CHE1"
    Any one help on this,
    It is stop the production .
    Regards,
    Murthy.

    Hello,
    please check your PO whether net price is in negative or not and also check ur matyerial master
    Thanks,

  • Purchase Price for the Material

    Hello World of SAP,
    Hallo Welt von SAP,
    Is there any report in standard SAP for Material Purchasing Price?
    Basically I'm using table EINA and EINE to check that purchase price,
    if the MAP price i check in MBEW.

    Dear Nikamz,
    Material net price in PO is store in info record , you can use ME1M or ME1P, you can take a look in it.
    Regards,
    w1n

  • Costing run for the material in Physical distribution Plant

    Hi experts,
    There's a material both creates in productoin plant 1000 & physical distribution plant 1999. (same material number)
    However, BOM & routing only create in prodution plant 1000.
    How do we copy BOM & routing (in prodution plant) for the material creates in Physical distribution Plant and excute costing run for it? (we need to excute costing run every month, so standard cost for the material in productoin plant 1000 & physical distribution plant 1999 needs to be the same every month.)
    Thanks in advance.

    HI AO
    1. There is no standard feature to copy the BOM/Routing from Plant 1 to 2...
    While creating in PLant 2, you can give the reference of Plant 1.. Or you can use some BAPIs to do the same
    2. If you want same std cost in Plant 2 as in Plant 1, then easier way would be to create a Special Procurement Key and assign the same in Material master - Costing View of Plant 2 (1999)
    Follow the steps below
    1. Go to OMD9
    2. Click on New entries: Enter your Plant = Plant 2 (receiver plant) "SP Pr Type" = Z1 and Proc Type = F;
    3. Under Special Procurement Secrion
    Enter U as special procurement and Plant 1 in the Plant Field (Transferring plant)
    4. Save this entry, and in Mat Master of Plant 2, specify Z1 as Special proc key in Costing view (NOT MRP VIEW)
    5. Run CK11N in Plant 2... and release from CK24
    Regards
    Ajay M

  • Material has more than one plant, only show the price for the first on

    Hi:
    I am having the standard price for the material with the different plants ,I am seeing only one Material and Standard price(if a material has more than one plant, only show the price for the first one In the report ):
    plant :de87 Material: 60020601 Standard price: 1237.00
    plant:PT01 Material :60020601 Standard price: 634.00
    In the report I am seeing DE87 with the standard price :1237.00 .
    I am extracting from the 0MATERIAL_ATTR
    Please help me how can I display all plants with the material and std price. In my data source there is no PLANT
    rgrds
    Kumar

    Hi:
    Report is running on 0MATERIAL(Transactional master data),Data sourc: 0MATERIAL_ATTR,
    We are having the standard price in the 0MATERIAL ,(Standard price is combination of plant and Material) .Plant is not available in the material,so in the report its displaying only first result
    plant :de87 Material: 60020601 Standard price: 1237.00 --->Displaying this
    plant:PT01 Material :60020601 Standard price: 634.00
    In the above we are having the same material but different plant and different standard price. so I need to display the both in the report.
    Rgrds
    kumar

  • Two prices for one material in sales order according condition type

    Hi,
    I configure the condition type according to following condition record:
    Plant/ Sales Organization/ Distribution channel/ Material / Customer
    (because system should calculate two prices for one material in two plants)
    In the sales order screen, when user firstly select material , quantity, plant ,  system calculate the related price correctly but if user select the material and quantity and enter and after that select the plant, system will show the error message in pricing procedure and to have a price for material, user should update the price in the price condition in sales order.
    It is so difficult for user to update one by one, because there are several sales orders which need to update.
    Is it any way to solve this problem?
    Thanks,

    > In the sales order screen, when user firstly select material , quantity, plant ,  system calculate the related price correctly but if user select the material and quantity and enter and after that select the plant, system will show the error message in pricing
    Hi,
    Why to let the user press Enter button before entering plant value Obviously, system will give error, because it doesnt get all the required value based on which you have maintained condition records.
    Ask the user to enter all the value at item level otherwise you will have go for the option that you are doing currently.
    It is said prevention is better than cure
    Hope you get some inputs
    regards,
    Sagar

  • EM C+ 723 Periodic unit price of the material will be negative

    Hello All,
    We have a problem in our production system , with the material ledger closing in transaction CKMLCP where for period 11 / 2011 the system has issued the error that u201CPeriodic unit price of the material will be negativeu201D for material ABCD in plant 1000.
    The analysis shows an amount against 'Not Distributed' as a separate line above cumulative inventory.
    We would like to know the reason for the error.
    regards
    Monali

    Dear Monali.
    The error C+723 is not caused by a program error. It is issued when
    the calculated price of a certain material would become negative.
    The error occurs only for cycle materials because for materials that
    are not in a cycle the system automatically applied a fallback strate
    gy to avoid a negative price (by using a different price, for example
    the actual price of the previous period or the standard price).
    There are two options to deal with the error:
    1) You can analyze the reason why the price would become negative.
       For this you can use the error document which is created by
       multi level price determinatio for the affected material.
       (-> use transaction CKM3). The negative price is caused by
       negative variances allocated during the period at the material
       itself or at one of its input materials.
       You can then analyze via CKM3 the postings done for this material
       and do a correction posting or complete a missing posting (for
       example a missing order settlement).
       The long text of message C+723 gives more information.
       After doing correction posting please repeat single and multi
       level price determination.
    2) If you have no time to analyze the error you can choose the
       automatic error management for cycle materials.
       In the variant maintenance of multi level price determination
       choose Edit -> Show postprocessing options
       In the frame 'Negative price: automatic error management you can
       then check the box Cycle 'cut all connections'.
       By doing this instead of issuing C+723 the system calculates
       the cycle by cutting all connections. Thus the materials are
       processed successfully, but no variances are rolled between
       materials within the cycle.
       The F1 help gives more information.
    br, Guido

  • Error :Maintain pricing conditions for the material for the excise invoice

    Hi
    i have maintained excise data for material, after that i have created scheduled agreement with lp and with 0 value private and dummy tax code  and delivery schedule is released. Now when i do the goods receipt i am getting error " Maintain pricing conditions for the material for the excise invoice date
    Message no. 8I629" can some body can help me.
    with regards
    Narendra kumar

    Hi,
    goto tcode fv11 u have to maintained the condition.
    first enter the condition type like jmop -
    then enter, next screen u have the select the below comination.
    select the plant/vendor/material base u have to maintain the conditions.
    Thank's
    MVS

  • ( error no CK 465)  No price could be determined for the material

    Hi,
    While costing for a material i am getting the error messages as folloows
    1) No price could be determined for the material   error no CK 465
    2)Cost component split costed with value of zero  CK240
    Materail procurement type is F - External procurement  so i hope no need BOM and routing , they were not created.
    Material has price control indicator - S
    Material type - ZVAR (Finished product variant)
              What could be the reason for this error and what is the solution
    THannks & regds
    Ramachandra

    Hi Experts,
    I also got the same error how to solve it.
    Many materials costed with errors how to resolve those.
    Error Messages are: 465,240,322,597,168
    Please let me know the solution.
    I have Run the cycle on 29-02-2012, Today i.e 0n 01-03-2012 MM consultant wants to close the period of February.
    Is it required to resolve the errors before closing the february period?
    Can we resolve the errors after closure of the period.
    Please guide me. Most urgent
    Jyoshna

  • How to Maintain two different prices for same material in different qty?

    Dear all,
    How to maintain two different prices for same material in different batch quantities in purchase order(ie.,info record)?
    (Vendor is supplying quantities in 2 different batches & also in different prices)
    Expecting valuable reply.
    Jeyakanthan

    In a PO you can create 2 items, and each item can be maintained with a different price in the conditions.
    In info record it is not possible to have different prices for the same period, except for scales.
    so if you have a price of e.g. 2 USD for 1000 kg and 1,90 USD for 2000 kg then you can maintain this in scales, but you still have to have 2 items in the PO so that each one can individually find its price.
    Alternative you can create contracts (as well with more than one item) to reflect the different prices and batches.

  • Assessable value not maintained for the material X

    Dear all,
    i have maintained material chapter ID,Plant and materialchapter id  combination ,assessable value , cenvat determination, and vendor excise details in the transaction J1ID .
    Even after maintaining all these conditions , i am not able to save the po,while saving the po i got a error message that assessable value not maintained for the material X..
    Points will be rewarded for useful suggestions.
    Thanks in Advance.
    velu+91-9789991357

    Hi,
    Search using approriate keywords in SDN, u get most of the details, i have now done the same searched and have pasted below .
    Try ME2N.
    Click on the "dynamic selections" icon and add the release indicator as an additional selection. Enter the release indicators that you class as "awaiting approval" and you will then have your list.
    The ME2* series of transactions are not that much use prior to 4.7, the layout is poor. But if you have 4.7 or later you can get the screen to use the ALV format and this transforms the ME2* (i.e. ME2L, ME2M, ME2N etc.) transactions into VERY useful reports.

  • Maintain diffrent prices for same material

    How to maintain different prices for same material (assume that the price of the the material is varying frequently that to with high margin)
    But my req is need to maintain N  values for same material .Is it possible??
    For ex,
    3 Jul Purchasing 20 Pc with 20 INR
    5 Jul Purchasing 10 Pc with 10 InR
    7 jul Purchasing 20 pc with 2 Inr .... like that price is changing freq. But i dont want to use MAP .Whatever price i purchased will be used for cost calculation.Any suggestion??
    Message was edited by:
            velmurugan s

    Hi,
    If your Purchase price changes frequently and you want your MAP or STD price to match the purchase price then you will have to write a simple ABAP that will read the last price paid for each item and automatically post an MR21 to change the MAP or STD price to that price.
    I have seen this used in other implementations and it is the only real way to get the MAP or STD price to relate to the last price paid.
    I would question why you need to do this  though as the two "prices" are designed to be different and there is no accounting reason why they should always be hkept in line.
    Steve B

  • Maintain pricing conditions for the material for the excise invoice date

    When I am doing MIGO (Release GR Blocked Stock-movement type) t)he system is giving an error "Maintain pricing conditions for the material for the excise invoice date"I am attaching screen shot for reference.
    I request if any one can provide me the solution

    Hi,
    Check did you have entry of that movement type in the following path where you specify which movement type relating to goods receipts involve excise invoices
    SPRO -
    > Logistics general -> tax on Goods Movements-> India -> Business Transactions--> Specify Which Movement Types Involve Excise Invoices
    Regards,
    Biju K

Maybe you are looking for

  • ABAP Proxy - Message prioritizing in ECC

    Dear Experts, Can you provide me any document to prioritize the proxy messages in Application Engine (ECC - SMQ2). I've already gone through the document for Integration Server but I need the one more specific for the Application Engine and more deta

  • Hic-cup when shutting down

    A recent change which worries me somewhat. I usually wait for the computer to shut down using the message "if you do nothing your computer will shutdown in 2 mins, 1min 59..." Until recently, when the 2 minutes were up the screen went black and then

  • Poll: which new features will be available in Adobe 10?

    I just learned that emloyees of Adoba are not allowed to communicate the details of the new product. But what I am interested in is what YOU think will be in it. and maybe some good idead will come from this for Adobe-development in the future. I am

  • Video files in iPad

    I am creating an application for iPad, and I need to add video files to this application, but it doesn't work

  • Adding audio to keynote

    Hi I am new to keynote and was trying to make a slideshow and i don't know how to add audio i know you can drag a mp3 to one page but then when i click to go to the next page the song stops and if i add a soundtrack then when i export it there is the