Excel Services for Project Server 2013 - Parameter

I have an
S curve graph project.
Using Excel Services connected to Project
Server 2013. You can pass parameter
by querystring to filter design?
Torres

Hello,
You could add the Excel Services report to a PDP and filter it using a query string filter web part, example below:
http://azlav.umtblog.com/2012/12/05/filtering-excel-webparts-in-office-365-part-2/
Paul
Paul Mather | Twitter |
http://pwmather.wordpress.com | CPS

Similar Messages

  • Which sharepoint service applications & services are required for Project server 2013 to work fine.

    HI,
    Can any one help me,
    I am planning to install project server 2013,  what are the service applications and Services ( Manage services on server in central admin ) in sharepoint  are required for project server 2013 to work fine, so that i will run only  service
    application and services to increase server performance..i don't want to configure all service applications  when i  am configuring.
    Thanks in Advance..
    vijay kommireddi

    Hi Vijay,
    If you are installing Project Server on SharePoint farm, You need to start the service Project Application Service which would be available after you install project Server 2013.
    For Project Server Reporting you need to start Excel service and Secure Store service.
    http://technet.microsoft.com/en-us/library/ee662106(v=office.15).aspx
    Thanks,
    Phani

  • Send email is not working in share point desinger 2013 for project server 2013 workflow

    Hi,
      How to configure email for project server 2013. i have created workflow where i am sending email. It is not sending it.
     i have set outgoing mail setting. Tasks are created in my workflow but mail is not sending.
    Thank you for helping us.
    Thank You
    Vinay

    Hi,
      How to configure email for project server 2013. i have created workflow where i am sending email. It is not sending it.
     i have set outgoing mail setting. Tasks are created in my workflow but mail is not sending.
    Thank you for helping us.
    Thank You
    Vinay

  • How to import the Issues list from an Excel File in Project Server 2013

    Hi,
    I'm using Project Server 2013.
    A Project Manager has been playing with the Issues List, deleting some fields, creating new columns and modifying some columns name. The result of this is that I'm getting this error everytime the task
    Reporting (Project Sync) is executed:
    General
    Reporting Wss list sync failed:
    ReportingWssSyncListFailed (24018) - 1100. Details: id='24018' name='ReportingWssSyncListFailed' uid='4feafda7-f147-e411-940d-005056957f05' SPListType='a1efd9a9-bd03-4604-91f3-31a2cc5693ff' Error='1100'.
    ReportingWssSyncListFailed (24018) - 1100. Details: id='24018' name='ReportingWssSyncListFailed' uid='5deafda7-f147-e411-940d-005056957f05' SPListType='a1efd9a9-bd03-4604-91f3-31a2cc5693ff' Error='1100'.
    ReportingWssSyncListFailed (24018) - 1100. Details: id='24018' name='ReportingWssSyncListFailed' uid='69eafda7-f147-e411-940d-005056957f05' SPListType='a1efd9a9-bd03-4604-91f3-31a2cc5693ff' Error='1100'.
    ReportingWssSyncListFailed (24018) - 1100. Details: id='24018' name='ReportingWssSyncListFailed' uid='75eafda7-f147-e411-940d-005056957f05' SPListType='a1efd9a9-bd03-4604-91f3-31a2cc5693ff' Error='1100'.
    ReportingWssSyncListFailed (24018) - 1100. Details: id='24018' name='ReportingWssSyncListFailed' uid='81eafda7-f147-e411-940d-005056957f05' SPListType='a1efd9a9-bd03-4604-91f3-31a2cc5693ff' Error='1100'.
    ReportingWssSyncListFailed (24018) - 1100. Details: id='24018' name='ReportingWssSyncListFailed' uid='8deafda7-f147-e411-940d-005056957f05' SPListType='a1efd9a9-bd03-4604-91f3-31a2cc5693ff' Error='1100'.
    Reporting message processor failed:
    ReportingWSSSyncMessageFailed (24016) - RDS failed while trying to sync one or more SP lists. The RDS queue message will be retried.. Details: id='24016' name='ReportingWSSSyncMessageFailed' uid='5beafda7-f147-e411-940d-005056957f05' QueueMessageBody='ProjectUID='a1efd9a9-bd03-4604-91f3-31a2cc5693ff'.
    ForceFullSync='False'. SynchronizationType='Issues'' Error='RDS failed while trying to sync one or more SP lists. The RDS queue message will be retried.'.
    ReportingWSSSyncMessageFailed (24016) - RDS failed while trying to sync one or more SP lists. The RDS queue message will be retried.. Details: id='24016' name='ReportingWSSSyncMessageFailed' uid='67eafda7-f147-e411-940d-005056957f05' QueueMessageBody='ProjectUID='a1efd9a9-bd03-4604-91f3-31a2cc5693ff'.
    ForceFullSync='False'. SynchronizationType='Issues'' Error='RDS failed while trying to sync one or more SP lists. The RDS queue message will be retried.'.
    ReportingWSSSyncMessageFailed (24016) - RDS failed while trying to sync one or more SP lists. The RDS queue message will be retried.. Details: id='24016' name='ReportingWSSSyncMessageFailed' uid='73eafda7-f147-e411-940d-005056957f05' QueueMessageBody='ProjectUID='a1efd9a9-bd03-4604-91f3-31a2cc5693ff'.
    ForceFullSync='False'. SynchronizationType='Issues'' Error='RDS failed while trying to sync one or more SP lists. The RDS queue message will be retried.'.
    ReportingWSSSyncMessageFailed (24016) - RDS failed while trying to sync one or more SP lists. The RDS queue message will be retried.. Details: id='24016' name='ReportingWSSSyncMessageFailed' uid='7feafda7-f147-e411-940d-005056957f05' QueueMessageBody='ProjectUID='a1efd9a9-bd03-4604-91f3-31a2cc5693ff'.
    ForceFullSync='False'. SynchronizationType='Issues'' Error='RDS failed while trying to sync one or more SP lists. The RDS queue message will be retried.'.
    ReportingWSSSyncMessageFailed (24016) - RDS failed while trying to sync one or more SP lists. The RDS queue message will be retried.. Details: id='24016' name='ReportingWSSSyncMessageFailed' uid='8beafda7-f147-e411-940d-005056957f05' QueueMessageBody='ProjectUID='a1efd9a9-bd03-4604-91f3-31a2cc5693ff'.
    ForceFullSync='False'. SynchronizationType='Issues'' Error='RDS failed while trying to sync one or more SP lists. The RDS queue message will be retried.'.
    ReportingWSSSyncMessageFailed (24016) - RDS failed while trying to sync one or more SP lists. The RDS queue message will be retried.. Details: id='24016' name='ReportingWSSSyncMessageFailed' uid='97eafda7-f147-e411-940d-005056957f05' QueueMessageBody='ProjectUID='a1efd9a9-bd03-4604-91f3-31a2cc5693ff'.
    ForceFullSync='False'. SynchronizationType='Issues'' Error='RDS failed while trying to sync one or more SP lists. The RDS queue message will be retried.'.
    Queue:
    GeneralQueueJobFailed (26000) - ReportingWSSSync.WSSSyncMessageEx. Details: id='26000' name='GeneralQueueJobFailed' uid='98eafda7-f147-e411-940d-005056957f05' JobUID='9e937da7-f147-e411-940e-005056957f0d' ComputerName='b579360a-53ab-4fe0-bf9b-c62f5e8d3529'
    GroupType='ReportingWSSSync' MessageType='WSSSyncMessageEx' MessageId='1' Stage='' CorrelationUID='0945bd9c-0d6a-a0f1-47b0-68cdfcfbff9a'. For more details, check the ULS logs on machine
    b579360a-53ab-4fe0-bf9b-c62f5e8d3529 for entries with JobUID
    9e937da7-f147-e411-940e-005056957f0d
    What I'm trying to do is to create a new Project from the scratch, update the Issues List, not deleting or modifying columns, just creating new columns in order to match the names he (the Project Manager) put in his Issues List, then Export the list to Excel,
    and then create a datasheet view matching the Exported list, but here I don't know how to import the list (copy / paste or whatsoever it can be done...)
    Do you know how to do it, or do you know another/any method to solve this problem?
    Thank you in advance,
    José Espases

    Hi José,
    2 considerations: 
    The first one is that (as you experienced) one should not delete or rename any of the predefined columns in the risk/issue list. What you did is the right way, meaning keeping the native column as is and creating new ones based on the business needs. Finally
    you just need to create view with the appropriate fields.
    Then for importing risks from an Excel list, I can't test it right now, but you should have a datagrid view (MS Access type) allowing you pasting data from Excel.
    Hope this helps,
    Guillaume Rouyre, MBA, MCP, MCTS |

  • SP1 files for Project Server 2013

    Hi,
    Where can we found the true SP1 files for SharePoint Server, Project Server and Project Pro 2013,
    after the withdraw of first SP1 ?
    Thanks

    Hello,
    SharePoint Server 2013:
    http://support.microsoft.com/kb/2880552
    Project Server 2013: http://support.microsoft.com/kb/2880553
    Project 2013: http://support.microsoft.com/kb/2817433
    Paul
    Paul Mather | Twitter |
    http://pwmather.wordpress.com | CPS

  • Authentication of Excel reports in project server 2013

    Please consider below scenario and advise me what I have missed or may require changes
    I have configured Excel Services Account in my project server farm
    Excel reports are browsed fine
    Once Refresh All data is clicked end in an error :
    We couldn’t load the Data Model. This may be because the Data Model in this workbook is damaged. 
    Access was denied by the external data source. The following connections failed to refresh:  xxxxxxxxxxxxxx
    I have already given read permission on the application to the excel services account.
    What could be the issue and how can I resolve this? 
    Regards, Syed Faizan ur Rehman, CBPM®,PRINCE2®, MCTS

    Hi,
    Did you add the apprpopriate urls to the trusted site locations?
    See reference:
    http://technet.microsoft.com/en-us/library/ee662106(v=office.15).aspx
    Hope this helps,
    Guillaume Rouyre, MBA, MCP, MCTS |

  • How to put if condition by using visual studio 2012 for project server 2013 worflow

    Hi,
     If Project Data:Funding Required equals Yes
        Go to s2- Lead Approval
    Else
        Go to End of Workflow
     above condition is used it in sharepoint designer. I want same condition used in visual studio 2012.
    Please help me how to get fields of project server in visual studio 2012.
    Thanks in Advance in helping us.
    Thank you
    Vinay

    Hi Vinay,
    I can't help you for the code, but the IF THEN ELSE statement is pretty well documented in the article below:
    http://msdn.microsoft.com/en-us/library/752y8abs.aspx
    Hope this helps,
    Guillaume Rouyre, MBA, MCP, MCTS |

  • Project Server 2013 timesheets not showing up for approval

    We're using Project Server 2013 and entering timesheets. I'm a team manager who is set up as the timesheet approver for a few people, including Nicole.
    Nicole opens her timesheet and fills it in for the week.  She applies time to four Administrative tasks and two project tasks.
    Nicole submits her final timesheet for approval.  (We have also tried having her save it first, then to the final submission, with the same results.)
    I go to my approval screen and see the four Administrative tasks listed as separate lines.  I do not see the project tasks.
    I select the four Administrative tasks and approve them.  They disappear when the screen is submitted.
    In previous weeks, and with some other employees, I would immediately see a single line item that said "My Timesheet" for Nicole which I could then approve.  But recently this stopped, and I do not see her timesheet.
    If Nicole checks the status of the timesheet it says it's submitted to me.
    On my Approval page if I go to History, Timesheets this timesheet is not listed under "approved by me" nor is it under "my resources unsubmitted timesheets."  It's in limbo.
    The only fix is for Nicole to recall the timesheet and resubmit it.  Then it shows up on my Approval page.
    Any suggestions?
    -- Paul

    We resolved this. The solution was as follows:
    Go to PWA Settings, and under Security choose Manage Groups.
    Click the Team Members group.
    Scroll to the Categories section, and in the Selected Categories area highlight (select)
    My Tasks.
    Click the box to allow the permission called Adjust Timesheet which is under the grouping for Resource.
    Now don't ask me how or why that works.  It's not a setting that intuitively matches what's going on.  But it fixed it for us.
    By the way, we had a number of other timesheet issues (view failures, etc.) that were all cleared up when we installed the April 2014 Cumulative Update for Project Server 2013, as well as SharePoint 2013 SP1.  I highly recommend both.
    -- Paul
    Paul LoSacco, Web Presence Team, Omnicare

  • Project Server 2013 reporting security

    HI
    I have a question and I have seen a couple similar ones but nothing definitive on the topic of permissions/security for Project server 2013 (in project server security mode) for either Excel(Odata) reports or for SSRS reports. 
    Even setting security aside the Out of the box configuration is certainly not elegant or even usable.
    Situation:
    In PWA project managers and team members can only see projects they, own, are team members on, or have been granted permissions explicitly to. (Pretty standard - is using security templates and "my Projects"). We are using secure store
    and impersonation for access to reports. We do have report authors groups.
    As an example a PM needs to create a weekly  status report but should not have to pull all the data back to then filter for their one project.
    However, when a PM goes to either SSRS or Excel using oData they can see every project in the company.  This is just does not make a lot of sense. Why would I hit the database for 100projects when I only care about one and yet there seems
    to be a lack of information on the topic. In contacting Microsoft we were told there was nothing we could do that is how it was designed.
    REALLY???? (see above)
    What we have come up for our approach is  that we're currently using the UserID value to set parameters in our data sources, but are looking for more 'elegant' approaches
    to security (if they exist) as there are some liabilities with this approach (EX is a report author forgets to put the parameter in the users will get everything back.
    QUESTION:
    If there is not another approach then we will stay with it. We can't imagine there isn't a better way.
    Additionally, the Project user view only contains the identity of the project owner not the rest of the team members (including sponsors who might need to see the data.) so where are they in the database?
    Tasks

    Hi Paul,
    I have a similar situation only I'm using Project Online. I have setup Groups and Categories where there is a relationship between clients and groups, and projects and categories. 
    Only issue is that when running a report a user receives an error and then all the data shows for all projects irrespective of the group/category/project relationship and the fact that user only exists in one group (and therefore can't see
    or access the other projects in PWA outside of their group.
    Hope that makes sense.
    Regards,
    Conrad

  • Project Server 2013 licensing

    I was reviewing the Microsoft Project Server 2013 licensing terms and noticed the following:
    PPM solutions require a Project Server 2013 license for each running
    instance of the software
    (source: http://office.microsoft.com/en-001/project/microsoft-project-licensing-project-for-multiple-users-online-and-on-premises-project-management-software-FX103802201.aspx)
    The PUR mentions something similar:
    For each license, you may use one Running Instance of server software
    (source: http://www.microsoftvolumelicensing.com/ProductPage.aspx?pid=443)
    You have to install Project Server on each SharePoint server in your farm. In the past it has always been said that you need one Project Server License for each installed copy (so for every SharePoint server in the farm).
    Has anything changed for Project Server 2013?
    Is a Project Server License only required for the SharePoint Server where you activate the Project Server Application Service?
    Or does running equals installed when it comes to licensing?
    Anyone can shed some light on this? Thank you!

    I agree with Bernhard on this one....there's been no real change for on-prem licensing....you still need a Project Server license for each server in the farm.
    That being said, there was a significant change (and confirm with your local MSFT rep), but in some cases, the online subscription pricing may be used for on-prem installations, i.e. I can pay by user by month instead of buying the CAL.  I don't think
    this impacts the server licensing, but worth noting.
    The "Running Instance" terminology is maybe meant to capture the VM scenario where I have one physical server running multiple VMs, each one running Project Server?
    Andrew Lavinsky [MVP] Blog: http://azlav.umtblog.com Twitter: @alavinsky

  • Problem after installation Project Server 2013 CU September 9, 2014

    Dear All,
    I have some problems after installation
    Project Server 2013 CU September 9, 2014 (Hotfix 2883072) on 3 level farm
    Before installing CU, I have installed
    SP1 for Project Server 2013, installation and configuration was successful.
    Then I have installed CU and I have not get any errors during installation process. Then I have restarted servers and in SharePoint health analyzer got an error about patch/installation status
    on WFE server.
    I checked in Windows installed updates and hotfix is installed. I checked in SharePoint Update and Upgrade history and there were no errors during installation. But when I checked in Manage
    Patch Status list I found an information:
    Language Pack for SharePoint and Project Server 2013 - Russian
    Microsoft Project Server Russian Language Pack 15.0.4420.1017 Installed
    Hotfix for Microsoft Project Server 2013 (KB2883072) 64-Bit Edition
    15.0.4649.1001 Missing/Required
    Microsoft Project Server 2013
    Microsoft Project Server English Language Pack 15.0.4571.1502 Installed
    Hotfix for Microsoft Project Server 2013 (KB2883072) 64-Bit Edition
    15.0.4649.1001 Missing/Required
    Service Pack 1 for Microsoft Project Server 2013 (KB2880553) 64-Bit Edition
    15.0.4571.1502 Installed
                Microsoft Project Server Web Front End Server
    15.0.4571.1502 Installed
    Hotfix for Microsoft Project Server 2013 (KB2883072) 64-Bit Edition
    15.0.4649.1001 Missing/Required
    Service Pack 1 for Microsoft Project Server 2013 (KB2880553) 64-Bit Edition
    15.0.4571.1502 Installed
    If I run installation again I get message that nothing will be updated - no update needed.
    Please help, how I can install missed packages?

    The problem was solved !
    I solve it using two ways:
    1. I have installed the hotfix for Project Server -  Hotfix for Project Server 2013 October 14, 2014 KB 2889959 (Projectserverwfe-x-none.msp, Projectservermui-Language-Code.msp)
    2. using command
    Psconfig -cmd upgrade -inplace b2b -force -cmd applicationcontent -install -cmd installfeatures -cmd installcheck -noinstallcheck
    After two actions I was able to run SharePoint Configuration Wizard and upgrade database. Configuration completed successful.

  • Issue while installing Ms Project Server 2013 on MS Server 2012 R2 with Sharepoint Server 2013

    Hello MS Support Team,
    I installed SQL server 2012 & Sharepoint server 2013 and after that the MS project Server 2013 is not installing on the same server -- pls hv a look the enclosed screenshot. sent at [email protected] and guide me to resolve it on priority.
    A windows poped up - Installation Error - This Project requires MS Sharepont Enterprise edition... (Which is not available on the MSDN Server)..only standard edition available.
    Please reply asap @ [email protected] - Call @ 0120471384
    Kind Regards,
    Vinay Bhardwaj
    Network System Administrator - GREC (IN)
    Rockwell Automation | A-66, Sector 64 | Noida | India
    LISTEN. THINK. SOLVE
    IP : 71384 | E : [email protected] | W : www.rockwellautomation.com

    Hi Siriosus,
    Indeed you do need Sharepoint Server 2013
    Enterprise for Project Server 2013.
    See article below where it is mentionned:
    Project Server 2013 requires the Enterprise edition of SharePoint Server 2013. Prior versions of SharePoint Server and SharePoint Foundation 2013 are not supported.
    http://technet.microsoft.com/en-us/library/ee662114(v=office.15).aspx
    Hope this helps,
    Guillaume Rouyre, MBA, MCP, MCTS |

  • Help needed Regarding Project Server - 2013 Workflow

    Hi All,
    I am new to Project server 2013 Workflow, hence please help me regarding this. Pardon me if this question is too trivial. 
    I have created a project type associated with a workflow and my workflow is as follows :
    So I am not doing anything here, I am just testing the workflow as mentioned by technet site : http://technet.microsoft.com/en-us/library/dn458865(v=office.15).aspx
    But it is mentioned that, after a minute or 2, the workflow state will change, also they have mentioned to press the Submit button.
    But in my case, the workflow is not moving to next stage [It just says 'The workflow is still processing - which never changes after hours] or I am getting the submit button (Submit button is disabled on the ribbon). Below is the state of my workflow :
    PS : I have made the user added to Portfolio managers group as well. But still I am having this same issue. 
    The Workflow manager is installed properly, and it is working fine in case of List workflow. I am facing the issue only wrt Site workflow for Project server 2013.
    Please help me to solve this issue.
    Thanks,
    shanky

    Hi Kiran,
    I am now facing issue while assigning a task to a person in the workflow.
    I am having a person named say 'John' , who is included in Project Manager as well as Portfolio Manager.
    And I am using a workflow as :
    Stage : Conceptual
    Assign a task to John (Task outcome to Variable: Outcome5 | Task ID to Variable: TaskID3 )
    Transition to stage
    Go to Approval
    But this is again giving issue as :
    Workflow Internal status : Cancelled
    Details: System.ApplicationException: HTTP 401 {"error":{"code":"-2147024891, System.UnauthorizedAccessException","message":{"lang":"en-US","value":"Access denied. You do not have
    permission to perform this action or access this resource."}}}
    PS : I have used the same Sharepoint admin account for 'Account Name' in ‘User Profile Sync' , Is this causing the issue? Please let me know.
    Thanks,
    Shanky

  • Workflow in Project server 2013 online not going particular stage after Approval

    Hi All,
    i have created workflow using sharepoint designer 2013 for project server 2013 online. and i have also set the approver after the first stage. when i create a project using this workflow, project is created successfully and the approval task also go for
    a approval to specific user. and i have set the property that after approval it has to go on specific stage. but the problem is when user approve the task it shows approved but my stage in workflow is remain same. it is not going to any stage. 
    i don't know why this type of problem is occur. 
    FYI, i have created same workflow for Project server 2013 on premise(Which is installed in my server) and
    it is working fine but when i want to deploy this workflow in
    project server 2013 online its giving error.
    so please help me to solve this type of issue.
    Thanks

    I am also experiencing issues with this.  After the approval task is completed, the Workflow gets cancelled with the following message
    RequestorId: 60d96368-4cb4-b059-8086-604972a92e60. Details: System.Collections.Generic.KeyNotFoundException: The given key was not present in the dictionary. at Microsoft.Activities.Hosting.Runtime.Subroutine.SubroutineChild.Execute(CodeActivityContext context)
    at System.Activities.CodeActivity.InternalExecute(ActivityInstance instance, ActivityExecutor executor, BookmarkManager bookmarkManager) at System.Activities.Runtime.ActivityExecutor.ExecuteActivityWorkItem.ExecuteBody(ActivityExecutor executor, BookmarkManager
    bookmarkManager, Location resultLocation)
    All other desired workflow actions work as expected.  Emails are sent, project is moved from stage to stage, however as soon as the workflow approval task is completed, either Approved or Rejected, the Internal Status is changed to Canceled and the
    workflow fails.
    What is interesting is when the Approval task is completed, the approver will receive an email notification that the task was CANCELLED or DELETED....
    not COMPLETED, which is what would be expected.
    Has anyone seen this - any potential resolution?

  • Project Server 2013 licenses in use

    Is there any way to retrieve the exact number of PWA and Project Pro licenses in use for a Project Server 2013 instance?
    In older versions you had the 'About Project Server' page and for 2010 there was a SQL script. But this script does not work for Project Server 2013.

    Thank you Paul! That query works just fine.
    I reworked it a bit to suit my needs: take into account DENY and the fact that a PWA CAL is included in the Project Pro license.
    My query to list the licenses in use is below:
    SELECT
    PERM.Username,
    CASE WHEN PERM.LogonProDeny = 1 THEN 0 ELSE PERM.LogonProAllow END AS [ProLicense],
    CASE WHEN PERM.LogonPwaDeny = 1 THEN 0 ELSE
    CASE WHEN PERM.LogonProDeny = 0 AND PERM.LogonProAllow = 1 THEN 0 ELSE PERM.LogonPwaAllow
    END
    END AS [PwaCal]
    FROM (SELECT
    RES.RES_NAME as Username,
    MAX(LOGON_PRO.WSEC_ALLOW+0) AS LogonProAllow,
    MAX(LOGON_PRO.WSEC_DENY+0) AS LogonProDeny,
    MAX(LOGON_PWA.WSEC_ALLOW+0) AS LogonPwaAllow,
    MAX(LOGON_PWA.WSEC_DENY+0) AS LogonPwaDeny,
    CASE WHEN RES.RES_TYPE > 100 THEN 0 ELSE 1 END AS UserIsActive
    FROM pub.MSP_RESOURCES AS RES WITH (NOLOCK)
    INNER JOIN pub.MSP_WEB_SECURITY_CLAIMS AS SC WITH (NOLOCK) ON SC.ENCODED_CLAIM = RES.WRES_ACCOUNT
    LEFT JOIN pub.MSP_WEB_SECURITY_GROUP_MEMBERS AS GM WITH (NOLOCK) ON GM.WRES_GUID = sc.SECURITY_GUID
    LEFT JOIN pub.MSP_WEB_SECURITY_SP_CAT_RELATIONS AS CR WITH (NOLOCK) ON CR.WSEC_SP_GUID = GM.WSEC_GRP_GUID AND CR.WSEC_CAT_UID IS NULL
    LEFT JOIN pub.MSP_WEB_SECURITY_SP_CAT_PERMISSIONS AS LOGON_PRO WITH (NOLOCK) ON LOGON_PRO.WSEC_REL_UID = CR.WSEC_REL_UID AND LOGON_PRO.WSEC_FEA_ACT_UID = 'D2F88263-31C5-4FF5-BEAE-B98B26C5C116'
    LEFT JOIN pub.MSP_WEB_SECURITY_SP_CAT_PERMISSIONS AS LOGON_PWA WITH (NOLOCK) ON LOGON_PWA.WSEC_REL_UID = CR.WSEC_REL_UID AND LOGON_PWA.WSEC_FEA_ACT_UID = '7C40A2C2-FD15-44E3-8FD3-11B3E0A4E441'
    WHERE RES.RES_TYPE IN (1,2,101,102)
    GROUP BY RES.RES_NAME, RES.RES_TYPE
    ) PERM
    WHERE PERM.UserIsActive = 1