Fetch Top level WBS elements for delivery type LP

Hi everyone,
we are working on a delivery analysis report and we are in progress of fetching sales order number for deliveries with delivery type LP.
How we are doing?
so we are fetch the UP values from PRHI table for the wbs elements in LIPS.
Now we need to fetching the top level wbs elements from PRHI table by passing the UP values to the same table until the UP field value becomes initial.
Then fetching the corresponding sales orders from the VMPA table for the wbs elements from PRHI table for the value of corresponding UP field is initial.
So it is going through so many iteration to fetch the UP value again and again until it is initial.
What we need?
So if someone can suggest a FM or method to fetch the top level WBS element for the given WBS element from LIPS table will be of great help.

Hi,
Try FM
'BBP_PS_PROJECT_GET_LIST
'BAPI_PROJECT_GETINFO

Similar Messages

  • Result Analysis with transaction code KKAJ for Top level WBS element

    Hi Experts,
    we have four level WBS structure with level 1 and level 4 with all operative indicators active
    when we are doing Result analysis by using KKAJ for level 1 WBS element, System is taking all level 4 wbs elements also into consideration.
    Is there a way to run results analysis using KKAJ only for level 1 wbs elements for multiple projects, avoiding the level 4 WBS elements.
    SAP version 4.6C
    Please suggest.
    Thanks in advance
    Chakravarthy

    Hi
    refer this thread posted a few days back
    Ajay M

  • Updating Prod Hierarchy field for all 2 & 3 level WBS Elements

    Dear All,
        My requirment is to update Prod. Hierarchy field for WBS element. Here in input i give 2 level WBS Element with respective Prod. Hierarchy then my program should update the Prod. Hierarchy for 2 level and 3 level WBS element under it automatically.
    I hope we need to use bapi BAPI_PROJECT_MAINTAIN.
    If any one had a sample code please reply with the attachment.
    Thanks & Regards
    NSK

    Hi Afzal,
         In which table the Left Right Up Down WBS elements are maintained.
    Regards
    Shashikanth Naram

  • Budget control at top level Wbs

    Dear PS experts,
    we have a requirement to have budgets distributed from top level wbs to level 2 wbs and all transactions to happen at level 2 wbs, but only budget availability check to happen at top level. can you please let us know if this can be aceived.
    Thanks a lot.
    Regards,
    Veera

    Try this:
    Exclude the level 2 WBS elements from the availability control by creating a user status profile (i.e., availability control business transaction is not allowed) and assigining the status to all WBS elements except your top level.
    Please search the forum if you need help on creating the user profile for Object Type WBS (T code OK02).
    Regards
    Sreenivas

  • Budget Control at top level WBS only

    Hello All,
    I have a requirement from client where I need to activate the Budget control (90% warning and 100% error). I have done the setting accordingly.
    Now the scenario is such that when client is doing budgeting, they are allocating the budget only at top level WBS (they have a different legacy, where they are doing there detail planning n budgeting, but since they want the feature of budget control in PS, they will do minimal budgeting in PS). As per my settings when I budget top level WBS and save the availabity control is activated (with no budget on lower level WBS). Now when I try to do some postings/or assign that WBS to PO, even with a value of 1 USD, i am getting an error of budget exceeded, which is fine as per the settings as that WBS is having 0 budget.
    The requirement from client side is such that they want AVAC to be activated only at top WBS and do postings to lower WBS. But if the total of lower WBS exceed the budget of top WBS, they should get an warning or error. For example:
    WBS level  BUDGET ACTUALS
      1               100
      2                              50
      2                              50
    so as soon as the actuals touch 100, the system should give an error/warning. Note that the 2nd level WBS are not budgeted in SAP, so budget is 0 on them.
    I have 2 questions:
    1.Is it possible to activate AVAC only for top WBS ?(without any enhancement/development)
    2.How the AVAC will work, if the total of 2nd level WBS exceeds the budget of top WBS (as explained in example above)?
    Awating your replies.
    Thanks
    Sarang

    Thanks Virendra, it was useful.
    I tried other way round also i.e. by not marking the release tab in OPS9 and activating AVAC in CJ30.It works in that way too.
    For my other question, regarding activating AVAC only at top level, we can achiebve that by using transaction control in user status.
    Thanks
    Sarang

  • Define a settlement cost element for receiver type CTR

    Hi, i work for real estate company and we just implemented SAP. were on our process of closing our books and we are tied by error during PS settlement. House repair, which is an income statement account and cost element as well, are monitored in Project Systems with settlement rule set to GL. Postings will initially be posted as Project Cost WBS and will be settled to house repair GL. however, someone advised us that only balance sheet accounts should be settled to GL. Cost and expenses should be settled to Cost Center and so we changed the configuration and business process to posting costs directly to GL house repair and settlemet rule is to be settled to CTR. After the change in configurations and settlement rule, we still cannot process settlement due to this error "Define a settlement cost element for receiver type CTR". Please help, i may have missed a step in system configurations. Thanks thanks

    Define a settlement cost element for receiver type CTR
    Check in OKO6 whether you have defined the required Settlement Cost Element to the allocation structure.
    thanks
    G. Lakshmipathi

  • Higher-level billing element for the selling company code in your network

    Hi ,
    I am getting the error " No wbs element found while substituting wbs element 00074419.at the time of creation of invoice from OBD
    I ahve refered note 672929 ,  solution is  "Define a higher-level billing element for the selling company code in your network" but then I odnt ahev anything defined in the network.
    Pls guide me how to go about it
    Regards
    Suvin.Sugathen

    HI,
    - Any of the WBSE which are hierarchically superior to your WBSE "74419" should have the relevant company code.
    Check for any such superior WBSE in your structure & assign the company code, in question,  to it. It should be a billing element also.
    this is because, while billing system checks for the proper revenue receiver cost object in the particular company code.
    regards

  • Budget at all level WBS element

    Dear All
    In my project secrino i had created  4 level WBS elements i.e under 2ed level 3 rd level and under 3rd level  4th level i had created. when i am going for budget the system is taking only 4 th level WBS element total to all the Level of wbs.Please guide  me to how to solve this  issue.  i want to have level by level budget.
    Regards
    Raj

    Hi Raj,
    Amol is right, you don´t need total up the budget. But keep in mind If you have level 1 and level 2 for example and you want 1000 USD for level 1 and 5000 for level 2 it is needed budgeting 6000 for level 1 and 5000 for level 2 ( level 1 only have available 1000 USD)
    Regards,
    Sara

  • IDOC error u201CPlease enter WBS element for This Cost centeru201D

    Hello SAP gurus,
    While doing PGI through IDOC u2013 basic type u2013 DELVRY03. I am getting error message u201CPlease enter WBS element for This Cost centeru201D
    Can some one please help me where I can check the settings?
    Thanks
    Sha

    Hello Arakish,
    That link is good one but not helpful for my issue and I have checked this forum then I posted my doubt. Still my issue is not resolved. Can someone please help me on this, I think only for this cost center I am getting this error.
    Thanks again.
    Sha

  • WBS element for Liability Item

    Dear Guru's
    Is it Possible to assign WBS Element for Liability Items ie Salary Payable
    Regards,
    R.Ramakrishnaraj,

    Hi,
    A WBS element is working on the same way as an internal for the postings from costs.
    The diffference is in the project system you set up a stucture with WBS element and you can say by WBS element if you can make a planning or post costs on it. (it is possible to make your planiing on level 2 and post your cost on a lower level)
    In internal orders you make an order and have to put this in a structure for reporting. The planning and the actual costs are posted on the internal order.
    Paul

  • Not able to send Email in SOA Suite 12c,getting No matching driver found for delivery type = EMAIL

    Hi All,
    I am getting following Errror whlie Sending Testing Mail from Human Workflow .
    No matching driver found for delivery type = EMAIL
    I followed all the steps mentioned in blogs.
    Steps that I followed--
    1,Downloaded Gmail and Imap Certificate.
    2.Imported in Keystore
    3.Create a Email driver properties.
    Than

    Did you resolve this? I am running into the same problem. Not sure if it a configuration issue or an issue with 12c (go figure). I have tried both a blank sender address list and explicitly putting the target address in. Notification mode is set to email. I am using the Notification Test under Human Workflow/Notification Managent. Where else could it be trying to match the driver to EMAIL?
    exception.type: ERROR
    exception.severity: 2
    exception.name: Error status received from UMS.
    exception.description: Status detail :
      Status type : DELIVERY_TO_DRIVER:FAILURE,
      Status Content : No matching driver found for delivery type = EMAIL,
      Addressed to : EMAIL:[email protected],
      UMS Driver : null,
      UMS Message Id : dcb01e3ec0a8456856fe8a439e6ecf3f,
      Gateway message Id : null,
      Status Received at : Mon Jan 12 00:49:27 EST 2015.
    exception.fix: Check status details and fix the underlying reason, which caused error.
    >

  • WBS Elements for Project

    Hi Guys,
    I have requirement like, my selection input as PROJECT , i need to get all the WBS element for the particular Project. Do we have any function module or table to get the data?
    Thanks,
    Gourisankar.

    Hello,
    Try the FM BBP_PS_PROJECT_GET_LIST
    Pass the project and in return you can get the WBS elements, Orders,Network activities
    P.S. Project number has a conversion routine attached to it check it before passing to the FM.
    Regards,
    Sachin

  • Define a settlement cost element for receiver type FXA

    Hi,
    While settling the AUC internal order,i am gettingg the below error.Kindly advice me
    Define a settlement cost element for receiver type FXA
    Message no. KD506
    Diagnosis
    In allocation structure A1 (controlling area AFCO), you did not define which cost element should be used when settling costs/revenues of the sender. Nor did you define receiver type FXA.
    Procedure
    Assign a different allocation structure to the settlement sender (-> Master data -> Settlement rule -> Goto -> Settlement parameters), or maintain allocation structure A1.
    Thanks
    Supriya

    Hi Supriya,
    Go to SPRO-> Controlling > Internal orders>Actual postings>Settlement> Maintain Allocation structures & choose A1 and go to assignment, select the relevant category like raw material / consumption and then go to source, check the range of cost elements first then click the settlement cos t element and under that choose FXA and define the settlement cost element which must be created under 22 category.
    After maintainig the above, you will not get the error anymore.
    Thanks & Regards
    Anuj Agarwal

  • [svn] 2877: Added a "flex4-compile" target in the top-level Ants script for easily recompiling flex4.swc.

    Revision: 2877
    Author: [email protected]
    Date: 2008-08-18 18:15:18 -0700 (Mon, 18 Aug 2008)
    Log Message:
    Added a "flex4-compile" target in the top-level Ants script for easily recompiling flex4.swc. It is similar to "framework-compile" and "airframework-compile".
    Reviewer: N/A
    Bugs: -
    QA: No
    Doc: No
    Modified Paths:
    flex/sdk/trunk/build.xml

    In the default php.ini is set open_basedir which limits work with php only to few directories (and directories bellow them). There is set /srv/http, /home,/tmp and /usr/share/pear by default.
    To allow your vhost you should add /data/www or set empty value.

  • WBS element for Sales Order Item level

    Hi gurus,
    I am trying to create an inbound idoc for sales order ' VA01'. I need to populate WBS element in the item level under Account Assignment Tab. I am using ORDERS05 basic type. Please help to find which segment to use for WBS element. Waiting for your reply. Please help.
    Regards,
    Satyajit
    Edited by: Satyajit Saha on Feb 22, 2008 1:24 AM

    Hi gurus,
    I am trying to create an inbound idoc for sales order ' VA01'. I need to populate WBS element in the item level under Account Assignment Tab. I am using ORDERS05 basic type. Please help to find which segment to use for WBS element. Waiting for your reply. Please help.
    Regards,
    Satyajit
    Edited by: Satyajit Saha on Feb 22, 2008 1:24 AM