FM to change Confirmation number of Production order

Hello Experts,
I have a requirement where I need to change the confirmation number ( which is already created for a production order) AFVC-RUECK.  I could see that the confirmation number is not modifiable once it is created and no opition to change it by BDC.  But my requirement is to change it for a production order. 
1.  Is there any FM or BAPI to change it? 
2.  Or directly changing in the database table AFVC is the only option?
3.  Or is there any other method in which we can do it.
Awaiting your reply,
Balaji

Hi Balaji,
Please check whether the below link is helpful,
Re: How to modify a wrong confirmation of a production order
Also for the relevant tables, check the link,
confirmation number of production order
Best Regards.

Similar Messages

  • Confirmation of the production order qty equal to sales order qty

    Hi Experts,
    I need to control the confirmation of the production order should be equal to sales order qty.
    I'm having the scenario as follows
    If sale order qty for X material = 3
    while running the MRP, system will plan the order qty as 8 because of we maintained rounding profile in the Material master and enhancement we used for this.
    Rounding Profile Qty=5
    Total Production Order Qty=8.
    But, finally they will do the GRN for sales order qty only, remaining will be used for testing purpose.
    So, the confirmation also has to happen for only sales order qty. There, we need to control the qty based on the sales order.
    Is there any exit or Enhancement is available for this.
    Please help me.
    Naren

    Hi,
    Exit for confirmation check is CONFPP04.
    However, opening orders for quantities higher than demand and leaving pieces undelivered and unconfirmed in production orders does not make sense. I could not get the requirement of incresing production quantity by adding rounding value? Moreover, if rounding is to be used for test purposes, why not do you receive them into stock? Why don't you receive 8 pieces into stock, deliver 3 pieces to sales order and transfer 5 pieces to related department?
    If it is because of MRP and you really do not want to produce extra 5 piece immediately, you may use material reservation or any other form of demand for 5 pieces, use EX for lot size calculation and have MRP create two planned orders for sales order and testing requirement, then you can convert planned order for sales order requirement into production order and continue processing.
    Regards.

  • Confirmation of a production order

    Hello,
    I have a question regarding the confirmation of a production order.
    Is it possible to confirm part of a production order into a temporary special stock in 4.6b? The reason is that we have to perform inspection before posting it into final unrestricted stock. The confirmation into the 'temporary' stock should not book any values of the stock. The value should be booked after the inspection.
    Looking forward to your feedback!!

    Hi,
    If you have QM module implemented, maintain inspection type 04 in material master & upon posting GR for the production order an inspection lot will be created. You can then do a results recording & a usage decision on the inspection lot. If it passes the QC it will be posted to unrestricted stock.
    If you do not have QM module then alternatively create a SLoc which is not included for MRP & specify this SLoc in your order header & when you do GR it will be posted to this SLoc. You can then a SLoc to SLoc transfer. Or if you dont want to create a SLoc, check in MIGO while posting GR for this order if you can specify that it is to be treated as a QC stock.
    Regards,
    Vivek

  • How to output serial number from production order in GLM ?

    how to pull serial number from production order in wwi template for GLM ?

    Hi,
    Please have a look to this thread:
    BAPI/RFC to get serial numbers for a production order
    Hope it helps,
    Kr,
    m.

  • Number range for serial Number in production order

    Hi all,
                I want to use the Serial Number in production Order ... It should be generated automatically ... when i try this system creating the serial number from 1.....i want the number to start from 2000000 , How to configure this number range ....
    Please advise me ...
    Regards,
    kumar

    Dear
    Following steps are required in Serial Number Management :
    1. OIS2 or Go to path SPRO > Plant Maintenance and Customer Service > Master Data in Plant Maintenance and Customer Service > Technical Objects > Serial Number Management > Define Serial Number Profiles. There enter "2" in Stkck column for your serial profile.
    2.SPRO->SAP Customizing Implementation Guide->Plant Maintenance and Customer Service->Master Data in Plant Maintenance and Customer Service->Technical Objects->Equipment->Equipment Categories->Define Number Ranges
    3. IQ01 Create Serial Number
    4. MM02 You need to add the above created Serial Number Profile in the Material Master ion the work scheduling view .
    5. CO02 Assigning the Serial Number through Production Order,
    Also Serial Number can be created automatically by clicking on u201CCreate Serial Number Automaticallyu201D , Release the Order
    6. MB31 Do the GR for the above created Production Order and Check in MMBE for serial Numbers
    Try and check
    Regards
    JH
    Edited by: Jiaul Haque on Nov 22, 2010 7:43 AM

  • How to confirm the CO Production Order?

    Hi,all
    The PP Production Order can confirm by TCode CO15.
    Then how to confirm the CO Production Order(Created by KKF1)?

    Hi,
    As you are aware that Co Production Order is being used when there is no quantity structure. Hence, there shall be no routings with details of activities and the quantity of activities, etc and we cannot use confirmation as we are doing in regular Production Corder. Consequently,  we are left with one alternative of passing on the activity cost(qty x price) to the CO Production through Direct Activity Allocaiton(KB21N).
    Trust this helps much!
    Cheers!

  • Change Confirmed qty. in sales order

    Dear SAP gurus,
                             After creation of sales order i want to change confirmed qty. in sales order how it can be done ??
    Please help,
    Regards,
    Amit Patil

    Hi,
    You can use transaction CO06 to change commitments manually.

  • I have change some fields in  (Production order component )

    I have change some fields in (Production order component overview)

    Hi,
    do you want to hide or disable the fields or add new fields ??? by the way can you please let us know the transaction that you are referring to ??
    Regards,
    Santosh

  • Co88 - for huge number of production orders -running for hours

    Hello All,
    I have a issue, in our manufacturing plant, we have huge number of production orders created every day, almost 1200 per day. During month end it takes almost 8 to 10 hours for running settlement, we find very difficult in doing month end closing. We also attempted parallel processing, it errors out.
    I heard that, the co88 program looks each order by order checking the status, like closed, and thats the reason, its time consuming, i am not sure how far its true.
    I am sure this general issue, people might have come across, can anybody share their experience. How to overcome this issue to run the settlement with possible minimal time, is there any note. please guide me
    thanks
    best regards
    gj

    Yes, this is a generic issue. Most clients manage by marking the orders as closed/deleted, so that these orders are not considered for period end settlement.
    Also consider note 545932, and search notes fo further help.

  • Serial Number. Production Order Confirmation. GR. UD. Sales Delivery

    Hi Gurus,
    Please help on this issue to get any user exits .....
    As part of Serial number management, we have a certain issues on serial number confirmation, goods receipt from production order and quality inspection with UD.
    Master data:
    Finished product material master, Workscheduling view, Serial number profile maintained " ASRN"
    Process flow:
    1) Avalon Specific Serial numbers generation for finished goods through production order release status.
                  (A11206000001)
                                        A  - Avalon
                                        1   - PCB Unit 1
                                        12 - Year 2012
                                        06 - Week
                                        000001 - Running serial number for the week.
    2) Production order confirmation through CO11n transaction.
    3) Production order Goods receipt through MIGO transaction against order.
    4) Quality Inspection with Usage Decision through QA32 transaction.
    5) Goods Issue for Delivery.
    SAP Product Error:
    1) System does not track and control the operation wise confirmed serial numbers during order confirmation.
    2) System does not track and control the finally confirmed serial numbers during order goods receipt.
    3) System does not track and control the last goods receipt qty in Usage Decision.
    4)  For semi finished product, if we maintain serial number profile in workscheduling view, system is not showing goods issue material list in Co11n transaction for the finished goods.
    5) Interfacing the serial number reading scanner with SAP,  is not working without entering material number and serial number manually.
    6) System does not tracking and controlling the last Usage Decision done serial number during Goods issue to Sale order Delivery.
    Regards,
    Santha

    Hi Santha,
    This is a bit vast, but I'll try to address at least some of the issues:
    1- serial number in operation confirmation is not possible, for the reason that serailization is part of stock management, and as WIP in an order, this is not stock yet. Actually you cannot confirm the manufactured material either, and those 2 go together.
    For tracking specificly WIP, there's something called WIP batches; you may look into it to see if you can use it.
    2- during GR system will propose those SNs that you have defined for the order at release or creation.
    3- ?
    4- GI in CO11N is provided only for BACKFLUSHED material components. Serialized materials CANNOT be backflushed.
    5- You can use a barcode reader to read the serial number (instead of keyboard entry) when cursor is on the right field in the respective screen.
    6- ?

  • Change Work Center during production order confirmation

    Dear All,
    I must to modeling this situation:
    I created an production order. In routing I used an work center A.
    After I confirmed a half of quantity, the work center A was damaged and I must to change it, with the work center B.
    The system allow this change, but when I checked the costing, the situation isn't real. The system counted the costs just for the work center A, and no for work center B.
    My question is: it's possible to change the work center, during production order confirmation and the costs updated with new cost?
    Thank you for your answer!
    Regards,
    Marian

    once a Order is released, the Process order detaisl for that order is frozen.
    however if you want to do it, change the order status to CRTD after reversing the Movements done.
    Do READ MAster data , this will copy the new Work center , redo the previously done Moevements.
    if the change is long term.
    or
    Just manually add the new work center and do the processing. if the change is temporary.

  • Changing material number when Process Order is released

    Hello,
    We have a scenario in which the material number of a process order may need to be changed after the process order is released.  We will have both in process and post production inspection types assigned to this order, and both inspection lots are created at process order release.  We also will have a batch number created at process order release. 
    When recording test results in the inspection lot before a process order has been confirmed, the users may identify that the material number should be different.  We would like a way to be able to either change the material number in the process order (and inspection lots).  We know this involves a lot of updates (master data changes to the existing process order and inspection lots).  Currently, there is no way to transfer information to a new material number without receiving product in and performing a usage decision in the post production inspection lot to transfer to a new material number. 
    The client has implemented all modules, except PP (which we are in the process of now).  We know that Variant Configuration would have been the right solution for this, but this is not an option since MM is already implemented. 
    If you have any suggestions, please reply. 
    Thanks in advance.

    Hi Prasobh,
    The exact scenario is as follows:
    1. A semi finished good will be used as a component to produce the finished good.
    2. This semi finished good will have treatments added to it, and quality inspection will be performed as treatments are added. 
    3. Inspections will occur several times as treatments are added.  If during one of these inspections, material is out of spec, and the blend should be transferred to another material number, we need to be able to change to another material number.  To have a customization where material number is changed in all of the relevant PP and QM tables seems risky. 
    This is why we can't really use material classification.  We also do not have the option to use VC bc the MM module is already implemented. 
    Thanks.

  • Change planning plant in production order

    Hi Gurus,
    my business scenario is the following:
    I have 2 plants that are assigned to 2 different company codes. Plant A (ordering plant) and Plant B (supplying plant).
    The users place a sales order on plant A and through MRP with special procurement key 80 the planned order is turned into a production order in plant B.
    But in the order confirmation the system tries to post the GR in plant A. Is there a way to change the planning plant of the production order at any time i.e in order creation or order confirmation? Because I need the GR against the production order to be done in plant B. Since the subsequent posting according to the business scenario would be after production, the goods should be sold from Plant A to Plant B via a sales order.
    Your help would be greatly appreciated.
    Panos

    Hi Panos,
    SPK 80 doesn't suit your requirement, since by design it is doing GR in the ordering plant.
    Alternatively you need to work with a SPK like 40, that is stock transfer from B to A. Just set up the intercompany process for this stock transfer.
    This way, when MRP in A detects a need for replenishment, a stock transfer requisition from B to A is created. Then MRP in B will create a planned order for production (that you will convert into a production order later). GR is in B. The stock transfer requisition is converted into a stock transfer order, and the actual transfer takes place.
    Check also this for more details:
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/f4/7d2d4d44af11d182b40000e829fbfe/content.htm
    Regards,
    Mario

  • Disply of Serial Number in Production Order info System

    Dear Guru,
    I want to see production order along with serial number in COOIS. Please guide me.I am using ECC-600.
    Regards,
    Sanjay Sahoo

    Hi,
    Please check in the CO26 transaction enter the plant and execute then in the filed selection tab select the serial number filed.But unable to retrive the serial number of components.
    Or
    U can get it on reverse way like
    Go to serial number change mode through IQ02 transaction double click on the serial number then click it on the history button the it will shows the serial number created against production order.
    Or
    U have to do some developments.
    Regards
    Vijay

  • Refernce number in production order

    Dear All
    This is MTO scenerio,starergy 20
    sales order is created with refernce to quotation,when i run MRP and MD04 in production order ,in reference tab the sales order number is quotation number
    Similarly it is creating sales order stock with refernce to quotation number
    My requirement is gow to change the refernce form quotation to sales order number
    Regards

    hi
    Pl check the schedule lines u rmaintaining for quotation ,if possible use seperate schedule line for quotation and remove TOR tick from schedule line.(VOV5)
    This will solve the problem.
    Regards
    Mandar