Follow-on documents from Auction to backend system (R/3)

Could somebody help us to configure the follow-on documents (Purchase order and Contract) from Live Auction (SRM Server 5.5) to backend system (R/3 4.6C)?
We are using the classic scenario in (SRM Server 5.5).
Thank you very much

Hi
<u>Please go through the follwoing links to find the detailed information required -></u>
SRM Live Auction Configuraton
Are you using the Extended Classic Scenario ?
Re: Create follow on documents
Local contract and classic scenario
Multiple levels of follow-on documents
Re: How to create a PO in R/3 from a local Bid Invitation in classic scenario ?
Re: Configuration changes of  "Classic to Standalone scenario"  in EBP system
Re: Live Auction: :):(
Re: Follow-on Documents not created
http://help.sap.com/saphelp_srm50/helpdata/en/52/8ed84b0e2447afb1c565990efd52d1/frameset.htm
http://help.sap.com/saphelp_srm50/helpdata/en/ea/18cc3fbeb83946e10000000a114084/frameset.htm
http://help.sap.com/saphelp_srm50/helpdata/en/c1/c3fe3930a34b2ae10000000a114084/frameset.htm
Hope this will help.
Regards
- Atul

Similar Messages

  • Posting of Trip Document from HR(in one system) to FI(in other system).

    Hello Experts,
    I have a question how to Post Trip Document from HR(in one system) to FI(in other system)? This is to be done via ALE/IDOC , i.e when creating posting run in HR, an IDOC should be triggered which will post trip document in FI in other system...
    How is it possible?? is their another alternative?? I am  a SAP ABAP guy is it my whole responsibility to handle this required,
    Thanks
    Puneet

    Hi Yogesh,
    I'm not sure about tr of data from FICA to FI-GL corporate. But in one of my earlier project we have tr data from FICA to FI-GL and then from FI-GL to Corp GL using customized iDoc structure ACC_DOCUMENT01.
    You can look into WE30 for standard iDoc structures that would suit your requirement.
    Hope this helps.
    Rgds
    Rajendra

  • Classic Scenario: follow on document from BID

    Dear All,
    We are trying to create a PO from an accepted BID . We can create the PO, and if we check it in the backend system, everything is OK.
    Our problem is that we are trying to find in SRM, somewhere that shows us the follow on document of the Bid but we can´t find it.
    It´s important to say that as soon as the PO is created, we get a message that contains the PO number. But after that, we can´t find in SRM the PO number anymore.
    Is this a lack of SRM or may be another problem? Has anyone face up with this issue? If so, How it was resolved?
    Thanks,
    Pablo.-

    I noticed that you have a very similiar Bidding scenario that we have.  We can create a bid invitation in SRM and we have used the BADI - BBP_DETERMINE_LOGSYS to indicate to the system to create a purchase order in the backend system after the bid is accepted.  We keep getting the following error in SM21:  Purchase orders cannot be created without IPC pricing
    Did you have to turn on the IPC in order to create the purchase order in R/3?  We are on SRM 4.0.  Also, if you have used the BBP_DETEMINE_LOGSYS Badi and have example code that might be helpful as well...thanks!

  • Password not sent from EP to backend System in Replication

    Hi,
      I am trying to replicate user data from Enterprise portal to R/3 system. And i was successful in doing so but the problem is when i create a user in EP then the same user is created in the backend system but password is not being set. The backend System says PasswordDeactivated.
    Can anyone tell me how to solve this.
    Regards
    Padmaja

    Hi Zuljana,
    Kindly check if your partner profile is active. (Indicated by 'A')
    Sometimes if your partner profile is not active, you wont be able to distribute your model. Check the 'A' indicator
    Regards,
    Nikhil
    Edited by: Pbponikhil on Dec 21, 2010 4:11 PM

  • Create Follow-up document from Service Contract automatically while saving

    Hi,
    In CRM 4.0, under the Service secnario, Service Data for Service Contract is related to --
    1. Interval value
    2. Period
    Based on these parameter values how to generate the corresponding follow up documents automatically while saving the parent doucment(i.e Service Contract).
    For ex, Interval = 6 , Period = 36, then all the 6 docs should be genarated at once while saving the Service Contract.
    Please Advice.
    Regards
    Deb

    Hi
    Yes , manually executing the Action through PPF.
    But the requirement is to generate the subsequent docs at once while saving the Service Contract i.e the corresponding Action should also triggered automatically.
    Please Advice.
    Regards
    Deb

  • Lead as Follow up document from Service Contract

    Hi Experts,
    There is a requirement to create Service Lead from Service Contract. I dont think there is something different by name Service Lead so i assume it is Standard Lead which is present in system.
    I maintained the copy control for Tx. Types and as well as for Item Categories.
    Issue:
    If i create a Service Contract and create a follow up Lead with no items, it works fine.
    Suppose i use an item (sales/service item), and i try to create a follow up Lead, the resulting pop-up to choose items from preceding document shows and error and the item doesnot get coped and displays an error, 'Sold-to-Party is not eligible for contract items'.
    Has anyone come across this issue?
    Thanks and Regards,
    MG

    Hi Maggii,
    1. Is it possible to create a Lead from Service Contract? Does the system allow it even after maintaining relevant copy control configurations?
    A.Yes, it is possible while arranging of copy controls for transactions need to activate u201CCopy Item numberu201D.
    2.What does the error message, 'Sold to party not eligible for contract items' mean....have u ever seen such error?
    A.  Means, the particular sold to party is not maintained for that contract (for trail check with any maintained sold to party for that error message), cross check the contract again under in partner functions.
    If it is suits to your requirement please some reward points,
    Thanks,
    Suuny.

  • Loading attached documents from SAP R/3 system to BW/BI system

    Dear Experts,
    In SAP R/3 system, I created generic datasource to extract sales activities which are entered with transaction code VC01N.  In SAP R/3 system, it is possible to attach documents (like word, Excel, pdf) to the sales activity. I need to upload these documents to SAP BW system as document to sales activity master data. I couldn't find where these attached documents are stored in SAP R/3 system. How can I find these documents?
    If I find these documents, I will be able upload these to BW using "How to Mass Upload Documents to BW" document.
    Thanks,
    Ozgur Yavuzkara

    Hi Girish,
    I don't understand your question completely. Is your question related to the Internet Transaction Server? If it is a Web Dynpro question, I can move this thread to the Web Dynpro forum. What do you think?
    - Henning

  • Migrate word documents from external system to SharePoint 2007 site

    Hi All,
    I have a requirement wherein I have to migrate around 2500 word documents from one of the system to SharePoint system.
    Please note that my client is using MOSS version of SharePoint.
    Also some excel files are embedded in to some of the word documents.
    Those word documents are stored in different system (other than SharePoint).  I have to migrate them into my MOSS system.
    Is it possible OOB. I suppose doing it manually will consume a lot of time and client wants it do be done in minimum time.
    Is there any tool readily available or do I have to develop one in visual studio 2005? If yes could some one please share the code as I do not know how to proceed on this.
    Your help is highly appreciated.
    Please respond. Let me know if you need more info.
    Thanks & regards,
    Manish

    Hi,
    From your description, you want to get numerous files into SharePoint Document Libraries.
    After you log on to the SharePoint document library->click Actions->followed by
    Open with Windows Explorer. After Windows Explorer opens, you can upload and download files and folders using the standard copy-and-paste operation.
    Refer to the article:
    http://windowsitpro.com/systems-management/easy-way-get-numerous-files-and-out-sharepoint-document-libraries
    Best Regards,
    Lisa Chen
    TechNet Community Support
    Please remember to mark the replies as answers if they help, and unmark the answers if they provide no help. If you have feedback for TechNet Support, contact
    [email protected]

  • Valid from and Valid to are not getting copied to follow up document.

    Hi Experts,
    I am creating job quote as a follow up document from master quote.All are getting copied from the master quote to job quote,but valid from and valid to dates are not getting copied from master quote,instead it is calculating the date from date profile rules.
    But I need to transport the dates from Master Quote to Job Quote.
    Please advice.
    Thanks,
    Adi.

    Hi,
    You need to implement CRM_COPY_BADY for that. Please refer to:
    Re: create a new follow up complaint to the earlier completed complaint
    Regards,
    Nicolas.

  • How is goods receipt and invoice sent from backend system to SRM system?

    Hi friends
    How is goods receipt and invoice sent from backend system to SRM system?
    Thanks
    regards
    Krishna

    Hi Khan
    BBP_GET_STATUS_2 and Clean_recrec_Up are background jobs to sync ecc and ebp.
    BBPIV and MBGMCR are used to send goods receipt and invoice from srm to backend system
    So we dont require any special idocs to send goods receipt and invoice from ecc to ebp.Are all handled by BBP_Get_status_2
    Regards
    Krishna

  • Problem in copying the territory id to the follow-up document

    Hi,
    I have sales order with all the partners determined with all the territories attached to them.
    Now I am trying to create a follow-up document from it. I am facing the following two issues:
    1. It is copying the partners to the follow-up document with different territory ID's
    2. For some partner functions, it is displaying the popup with all the territories. Eventhough this partner has one territory in preceding document.
    The bottom line of the requirement is: It should copy all the partners with the same territories as in preceding document.
    Could you please help me out, how can I solve this.
    Thanks,
    Sandeep

    Hi Sandeep,
    The problem could be due to the territory determination, may be the list of partner you have in your oppurtunity is determined to multiple territories, in that scenario the system will provide a option to select the territory which is more proper.
    So please check the territories that are assigned to the partner or else you need to do a customisation to make sure that the required territory is copied to the follow up document. You can try enhancing the CRM_COPY_BADI.
    Hope this helps you out!
    Regards
    Veena.

  • Syndication of merged records to multiple backend systems (MDM 7.1)

    Hi all,
    I have setup an MDM scenario with >1 ECC systems connected to MDM via PI. Everything works fine in terms of end-to-end process from ECC to MDM or MDM to ECC (creation, update, syndication). I have also merged records in MDM from the same backend system and am able to see the remote key information under 'edit key mappings' and when I update the merged records in mdm the data is olso updated in ECC.
    BUT the update in ECC does not work for merged records where the keys are from different backend systems.
    Example:
    Remote system: RS1 and RS2
    I have merged two records, one from RS1 and the other from RS2. The newly created record has two key mappings (RS1/RS2). Also the newly created record shows - let's say - RS1 in MDM and the the RS2 informaion is attached as remote system information. When modifying the record in MDM, only RS1 is updated but not RS2.
    Remote Systems RS1 and RS2 are set up in the Cosole. Also I have setup a port for each remote system. Syndication in general works perfectly without any problem. I know that I have to trigger syndication for each port but still does not work. Any ideas?
    Thanks!!!
    BR,
    Erdal
    P.S. I am using MDM 7.1

    Hi Erdal,
    OK, I assumed a setup like this.
    > in 5.5 there was "Output Remote Systems" whereas in 7.1 we don't have
    You have this one in 7.1, too. "Output Remote Systems" was renamed to "Remote Key Override". I don't know why, but the functionality is exactly the same.
    > "Supress Unchange Records" is checked
    This explains the behaviour that you are facing. "Supress Unchanged Records" is used to distribute only these records that have been changed. What happens inside MDM is the following.
    MDM Server creates kind of a change pointer for the changed record AND for each remote system that record belongs to:
    Imagine you have a record A with a key for RS1 and RS2 each. You change this record. MDS creates two change pointers A-RS1 and A-RS2.
    Now you switch to Syndicator and distribute the records with the port for RS1, but with "Remote Key Override" for both RS1 and RS2. Syndicator creates a single message and includes both the remote keys for RS1 and RS2. Furthermore it deletes BOTH change pointers A-RS1 and A-RS2 as the record was distributed for BOTH systems!
    If you then connect with Syndicator to the port for RS2 and start the syndication, Syndicator cannot find any change pointers and thus won't create a message.
    If you want to send the golden record to different systems, I'd suggest to add each system to MDM Console. Create a syndication map & port FOR EACH system. Within the map use the target system only as "Remote Key Override". Use "Supress Records without key" to exclude those records, that do not have a remote key for the target system. Use "Supress unchanged records" if you want to distribute only the changed records.
    If you need a message having all keys of all systems (e.g. to update a BI system with grouping information), create a specific remote system for this purpose. Create a map & port, the map shall now use the "Remote Key Override" for all systems. The "Supress" settings can be made as above, but especially for BI we're recommending to syndicate always all records (do not "Supress unchanged records").
    Best regards
    Michael

  • Follow on document details not updating in shopping cart

    Hi Experts,
    I created a shopping cart  and created PO as a follow on document  from sourcing cockpit after assigning vendor.
    but Shopping cart is not updating with follow on document (PO)details even after running BBP_GET_STATUS_2 report also.
    Is there any other settings required to do for updating shopping cart with follow on document details.
    Thanks,
    Bhaskar.

    Hi ,
    Please check the repots ( jobs )  CLEAN_REQREQ_UP And BBP_GET_STATUS _2 are running..
    Check in RZ20 is there any error message for the follow on document.
    Thanks
    prasad.s

  • Switching Backend System

    Hello everybody
    We've setup SRM 4.0 with SRM Server 5.0 SP08 and CCM 2.0 SP03 on a development/customizing machine called DIM. We connected it to temporary devel./customizing SAP R/3 4.7 backend system called RIS.
    Why a temporary devel./customizing backend system? Well, that's a complete other story...
    However, we now have to change this connection to the definitive devel./customizing SAP R/3 4.7 backend system.
    The problem / question is: after having changed all customizing settings (changed logical and/or RFC destinations everywhere) we are able to replicate DNL_CUST_BASIS3, DNL_CUST_PROD0 but not DNL_CUST_PROD1 from the new backend system.
    In R3AM1 it hangs with a yellow status, in SMQ2 it stays in the inbound queue with an error message ":COM_PRODUCT_CUSTMSG:028 R3PRODHIER RISCLNT200".
    RISCLNT200 is the logical system name of the old backend system.
    Is this error message araising because we already replicated from this (old) backend system? Does anybody out there know this issue? Anyone having a solution to it?
    Other question:
    Is it somehow possible to wipe out all repliacated data (hierarchies, categories, material, ...) from an SRM server instance without having to reinstall everything from scratch? We're still on development/customizing level and not in production yet!
    Thanks in advance for some help. Would be happy to reward with points!
    Renaud
    EDIT: looking at COMM_HIERARCHY I can see that the product categories were replicated. Any ideas, why I get above error in the inbound queue SMQ2 then?
    Message was edited by: Renaud Desarzens

    Hi Christophe
    Thanks for the tip. Just tried it out, went to COMM_PRAPPLCAT and deleted the entry with application 01 and its assigned hierarchy id (R3PRODHIER). Then went to the pending queue entry in SMQ2 and restarted it.
    Now the system returns another error in the inbound queue (SMQ2). It tells me that the hierarchy id R3PRODHIER already exists.
    Tried to delete it in COMM_HIERARCHY but of course the system says it may only be maintained in the backend system. This backend system is no more of interest for us. We want to replace it by another one.
    What else can I do? Is there a way to wipe out all replicated hierarchies and all products just to be able to redo an initial replication from a new (NOT additional!!!) backend system?
    BTW: In the actual R3MATCLASS hierarchy I have some categories from our old backend system and some additional new ones from the new backend system. How can I make sure to have only categories from 1, the new one, backend system?
    I'm kind of lost here...
    Best regards,
    Renaud

  • BBPGETVD throwing an error -Backend system with release 701 are not support

    Experts,
    After changing the Backend connection from  R3 4.6c to ECC6 sysem in our BBPCRM4.0,
    the transaction "BBPGETVD" is not working, which is throwing an error as
    "Backend system with release 701 are not supported".
    Already we have applied some of the notes (822883 &862290)
    Thanks
    Ahamed

    Are you able to replicate other data like plants, product categories from the same backend system or are you facing the same error?
    Also please check the logical system and see if they are assigned to the client correctly. (in SPRO settings)
    Thanks,
    Prashanth

Maybe you are looking for

  • Solution - Battery error is detected. Irreparable damage to the battery has been detected. Replace

    I own a T61 7658 I bough on 2008, it worked great with the default power settings until October 22nd I decided to change my power profile to MAXIMUM PERFORMANCE.   Next day I received on Message Center...  10/23/2010 - Battery health is critical. Wit

  • Problem in querying the records

    what is the thing changing the values on my master/detail form n giving me a message that "do u want to save the record" on fetching of each record? even if there is not pre or post-query trigger. is there any problem in the default Master-Detail tri

  • Button to open file

    I would like to include a set of instructions in my form.  My thought was to include a help button, that when clicked would open up a separate file containing the work instructions.  I have 2 questions. 1.  How can I include the work instruction file

  • Trouble downloading Premier Elements 11

    I purchased PE11, but when I try to download it's saying I need a supported browser.  I'm already using Internet Explorer 10.  Any suggestions?

  • Getting sign in error for LR Mobile sync on desktop LR5.4

    I just updated the desktop LR to 5.4 and downloaded the Adobe LR app. Signed in fine to the app. When I try to sign in to activate sync on the desktop, I get the error message "Lightrrom has experienced an unexpected Sign In failure. Please try again