Goods receipt for process order during confirmaiton

Hi
Gurs ,
I have created  I could not able to GR for the process order  automatically while i am doing confirmation .
I have mainted all the setting in the master data  like back flush indicater in the material master and back fluch indicater for the
in work center .
I have maintained the setting in the control key and order and PSP as well but still it is not doing 101 automatically at the time of confiramtion.

Hi,
i just don't know why you raised new thread as already ur previous thread is not closed
Now just let us know whether system is throwing any error
or what exactly happing in cofirmation screen
Go to OPK4, here
under goods movement there is option all components  just tick it
then in second tab Gen individual entry tick Goods movement & termination for incorrect goods movement
Coming to GR
what is storage location ur giving
just check in MMSC, whether this storage location is activated for the header material ( GR )
Added
Plz Go through all possible options
[Auto GR is not happening.;
Regards
kumar
Edited by: kumar kumar on Nov 10, 2009 2:25 PM

Similar Messages

  • Reverse Goods Receipt for Process Order

    Dear All,
    Please tell me how to reverse the Goods Receipt for Process Order for which already QM is cleared for that Particular Lot.
    But Confirmation is still yet Pending.
    I tried MIGO - Cancel - Material Document. But it is showing a message "Process Order already processed".
    Regards
    buss

    Hi,
    Use t code MB31
    Movement type 102
    Stock type = Unristricted use.
    Reverse by entering above information then you have to manually cancel the inspection lot.
    Regards,
    Vishal

  • Error while doing Goods receipt for process order. Error code: "BS027"

    I am getting error while doing GR for a day whereas previous day(s) GR is already done and also 2 days post that day are also done successfully.
    Error :  ""Goods receipt for prodn. order" is not allowed (ORD XX-CEMTSAL) " (XX = First two characters of plant code)
    Error code: BS027.
    Thanks to all in advance.

    Hello,
    This issue would occur when you want to post a confirmation for a production order. The error message is generated if you wanted to post a backflush for a component and if this component was assigned to a sales order stock. The sales order itself was assigned to a work breakdown structure element which should be debited with the actual costs. However, the business transaction 'Confirm' is not permitted for a work breakdown structure.
    Please look into SAP Note 62367 and 64370
    Hope the information is helpful
    regards

  • Bapi bapi_goodsmvt_create for goods receipt of process order

    Hello All ,
    I am trying to a GR with MIGO for a process order .Its giving me error like
    Content of order 2000002339: 100001374 transferred to interface (IMSEG): 100001374
    I am not able to trace the error out .I am passing the below parameters .pls check
    gmhead-pstng_date = sy-datum.
    gmhead-doc_date = sy-datum.
    gmhead-pr_uname = sy-uname.
    gmcode-gm_code = '02'.   "01 - MB01 - Goods Receipts for Purchase Order
    itab-move_type  = '101'.
    itab-mvt_ind    = 'F'.
    itab-plant      = '1AAE'.
    itab-material   = '100001374'.
    itab-entry_qnt  = '1'.
    itab-move_stloc = 'B100'.
    itab-stge_loc   = 'B100'.
    itab-orderid  = '002000002339'.
    append itab .
    CALL FUNCTION 'BAPI_GOODSMVT_CREATE'
      EXPORTING
        goodsmvt_header             = gmhead
        goodsmvt_code               = gmcode
      TESTRUN                     = ' '
    IMPORTING
        goodsmvt_headret            = wa_head
       materialdocument            = lv_mblnr
      MATDOCUMENTYEAR             =
      TABLES
        goodsmvt_item               = itab
      GOODSMVT_SERIALNUMBER       =
        return                      = errmsg
    Pls reply ..
    Thanks .

    HI ...
    Since this is a production order ,i used the GM code as '02'.bcoz the documentation says the same .
    There are the following types of transactions/events:
    1. GM_Code 01: Goods receipt for purchase order
    2. GM_Code 02: Goods receipt for production order
    3. GM_Code 03: Goods issue
    4. GM_Code 04: Transfer posting
    i also tried changing it to '01' ,its not working still...
    Pls reply
    Thanks .

  • Error during Goods Receipt for Production Order

    Hi All,
    When using MIGO to post Goods Receipt for a Production Order, I got a customize message saying that the posting is only available between 2010.08.25 to 2010.08.27.  I have checked in Business Add-in using SE19 but there are no implementation present.  I know that in Logistic Verification MIRO there is a transaction OMRM to set messages.  I would like to ask is there anything similar for MIGO.  
    Or is there any other place in Configuration which allows me to add these Customize message.
    Thanks.
    Edited by: jamison2004 jordan2004 on Jul 9, 2010 9:09 AM

    Hello Jiaul,
    Sorry I may have mislead you.  The actual error message is "Goods Receipt for Production Order XXXX can only be made on 2010.08.25 to 2010.08.27".  These two dates are the Start Date and FInish Date for the Production Order in CO03, 
    The Basic Start Date for the current Production Order is  2010.08.25
    The Basic Finish Date for the current Production Order is 2010.08.27
    I think what it means is that you can only Post Goods Receipt for the Production Order only after the Basic Start Date of the Production Order.  Do you know where I can find the configuration for this message?
    Thanks

  • Error: GR "Goods receipt for purch. order" is not allowed (ORD 4000048)

    Hi gurus, can anyone please help me
    while doing service entry for the PO with account assignment F and Item Category D
    our client is facing the error
    "Goods receipt for purch. order" is not allowed (ORD 4000048) MSG no: BS007
    Diagnosis
    The current status of object 'ORD 4000048' prohibits business transaction 'Goods receipt for purch. order'.
    Procedure
    To process business transaction 'Goods receipt for purch. order', you first have to change the status of object 'ORD 4000048' to allow the transaction 'Goods receipt for purch. order'.
    This gives you an overview of the system and user statuses that affect the transaction. A transaction can only be executed if there is at least one status that allows it and there is no status that forbids it.
    Anyone can give the solution please
    Guruk

    hi dear all
    Really thanks for your prompt reply.
    i solved this issue, as what u said, it is not released in IW31, at the time of PR creation. So i asked the User to go to IW32 anc choose the apprpriate order and change mode and click on Flag Icon to release.
    Any way i awarded points for your support
    Thanks
    regards
    Guru

  • "Goods receipt for purch. order" is not allowed (WBS P-0400-1-1-8010-1)

    Dear All,
         Can you tell me how to do?
    "Goods receipt for purch. order" is not allowed (WBS P-0400-1-1-8010-1)
    Message no. BS007
    Diagnosis
    The current status of object 'WBS P-0400-1-1-8010-1' prohibits business transaction 'Goods receipt for purch. order'.
    Procedure
    To process business transaction 'Goods receipt for purch. order', you first have to change the status of object 'WBS P-0400-1-1-8010-1' to allow the transaction 'Goods receipt for purch. order'.
    This gives you an overview of the system and user statuses that affect the transaction. A transaction can only be executed if there is at least one status that allows it and there is no status that forbids it.
    Transaction analysis

    Hi Zhang,
    Goto Transaction CJ02.
    Now goto Edit button in Menu.Click on Status , then System/User Status.
    Here u can find the current status of Project.
    Later once again goto CJ02.
    Now goto Edit button in Menu.Click on Status -- Release.
    Once released u will be able to post GR.
    Regards
    Ramesh Ch

  • Goods receipt for purch. order" is not allowed (NWA EXCANETHDR 0030)

    Hi Gurus,
    Message no. BS007
    While doing MIGO with PO, Iam receving the following error msg as
    "Goods receipt for purch. order" is not allowed (NWA EXCANETHDR 0030)".
    Diagnosis
    The current status of object 'NWA EXCANETHDR 0030' prohibits business transaction 'Goods receipt for purch. order'.
    Procedure
    To process business transaction 'Goods receipt for purch. order', you first have to change the status of object 'NWA EXCANETHDR 0030' to allow the transaction 'Goods receipt for purch. order'.
    This gives you an overview of the system and user statuses that affect the transaction. A transaction can only be executed if there is at least one status that allows it and there is no status that forbids it.
    Pls help me in this
    Thanks in advance,
    Vasanth

    Hi,
    I guess it the goods receipt is against a PO having an asset or used an Internal order .In the Internal order control data Goods receipt allowed indicator has not been set. Please see the order in KO03 and check the allowed transactions. If GR (RMWE) is not there than ask your CO team for the needfull change after which take up GR.
    Dhruba

  • Partial reversal of a goods receipt from process order

    Dear All
    Could anyone please help me with explaining how to do a partial reversal of a goods receipt from process order? If Iu2019m using trans CORS I have to cancel the entire operation, which I donu2019t want to do. If Iu2019m using MIGO and MT 102 I only reverse the goods receipts of the produced material, the corresponding components from the BoM is not reversed with MT 262 as they are if I cancel with CORS, and I donu2019t want to do a second MIGO transaction in which I cancel the components with MT 261. I have also tried to create an operation with a negative quantity, but without any success.
    Itu2019s not an option for the business to reverse the entire quantity and then perform a new goods receipt with the right quantity.

    Hi again,
    I have been trying to do the reversal with CORR but Iu2019m getting the error message u201CMixed confirmation types (time ticket/time event) are not allowedu201D, message number RU179.
    Anyone who can help me on the way?
    /WM consultant on unknown territory

  • Goods receipt against process order with inbound idoc

    Hi Experts,
    We need to post good receipt against process order with movement type 101 and for By-product 531.
    Can we use inbound idoc-WMMBID02,with message type WMMBXY to achieve this functionality?
    Or please advise if we can achieve this  from any other Idoc type.
    We are getting below field values for external system
    1. process order number
    2.plant
    3.material
    4.quantity in unit of entry
    5.unit of measure
    6.storage location
    7. movement type
    8.Batch
    Kindly advise how can we achieve this.
    Best Regards
    CS

    261 and 262 are two different movement types INDEPENDENT of each other. I definitely know for the fact that SAP allows you to create a 262 without a 261. if you were to restrict it... you can disable access through a tcode for that mov. type 262 and ask users to use MBST to cancel any material documents created via 261 movt type.. that would ensure a smooth process

  • Message no. BS007-Goods receipt for purchase order not allowed

    Hello SAP Experts,
    I have created an internal order to collect expense within the order.
    When I tried to reverse an GR against the PO created with the internal order assigned, the following Error occured.
    "Goods receipt for purch. order" is not allowed (ORD 145116170204)
    Message no. BS007
    Diagnosis
    The current status of object 'ORD 145116180204' prohibits business transaction 'Goods receipt for purch. order'.
    Procedure
    To process business transaction 'Goods receipt for purch. order', you first have to change the status of object 'ORD 145116170204' to allow the transaction 'Goods receipt for purch. order'.
    This gives you an overview of the system and user statuses that affect the transaction. A transaction can only be executed if there is at least one status that allows it and there is no status that forbids it.
    The order was previous TECOed, and change it's status to Release, but still have the error.
    Please give possible solutions. Thank you in advance.
    Regards,
    Steven Lin

    Hi Br. Ajay M,
    Released the order and Status line as follow
    REL  AVAC BUDG GMPS
    but the error changed while reverse the document
    item 0001 Order is invalid.
    Many thanks for your kindly reply.
    regards,
    Steven

  • Automatic Batch determination at time of Goods receipt for production order

    Hi SAP experts,
                             Greetings to you all. I wish to ask a query that how batch is determined automatically at the time of goods receipt for production order .
                             I have done the following settings:
    1.Specified batch level at material level
    2.External batch number assignment
    3.Defined production order condition table '501' (plant/material)
    4.Defined production order access sequence (order type-plant -material)
    5.Defined Production Order Strategy type.
    6.Defined Batch search procedure in Production Order.
    7.Assigned Batch search procedure to Production order type for a particular plant  , batch check not activated.
    Please let me know of any more settings to be checked for the same.
    For example, a production order is being confirmed for a quatity of 5 nos . at a time . However, the GI movement (261 movement type) for the production order components  is taking place for 1 EA qty. from 5 different batches.
    So now, how the system will define the GR (movement type 101) for the production order header material for the qty. 5 nos. EA ?
    It is desired that the system should do GR for the qty.  1 EA of the header material for the 5 different batches (batches which were automatically deteremined for the Goods issue of the components).
    Thanks in advance. good day.
    Best regards,
    RB

    HI Rahul,
    As explained earlier, for e.g., if the GR is taking place for the production order for qty. 5 nos. , and in that , if the component qty. is 1 EA for 1EA of header material ; then , the GR for the header material should take place for the same different batches from which the order components were issued for the order and not for the other batches in stock for the header material as well as components.
    I am not sure if i understand your requirement 100%.
    But let me explain you standard behaviour.
    When Confirmation for production order happens and GR is posted during confirmation , All the GR happens agaist same batch number which i sassigned in production order assignment screen.
    So for all the order qty single batch would be fixed. Say batch A1 is created for Header material for 100 qty.
    Now during components issue to production order, If 100 qty needs to be issued for compoenent B it is possible to use multiple batches of componenets ( using splilt batch functionality /or manual batch number entry agaist componenet in goods movement screen) but header batch remains the same.
    Check and Revert,
    Santosh Sarda

  • Steps For Goods Receipt For Work Order Using Handling Units

    Hello MM gurus,
    I'm new to HU Management.  Can you please share with me the steps for executing a "Goods Receipt For Work Order" using Handling Units?
    I created a HU (1000000026), and then using transaction COWBHUWE I tried using that HU to create a goods receipt, but I keep getting the message below:
    Handling unit 1000000026 is not provided for goods receipt
    Message no. VHURM046
    Do you have to assign/plan HUs to Process Orders first? I think the problem is that I'm not understanding the process or the requirements for a goods receipt for work order using HU.

    Hello Manish Kumar,
    I've been doing Handling Units testing in our sandbox environment and I've been trying to Pack a Finished Product for a Process Order using
    1-Transaction code HU02 to create the Handling Unit
    2-Transaction COWBHUE after creating the HU to enter the production order number and the HU number and propose it, but the it doesn't work. When I propose it, nothing happens.
    3.-I also tried COWBPACK, but for some reason, when I go into COWBPACK, key in the Process Order, and then press enter, I get the following message:
    You do not have authorization to create handling units for plant BP08
    Message no. VHUPD500
    Do you know how to solve this issue?

  • Call BAPI_GOODSMVT_CREATE to create a goods receipt for purchase order

    Hi,
    I'm calling the bapi BAPI_GOODSMVT_CREATE to create a goods receipt for purchase order, but the following code doesn't work. It doesn't give me any kind of error message but it does nothing as well...
    Can anyone help me please?
    Thank You
    Hugo
    Code
    DATA: wa_goodsmvt_header  LIKE bapi2017_gm_head_01,
                            wa_goodsmvt_code    LIKE bapi2017_gm_code,
                            wa_bapi2017_gm_head TYPE bapi2017_gm_head_ret-mat_doc.
                      DATA: it_goodsmvt_item LIKE bapi2017_gm_item_create OCCURS  0 WITH HEADER LINE,
                            it_return        LIKE bapiret2 OCCURS  0 WITH HEADER LINE.
                      wa_goodsmvt_header-pstng_date = SY-DATUM.
                      wa_goodsmvt_header-doc_date   = SY-DATUM.
                      wa_goodsmvt_header-ref_doc_no = '4500000020'.
                      wa_goodsmvt_code-gm_code = '01'.          "Goods receipt for purchase Order
                      it_goodsmvt_item-stge_loc  = 'BPF2'.
                      it_goodsmvt_item-move_type = '101' .
                      it_goodsmvt_item-entry_qnt = 17.
                      it_goodsmvt_item-entry_uom = 'KG'.
                      it_goodsmvt_item-mvt_ind   = 'B'.
                      it_goodsmvt_item-po_number = '4500000020'.
                      it_goodsmvt_item-po_item   = '00010'.
                      it_goodsmvt_item-material  = '50'.
                      APPEND it_goodsmvt_item.
                      CALL FUNCTION  'BAPI_GOODSMVT_CREATE'
                        EXPORTING
                          goodsmvt_header  = wa_goodsmvt_header
                          goodsmvt_code    = wa_goodsmvt_code
                        IMPORTING
                          materialdocument = wa_bapi2017_gm_head
                        TABLES
                          goodsmvt_item    = it_goodsmvt_item
                          return            = it_return.
                        data: begin of errmsg occurs 10.
                                include structure bapiret2.
                        data: end of errmsg.
                        data: wmenge like iseg-menge,
                              errflag.
                        clear errflag.
                        loop at errmsg.
                          if errmsg-type eq 'E'.
                            write:/'Error in function', errmsg-message.
                            errflag = 'X'.
                          else.
                            write:/ errmsg-message.
                          endif.
                        endloop.
                        if errflag is initial.
                          commit work and wait.
                          if sy-subrc ne 0.
                            write:/ 'Error in updating'.
                            exit.
                          else.
                            write:/ 'Ok'.
                          endif.
                        endif.
                        CALL FUNCTION 'BAPI_TRANSACTION_COMMIT'
                        EXPORTING
                        wait = ' '.

    Hi,
    Thank you for the asnwer! I'm a rookie at ABAP so please forgive my stupid questions
    I've changed the code to:
    DATA: wa_goodsmvt_header  LIKE bapi2017_gm_head_01,
                            wa_goodsmvt_code    LIKE bapi2017_gm_code,
                            wa_bapi2017_gm_head TYPE bapi2017_gm_head_ret-mat_doc.
                      DATA: it_goodsmvt_item LIKE bapi2017_gm_item_create OCCURS  0 WITH HEADER LINE,
                            it_return        LIKE bapiret2 OCCURS  0 WITH HEADER LINE.
                      wa_goodsmvt_header-pstng_date = SY-DATUM.
                      wa_goodsmvt_header-doc_date   = SY-DATUM.
                      wa_goodsmvt_header-ref_doc_no = '4500000020'.
                      wa_goodsmvt_code-gm_code = '01'.          "Goods receipt for purchase Order
                      it_goodsmvt_item-plant     = 'BP01'.
                      it_goodsmvt_item-stge_loc  = 'BPF2'.
                      it_goodsmvt_item-move_type = '101' .
                      it_goodsmvt_item-entry_qnt = 10.
                      it_goodsmvt_item-entry_uom = 'KG'.
                      it_goodsmvt_item-mvt_ind   = 'B'.
                      it_goodsmvt_item-po_number = '4500000020'.
                      it_goodsmvt_item-po_item   = '10'.
                      it_goodsmvt_item-material  = '50'.
                      APPEND it_goodsmvt_item.
                      CALL FUNCTION  'BAPI_GOODSMVT_CREATE'
                        EXPORTING
                          goodsmvt_header  = wa_goodsmvt_header
                          goodsmvt_code    = wa_goodsmvt_code
                        IMPORTING
                          materialdocument = wa_bapi2017_gm_head
                        TABLES
                          goodsmvt_item    = it_goodsmvt_item
                          return            = it_return.
                          write:/ it_return-message.
    And the return message is : Material document data and PO data do not match (Material)
    Any idea of what might be the problem?
    Thanks

  • Goods receipt for subcontracting order! BAPI_GOODSMVT_CREATE

    I wanna use BAPI "BAPI_GOODSMVT_CREATE"  to create goods receipt for subcontracting order.
    But it says that this combination is not possible.  Combination of my movement type and this BAPI.
    What can i do to solve it?
    thanks in advance.

    >
    Julia Nikiforva wrote:
    > I wanna use BAPI "BAPI_GOODSMVT_CREATE"  to create goods receipt for subcontracting order.
    > But it says that this combination is not possible.  Combination of my movement type and this BAPI.
    >
    > What can i do to solve it?
    >
    > thanks in advance.
    Might work
    report zbapi_goodsmovement.
    parameters: p-file like rlgrap-filename default
    'c:\sapdata\TEST.txt'.
    parameters: e-file like rlgrap-filename default
    'c:\sapdata\gdsmvterror.txt'.
    parameters: xpost like sy-datum default sy-datum.
    data: begin of gmhead.
    include structure bapi2017_gm_head_01.
    data: end of gmhead.
    data: begin of gmcode.
    include structure bapi2017_gm_code.
    data: end of gmcode.
    data: begin of mthead.
    include structure bapi2017_gm_head_ret.
    data: end of mthead.
    data: begin of itab occurs 100.
    include structure bapi2017_gm_item_create.
    data: end of itab.
    data: begin of errmsg occurs 10.
    include structure bapiret2.
    data: end of errmsg.
    data: wmenge like iseg-menge,
    errflag.
    data: begin of pcitab occurs 100,
    ext_doc(10), "External Document Number
    mvt_type(3), "Movement Type
    doc_date(8), "Document Date
    post_date(8), "Posting Date
    plant(4), "Plant
    material(18), "Material Number
    qty(13), "Quantity
    recv_loc(4), "Receiving Location
    issue_loc(4), "Issuing Location
    pur_doc(10), "Purchase Document No
    po_item(3), "Purchase Document Item No
    del_no(10), "Delivery Purchase Order Number
    del_item(3), "Delivery Item
    prod_doc(10), "Production Document No
    scrap_reason(10), "Scrap Reason
    upd_sta(1), "Update Status
    end of pcitab.
    call function 'WS_UPLOAD'
    exporting
    filename = p-file
    filetype = 'DAT'
    IMPORTING
    FILELENGTH =
    tables
    data_tab = pcitab
    EXCEPTIONS
    FILE_OPEN_ERROR = 1
    FILE_READ_ERROR = 2
    NO_BATCH = 3
    GUI_REFUSE_FILETRANSFER = 4
    INVALID_TYPE = 5
    OTHERS = 6
    if sy-subrc <> 0.
    message id sy-msgid type sy-msgty number sy-msgno
    with sy-msgv1 sy-msgv2 sy-msgv3 sy-msgv4.
    exit.
    endif.
    gmhead-pstng_date = sy-datum.
    gmhead-doc_date = sy-datum.
    gmhead-pr_uname = sy-uname.
    gmcode-gm_code = '01'. "01 - MB01 - Goods Receipts for Purchase Order
    loop at pcitab.
    itab-move_type = pcitab-mvt_type.
    itab-mvt_ind = 'B'.
    itab-plant = pcitab-plant.
    itab-material = pcitab-material.
    itab-entry_qnt = pcitab-qty.
    itab-move_stloc = pcitab-recv_loc.
    itab-stge_loc = pcitab-issue_loc.
    itab-po_number = pcitab-pur_doc.
    itab-po_item = pcitab-po_item.
    concatenate pcitab-del_no pcitab-del_item into itab-item_text.
    itab-move_reas = pcitab-scrap_reason.
    append itab.
    endloop.
    loop at itab.
    write:/ itab-material, itab-plant, itab-stge_loc,
    itab-move_type, itab-entry_qnt, itab-entry_uom,
    itab-entry_uom_iso, itab-po_number, itab-po_item,
    pcitab-ext_doc.
    endloop.
    call function 'BAPI_GOODSMVT_CREATE'
    exporting
    goodsmvt_header = gmhead
    goodsmvt_code = gmcode
    TESTRUN = ' '
    IMPORTING
    goodsmvt_headret = mthead
    MATERIALDOCUMENT =
    MATDOCUMENTYEAR =
    tables
    goodsmvt_item = itab
    GOODSMVT_SERIALNUMBER =
    return = errmsg
    clear errflag.
    loop at errmsg.
    if errmsg-type eq 'E'.
    write:/'Error in function', errmsg-message.
    errflag = 'X'.
    else.
    write:/ errmsg-message.
    endif.
    endloop.
    if errflag is initial.
    commit work and wait.
    if sy-subrc ne 0.
    write:/ 'Error in updating'.
    exit.
    else.
    write:/ mthead-mat_doc, mthead-doc_year.
    perform upd_sta.
    endif.
    endif.
    FORM UPD_STA *
    form upd_sta.
    loop at pcitab.
    pcitab-upd_sta = 'X'.
    modify pcitab.
    endloop.
    call function 'WS_DOWNLOAD'
    exporting
    filename = p-file
    filetype = 'DAT'
    IMPORTING
    FILELENGTH =
    tables
    data_tab = pcitab
    EXCEPTIONS
    FILE_OPEN_ERROR = 1
    FILE_READ_ERROR = 2
    NO_BATCH = 3
    GUI_REFUSE_FILETRANSFER = 4
    INVALID_TYPE = 5
    OTHERS = 6
    endform.