Goods receipt for shipment

Hi All,
We have a scenario wherein our client when they buy intra/inter company have a special way of sending and receiving goods.
What they do is that when one plant is sending materials to other by 'ocean' a container is loaded with materials from multiple POs. When the container is ready a shipment number is generated and stuck onto the container. Then the receiving plant posts a GR against the shipment number thus saving a lot of time on posting GRs for several different POs. As soon as the shipment number is entered while posting GR it lists down all the materials in the container which is then only physically verified for quantity. One container may contain material from more than 10 different POs with multiple lines.
In future when they have implemented SAP these will be multiple STOs. Does anyone know of any standard SAP solution for this scenario?
Regards,
V S

My client have almost same scenario. I  think this should help you.
This scenario require two step stock transfer.
DO GI from plant for material present in PO's refering Shipment number. So only one article doc will be generated for one container which have ,material from different PO's.
Now at time of GR, use article doc instead of PO and again refer same shipment number in article slip feild.
In case of doubt please provide more details about your exact requirement.

Similar Messages

  • Doing a goods receipt for a customer material that is ASEQ status

    We are needing to find a way to be able to do a goods receipt for a child part in ASEQ status.  Most of our customers will send in their part after disassembling it themselves.  Since we can not receive the part our present process is to dismantle so the system status changes to ESTO and we can receive.  The problem with this is that the end user forgets to assemble the part back and we end up breaking the linkage.
    We have looked into using User Status in the equipment master and have configured that.  However the user status button, nor name shows up in the equipment master.  I have looked at the field selection in IMG and it is not hidden.  I am assuming it is being supressed by a user exit we have.
    Can anyone give me any suggestions on how we can improve the process using SAP for material that is ASEQ status and being able to create an inbound delivery so we can receive in our warehouse for this status without dismatling the unit? 
    We are on ECC

    Hello Kimberly
    You lost me while describing your current process, so  please provide more details as to how you dismantle and reinstall etc.  Also how the part goes back to the customer.
    However I can provide you  clarifications to some questions you raised..
    You see both system and user statuses in the field 'Status' itself. This is the 3rd row in the Equipment display screen under Equipment number and Description. If you see carefully you will see 2 sections, the one on left is system status and the one on right is User status. If you click on the i (info) icon, you will be taken to a screen where you see more info like status and business processes etc.
    ASEQ is a system status and it is determined by what you did ( example dismantling) and can't be changed by you (user). If you see the 'Business Processes' tab, you will also see the this won't allow assignment to a Delivery and so on. So my point is having a user status will not help you. Based on the combination of system and user statuses, some processes are permitted, some not. For example if Goods Receipts are allowed, may be you can receive without an Inbound delivery.  I am mentioning this as a thought initiator, I know you will have a Return/Repair order process including a return delivery.
    I guess you have to systematically prevent the user from  doing whatever they are doing out of turn, e.g., forgetting to reassemble (install?) and for this User statuses can help.
    Let us know your process more in detail and I am sure SAP will have a standard way to receive a child part of a big assembly. Other members will share their practices also.
    Take care.

  • Transaction BORGR: No tolerance on goods receipt for Kanban calloff

    Hello,
    we have the following situation:
    - MM scheduling agreement with tolerance of 10% for under and overdelivery, production supply "summarized JIT call" is set.
    - KANBAN cycle has 1 empty container with a summarized JIT call for replenishment, quantity 10 pieces.
    - ASN has been created with BORGR transaction, it contains: 1 line item for the material with delivery quantity 9 pieces, assigned to this line item is the JIT call with notified quantity 9 pieces as well.
    My expectation was that the JIT call can be booked with 9 pieces as it is inside the 10% tolerance defined for the scheduling agreement. In addition, I expected the KANBAN container be set to full.
    Instead, the following error message is given:
    'Post GR' carried out without success
    (Message no. BORGR215)
    Because of previous error, dispatching is not possible for ID 0180573431
    (Message no. /SPE/ID_HANDLING011)
    Inbound Delivery 0180573431 00010
    (Message no. BORGR210)
    Total of the summarized JIT calls does not match the current delivery qty
    (Message no. BORGR540)
    Changing the delivery quantity and the notified JIT quantity to 10 pieces, the goods receipt is booked correctly.
    I only found the following notes that deal with tolerances but they are outdated, as we are using DIMP release 603:
    https://service.sap.com/sap/support/notes/393421
    https://service.sap.com/sap/support/notes/508215
    Has anybody faced a similar problem or can help me with this?
    Thanks!

    Hello Jiaul,
    Sorry I may have mislead you.  The actual error message is "Goods Receipt for Production Order XXXX can only be made on 2010.08.25 to 2010.08.27".  These two dates are the Start Date and FInish Date for the Production Order in CO03, 
    The Basic Start Date for the current Production Order is  2010.08.25
    The Basic Finish Date for the current Production Order is 2010.08.27
    I think what it means is that you can only Post Goods Receipt for the Production Order only after the Basic Start Date of the Production Order.  Do you know where I can find the configuration for this message?
    Thanks

  • Value of inventory after Goods Issue, before Goods Receipt for open order

    Dear Experts,
    Raw materials R72 and R82 are required to produce Semifinished Product S10.
    Semifinished product S10 is required to produce Fnished product F20
    On 10th August 2011, I created and release a Process Order for material S10 copying component materials R72 and R82.. Goods issue for component materials R72 and R82 were done for this process order using tcode MIGO (mvt type 261).
    It  takes four to five days to properly blend components R72 and R82 to obtain S10.
    It means Goods Receipt for this process order will be done on 14th or 15th August when this blending has been completed.
    Management suddenly issues a directive that stock take should be carried out in the plant on the 12th August 2011, and my process order is still open and cannot be closed ( or goods receipt cannot be done)  because blending is yet to be completed.
    Please how do I take care of this scenario/situation since Goods Issue has been done already?
    How will the Accountants see or get the correct value of inventory?

    When I run WIP Calculation for my Process Order, what will be the effect ? I mean what accouts are updated by WIP Calculation within a period (not across a perion or  at period end)?
    GI values issued to the Process order will come into WIP GL .( Since your client want to know the stock take should be carried out in the plant on the 12th August 2011- we are doing WIP calculation)
    > After  this WIP Calculation is run,  and say about 2days later, Goods Receipt for this process order is to be posted, what steps am I suppose to carry out?
    After GR Made, Run a WIP calculation again for the order so that The WIP from the GL account will get reduced ,now WIP= (GI value + confirmation ) -(GR Value),
    Check in DEV system before doing in PRD,
    On Month end, do the variance calculation and do the settlement

  • Error while doing Goods receipt for process order. Error code: "BS027"

    I am getting error while doing GR for a day whereas previous day(s) GR is already done and also 2 days post that day are also done successfully.
    Error :  ""Goods receipt for prodn. order" is not allowed (ORD XX-CEMTSAL) " (XX = First two characters of plant code)
    Error code: BS027.
    Thanks to all in advance.

    Hello,
    This issue would occur when you want to post a confirmation for a production order. The error message is generated if you wanted to post a backflush for a component and if this component was assigned to a sales order stock. The sales order itself was assigned to a work breakdown structure element which should be debited with the actual costs. However, the business transaction 'Confirm' is not permitted for a work breakdown structure.
    Please look into SAP Note 62367 and 64370
    Hope the information is helpful
    regards

  • Goods receipt for inbound delivery

    Hi,
    I'm using idoc  DELVRY03 in order to post a goods issue. And It's working very well.
    I want to make a goods receipt for an inbound delivery using idoc DELVRY03. When I use this idoc for this (To make a goods receipt), my delivery can't be updated any more (Just like if the goods issue was done) and Its status are updated. And I can't to make the goods receipt manually. But the stock isn't updated, No item document is generated, and the quantity received is still equal to 0.
    Can any one please tell me if there is a special thing I need to do in order It works. And If It's not possible, to make the goods receipt using delvry03, what's the idoc type allowing to do this.
    Thanks in advance

    Hi
    Please try using idoc type DESADV01.
    Please award points if  you find this helpful
    rgds

  • Make goods receipt for the items w/difference after the proof of delivery

    Hello experts,
    I do like to know how finish the process of proof of delivery, when I does have items with differences over the quantities that arrived to my client. For example, one sales order for 20 units. I did the delivery note, and posted the goods issue. Then I did the Proof of Delivery, confirming 19 units and the deviation reasons, saving the document. Then I made my billing document for 19 units of material.
    The deviation reasons was a damage material, my questions is: How does make goods receipt for the items with difference over the quantities after the confirming of proof of delivery?
    Thanks in advance
    Edited by: Johnattan Company on Sep 8, 2009 3:45 PM
    Edited by: Johnattan Company on Sep 8, 2009 3:59 PM

    Hello Chetan,
    Thinking in the process, I have found a solution to do it. If the differences was caused by unknowing reasons, like stolen or whatever reasons and the material will not enter again in the warehouse, we donu2019t need to make any process.
    But if the causes was a broken material, a lapsed date expired or unknowing others reasons as a consequence the material will enter again in the warehouse; I have customized a returns order, and a returns item with the option not relevant for billing to conclude the process.
    Thanks for your help.

  • Problem in picking base value from PO while doing goods receipt for multiple POs

    Hi,
    Our user is trying to post goods receipt for two purchase orders which have same vendor. After the materials of two POs are allocated in the item detail screen and checked the item ok, system throwing error as "Please check the base value of the item is zero" ( also excise tab does not appear for last three line items). This error does not occur when we are trying to do the goods receipt separately for each POs. Only when we do goods receipt for both the POs together, we are facing this error.
    Please let us know what could be the reason. Is there an issue with standard CIN? Any notes to be applied? Please help!

    Refer these notes for the issue.
    1528009 - MAA: incorrect distribution of goods receipt
    quantities
    and
    1677707 - Determining the valuation type for stock transport orders
    at the time of GI
    For Excise tab not appearing, you have to check J1ID for "Material-ChapterId combination" and "Cenvat Determination".
    Regards
    Binoy

  • Post Goods Receipt for Inbound Delivery using WHSCON IDoc

    Dear All
    Currently I am working on a big project dealing with EDI connections to our logistics partner for the Export business. The entire message flow between Lindt and our partner should be via EDI. Our SAP release is (still) 4.6c.
    We will create two kinds of despatch advice messages, one for inbound deliveries and one for outbound deliveries for customers.
    I would appreciate your support in the following problem that I am facing with the inbound delivery scenario:
    We create stock transport orders (purchase orders, POs) for the goods intended to be delivered into the plant at our partner
    We create a delivery (type NL = replenishment delivery) for this POs
    As soon as we post the goods issue we send the despatch advice (as EANCOM D96A DESADV message) to our partner.
    At this point the delivery is basically completed, i.e. packing status (PS) and goods movement status (GM / GS) are equal to 'C' (= completed).
    Our logistics partner uses the same EDI message to send us the goods receipts data, e.g.:
    We dispatched 50 units of a product => QTY:50:12
    The partner received indeed 50 units => QVR:50:66
    Please note that we do not use the QVR segment for the quantity difference (between despatched and received quantity) but it contains the received units. This way we avoid negative values in the QVR segment.
    When the logistics partner sends back the DESADV message containing the received quantities (QVR segment) we want to make
    the goods receipts for the products in the original stock transport order and
    upate the message flow in the delivery
    My idea was to transform the incoming DESADV message into a WHSCON.DELVRY03 IDoc based on the documentation in: [Delivery Interface|http://help.sap.com/saphelp_crm40/helpdata/en/e2/654b15a9f411d184ec0000e81ddea0/content.htm]
    In the delivery header control E1EDL18 I used QUALF = 'PGI' (Post goods issue).
    I prepared an inbound WHSCON IDoc according to the documentation mentioned below. I managed to get some feedback from the Idoc processing implying that the system tried to do the goods receipt in the PO but failed.
    To make a long story short here are my questions:
    Can an inbound WHSCON IDoc used for doing both the goods receipt in the PO and the update of the message flow in the delivery?
    Does anybody have an example on how to fill the WHSCON IDoc?
    Or is my approach a cul-de-sac ?
    Kind Regards
       Uwe
    PS: A related question can be found here: Goods Receipt in PO AND Message Flow Update in Inb. Delivery using WMMBXY

    Hi Uwe,
    Can an inbound WHSCON IDoc used for doing both the goods receipt in the PO and the update of the message flow in the delivery?
    The binary answer would be no. You should use WMMBXY or MBGMCR instead.
    But if we are doing goods receipt against Inbound delivery then answer is YES with additionally E1EDL18-QUALF = 'PIC' populated. But please remember no partial receipt is possible against Inbound Delivery.
    We should populate E1EDL20-VBELN with our Inbound delivery number and line item info should go to E1EDL24.
    I have done a similar interface recently where we are doing receipt against Inbound delivery. But our case was a bit complex because we had to support against Inbound delivery. So we had to go for a custom solution on top of IDOC_INPUT_DELVRY.
    Hope this helps. Let me know if you have more questions.
    Regards,
    Rudra

  • Partial Goods Receipt for Inbound Delivery

    Hello Frends,
    We have a requirement to generate partial goods receipt against Inbound delivery created in Intercompany scenarios, however when we analzed there two alternative ways possible -
    1.  Goods Receipt in Inbound Delivery - Transaction VL32N : In this transaction,ssytem allows goods receipt for complete quantity but not for partial quantity
    2.  Goods Receipt reference to Inbound Delivery - Transaction MIGO : In thsi transaction, there is a provision to generate partial goods receipt however system not updating the status in inbound delivery document.
    In this regard, requesting your support on what is possibility to fulfill our requirement, is there any standard SAP approach for this.
    Appreciate your support.  Thanks
    Best Regards,
    Goutham

    Hi,
    Thanks for your quick reply..
    I have a outbound delivery with 100 EA, now system automaticallly generates a Inbound delivery for 100EA using output message.  Now we need to generate partial goods receipt for the inbound delivery, mean first 20, then 40 and the remaing.
    What are the best practices available since when I check from the Inbound delivery,we cannot make partial goods receipt.
    Best Regards,
    Goutham

  • Reverse Goods Receipt for Process Order

    Dear All,
    Please tell me how to reverse the Goods Receipt for Process Order for which already QM is cleared for that Particular Lot.
    But Confirmation is still yet Pending.
    I tried MIGO - Cancel - Material Document. But it is showing a message "Process Order already processed".
    Regards
    buss

    Hi,
    Use t code MB31
    Movement type 102
    Stock type = Unristricted use.
    Reverse by entering above information then you have to manually cancel the inspection lot.
    Regards,
    Vishal

  • Message no. RU 195:Automatic goods receipt for order 619271463 is not possi

    dear expert:
    when i confirm the production order via co15  ,sytstm prompt :
    Automatic goods receipt for order 619271463 is not possible
    Message no. RU 195
    Diagnosis
    Order 619271463 contains several operations, which have a control key which indicates "automatic goods receipt".
    However, an automatic goods receipt is only allowed once per order for the following reason:
    If the automatic goods receipt is posted more than once, this would lead to incorrect stock quantities.
    Procedure
    Check the control keys of the operations in order 619271463. Change the control keys in such a way, that an automatic goods receipt occurs for one operation only.
    production order is confirmed  but it cann't be delivered automatically.
    help me analyse it .
    best reagards.

    Hi,
    In normal scenario in a production order each routing operation will consist a control key with settings for automatic goods reciept.
    So in a production order you can use only one control key with automatyic goods recipt. This will be the last operation of the order. From message mentioned by you it is showing as may u have mentioned auto goods reciept for more than one operation.
    PP01 is normal confirmation control key & PP99 is for milestone with auto goods reciept. PP95 - w/o milestone with auto GR.
    Please check control key & correct it.
    Hope this will help you.
    Regards,
    Ashish

  • Error: GR "Goods receipt for purch. order" is not allowed (ORD 4000048)

    Hi gurus, can anyone please help me
    while doing service entry for the PO with account assignment F and Item Category D
    our client is facing the error
    "Goods receipt for purch. order" is not allowed (ORD 4000048) MSG no: BS007
    Diagnosis
    The current status of object 'ORD 4000048' prohibits business transaction 'Goods receipt for purch. order'.
    Procedure
    To process business transaction 'Goods receipt for purch. order', you first have to change the status of object 'ORD 4000048' to allow the transaction 'Goods receipt for purch. order'.
    This gives you an overview of the system and user statuses that affect the transaction. A transaction can only be executed if there is at least one status that allows it and there is no status that forbids it.
    Anyone can give the solution please
    Guruk

    hi dear all
    Really thanks for your prompt reply.
    i solved this issue, as what u said, it is not released in IW31, at the time of PR creation. So i asked the User to go to IW32 anc choose the apprpriate order and change mode and click on Flag Icon to release.
    Any way i awarded points for your support
    Thanks
    regards
    Guru

  • Inbound IDoc MBGMCR02 Goods receipt for delivery status 51 Reference Docume

    Hello IDoc experts,
    I try to do a goods receipt for an inbound delivery using inbound IDOC MBGMCR02.
    The inbound delivery is linked to only one PO, and the bill of lading number in the delivery is unique.
    Still I get the following error message:
    Reference Document Number is existing at more then one Purchase Order!
    The inbound delivery is linked to only one PO, and the bill of lading number is unique
    These are the fields I fill:
    E1EBP2017_GM_HEAD01
            PSTNG_DATE:  '20100421
            DOC_DATE:   '20100421'
            REF_DOC_NO: 180000008 (number of the inbound delivery)
            BILL_OF_LADING: 4500001992 (I have put the PO number in the bill of lading number in the delivery)
    E1EBP2017_GM_ITEM_CREATE
            MATERIAL: CH0463COEUR\1 (material number of the first item of the delivery)
            PLANT: ST01
            STGE_LOC: 0001
            MOVE_TYPE: 101
            VENDOR: 100080
            ENTRY_QNT: 100
            ENTRY_UOM: PCE
            ENTRY_UOM_ISO: PCE
            PO_PR_QNT: 100
            ORDERPR_UN: PCE
            ORDERPR_UN_ISO: PCE
            PO_NUMBER: 4500001992
    E1EBP2017_GM_ITEM_CREATE1
            DELIV_NUMB: 180000008
            DELIV_ITEM: 10
    Do you guys have any idea where I go wrong?
    Kind regards,
    Rudy Zijp

    I hope you filled the moment typ indicatior E1BP2017_GM_ITEM_CREATE.MVT_IND to 'B'.
    and E1BP2017_GM_CODE-GM_CODE  to '01 and for Bill of lading field also pass delivery nymber.
    please try with these inputs.
    Regrds,
    Suresh
    Edited by: Suresh Reddy Avutu on Apr 29, 2010 4:40 PM

  • BAPI/FM for goods receipt for a Sub Contracting PO

    Hi All,
    Is there a BAPI/FM to perform goods receipt for a sub contracting PO? BAPI_GOODSMVT_CREATE can not perform goods receipt for sub contracting PO.
    My purpose would be served if I can know how to find the component material of a subcontrcting PO.
    Please help.
    Thanks,
    Rana

    Thanks for your input
    Well, I wanted to ask if the BAPI is capable of performing GR for SC PO. Instead of a question, that went as a statement :-). Your recommendation helped me to find answer to my question.
    Thanks again.

Maybe you are looking for

  • MSI Big Bang II Advice...

    I just put my system together (ordered MSI X79 Big Bang II motherboard  from newegg early june 2013)and everything looks good (haven't installed an OS yet) Before I go any further, is there anything I should look out for? What Bios do I want? Will be

  • Need Help in Exporting using DBMS_DATAPUMP

    Hi, I need a help in building the Procedure where I will use DBMS_DATAPUMP for Export purpose. I have a scenario where there is TABLEA and TABLE B. TABLE A structure: CODE VARCHAR2(10),NAME VARHAR2(50) TABLE B structure: DEPT VARCHAR2(10),CODE VARCHA

  • Report Server: Error initializing printer

    Oracle Report Server 6.0 for Windows NT doesn't work. When I try to call any report I get next error message: Error message returned from Reports server: REP-3002: Error initializing printer. Please make sure a printer is installed. The printer is in

  • How would I do nightly, automated builds using cvs, svn and XCode

    Here's what I'm trying to do. We have source code repositories. Some are svn, the rest are cvs. What I'd like to do is, each night, do cvs/svn updates, and then open those projects in XCode, and build the projects. Secondarily, I'd like to have build

  • EXBED and BEDINV in the table J_1IEXCDTL

    Hi, We have one depot plant, so as per std. procedure first we make as per PO first we make the GR then ref. to GR number RG23D register updation with J1IG transaction ref. to GR number and all the bed amount, ECS and SECESS with amount and % enter m