Goods Receipt of BOM material- cost centre required for components

I have created a subcontracting PO with a BOM material.
When trying to post a Goods Receipt the components of the BOM material are required to have a cost centre assigned to them.
The profit centre for the BOM material and components are the same. The BOM material does not require a cost centre to be entered in the Goods Receipt as the Profit Centre is allocated to account assignment tab.
Why does the profit centre assigned to the components not default in the account assignment, why is the system asking for a cost centre?

I receive this error when trying to post the material document:Field Cost Ctr is a required field for G/L account 1000 7023000200
Message no. F5808
Diagnosis
The value for field "Cost Ctr" in the interface to Financial Accounting is an initial value but you are required to make an entry in the field selection for G/L account "7023000200" in company code "1000" linked to the field selection for posting key "81".
System Response
Error
Procedure
It might be an error in the configuration of the G/L account field selection. The initial application, used to call up the interface must otherwise define a value for field "Cost Ctr". If this is the case, contact the consultant responsible for the application used to call up the interface or get in contact with SAP directly.

Similar Messages

  • Goods receipt to a material document

    Hi!
    Does anyone know the purpose of goods receipt to a meterial document (i.e., the reference for goods receipt is a Material Document)?
    Thank you.
    Marlon
    Edited by: Marlon Manto on Jun 22, 2011 7:59 AM

    Hi,
    Materials document is the proof for a goods movement. Materials document will created for GR,GI ,TP & other goods movement processes.
    If you want Materials document for GR to differentiates , then you can check in t.code: MB51 with movement type.
    Here you can find Materials document for GR WRT PO with movement type 101,Materials document for GR without PO with movement type 501 &  Materials document for GR without Production Order with movement type 521.
    Regards,
    Biju K

  • How to identify Sale Order costing is required for Items in Sales Order

    Howstandard cos estimate*w to identify Sale Order costing is required for Items in Sales Order?
    On which criteria we can conclude Sale Order Costing is reqd ?
    ? * means what and wat is the purpose and how to chk for the Item in Sales Order, either it is required or not**.

    Hi Dharamveer,
    The best way is to make the order qty is equal to the quantity delivered. This way, when some one looks at this order in future - they think that the order was for X and the delivery was for X qty is completed. They will not know the background of the issue unless they go through change log. Even in change log, they see that the Ord qty was adjusted, but may not understand why?
    The good practice is to make order qty equal to already delivered qty.
    Create a new line for the remaining qty and reject the same with appropriate reason for rejection. This way, any one can understand the background , the reason for rejection easily. Hope it helps !

  • Duplicate depedent requirements for components

    Hi Gurus,
    We have KANBAN separate storage location which is a not a WM managed location for which we have defined control cycles for SFGs but their components are managed in other than KANBAN location which is WM managed storage location.
    Now the issue is we have independent requirements created for those SFGs to plan components as KANBAN storage location is excluded from MRP the requirements are not created for SFGs but dependent requirement passed to components as the storage location is MRP relevant, apart from these there are independent production orders are created for KANBAN SFGs through KANBAN demand board  for which another dependent requirements are passed to components by which for  components we can see duplicate dependent requirements are created.
    We cannot create KANBAN control cycle for WM managed location so the reason we have separate storage location for SFG control cycles and we cannot maintain the SFG components in non WM managed storage location.
    Is there any possibility to create control cycles with WM managed location? Or is there in any way to control having created only one dependent requirement for components through standard configuration or through any enhancement?

    I have an workaround for this situation ''We can have demand created for components itself rather than creating for SFGs to plan them in advance and we can control dependent requirements creation for components from KANBAN production order with MM MRP setting''
    Any body have any better solution than this?

  • GR/IR Clearing-Goods Receipt Accounting Doc - No cost center or IO

    Hi All,
    For the GR/IR Clearing Account, users did the Goods Receipt. GR document post to FI and created Accounting Document. When we look at GL line item display of GR/IR clearing account (FBL3N), we cannot see the cost center or internal order on Goods Receipt doucment ( document type WE).
    When we look at Invoice ( document type RE), we can see cost center or internal order on invoice accounting document.
    Anyone know how to capture cost center / internal order from Goods Receipt to FI accounting document during GR time ?
    Thank You
    Alex Lee

    Hi
    Thank your for reply. We don't have invenntory.
    GR:
               Dr. Expense ( cost center )
                      Cr. GR/IR Clearing Account
    IR :
                Dr. GR/IR Clearing Account 
                      Cr. Vendor
    In the FBL3N , GL line itme display for GR/IR Clearing Account, it shows cost center on  invoice document (doc tyep : RE) , but we cannot see cost center on goods receipt document (doc type : WE) .

  • Goods receipt with no  std cost

    How can I stop a goods receipt for a Shop order when the part in question does not have a released std. price?

    Hi,
    You might want to consider using user exit MB_CF001 to provide the check on material price during goods movement. Within this user exit, you will get the information on material number, movement type (MSEG-BWART), and movement indicator (MSEG-KZBEW).
    You can determine if the material is a standard price by retrieving the value of MBEW-VPRSV. You can determine if the transaction is GR against order by checking the movement type (the value should be 101) and movement indicator (the value should be F). If these conditions are met, you can then trigger error message, preventing the material document from being posted. Once the standard price is corrected, the user exit will allow the material document to be posted.
    Hope this helps.

  • Goods receipt note WRT MATERIAL DOCU NUM

    hi thr
    can any one plz tell me the senario of goods receipt not with respect to material document number.
    thanx

    Hi Ashwini,
    Actually if you want to do the Goods receipt note with respect to Material document in MIGO,
    First you need to check whether the reference document which is created should created with option of "Others" like it should not be created with any reference like w.r.t PO, inbound delivery, reservation, transfer order etc like that,
    It should be created as others (MB1C) using movement types 501, 561, etc .
    These documents can be used as reference document if you want to create a another document based on reference document.
    Hope you understand.
    rgds
    Chidanand

  • Goods receipt indicator is PO is not set for Stock -item

    Hi Gurus,
    I have created PO for a raw material but it is so strange that the Goods receipt indicator in Delivery tab is not set (it is greyed out also). Then, I cannot do Goods receipt for PO anymore.
    Normally, this Goods receipt indicator is set automatically if material is stock-item.
    Can anyone help me find out the reason?
    Thanks,
    Hong

    Hi,
    For the material type RAW MATERIAL ,  aganist your plant ( Which is given in the PO) have you activated QTY UPDATE check box?
    Check in the transcation OMS2
    Select your material type and click on the Qty update / Value update ( Which is in the left hand side window).
    Check QTY UPDATE check box aganist ur plant code. If not activated, check / activate check box.
    If this check box is activated, then only GR checkbox is activated in the PO - Delivery screen
    Regards
    KRK

  • Restrict GL / Cost Centre combinations for users/roles?

    Hi,
    Please could someone advise if it is possible to restrict Cost Centre and GL Account combinations during PO creation for specific users/roles?
    For example:
    Valid Combinations:
    CC A1  GL 99
    CC B2  GL 88
    Scenarios:
    Create PO with A1, 99   -> Allowed
    Create PO with B2, 77  -> Not Allowed
    I've found a related post, but not exactly my requirement - any other thoughts?  Or has anyone done this themselves?
    Authorisations - User Profile for purchasing - restrict by cost centre

    Use the user exit MM06E005 to control the CC and G/L for user dependent.
    to do that - ask ABAPer to create the custom table for user, CC and GL combination and let teh user exit read the combination from the table and give a error or warning based on your requirements.

  • F-92 posting error- Cost centre locked for revenue posting

    Hello,
    While I am trying to post F-92 (Asset Retirment), I get the following error:
    "Cost center AR011001 in controlling area 1000 is locked for revenue postings on 25.11.2009."
    How do I go ahead?
    Thanks,

    Hi Eli,
    Thanks for the quick response.
    I am aware I can remove the lock indicator in the cost centre master data.  We had earlier uploaded cost centre master data through LSMW .
    My question is  once the lock is removed , we will be able to go ahead and post to the cost centre .The Gl account used here is CLEARING REVENUE ACCOUNT FIXED ASSET and when we assign the cost centre with lock indicator we get the message
    "Cost center AR011001 in controlling area 1000 is locked for revenue postings on 25.11.2009"
    Would like to know the impact (apart from effect on reporting) once the lock indicator is removed.
    Thanks,

  • WBS element&Cost center required for Account 11111000000 Profit center 1234

    Hi,
    While realeasing the billing document we are getting the subjectted error.
    We do maintain the cost centre in the sales order, however no idea about the WBS elemnt.
    Pls help.
    Regards,

    For information, if you want to post any data to WBS element, the Account Assignment indicator should have been ticked which you can do in OPSA or try in T.Code CJ20N where you can input manually.
    For more information on WBS element, go through this thread
    [WBS Element  |WBS Element]
    thanks
    G. Lakshmipathi

  • Goods Receipt of a material in Quality aswell as Unrestricted stock

    Hi All,
    When receiving material against PO from different vendors ,stock from few vendors should go into Quality stock whereas receipts from other vendors should be received into Unrestricted stock.
    Please suggest how to achieve this.
    Regards

    Hi,
    Thanks for your replies but i had made the selections as per senthil's suggestions but still the Inspection lot is being created and the stock is posted into Quality.I am not sure which CTRL Key to select i have tried the underlined ones from below ..should i be selecting some other key and are there any more settings that need to be done.
    0000 No active functions
    0001 Vendor release (with Warning)
    0002 Vendor release, tech. delivery terms
    0003 Vend.release, tech.del.terms, QA agreem.
    0004 Vend.rel,TechDelT.,QA agreement,certif.
    0005 Vendor release, certificate
    0006 Delivery release, documentation required
    0007 Delivery release, invoice block
    0051 Vendor release, certificate,Inv Block
    0052 Vendor release, Inv Block
    0053 Inv Block
    0054 Vendor release, certificate, error mess
    0055 Vendor release, certif, inv block, error
    0056 Vendor release (with Error)
    0057 Certificate,Inv Block (with Warning)
    0058 PBB - VenRel/Cert + Sub Spec Mgmt
    0059 PBB - VenRel/Cert + Packing/SMI
    0060 certificate required
    8888 Vendor block inactive
    9999 All functions active with error message
    Regards

  • How to enter / Post Goods receipt of Raw Material from subcontractor

    Dear Experts,
    As standard subcontracting procedure, Raw Material Transfer posting is made to Subcontracting Vendor
    and the Semi finished material [Assembly] is received from the subcontractor.
    If in case extra or by any reason, raw material stock is with subcontractor, he want to return the raw material stock.
    How to receive raw material stock from subcontracting vendor and how to handle subcontracting challan transactions in SAP ?
    Thanks in Advance !

    Hi,
    >>Receive the RM using MB1B / 542
    >> Reconcile using J1ifq
    >> Complete challan using J1if13
    Thanks,
    Rajoo

  • Material cost by period  for WBS/ Project

    Hi, I am working on one reporting requirement.
    Requirement is like that material  actual cost & quantity  which issued to WBS/ Project in perticular period.
    I am having some idea. Like COEP table via value type 4 I can fetch the actual cost for the porject.
    How to fetch the cost for only material consumbed by proejct.
    Please extend your help. so, I get more clear path to work ahead. 
    Regards
    Nitin P.

    Hi,
    Pls check Automatic Posting account (OBYC).
    There is G/L account maintained againt Valuation Class in Transaction GBB.
    When u assign material which is having maintained Valuation class , G/L account gets automatically picked up.
    using this u can get values from COEP.
    Regards,

  • Cost Center required for Mvt Type 309

    Hi,
    In the standard configuration of Mvt Type 309 without special stock indicator, is the cost center field required?

    Hi
    Cost center is not a mandatory field for movement type 309.
    Material to material transfer posting is possible only if both the materials are maintained in the same base unit of measure.
    The following additionally applies to material-to-material transfer postings:
    • They cannot be preplanned via a reservation.
    • They can only be posted from unrestricted-use stock of the issuing material to
    unrestricted-use stock of the receiving material.
    • They can only be posted in a single step.
    Hope it helps
    Thanks/Karthik

Maybe you are looking for

  • Safari will not open CNN at all

    Yesterday I noticed that Safari will not open CNN.com it just times out and gives me the following error message. Safari can't open the page "http://www.cnn.com/". The error was: "lost network connection" (NSURLErrorDomain:-1005 I tried Internet Expl

  • Excise not coming in PO

    Hi I have created a tax code but when I am using it in PO then for some materials the excise amount is coming correctly (12% on 100% of base amount ) and for some materials it is coming as 0%.I have maintained the required settings for the materials

  • How do I edit playlists on my iPod from a new PC

    My iMac is in storage until we move. I only have access to my husband's PC. I have a shuffle. I need to edit a playlist on my shuffle. My itunes on the PC does not have the same songs as my shuffle, and I can't seem to download those songs or edit an

  • When i try to open Safari, it says it quits enexpectedly. How can i fix this so that i can use Safari again?

    Whenever i open my safari browser, it says "Safari Web Content quit unexpectedly."  I just did a software update to get the latest update of Mountain Lion, and now safari wont work.  Also, about a week before the update, i would get the same message

  • Errors: Business partner of organizational unit 50024549 has no address

    Hello all, I have this message error if I try to create a user in EBP browser.And that I verify this organisational structure and I have a good shipping and billing adresss. Please help me resolve my problem. Thanks