Guidelines to line up multiple clips in split screen

The screen in a video series I'm doing needs to be split into 3 parts, each one with a different clip (multi cam recording).
Since I need to work with lots of different clips it would help to be able to align them perfectly every time again.
Also, snapping a clip window to the outer edges of the canvas would be great.
Screenflow does this, is this possible in Final Cut Pro X?
Thanks a lot for your help!

Thanks a lot, Russ!
I'd need Final Cut to recognise the borders of other clips in the canvas and snap to them, just like in Pages, Sketch etc.
I thought this was pretty much an Apple thing.
However, my workaround is simply copy and pasting a lot of cropping values all over my clips...

Similar Messages

  • Multiple clips + split + delete = wrong result

    Some time ago I encountered a rather weird problem in iMovie:
    I imported several (3 to be exact) HD clips from my camera (each about 60 minutes long) into a single iMovie project. As I wanted to discard several parts of the last clip, I split that clip into several parts and then deleted the unwanted parts. The result however was that some piece of footage of the length I was "removing" was removed somewhere else (I can't remember where exactly but can most probably reproduce it if someone needs to know) while the unwanted part was still shown on playback.
    Has anyone else experienced this problem in iMovie 6, and if so, is it solved in a later version ?

    Hi
    Only times my Mac starts to behave in an occult fashion is
    • when iMovie pref file get corrupt - trash it and eventually start a new account
    • or when free space on internal boot hard disk goes low eg under 10Gb. Then my Mac
    get's confused and does a lot of silly things.
    • Or when I try to do something even the program maker didn't think of. So easy to
    take things for granted. Then figuring out that it wasn't the way to do it.
    Else
    *Not knowing the origin to Your problem - General approach when in trouble is as follows:*
    • Free space on internal (start-up) hard disk if it is less than 10Gb should rather have 25Gb
    • Hard disk is untidy: Repair Permissions, Repair Hard disk (Apple Disc Util tool)
    • Garageband-fix. Start it and Close it. Re-try
    • Delete iMovie pref file - or rather start a new user/account - log into this and re-try
    iMovie pref file resides:
    Mac Hard Disk (start-up HD)/Users/"Your account"/Library/Preferences and is named: com.apple.iMovie.plist
    While iMovie is NOT RUNNING - move this file out to desk-top.
    Now restart iMovie.
    • Third party plug-ins that doesn't work OK (not relevant for iMovie’08)
    • Program miss-match: iMovie 5.0.2, up to Mac OS X.4.11 AND QuickTime 7.4.1 - is OK
    • Program miss-match: iMovie 6.0.3 or 6.0.4, Mac OS X.4.11 AND QuickTime 7.4.1 - is OK (might work under Leopard)
    • Program miss-match: iMovie’08 v. 7.0.1, Mac OS X.4.11 AND QuickTime 7.4.1 - is OK (might work under Leopard)
    • Screen must be set to Million-colors
    From LKN 1935: (in this case = iMovie HD (5), I tried it all, but nothing worked.
    Your answer (above) has been helpfull insofar as all the different trials led to the conclusion that
    there was something wrong with my iMovie software. I therefore threw everything away and reinstalled
    iMovie from the HD. After that the exportation of DV videos (there has not been any problem with HDV videos)
    to my Sony camcorders worked properly as it did before.

  • How can I edit multiple clips with different frame rates on the same timeline

    how can I edit multiple clips with different frame rates on the same timeline

    You do not want to edit material from different frame rates on one timeline. You CAN do this, but it is a very bad idea - and this is why.
    Once you establish the sequence frame rate - lets say it is PAL material at 25fps, any material that you drop into the sequence other than 25 fps will have to be changed to play at 25 fps. If the material you add is NTSC (29.97), FCP will DROP 5 frames per sec to bring the frame rate down to 25 fps. Which 5 get thrown away? Every 6th one. This yields a funky cadence that becomes even more complex as as there are also interlaced fields (DV/NTSC is an interlaced format). Oh, and by the way, the image sizes are different as well. DV/PAL has 576 lines of resolution and DV/NTSC has 480. FCP has to scale up the NTSC to fit the PAL frame.
    You do not want FCP adjusting these things on the fly. You want to do a thoughtful (and time consuming) conversion so that you end up with all your material in one format with the best possible image from the conversion process. Compressor can do an adequate job with Frame Controls turned on. The Natress Standards Conversion FCP plugin is another way to go. A third option is to find a post house that can do the conversion for you using a hardware based process.
    The good news is, once everything is in the same format, editing it will be painless and the output process very quick.
    Whatever frame rate/ image size you select, I'd suggest using ProRes for the codec. It is 4:2:2 color and will withstand color correction and composting with much more grace than any variant of DV based codecs.
    Have fun.
    x

  • Move multiple clips at once

    I often have to move multiple layers of clips or still images and keep their position relative to each other. In AE and in PS I can select multiple layers and drag their position around freely, but in Premiere Pro, I can only drag one layer at a time.  Bouncing to AE is not a solution for me because everything I work with needs to be timed with multiple layers of audio at all times.  Nesting is not a solution for me because I need to be able to adjust each layer independently as well.  This is a feature I would use (and did use in FCP) dozens of times every day!  I really need this.  Any chance it's coming in a future update? 

    Hi Chris,
    Hi Kevin, I resurrected this old thread today so I'm not sure if the original poster is still around but thanks for the replies.
    Sure, no problem.
    The After Effects work around is quite long winded for what seems like a very simple task, but I do appreciate your point about how FCP was designed differently from the beginning.
    Indeed, it really seems that way from the outset, but AE launches really fast these days. You can set up these kinds of comps very quickly and be back in Premiere Pro in no time. Remember how Motion and FCP used to work together? I think of it in the same way.
    Sure it would be better if Premiere Pro had all the goodies FCP had (like this feature), but it's a totally different application and so you may have to adjust your expectations.
    I'm sure it's not the case of just changing a couple of lines of code in Premiere, unfortunately! Hopefully the "multiple clip parameter editing" and "horizontal/vertical lock" features can be implemented in the future.
    That's often the case, but the question is then "when would we have the time to write and test that code when there are 800 priorities ahead of it?" The key is feature requests. The more we get for any one feature, the faster it rises to the top of the list of priorities.
    If anyone else would like these please submit feature requests! http://www.adobe.com/go/wish
    You have the right idea. Thanks!
    Kevin

  • How to select multiple clips???

    I am a very avid iMovie user and now this new version has me so confused. I have the basics down, but I can't figure out how to select all clips and dump them into the "timeline" area. I can select them one at a time and place them in the assembly area but that takes forever on a one hour soccer game. Anyone figure out how to select multiple clips or all clips at once?
    Thanks ahead of time.

    Weird seeing this question today after I dealt with this yesterday. I did a movie yesterday that was multiple clips. I was able to select all clips at once and drag the entire thing up to the top window. I just tried to do the same thing again after reading this question and for the life of me, it will no longer allow me to click and drag to select them all. I wonder if this has something to do with the fact that all 10 or so clips I was able to highlight before, were all parts of the same clip when filmed (they were split into individual segments when imported). When I try to combine two clips that are not filmed sequentially, it will no longer allow it. The help menu says nothing about this. All it says is you need to click on the first clip and hold the mouse down and drag it to the end and it will select all. That is not working.

  • How do I create a split screen on a motion clip in Photoshop CS6?

    I have a project due soon and the last requirement is to "create a split screen on a motion clip". Any ideas? Thanks!

    In the time line panel you will either need to split the video by moving the playhead to the location then click the split button. Or you can add another video if you want two different video's playing.
    Because one video is on top of the other you need to scale both videos so they fit the screen. Select one video the press ctrl-t on windows or cmd-t on mac to enter transforms mode. Click and drag the corner to scale the video. Then repeat for the other video. You will also have to move the video's into place.
    When satisfied click enter or return on keyboard.
    Ex. For standard video the document should be (in the USA) 640x480 pixels. (I believe Adobe states it should be 720x480 for video, but this is only an example)
    So, to place two video's side by side each video would have to be divided by 2 for the width. 320x480
    When you move the video's they should snap into place.
    For two video's that stack, the height would be divided by two - 640x240

  • When I move video clip, my audio clips (unlinked) split ??

    I have separate video and audio clips on the timeline (they are not linked).  When I try to move a video clip (or multiple clips at one time), before I let go of the mouse, the audio clip(s) below the video split, so that they are before and after the moved video clip.  They are not linked together.  How do I move a video clip without affecting anything else?
    Thanks.

    This might be helpful from some of my old notes. The ripple behavior can be overcome by the use of the CTRL
    button. However it depends on whether you press CTRL before or after you start moving the clip. When moving clips
    around in the timeline there are 4 basic types of movement Lift, Extract, Insert and Overlay:
    The first two, Lift and Extract have to do with how the clip is moved OUT of it's current position. To see what I
    mean, hover your mouse over a clip in the timeline, then press and release the CTRL key while watching the status
    text string in the lower left of the application window, you'll see that holding CTRL before clicking and dragging
    triggers the extract behavior (which tells the timeline that there is a gap being created that should be closed)
    but clicking and dragging with no CTRL modifier allows the Lift behavior (which tells the TL to ignore the gap)
    The second two, Insert and Overlay have to do with how the clip is placed IN to it's new position, that is,
    whether it is Overlaid over exisitng footage without any ripple movement or Inserted within the existing footage,
    causing any following media (including that on other tracks) to be rippled forward.
    Since there is no way to lock down tracks in PE, you must always be mindful of what this default rippling behavior
    is doing to overlapping media on other tracks.

  • Change duration of multiple clips "as one" overall clip?

    Here's my situation:
    I have a song at 127 BPM. I have a music video (muted sound) at 125 BPM.
    I've spent a long time slicing up clips from the video into different channels and muliple clips to form one timeline (but with many clips and channels lined up).
    I now want to change the overall duration of the video clip to match the BPM of the song (which I should have done in the first place), but the video is, as previously stated, sliced up in mulitple clips in multiple channels. How can I change the duration of all clips at one time, where the end and start of the clips still line up to eachother?
    This would've been incredibly easy if there were a un-nesting feature. Where I can nest multiple clips, change the duration, and un-nest the clips to slices clips with a changed overall duration. (Which is not possible. Yes, I can drag the clips out of the nested clip, but the clips will still have the original duration).
    TL;DR: How can I change duration of multiple clips "as one" overall clip?

    Never mind. I've found a alternate solution. I used a time stretch calculator at http://mp3.deepsound.net/eng/samples_calculs.php and time stretched all the clips to match the BPM of the song. Now I only need to snap all the clips, which can be done one by one, but I found this trick to snap all the clips at once: http://vimeo.com/27428526.
    I'll just let this thread stay open so other with the same problem can find this

  • PO line with Multiple Tax Codes

    Hi Everyone,
    Please guide me about the following query:
    If a PO line is created with amount :Rs.10000.
    Is it possible to apply Tax Code 'X' on 90% of the amount and Tax Code 'Y' on rest 10% of the amount?
    If yes, then please guide how?
    Please guide.
    Thanks and Regards

    Hi
    SAP STD system will not allow multiple tax codes for Single line item of Purchase order - Split the material into multiple line items and do enter the tax code respectively according to your requirement
    Regards
    Anand

  • I can not copy a transition between multiple clips in premiere 12

    Following the procedure described in the manual, I can not copy a transition between multiple clips in Premiere 12.
    Premiere copy a single transition in the clip closer to the time bar.
    I had tried in various ways but to no avail. The problem can be solved?
    Thanks for the help.

    Sig. T.T. Romano,
    javascript:void(0)
    I finally figured out that you can not copy a transition between multiple clips at the same time and it will copy one at a time.
    What seems strange, however, because in Pinnacle, which I used until recently, this could be done, and Adobe is not less than Pinnacle.
    Maybe Adobe does not consider interesting this thing, or maybe it is inserted in Premiere Pro. How, for example, in the titles, the ability to animate multiple lines. In Premiere Elements missing but I knew that in the Pro's.
    I thank you anyway for your helpful answers.
    Vincent Chiti

  • Export multiple clips from one timeline

    Hi,
    Is there a way to export multiple clips into separate files from the timeline. So, basically i have a time line with many clips which i need to export to individual files, not one long video. In FCP 7 I would drag all these clips into a new folder and then batch export. But in FCPX?
    Thanks!

    Of course i's  not "half baked". Just because it lacks a feature that you want doesn't make it so.
    There isn't  as NLE out there that doesn't attract  complaints from some users about its functionality in some area or other.
    Fortunately, the fully functional  trial version gives us a good chance to find out first-hand whether the design meets our requirements.
    Russ

  • Moving multiple clips together on the timeline

    I have multiple clips on a time line and need to move them together either right or left to accomodate new additions.
    Thank you for any help and God Bless,
    Mark A. Sam

    There are a number of ways of "selecting" multiple clips (including a Tool)
    Lasso them as a group
    Shift-Select them individualy to create a group selection
    Ctrl-A   select all of them ( targeted tracks)
    Track Tool
    and Keyboard short cuts too...
    Select ....and move , nudge, cut, copy, paste, drag......

  • Copy edits to multiple clips malfunction?

    When I "copy edits" to multiple clips weird things happen.  If the clip has been cropped or transformed the frame is restricted.  Not sure if I can explain this well but here goes.
    I have transformed a clip and cropped the edges
    I command-option-c to copy the edits
    I command-option-v to paste to 3 other clips that are a similar setting to save time
    I go to the next clip to add a couple other edits or backgrounds and move the clip in the view but now the crop boundries are all screwed up and the area that I previous cropped is visable but the "crop-lines" are where I set them.  If I move the clip in the viewer, left or right or up or down, it moves within a stagnant cropped field.  If I drag the "crop-line" its way off the edge of the clip.
    Hope that makes sense.  This is something I did many times before the update with not issues.  It saved a lot of time but now I have to do these edits to each clip.  What happened? 

    Are you using FCPX?  Forget the Command-Option-C for copy the "effects".  You want to copy attributes.  Just use Command-C, the normal copy command.  To Paste Attributes, use Shift-Command-V.  You'll have more control over things.
    And make sure the clips you're pasting attributes to have NO effects or tranformations done to them before hand.

  • Edit multiple clips

    Hello
    I want to edit multiple clips at once. For example, change the textcolor, or the line pitch of subtitels. Or change the sound volume of all sound clips in the timeline.
    Is there a way to do this not one by one?
    I have Final cut Pro 7.0.3.
    cheers

    Select the clip with the modifies attributes and copy (command c). Select any or all the clips that you want to adopt the attributes of the copied clip. Control click in one of the clips you're about to change. Choose Paste Attributes from the drop down menu and then check off the attributes you want them to adopt from the first clip. Hit OK and you should be good.
    Russ

  • How to change Opacity Blending on multiple clips...??

    First the problem:
    Whenever I open a Premiere v6.5 project, CS4 does a "conversion."
    Maddeningly, during this process, it changes the Opacity\Blending Mode of every single clip in the project to "Color" instead of leaving it at "Normal."
    Since I am working with Stereo (3D) footage with a different camera on V2 & V1, I always have at least two, and often many more, video tracks (for titles, etc).
    This means I have to go through every single clip on every single video track and reset it to Normal before I can proceed with the project! This can be upwards of 500 clips.
    PITA!!
    1) Does anyone have any idea why this is happening & how to prevent it?
    or,
    2) Is there a way to change this setting in all the clips at the same time?
    Whenever I select multiple clips, no Effect Settings (or whatever Shift 5 is called) appear. Only there for single clips.
    TIA,:-)

    Do one clip, copy (rightclick) the clip, select all the others and paste attributes.

Maybe you are looking for

  • Mass creation of materials

    Hi gurus, I need to create about 200 materials with reference to dummy material through MASS, I selected the table MARA ,data records to be created and entered the ref material and all the material nos to be created in the top boxes, After execution

  • Apple tv airplay

    i am having trouble with the sound on airplay with my apple tv through my macbook pro.  I can hear the audio beeps when i increase or decrease the volume but when i am playing a video, the sound does not transfer.  I had this happen before and i was

  • Local currency in DP

    Hi All. What is the best way to deal with local currency in demand planning? In my scenario, the client requires to adjust demand plan based on a forecast valuation versus budget in <u></u>local currency<u></u>. i.e., Sweden in SEK, UK in GBP Thanks

  • ORA-01152 -- When Bringing Up Standby Database

    Hi All, I'm trying to bring a standbye database on the same server as my primary database. i'm doing this to play around, hoping to do it with PRD using separate servers. I have found several good step by step references for doing this. I'm currently

  • 403102 - Offset takes non-working time of resource into account (OSS notes)

    Hello Friends, I have implemented the OSS notes 403102 for considering the offset value without considerding the non working time of the resource. but as i have implemented the sample code given there(copy & Paste) the functionality seems to be not w