Help needed Regarding Project Server - 2013 Workflow

Hi All,
I am new to Project server 2013 Workflow, hence please help me regarding this. Pardon me if this question is too trivial. 
I have created a project type associated with a workflow and my workflow is as follows :
So I am not doing anything here, I am just testing the workflow as mentioned by technet site : http://technet.microsoft.com/en-us/library/dn458865(v=office.15).aspx
But it is mentioned that, after a minute or 2, the workflow state will change, also they have mentioned to press the Submit button.
But in my case, the workflow is not moving to next stage [It just says 'The workflow is still processing - which never changes after hours] or I am getting the submit button (Submit button is disabled on the ribbon). Below is the state of my workflow :
PS : I have made the user added to Portfolio managers group as well. But still I am having this same issue. 
The Workflow manager is installed properly, and it is working fine in case of List workflow. I am facing the issue only wrt Site workflow for Project server 2013.
Please help me to solve this issue.
Thanks,
shanky

Hi Kiran,
I am now facing issue while assigning a task to a person in the workflow.
I am having a person named say 'John' , who is included in Project Manager as well as Portfolio Manager.
And I am using a workflow as :
Stage : Conceptual
Assign a task to John (Task outcome to Variable: Outcome5 | Task ID to Variable: TaskID3 )
Transition to stage
Go to Approval
But this is again giving issue as :
Workflow Internal status : Cancelled
Details: System.ApplicationException: HTTP 401 {"error":{"code":"-2147024891, System.UnauthorizedAccessException","message":{"lang":"en-US","value":"Access denied. You do not have
permission to perform this action or access this resource."}}}
PS : I have used the same Sharepoint admin account for 'Account Name' in ‘User Profile Sync' , Is this causing the issue? Please let me know.
Thanks,
Shanky

Similar Messages

  • Workflow status web part gives error when going back to previous stage (using GO TO) in Project Server 2013 workflow

    Hi,
    Workflow status web part gives error when going back to previous stage (using GO TO) transition activity  in Project Server 2013 workflow.
    Please guide how to create a workflow which restarts from a desired stage.

    Thanks for your prompt reply....
    It gives following error
    Workflow Status
    This Web Part was unable to load.
    Information that may be useful in solving this problem was written to the Unified Logging Service (ULS) log on the Project Web App with the following ID: e95a9c9c-1f68-90d7-0a3e-5951df70fec6
    For more information, contact your Project Web App administrator.
    what do you mean to restart the Project Server 2013 with different project name, please elaborate....

  • Project Server 2013 - Workflow Execution " Submit button is grayed out. "

    Dear All,
    As i was in progress to making workflows in sharepoint designer this is my first project of implementing project server 2013 and executing the workflows,in the continuation of this i followed below mentioned link to go through the process of WORKFLOWS but
    got some issue
    LINK: http://msdn.microsoft.com/en-us/library/office/jj163494(v=office.15)
    ISSUE: Is that the SUBMIT Button is grayed out after saving initial proposal plan. Snapshot is attached.
    I have checked in/out process along with this gone through re-executed the whole process same result occurred.
    Suggestion/Help needed... 
    REGARDS DANISH DANIE

    Hi Danish, 
    Its a common thing which users are experiencing.
    When you create project from workflow click on Submit it take time for transition before transition it check all the condition which you have set for workflow stage. As per your screenshot it is waiting for details in PDP (Provide details of the proposed project) 
    when you click on submit it push data into the database,sometimes it send e mails to stakeholder then it use exchange and take times to send e-mails and for transition too.
    When you/user face this issue ask them to wait for some time or close the file then reopen. 
    In the screen workflow is waiting for Project detail information in PDP that is why it is still in process and not going to next stage.
    kirtesh

  • Send email is not working in share point desinger 2013 for project server 2013 workflow

    Hi,
      How to configure email for project server 2013. i have created workflow where i am sending email. It is not sending it.
     i have set outgoing mail setting. Tasks are created in my workflow but mail is not sending.
    Thank you for helping us.
    Thank You
    Vinay

    Hi,
      How to configure email for project server 2013. i have created workflow where i am sending email. It is not sending it.
     i have set outgoing mail setting. Tasks are created in my workflow but mail is not sending.
    Thank you for helping us.
    Thank You
    Vinay

  • Project Server 2013 Workflow Task Permissions Breaking Inheritance and Causing Workflow to Cancel

    I have an on-premise instance of Project Server 2013 with a workflow that includes an
    Assigned Task to assign users to Approve or Reject a WF phase. The workflow successfully assigns the task and notifies the user of the task. However, after (or possibly just prior) the user Approves the task, the workflow is automatically
    cancelled. 
    By default, the WF Task List is set to inherit permissions. After Approving an item, it appears that the list permissions automatically breaks inheritance, causing the workflow to cancel. This occurs somewhat regularly after resetting permissions to inherit
    from the parent site. Although there are stretches where the issue doesn't occur. I'm not sure what's causing the list permissions to change. 
    This issue occurs in both our Dev and Prod environments. Has anyone experienced this issue with permissions breaking inheritance automatically?

    Hi Vic,
    According to your description, my understanding is that the workflow was cancled when you created a workflow with Impersonation Step to break inheritance permissions.
    After breaking inheritance permissions, make sure the workflow initiator (the creator) still has least edit permission on the list.
    In addition, please check the workflow history list to find more information about this issue.
    I hope this helps.
    Thanks,
    Wendy
    Forum Support
    Please remember to mark the replies as answers if they help and unmark them if they provide no help. If you have feedback for TechNet Subscriber Support, contact
    [email protected]
    Wendy Li
    TechNet Community Support

  • Submit button grayed out in Project server 2013 WorkFlow

    We published the Workflow in project server'13 through SharePoint desginer 2013 and we used the Microsoft sample workflow. after saving the project information Submit button is in disable mode. So can any body clarify this issue ?
    we tried  the re provisioned the PWA through the above article but still submit button is in grayed out mode.
    Please clarify me where i am wrong?
    Thanks in advance.

    Hi,
    Open your site in SharePoint Designer
    Expand the "Workflows" folder, and the folder containing the workflow you want to fix
    Right-click on the file that ends in "xoml.wfconfig.xml"
    Choose Open With -> SharePoint Designer (Open as XML)”
    Look for the “RulesVersion” attribute
    Change its value to “V1.0”
    Save the xml file
    If you modify the workflow again, you’ll have to change the “RulesVersion” attribute again before saving as an STP as changing the workflow increments this
    attribute value which has to be reset to "V1.0".
    Source: http://suguk.org/forums/thread/3942.aspx
    Hope this will help you.
    Jalal Blali MCTS, MCITP

  • How to send previous stage of a project in project server 2013 workflow

    Hi
     I have taken three stages. First stage i have submitted fields it goes to second stage. Now on basis of condition if it fails the condition it should go to stage1.
     Can it be possible. If it possible pleas guide me. I am using Project server designer 2013.
    Thank You
    Vinay

    Vinay,
    What you are looking for is a State-Machine Workflow. In SharePoint 2013 Designer, the "Stages" model will allow you to do this. See my example below. However, if you workflow logic is overly complex,  Visual Studio might be a better tool to build the
    workflow.
    Cheers,
    Prasanna Adavi, Project MVP
    Blog:
      Podcast:
       Twitter:   
    LinkedIn:
      

  • Project Server 2013: I am using Project Server Permission Mode and need help with permission assignments?

    Hi 
    Project Server 2013: I am using Project Server Permission Mode and need help with permission assignments?
    How can I change Permissions for the individual users to see specific projects or all projects in project center and to see specific quick launch items?
    For Example: if i have 4 users, A, B, C and D. what i want is:
    User A can see everything and act as a project manager or Admin.
    User B can view all projects in project centre but can change the schedule or resource assignment etc.
    User C can only act as approver of projects and can view all projects in project centre.
    User D can only view specific projects for which permissions are given.
    can i have some expert help in sorting and understanding permission modes... as i was playing with project server mode permissions and can't figure out how to apply the above scenario to set of my user.
    Thanks in Advance
    Cheers
    AJ
    Ajay Kumar

    Hi Ajay,
    Please refer to this link for detailed explanations about PS2013 security model. 
    http://technet.microsoft.com/en-us/library/cc197638(v=office.15).aspx
    Actually, it will take a couple of days to explain in detail the security model that is a fundamental and tricky aspect of every PS implementation. But basically, you NEVER set permissions for a single user. You have groups in which your insert users. Groups
    define "what users can do". Then you associate groups to a corresponding category. Categories define "what user can see". Thus the association of a group with a category will set "what the user can do on the objects he can see". Then, for more advanced security
    level, you can use the RBS that will consist in "branches" in which you'll insert users. Based on those branches, you'll customize categories to fine-tune what user can see (for projects and resources) depending on the RBS branch and level.
    I'd advice you to start "playing" in a test environment with the default categories/groups that might probably cover your need.
    Concerning your 4 users:
    user A : add him to the "administrator" group. Be careful that you're mentionning either project manager or administrator, which are 2 groups/categories with totally different permissions level.
    user B : basically can see everything and change everything? it could be in the project manager group, assuming that there are no project visibility restrictions on the category via the RBS.
    user C : waht do you mean by "approver"? Workflow approvals? Then it will be the portfolio manager group. Task update or timesheet approval? Then it is another long topic: please refer in the documentation to the "status manager" and "timesheet manager"
    concepts. There are not related to the security model. In a few words, the status manager is the owner of the project plan, is defined for each task and approves tasks updates. The timesheet manager is an attribute defined for each resource in its parameters
    and approves resource timesheet.
    user D : you have to define which permission level must be given to this user. Basically it could be a team member that will see only projects he's in the project team. Note that team member cannot interact with the project plan in another way than submitting
    timesheets and/or tasks updates which must be approved.
    Once more, those are large and complex subjects that require a deep dive into your business model and tons of tests in a test environment.
    Hope this helps.
    Guillaume Rouyre - MBA, MCP, MCTS

  • Saving Error in Project Server 2013, Need Help!

    Hey All,
    I am running into issues with a Projects saving from Project Pro 2013 to our Project Server 2013 Farm.
    It is strange, when someone tries to save a project out of Project Pro 2013 to Project Server, it will run through the "Synchronizing Data to the Server", and then bombs out with error
    Job Type: Save
    Error ID:9000(0x2328)
    The project could not be saved to the server, Etc..
    My understanding is that this is a generic save error that could mean many things.
    In the ULS logs under "Active Cache Save" , I am getting:
    "Cancelling correlation 1339927b-e9e5-e311-941d-00155d2bc10d as save is an overwrite or resubmit"
    What is strange at this point is if I check the project back in, and re-open/re-checkout the project, and try to save again, it is successful in saving.
    Just a few details about the environment:
    Project Server Version: 2013 RTM (In the process of upgrading)
    SharePoint Version: 2013 RTM (In the process of upgrading)
    Project Structure: One Master Project with all other projects being subprojects of the master
    Published Status: All Published
    SQL Version: SQL Server 2012 SP1
    User Count: About 5 currently
    Deployment: 1 WFE, 1 APP Server, 1 SQL Server
    It is just odd, as it seems to be completely random. We have tried clearing caches out to see if that resolves it but it did not. It is just odd that it takes two saves for it to actually work correctly, and is problematic as the many times they are saving
    from the master and it bombs out there.
    I am not sure how it could be an issue as it is usually just a single user working on the individual subprojects.
    Maybe it is an issue in the RTM? I couldn't find any info in any of the CU's or SP's that addresses this directly
    Has anyone seen this, or have any suggestions?
    MS Support has not been any help at all.
    Thanks all

    I have heard of issues with Master and Sub-Projects and both being published to Project Server, as a rule it is a feature I learnt to avoid as a result of bad experiences with earlier versions of Project Server.
    Whilst this will not resolve the issue you have encountered the following suggestion may help you avoid pain in the future and leverages the potential of Project Server to represent common attributes for projects.
    Typically a Master/Sub Project environment is intended to reflect projects that are commonly aligned - it is not unusual for a Master Project to represent a programme and for there to be multiple sub-projects forming the programme - there can be programme
    level events that have multiple predecessors from multiple sub-projects. 
    Rather than create a master and sub-project situation I would suggest looking to define two Enterprise Custom Project fields to assist with such situations. The first being a Project Field called Programme that has a look up table with a list of current
    programmes you can select from. The second Project Field would be a Programme Status Field  with an associated lookup table with 3 values, Master, Sub-Project, Standalone.
    You can have a project represent the Master (Programme) project and open it and all sub-projects in the programme (albeit this would have to be a one by one action to begin with). With all the projects open go and open a New Window in Project Professional
    and elect to include all the open projects in the new window - this will create a new project with all the selected projects showing as
    "embedded objects" and then create dependencies from sub-projects to programme level events in the Master Project (I would suggest what I call
    "one way traffic" when creating "cross project dependencies" to avoid further headaches). Close the project, you will be prompted to save changes which you should do but do not save the new window
    "container" project. The dependencies across the projects will persist - in each project you will be able to see external successors - tasks in the master project. In the master project you will be able to see external predecessors.
    In PWA you can create Project Centre Programme views that filter to exclude projects that ARE Standalone and group them by Programme and sort by Programme Status Field - this will ensure that the "Master" sits at the top of the pile for each programme grouping.
    Just a suggestion - I hope the issue you have encountered is resolved soon.
    Dominic Moss | MAPM Microsoft Certified Technology Specialist | Our Newsletter:
    PM News Project Server Specialists
    Project Server PRIME | Twitter:
    @Twitter | Facebook:
    @Facebook | Linkedin:
    Wellingtone

  • How to handle PSW approval task in project server 2013 through declarative workflow VS 2013

    Hello,
    Plz explain in detail handling PSW approval task in project server 2013 through declarative workflow VS 2013
    bcoz when using am posted on with this error when i try to approve the item
     "This list item  has not been created by the workflow.you cannot apply this content type"
    any help would be appreciated!!!!
    Thanks regards, Vignesh.

    I am also experiencing issues with this.  After the approval task is completed, the Workflow gets cancelled with the following message
    RequestorId: 60d96368-4cb4-b059-8086-604972a92e60. Details: System.Collections.Generic.KeyNotFoundException: The given key was not present in the dictionary. at Microsoft.Activities.Hosting.Runtime.Subroutine.SubroutineChild.Execute(CodeActivityContext context)
    at System.Activities.CodeActivity.InternalExecute(ActivityInstance instance, ActivityExecutor executor, BookmarkManager bookmarkManager) at System.Activities.Runtime.ActivityExecutor.ExecuteActivityWorkItem.ExecuteBody(ActivityExecutor executor, BookmarkManager
    bookmarkManager, Location resultLocation)
    All other desired workflow actions work as expected.  Emails are sent, project is moved from stage to stage, however as soon as the workflow approval task is completed, either Approved or Rejected, the Internal Status is changed to Canceled and the
    workflow fails.
    What is interesting is when the Approval task is completed, the approver will receive an email notification that the task was CANCELLED or DELETED....
    not COMPLETED, which is what would be expected.
    Has anyone seen this - any potential resolution?

  • Workflow in Project server 2013 online not going particular stage after Approval

    Hi All,
    i have created workflow using sharepoint designer 2013 for project server 2013 online. and i have also set the approver after the first stage. when i create a project using this workflow, project is created successfully and the approval task also go for
    a approval to specific user. and i have set the property that after approval it has to go on specific stage. but the problem is when user approve the task it shows approved but my stage in workflow is remain same. it is not going to any stage. 
    i don't know why this type of problem is occur. 
    FYI, i have created same workflow for Project server 2013 on premise(Which is installed in my server) and
    it is working fine but when i want to deploy this workflow in
    project server 2013 online its giving error.
    so please help me to solve this type of issue.
    Thanks

    I am also experiencing issues with this.  After the approval task is completed, the Workflow gets cancelled with the following message
    RequestorId: 60d96368-4cb4-b059-8086-604972a92e60. Details: System.Collections.Generic.KeyNotFoundException: The given key was not present in the dictionary. at Microsoft.Activities.Hosting.Runtime.Subroutine.SubroutineChild.Execute(CodeActivityContext context)
    at System.Activities.CodeActivity.InternalExecute(ActivityInstance instance, ActivityExecutor executor, BookmarkManager bookmarkManager) at System.Activities.Runtime.ActivityExecutor.ExecuteActivityWorkItem.ExecuteBody(ActivityExecutor executor, BookmarkManager
    bookmarkManager, Location resultLocation)
    All other desired workflow actions work as expected.  Emails are sent, project is moved from stage to stage, however as soon as the workflow approval task is completed, either Approved or Rejected, the Internal Status is changed to Canceled and the
    workflow fails.
    What is interesting is when the Approval task is completed, the approver will receive an email notification that the task was CANCELLED or DELETED....
    not COMPLETED, which is what would be expected.
    Has anyone seen this - any potential resolution?

  • Need to create a TASKS page with a filter default in PWA Project Server 2013 (Online)

    Never done this so, I am wondering How to go about or what I would need to create a simple PWA page like "Tasks" in Project Server 2013 online where it default to a filter that is set to not equal to the user that is logged on?
    \Spiro Theopoulos PMP, MCITP. Montreal, QC (Canada)

    Hi Spiro,
    The "my tasks" page or "my timesheet" are automatically filtered on the user currently connected. Unless you are using workarounds such as status manager or delegation, I see no way to bypass this.
    Hope this helps,
    Guillaume Rouyre, MBA, MVP, P-Seller |

  • Error during project server 2013 The property or field 'StartDate' has not been initialized. It has not been requested or the request has not been executed. It may need to be explicitly requested.

    Hi sir,
    when I have try to fetch the value of project start date and finish date and some other field value , I have recived error message like The property or field 'StartDate' has not been initialized. It has not been requested or the request has not been
    executed. It may need to be explicitly requested.
    I have used client context for project server 2013.
    I have also load and execute query.but fail to resolve it Please suggest me and provide solution.
    vijay

    Hi,    
    If you use the Include<TSource> Method in the Load method, we will retrieve only the ids of items in this query, so
    the listItems.ListItemCollectionPosition will not be initialized.
    You can use the <ViewFields> tag in CAML Query to specify the field values to return with each item instead.
    Best regards
    Patrick Liang
    TechNet Community Support

  • The Stage Gate Workflow get suspended in project server 2013

    Hi,
    Getting following error when i am trying to create an stage gate project/workflow in project server 2013. The submit button in
    the ribbon gets disabled and when i see the workflow status it is suspended. and getting following error message. 
    RequestorId: d5f04432-bd27-3da1-0000-000000000000. Details: RequestorId: d5f04432-bd27-3da1-0000-000000000000. Details: An unhandled
    exception occurred during the execution of the workflow instance. Exception details: System.ApplicationException: HTTP 401 {"x-ms-diagnostics":["3001000;reason=\"There has been an error authenticating the request.\";category=\"invalid_client\""],"SPRequestGuid":["d5f04432-bd27-3da1-bc57-8ce72d9f5e43"],"request-id":["d5f04432-bd27-3da1-bc57-8ce72d9f5e43"],"X-FRAME-OPTIONS":["SAMEORIGIN"],"SPRequestDuration":["153"],"SPIisLatency":["0"],"Server":["Microsoft-IIS\/8.0"],"WWW-Authenticate":["Bearer
    realm=\"2a5d48f2-f71d-4589-a6ae-ab6c0d30fafd\",client_id=\"00000003-0000-0ff1-ce00-000000000000\",trusted_issuers=\"00000005-0000-0000-c000-000000000000@*,[email protected]0d30fafd\"","NTLM"],"X-Powered-By":["ASP.NET"],"MicrosoftSharePointTeamServices":["15.0.0.4481"],"X-Content-Type-Options":["nosniff"],"X-MS-InvokeApp":["1;
    RequireReadOnly"],"Date":["Thu, 04 Jul 2013 11:20:43 GMT"]} at Microsoft.Activities.Hosting.Runtime.Subroutine.SubroutineChild.Execute(CodeActivityContext context) at System.Activities.CodeActivity.InternalExecute(ActivityInstance
    instance, ActivityExecutor executor, BookmarkManager bookmarkManager) at System.Activities.Runtime.ActivityExecutor.ExecuteActivityWorkItem.ExecuteBody(ActivityExecutor executor, BookmarkManager bookmarkManager, Location resultLocation)
    Could anyone help me to fix this issue and reason why the Stage gate workflow isgetting suspended.
    Thanks,
    Sunitha

    Check your User Profiles and make sure that the user's domain is correct. We've seen workflows suspend with 401 errors when the User Profile Service syncs with AD and pulls the wrong domain name - for
    example if your FQDN is corp.company.com and the user logs in with company\username, UPS might have corp\username instead. Hence a 401 error...
    Here is a link that includes the steps to fix this:
    http://social.technet.microsoft.com/wiki/contents/articles/18060.sharepoint-20xx-what-if-the-domain-netbios-name-is-different-than-the-fqdn-of-the-domain-with-user-profile.aspx
    Neall

  • Configure Workflow Manager 1.0 in Project Server 2013 with FBA

    Hi,
    Please suggest the ways to configure Workflow manger in Project server 2013 where PWA using FBA
    we have tried for below situation, but no luck!!
    The workflow manager configured using windows login account, we are associating a FBA site with workflow manager which is 
    Register-SPWorkflowService -SPSite 'http://FBAsite' -WorkflowHostUri 'http://workflowmanagerapplication:12291'
    Following steps are taken care while creating workflow.
    We have added users to the user service profile services
    User profile synchronization is started
    The user by whom we are logged is available in User Profile list
    we are not running workflow with share point system account
    Final step full synchronization of User Profile Application
    Below the error we are getting when workflow run
    Resume this workflow  
     RequestorId: 879e36f9-9db0-3c16-0000-000000000000. Details: An unhandled exception occurred during the execution of the workflow instance. Exception details: System.ApplicationException: HTTP 401 {"Transfer-Encoding":["chunked"],"X-SharePointHealthScore":["0"],"SPClientServiceRequestDuration":["440"],"SPRequestGuid":["879e36f9-9db0-3c16-a91c-356d29becb34"],"request-id":["879e36f9-9db0-3c16-a91c-356d29becb34"],"X-FRAME-OPTIONS":["SAMEORIGIN"],"MicrosoftSharePointTeamServices":["15.0.0.4605"],"X-Content-Type-Options":["nosniff"],"X-MS-InvokeApp":["1;
    RequireReadOnly"],"Cache-Control":["max-age=0, private"],"Date":["Sun, 15 Jun 2014 12:44:03 GMT"],"Server":["Microsoft-IIS\/7.5"],"WWW-Authenticate":["NTLM"],"X-AspNet-Version":["4.0.30319"],"X-Powered-By":["ASP.NET"]}
    at Microsoft.Activities.Hosting.Runtime.Subroutine.SubroutineChild.Execute(CodeActivityContext context) at System.Activities.CodeActivity.InternalExecute(ActivityInstance instance, ActivityExecutor executor, BookmarkManager bookmarkManager) at System.Activities.Runtime.ActivityExecutor.ExecuteActivityWorkItem.ExecuteBody(ActivityExecutor
    executor, BookmarkManager bookmarkManager, Location resultLocation)

    Hi Mafeer,
    Since this issue is related to Project Server, I would like to recommend you to post there for more effective support:
    Project Server General Questions and Answers
    Thanks for your understanding.

Maybe you are looking for

  • How to hide columns in each page of SSRS report for grouped tablix

    Hello all, I have a requirement like when SSRS report (used row grouping)is exported to EXCEL 1)  Each report page should be exported to a separate excel sheet 2) Each sheet will have different columns (that is some columns will hide in sheet2, sheet

  • Cascading lovs in af:table

    Enviroment: Oracle Jdeveloper Release 2 (11.1.2.00) I have a simple model : country - state - county - city - zipcode (with their associations; view links and foreign key in the database end). using ADFbc. and lovs for all related fields. when I run

  • Simultaneous clearing of one GL account (F-03)

    Hello Experts, The system issue an error message when several people try to clear at the same time the same account via transaction code F-03. Is there a way around this standard message ? My client has a huge number of lines that cannot be automatic

  • NOCOMMIT in hr_infotype_operation not working

    Hi, I am using HR_INFOTYPE_OPERATION, and passing nocommit as 'X', still the record is being created. Have searched on SDN, but could not get the asnwer, Can anyone please help me. Thanks and Regards Manu

  • Error Code 2 on updating template links

    When I attempt to update the links to my templates I receive an error message: Error accessing file "...\Templates\PageTemplate.dwt", file not found (error code 2). The error comes up three times as some 22 pages are being updated. I imagine that whe