Help on LSMW for extending materials to storage location

Hi Friends,
Please guide me with steps in LSMW to extend material master data to different storage location with same plant using tcode MMSC.
Thanks in advance
Smitha

You should not do LSMW on MMSC, this does not make much sense.
Use standard given mateial master import procedures, like BAPI, which is the easiest procedure to create just one view.
By the way, you can do it easily with MM17, except you have to maintain individual values líke bin description.

Similar Messages

  • LSMW for extending materials to new set of plants

    Hello All,
    Our requirement is to extend some hundreds of materials to a set of few plants. Can this be done in LSMW? Or should BDC be used??
    Please elaborate on this.
    Regards
    Mahesh

    Hi Girish,
    How can I extend materials to a new plant and Sales Org.  through LSMW?
    I use the Standard Batch Object 0020, program RMDATIND for creating new Materials the first time (this qworks fine), but there is no option 'Extend to existing material'  or there is no field called Reference Material...
    Maybe it is because we use internal numbering of the new Materials that makes it unpossible to extend materials to existing material-numbers?
    Thank you, regards, Walter.

  • Define Shipping Data for Stock Transfers Between Storage Locations

    Hi Guru,
    Can i know what is the purpose to maintain Customer, SHipping data for each storage location for the STO between storage location?
    Purchasing --> Purchase Order -->
    Set up Stock Transport Order-->
    Set Up Stock Transfer Between Storage Locations-->
    Define Shipping Data for Stock Transfers Between Storage Locations

    The Sales org, Distribution channel, Shipping point, Vendor and Customer are maintained to created the delivery.
    It is for the transfer of stock between storage locations with any movement type.
    Eg: When you do a 311 movement type from Sloc A to Sloc B, then it will create a inbound delivery with the Vendor specified for Sloc A and an outbound delivery from Sloc B with the Customer specified assuming the customer and the vendor as the Plant.
    You have to create a internal Vendor and Customer.
    Hope it helps.

  • Help required -for MRP Run at storage location level

    Hi ,
    we need to have separate MRP fro two storage locations with direct procurement from Storage locations. Right now we have MRP run at Plant level for all the storage locations. we donot want the materials in these two storage locations to be planned at Plant level only with Separate storage locations. Plant level MRP will run for the other storage locations .
    I have created separate MRP areas for the storage locations & activated MRP for MRP Areas client level. material masters for the two storage locations have been asigned the MRP areas & maintained the MRP area data in material master .
    When we run the MD01, the Planned orders are getting created at both MRP areas plus at the Plant level.we donot want the planned orders creation at Plant MRP area level-only at the storage location level for those two storage locations MRP areas.
    Can anybody guide me -how to achieve that ? Did we miss any configuration?
      I tried to maintain scope of planning & getting error for parallel processing .
    Do i need to maintain parallel procesing with servers ?
      Pls need your input on this. Any help will be highly appreciated .
       Thank you in advance.
        Regards,
        Krish.

    Hi,
         Go to IMG settings 'Materials Management + Consumption-Based Planning + Planning + Define Storage Location MRP per Plant' Enter your Plant, It will show list of storage location in that Plant, then select 2 in 'MRP Indicator' field for storage location for which u want to plan seperately.
    Hope It will clear Your Problem
    Regards
    Sunil Kumar

  • Authorization for extending materials master to a plant.

    I want to give the authorization for extending the the existing materials to a particular plant. I dont want that this person should change any thing while extending the same.
    How can i do that
    Atul

    if you extend something, then you do not get the screens that are already maintained, hence one can just enter new values when doing MM01.
    If the same user has MM02 change rights, then he can go into this material and can change anything for what he has authority.
    If you dont want that a user who is extending e.g. accounting views shall have the possibility to change the basic data view, then you must not give him autorization for this view . for this you have authorization object M_MATE_STA

  • Need help with LSMW for ME23N

    Hey Guys,
    I have this problem where i need to do a recording for LSMW for ME23N. This are the steps i took:
    1. Enter ME23N
    2. Click on the Change Button (i can't enter me22n directly to edit when its running a batch)
    3. Click on the Drop down List
    4. Key in a different Item number
    5. Press enter
    6. Select the delivery TAB
    7. Check the Delivery completed button
    8. Save.
    When i run the batch, the problem comes at step 4. I have a batch file with the following format:
    05 4500120382
    The list box, cannot read the number 05. Is there anyway to go around this?
    Thank you

    hi,
    Check it, may be usefull for you:
    Here is the link explaining step by step LSMW
    /people/hema.rao/blog/2006/09/14/lsmw--step-by-step
    http://www.scmexpertonline.com/downloads/SCM_LSMW_StepsOnWeb.doc
    Regards
    Priyanka.P

  • SCAT t-code catt for extending materials - import file?

    want to extend materials to a new plant but not with the MASS transaction.
    apparently SCAT can do this more efficiently.  i'm not sure how the import file should be formatted.  i.e. want to make thousands of finished goods that will have ~ 7 default screens from MM01.
    please send detailed documents to me if you can
    [email protected]
    thanks

    Hi,
    I have send u a soft copy of how to use SCAT..
    Reward Points,
    Thanks,
    KSR.

  • How to extend material in storage location automatically???

    Dear Gurus,
    We have 9 plants in this company.
    Every time we create a material we have to extend it in all plants.
    Because it takes to long to do this one by one with MM01 we use mm17 and we created there a variant that extends the materials in all plants automatically.
    Then we have 3 storage locations for each plant. we use MMSC: enter storage locations collectively, to extend each the material in all the storage locations of the company 9x3 = 27. This takes too long as a procedure.
    Is there a way to automate this procedure, via rutines, codes, variants, ABAP etc??? and how should I do that??
    Thank you in advance

    Dear Friend,
    In customization spro>>MM>>inventory management>>Plant parameters>>select your plant >>click on create storage location automatically
    click that one, if your not extended the material to the particular storage location and doing the goods receipt to the particular storage location  system  will allow you to do that
    Regards
    Pramod

  • Report for material documents with storage location

    Hi gurus,
    I would like to know if there is a report to display material documents but in the same screen display storage location from and storage location dest.
    Thanks for your help.
    Regards.

    Hi,
    You can use MB51 or MB59 with customised layout selection for your requirement.
    With regards,
    Ajay.

  • PO number not displaying for STO PO between storage locations in VL10B

    Hi Experts
    I have created a STO PO for stock transfer between 2 storage locations.
    The PO has been created correctly - along with the "Shipping" details aptly.
    However, when I execute VL10B along with the PO, the output screen doesn't show the PO created.
    I have checked various discussions and verified the same. However, I am unable to create the outbound delivery for the PO.
    Please help me on this.
    Best Regards
    Sudhi

    Remove everything from the selection screen (including shipping point and delv. date). Just put the PO in the Purchase Order tab. Check all the other tabs, material, user role etc for extraneous/incorrect info.
    Does the PO appear then?

  • Material block for sale in plant-storage location level

    Dear experts,
    Please help me how to block a material to sale in plant-storage location level.
    Thank you.
    Regards,
    Badruddoza

    The standard sales block (MVKE-VMSTA) in material master is valid for sales organisation / distribution channel combination (VKORG, VTWEG) - this means you cannot do it for Plant / SLoc combination,
    What does it mean to block it at plant / sloc level? Generally in SO you do not specify the storage location. Or you are speaking about MRP also? In this case you could use SLoc-MRP (with proper availability check in delivery) for your material but the problem is that a plant might be assigned to several sales area and this SLoc would be hidden for them also.
    Could you please specify what would you like to achieve, what sales block means according to you?
    Regards,
    Csaba

  • Purchase info record for PO determine by Storage location

    Dear Guru,
    Can you please advice when during the creation of PO, is there possible to determine the Purchase info record by the Purchasing Org, material, Vendor as well as "Storage Location".
    Reason,
    Sometime we need to raise the PO those customer who will be exempted from the governamt VAT or duty which the goods has to delivery to the country Bonded warehouse.
    I created 2 Storage location;
    1.) 1000 for general WH
    2.) 2000 for Bonded Wh
    So i would like to know if we can create 2 different info record determine by Storage Location?
    Thank you very much,
    Regards
    Chee Wee

    Hi
    In Standard SAP it is not possible

  • Location required for stock within a storage Location

    Dear All,
    Can we have location concept to identify different stock location within as Storage Location. We are only using MM module and not using WM Module.
    Is there a option to maintain location concept to identify stock located at different location in a storage location only in MM Module.
    Regards
    Vikas Sehra

    Hi,
       As you know, the same can be very well mapped using WM. If you are not using WM, you may check the following option.
       If you are using same location for a material within a storage location, you can maintain the location as "storage bin" in the material master - "plant data / stor. 1" view as shown below:
       The same will be shown in MMBE:
       Please note that this storage bin is not actual storage bin, its just a text field for tracking the storage area. It doesnt have any other control.
    Regards,
    AKPT

  • MRP - Create STO for Stockk Transfer between Storage Locations

    Hi Everyone,
    I have a scenario where MRP run should create Planned Order as well as STO for a VSF Requirement. The reason is our Plant has got 2 Storage Locations. One is the Production Storage Location and the other is Warehouse Storage Location. The Planned Order should be for Production SLoc and STO should for Stock Transfer from Production to Warehouse Storage Location. Your suggestions are much appreciated to resolve this issue.
    Thanks,
    Jay.

    new releaes bring new features........
    not all new features can run in old environments.
    I know that companies did already Storage location to storage location STOs in 4.6c but they had z-tables to assign customer numbers at storage location level, and they had changed some  coding to make it happen.
    I am not sure if there is an OSS note that explains the steps and modifications needed......but try to search OSS.

  • STO- delivery document not commiting materials from storage location.

    While creating an STO PO and delivery to move a material from a storage location in Plant 0003 (plant 0003 consists of 30 storage locations and 3 Shipping Points (1 for each of the Depots)), we are facing 0 stock issue.
    We can change the Shipping Point in the STO PO to the Depot the material is coming from but no place to identify the Storage Location from which we are pulling.
    The STO PO commits the material and provides a commit date.
    We are using VL10B to create the Delivery > the Delivery fails and the log says "440000 0010 Only 0 EA of material 772-8760-876 available".  There is material in 3 different Storage Locations in that Plant.
    Does a delivery document consider shipping point only and not the storage location (sloc) inventory?
    Do we need sloc-shipping point tie-up one to one?
    We have inventory in both Storage Locations for MRP and for NO MRP.
    Any advice, not sure if we are missing anything in config!
    Thnx!
    Points will be rewarded.

    Check the following in OPJJ
    The checking rule(for delivery it is B in std SAP) and avaiability check(from material master) combination
    in the storage loc check sub screen
    NO storage loc inspection  check box is activated or not?
    If it is not activated then system will check as per storage loc specified in delicvery, if activated, then system will check and give commitent at plant level
    One more check is
    In table TVKOL, is the storage loc is determined through shipping point/plant/stog condition combination?
    IS so this storage loc is taken for checking