Hide Controlling Area from Cost center in report

Hi Experts,
I have Costcenter as reporting field in BW report. Controlling Area is compunding char for Cost center.
In the report, it shows both values (cost center and controlling area) when i use cost center in query. foreg. KO01/C123456 as key.
(KO01 is controlling area and C123456 is Cost center)
Is there any way to ONLY display Costcenter value in report??
Thanks in advance.
-Abhijit

You can add controlling area IO in the line and hide it (in properties set never display) or you can also insert it in filter with fix value KO01.
Hope it helps.
Regards

Similar Messages

  • Not able to delete Business Area from Cost Center Master: Msg KS022 & KS370

    Hi,
    We have a created a cost center with a business area by an oversight
    (i.e we are not using  BA) and postings have been done to CC, now we want to
    delete the business area from CC master but the system is giving error
    KS134 'Field change Business Area is not possible (transaction data
    already exists)'.
    So we tried to change the analysis period and in the new analysis
    period (which is mid-year) we deleted the BA and during saving there
    are messages KS370 'No fiscal year defined for the analysis period' &
    KS022 'No further processing -> contact your system administrator' .
    We are using V3 as the fiscal year variant which is non-calendar fiscal
    year.
    Please let us know how handle this as we need to delete the Business
    area from the CC master during mid-year.
    Thanks
    VS

    Hi,
    You need to change BA of an already posted against cost center.
    There is a consulting note you should take into consideration:
    62716 KS020 when changing company code, business area The prerequisites of how the business area might be changed during the fiscal year:
    -The change interval is set to period limits
    -There is no dependent actual transaction data in the change interval or afterwards.
    -There must already be an analysis period for the respective cost
    center which starts on the first day of the chosen period. If this is not the case, you can create one with 'Change cost center' - KS02 (for example, by changing the cost center manager).
    Nevertheless if there is dependent actual data already posted in the time frame from the change date and all periods forth it is not possible to change the business area. This is bound to consistency reasons as the business area is stored in the CO-documents.
    If You need to change the business area in this particular period with actual postings You must cancel all actual documents already posted on the cost center between the date of change and all forthcoming periods.
    regards
    Waman

  • CO-PA derivation of Country from Cost center

    Hi,
    I am trying to derive Country for COPA purposes from business area of Cost center. I have creation a Table-lookup rule for first deriving the business area from Cost center. But this rule has Controlling area, Cost center and Date To field as the key field. I am confused which field to enter in the corresponding field of COPA for Date TO field in CSKS table. Can we derive business are through this method in COPA? When i display the characteristic COPA_KOSTL, Origin table and Origin field is coming as blank. Please clarify these two things.
    Regards
    Suresh

    Hi Waman,
    My problem is in case of non project related expenses which we book to Cost center. I can derive country in case of project related expenses from Project itself which has country of project.
    Please clarify if you have an option for doing this.
    Regards
    Suresh

  • Function Area derive from cost center

    Hi, here is a question.
    The function area was input in the cost center master data. Cost center A ( Function area 1000), Cost center B (Function area 2000)
    Then creat a PO with Account Assignment Category(K), Item Category (B), input the cost center A in the PO.
    When I do MIRO, I change the cost center (A TO B), but the function is still 1000, not change to 2000. But if I delete the Function area in MIRO first, then change the cost center, the function area update to 2000.
    There is no default function area in GL account and cost element, also no substitution.
    Is it standard in SAP?  I want the Function area can be updated with the cost center. Any method?

    Here is what SAP help says about this.
    Functional area field for postings - ready for input?
    You can enter the functional area directly when entering G/L account postings, provided the "Functional area" field is shown in the field status group of the G/L account.
    SAP recommends that you do not show the "Functional area" field in the field status group of the G/L account, but rather that you have the system determine the functional area of the account assignment. This eliminates the risk of the user entering incorrect functional areas.
    You said you have functional area in cost center master data.  When you post documents, do you get func. area from the cost center automatically or not?

  • Changing controlling area from single company code to cross company code

    Hi,
    Due to my client requirement, in the middle of the year, we need to change the controlling area from being same as company code to cross company code controlling area. Although the currency is same. We are going to create a new company code. Is the changing controlling area settings possible to do? what are the precautions and changes need to be taken?
    One more question, we need to change the company code when the new company code is created in the system in Cost Center Masters in the middle of the year. Is this possible after changing controlling area from single company code to cross company code. Right now company code is not appearing in the cost center master.
    Thanks & Regards,
    Saidarao

    Hi,
          If both companies having transaction data its not possible,Normally before defining Organisational Strucutre only we have to deside both companies is assigning same controlling are or have to maitain separately for this we have to compare the Fiscal year,Operating chart of accounts ,if both having same then we will assign both the company codes to one controlling area if these two companies having different currencies also its not a problem.When we creating Controlling Area we have to choose option of controlling area as same company code (if one company code one controlling Area) for example if you assigning two companies then we have to use cross company code cost accounting.If u need any further information let me know.
    Regards,
    Satya

  • How to SeeThe Cost Center Budgeting Report

    Hi Experts,
    I am preparing the scnario for Cost Center Budgeting,once we enter the details in the budgeting plan,,we will post to the cost centers as well.after that how can we see the Cost Center Budgeting Report....will it be available in S_ALR_87013611 or anything else????
    Regards
    Sap Guru

    You are right, i.e you can view the budget/planning  report from S_ALR_87013611. But some other reports are available to view the planning data like S_ALR_87013612, S_ALR_87013613, S_ALR_87013614 where you can view the actual vs planning data. You can view only planning data from KSBL, KSBP etc.
    Thanks,
    Regards,
    Ramnath V.

  • Derivation of Funds Center from cost center for Asset PR/PO in FM

    Hello Experts,
    We configured new FM area and relevant BCS settings. It is working fine except PR or PO for Account assignment category A.
    Issue: system is not able derive funds center from cost center in the asset master. cost center is not updated in EBKN table for Asset PR.
    we have maintained the following;
    1. Funds center is activated in Asset account assignments
    2. Maintained derivation rule with function module: FMDT_READ_MD_ASSET
    3. Derivation rule for cost center to funds center also maintained
    If maintain funds center manually in PR it is working fine and consuming budget also.
    Requirement: How derive funds center from cost center assigned in asset. I have verified all tickets raised in this forum, but nothing has answered my question.
    Request you to provide solution for above issue.
    Thanks in advance for support.
    Regards,
    Chalapathi

    Hi Venkata,
    You have two derivation rules, first related to Asset function module and second one is related to CC and FC combination.
    You need to maintain the function module derivation rule first then you need to maintain the derivation rule related to combination of CC and FC. Because first you need to derive CC from asset master and then you need to derive fund center with reference to this CC.
    Regards,
    Ankit Agarwal

  • Profit Center deriviation from Cost Center

    Hi all,
    I have just configured CCA and PCA for one of our new company code.
    I have created 3 cost centers like A, B, C and subsequently same have been created as profit centers too.
    Maintained the profit center in the cost center master data.
    No other derivation rules has been configured so far.
    Now i am trying to do a expense posting with F-02, after entering cost center, system is updating profit center field with a dummy profit center only.
    Even i f a changed the dummy to normal profit center, again system replacing the normal PC with dummy PC.
    I want like...when i enter CC as A, then i need to derive PC also as A for the line item. ( For both expense items as well as revenue items).
    Please suggest.
    Regards,
    Srinu

    Hi Chintan,
    Thanks for your quick response.
    We have already implemented the said SAP note.
    Let me explain my requirement again.
    We have IOA, CCA, PCA active in our system.
    For every expense or revenue line item Internal order is mandatory.
    apart from we have 3 cost centers and 3 profit centers ( 1:1 )
    in cost center master , profit center is assigned.
    1) users are going to decide the cost center, while posting FI direct entries only. So while doing F-02, they will enter CC, and IO manually and at the same time PC should derive from cost center master data ( as it is 1:1 only).
    2) as specified above, we have IOA, CCA, PCA active. In this case IO, CC, PC are to be set as mandatory fields for Field Status Groups G004 and G029?
    Please advise...
    Regards,
    Srinu

  • Vendor - asset - cost center wise report

    Hi Friends.
    Good morning,
    Please let me know vendor,asset  and cost center wise report ( ie for all vendors at a time.)
    Regards
    Srini

    Hi,
    From T.Code: AR02 you will derive your expected report.
    for vendor select dynamic selection and select ORIGN DATA Tab here you will get vendor field.
    Regards
    Viswa

  • Return material from cost center

    Dear All,
    Return material from cost center:- xx, Material:- yyy qty z Pc in inventory. create sales order for delivery.
    They are materiel in prototype in R&D for customer loan
    What is the Process that has to be follows in SAP for this can some explain.
    sapuser

    hi
    is it possible do more description
    regards
    R.T

  • Field Business Area in cost center cannot be changed

    Hello all,
    we would like to change the "Business Area FS" (OB65) field for our
    company code to required. But if we do that, we have issues with 2 of
    our cost centers (ks02, analysis period 01/01/10-12/31/10) that won't
    allow us to enter a business area.
    We get the following error message:
    NA KS134 Field change Business Area is not possible.
    Diagnosis: To ensure of existing data, you can only change object
    Business Area if no transaction data exists in the change period; that
    is, neither plan data nor actual data has been posted.
    I have checked with our accounting and the cost center report does not
    have any data in actual nor budget.
    Somehow I figured out that we do have an entry in table CEKO for this
    cost center for 2010. (se16n). I did some further research and tried to
    test report RKPLNC18 to delete this entry. But I get the message:
    the deletion could not be carried out. The following plan/actual
    records are available...
    Any suggestions?
    Thanks
    Anne

    Hi
    You can change the business area in cost center by changing the Analysis period. If there's any data exsist it is not allow you to change the business area. If else block or eleate the cost center and create a new one ( even though this might not permitted if  data exsist in related to cost center.
    Regards
    Kesharika

  • Allocation of Costs from Cost center to COPA

    Hi
    We are booking costs to a Cost Center with reference to a Primary Cost Element. However, in month end, the same cost has to be transferred to COPA. One of the Characteristics in COPA is also Profit Center.
    The issue is that we can allocate costs from Cost centers to COPA through Assesement Rule, system requirement is for Assesement Cost Element, which is a secondary Cost element. In such a case, the PCA Balances, after execution of Assesement cycle are shown with the Secondary Cost Elements.
    In a case, I have booked costs of INR 100000 in a cost center 103007 against a Primary Cost Element 423101. Since Profit Center 103007 is assigned in Cost Center 103007, the Profit Center Line Items will show a balance of INR 100000 against cost element 423101 for Profit Center 103007.
    After this at month end, we need to allocate costs from Cost Center to COPA. But the requirement is that after allocation also, the balances should be shown against Cost Element 423101 for Profit Center 103007
    Regards
    Sanil

    Hi Sanil
    That is not possible.. There is no "Distribution cycle" available for COPA.. In COPA you can have either an Assessment Cycle or an Indirect Act Allocation or a Template Allocation...
    I dont know about template allocation as I have never used that, but gut feel says even that wont serve the purpose...
    One work around is you allocate from Cost Center to an Internal Order using Distribution cycle... Then Allocate from IO to COPA using assessment... In order to use IO as sender in allocation cycle, use note 605281
    At best, what you can do is to use an Allocation Structure instead of one single assessment cost element per Segment... Using an Alloc Str, you can map, say, GL Accounts for Basic Salary, DA, HRA to one Secondary cost element... This way, create logical groupings of GL accounts and map to multiple secondary cost elements
    But bear in mind, The more you use Secondary cost elements, the more will be the line items in CE1XXXX table...
    Regards
    Ajay M

  • Functional areas vs. cost center groups for cost of goods sales

    What are the benefits of using functional areas over cost center groups when building your p&l for cost absorbtion or visa versa?  Which of the two is recommended?

    Hi,
    1: a P&L statement does not only contain cost-center related postings, you can have different CO-objects (Internal order, WBS-Element,...)but all of them contain the functional area in its master record.
    The P&L reporting structure (created via report painter) can use account groups but restricted to one functional area for porper P&L structure creation.
    Best regards, Christian

  • How to distribute from cost center to profit centers?

    Dear Experts,
    We have created profit centers as per business.  We have certain expenses that are common.  e.g. IT, A/c, HR etc.  We have created cost centers for the same.  Now we want to assign it to various PCs.  How to distribute from cost center to profit centers?
    With Regards,
    Ajeesh S
    Moderator: Please, avoid asking basic questions

    Assign profit center in cost center master data at KS02.  It will directly post to profit center
    Srinivas

  • Transfering the Cost from Cost center to PM Work order

    Hi all,
    We have a scenario.
    we are doing material consumption from storage locaiton to a cost center using 201.
    when the material requirement comes from work order, we are doing reverse consumption posting from Cost center to storage location using 202. and then issue the material to work order using 261.
    Is there any way, that we can move the cost directly from cost center to work order (skipping the storage location in between).
    Thanks in advance.
    Piyush

    Hi,
    I guess Initially you are transferring material (201 movement) from Central Warehouse to Cost Center assigned to each department. After that, if you get any reservation from the particular department work order, you are issuing the components to work order by doing 202 & 261 movements.
    You can follow either one way.
    1. Without doing 201 movement type, once you create a order, based on reservation you can do 261 movement to order from central warehouse directly.
    OR
    2. Define storage location, do the stock transfer between storage locations. While creating maintenance order, assign the concern storage location in the order. So from that storage location, you can do 261 movement. Also by Material valuation, you can find the value of materials as well.
    Regards,
    Maheswaran.

Maybe you are looking for

  • Neo2-F/A64 3000+/Zalman showing 40C at idle in BIOS v1.9!!

    My Neo2-F w/ A64 3000+ Venice arrived last night, along with some other parts (will list full specs below).  The BIOS version that it came with out-of-box is 1.9. When I go to System Health in BIOS, it shows my CPU temp as ~40 degrees C!!  I don't th

  • Batch determination at material level.

    Hello SAPians, I have a question about the batch management at material level. i have maintained batch determination policy at material level in system conversions also get done... now my problem is here ,i want to reassing it to plant level.. please

  • Process Stuck at Start Activity

    I have a BPM process (11g) that is being called by another application as a service. Whenever my process is invoked, it just gets stuck at the Start activity. The invoking application is passing some parameters to the process. Has anyone run into thi

  • Functions DECODE

    DB 8.0.1.... Hi, The decode function is useful for order by, but  I often have problems when table columns differ, e.g. char, number, date. SQL:          Select *          from people          order by decode(:ORD,'N',name,'C',ID_people,date_born); e

  • Process Chain Interrupt Process

    Hi All, I have an interrupt process in one of my process chain. It will wait till one particular event is triggered. It was working fine until one day I manuallly triggered that event from SM64 for some other testing. I dont know how many times that