How can we define time stamp in rough cut planning profile

Hi all
There is no time stamp(From date to date) in Rough cut planning profile and it is just time span (0-5 ,5-10,... workdays) . If I have different capacity for my resource in different intervals how should I define it so that in planning table it can take it to account and show me requirement versus avalilable capacity acoordingly.Note that we are working with repetitive plannig and our resources are lines which have different production rate between each interval.
Regards
Babak Bolourchi

Dear,
In REM you can use planning table through MF50 for your requirement.
For time stamp in rough cut planning profile   please refer my reply from this link,
[Rough cut planning|Rough cut planning profile]
[Link 2|https://forums.sdn.sap.com/click.jspa?searchID=25236413&messageID=6404039]
Hope it will help you.
Regards,
R.Brahmankar

Similar Messages

  • Rough Cut Planning Profile-by Capacity category

    Hai,
    I am creating Rough Cut Planning Profiles in ECC6.0 for use in Standad SOP (S076). In MC35, I don't see a place where I can enter by Work center category- like I want both Machine and Labour categories as I have different times for each category.
    { when I view the rough-cut capacity situation in MC82, system displays both categroies, but it is based on only the hours I maintained for one of the categories- how do I maintain for both categories?}
    Thank you in advance:)
    Sonali
    Edited by: Sonali on Apr 28, 2009 3:05 PM

    Hello Sonali,
    Rough cut capacity planning is used only  for bottle neck resources.Analyze your process and you will come to know for the product group or material which category or machine is bottleneck.
    Create a rought cut planning profile for a production line or Workcenter or PRT or Cost(Relative cost not product cost).
    PS:Roughtcut capcity planning should not be used for all the workcenters.
    Thanks,
    Raj

  • Rough Cut Planning Profile MC35

    Hi all,
    I was trying to check capacity rough cut planning in product group level, so i have to make the RCPP (ROugh Cut Planning Profile) in that product group level using MC35,
    i still confuse with the time span, base qty and the value in resource table at MC35, what is the connection between these 3 value??
    regards,
    MARUFAT

    Hi,
    i still confuse with the time span and the resource table in RCCP MC35
    i enter the time span with value 1, and the resource table column will give value 1,2,3,...
    and when i enter the time span with 5, the resource table column will give value 0-5, 6-10, ...
    if i enter the base qty is 5000 to, with time span value 1, and in resource table i enter for column 1 with value 40 and column 2 with value 50, what is the meaning of that? ( the Resource table use work center with UOM HR )
    regards,
    MARUFAT

  • Error while creating Rough cut planning profile

    Facing the following error while creating rough cut planning profile (mc35) in SOP for product group. "Work center x plant y does not exist for task list type 3". pls advise- do i need to create tsk list for product group? pls advise with tcode to be used.

    pls check the (task list ) usage you have maintained in the Work center.
    In OP45 , pls ensure that for the usage ,
    task list type 3 (Rough cut planning profile) is included.
    If it is not included there , pls include the TL type 3 for your usage and now the prob will get solved.
    Regards.,
    Sheik

  • Rough cut planning profile

    Hi Gurus,
    Our scenario is we have two plants.The sales orders and the PIRs will be created in the Plant 1 and these requirements will be transferred as Stock transport orders to plant 2(with special procurement key) .All the materials will be manufactured in plant2.BOMs and routings are maintained in Plant 2.
    In this case if i want to maintain the rought cut planning profile , how can i map the scenario.
    Please help me in this.
    Thanks in advance,
    Ravi

    Hi Krishna,
    There are two plants.
    Plant 1
    Plant 2
    We will be creating PIRs in Plant 1.There is a special procurement key maintained for material which will say stock transfer from plant 2.
    The below are the steps:
    1. Create PIRs in the plant1.
    2. Run MRP
    3. STO req. will be created in Plant 1 against the PIRs.
    4. As the special procurement key is maintained in material master Planned orders will be generated in plant 2 against these  STOs from plant1.And production will be done in plant 2.
    So, now if i want to do rough cut plannig profile how can i proceed.
    Thanks,
    Ravi

  • Rough Cut Planning Profile in SOP

    Hi,
    Need an input on the Values keyed in to the Rough cut capacity profile? Is there any documentation on the same?
    I have maintained the Time span as 1 work day and the basse quantity as 1. In the resource table, i have keyed in the work center and the unit as H. Now when i maintain a value of 1 under the first day the capacity req is 1 in SOP but when i maintain a value of 1 in day 1 and day 2- the capacity requirement doubles
    Edited by: Karthikeyan Balasubramaniam on May 9, 2008 4:28 AM
    Edited by: Karthikeyan Balasubramaniam on May 9, 2008 4:29 AM

    Hi Karthikeyan,
    The follwoing information given by sap will be useful.
    help.sap.com/printdocu/core/Print46c/en/data/pdf/PPCRPSOP/PPCRP_SOP.pdf
    help.sap.com/saphelp_45b/helpdata/en/a5/63211443a211d189410000e829fbbd/frameset.htm
    Reward if useful.
    Thanks and Regards,
    /N

  • Rough cut planning in SOP for resource levelling

    Hello,
    I am trying rough cut planning in SOP.
    I have created rough cut planning profile for a product group by using MC35.
    The task list exits for the product group.
    In task list , work centre is maintained and the same is given while creating the rough cut profile.
    This product group contains some part number.
    When I try Views--->capacity situation -> rough cut planning--->show.
    System gives error that -
    > No resource load found.
    <u><b>Diagnosis given by system is as follows,</b></u>
    This situation may be caused by one or more of the following:
    •     No PP task list (rough-cut planning profile, rate routing, or routing) corresponding to the Customizing selection criteria has been defined for this material/product group at this scheduling level.
    •     Resources planning has not been configured appropriately in Customizing.
    •     The information structure which you are planning has not been configured appropriately in Customizing.
    System Response
    No capacity load could be determined.
    Procedure
    1. Check that a PP task list exists for this material/product group.
    2. Check that a lot size range has been maintained in the PP task list.
    3. Have your systems administrator check and, if necessary, change the resources planning settings in Customizing for Sales & Operations Planning (the steps "Scheduling levels" and "Routing selection").
    4. Have your systems administrator check that capacity planning has been defined for this information structure in Customizing.
    Please let me know how to maintain the resource planning settings for scheduling level and routing selection.
    Waiting for your reply.
    Regards,
    Ravindra Deokule

    Hi Ravindra,
    You can use t.code mc84 to create a product group.
    Pl follow the following steps to do SOP with product group.
    1. Create a Product group in tcode MC84.
    Enter a percentage for material say X & Y to be produced. X 40% & Y 60%. Total qty will be split in the ratio as per the %.
    2. Create Production Plan in tcode MC81.
    Enter the sales plan qty.
    Then goto menu,edit & choose create Prodn Plan synchronus to sales.
    3. Create Rough cut Planning Profile in tcode MC35.
    4. Enter the Status ,Usage & lot size.
    5. Choose resources tab & then choose work center & enter work center name which you consider as a bottle neck & then enter the unit of measure as 'min'.
    6. Use MC82,
    Choose inactive version and select your version.
    then goto menu->views> capacity situation>show
    7.Check for over loads & adjust your qty acordingly.once the load becomes 100 % save.
    8. Change the inactive version to Active version in tcode MC78.
    ie in the version enter the inactive version & in the target version enter'A00'
    9.In mc82 choose active version, you can see that the plan is activated now.
    10.In the menu choose extras & transfer to demand mgmnt.
    11.You can see the requirement in the md62 transaction.
    12.Then run mrp.
    Also regarding the unit of measure in t.code mc35,
    If you select your resource as 'workcenter' & choose min or hour & then you enter 1(eg) in the first field against the work center. This means it takes 1 min or hour to produce 1pc(base quantity) in that particular workcenter(bottleneck workcenter)
    Reg: Capacity calculation in mc87,follow the eg as above.Enter 1 min as time & base qty as 1 in mc35. Then check in mc87, you will get the load in %. ie if your work center is permitted to work for 8 hours/day & you pass a production plan of 480, then your load will match for 100%.
    Regards,
    Senthilkumar

  • Error while creating rough cut plannin profile using Info structure

    Hi,
    I got the following error while creating rough cut planning profile for Info structure,
    Capacity planning is not possible for this info structure S504
    Message no. MA489
    Diagnosis
    In the planning parameters for info structure S504, no key figure for capacity planning has been entered.
    Procedure
    If you want to capacity planning to be possible for this info structure, you need to enter a capacity key figure in the planning parameters for the info structure in the Implementation Guide.
    The info structure which i used here is created by me. Can any one help me to overcome this error
    Waiting for your replies
    G.Muthamil Murugan.

    Hi addy,
    Thanks for your reply. I have maintained the following Info structure which I created,
    Under characteristic I have maintained the following,
    1.Sales Organisation.
    2.Sales group
    3. Sales office
    4. Distribution channel
    5.Division
    6.Material
    Under Key figure I have maintain the following,
    1. Order items
    2. Production
    3.Sales
    4. Stock level
    5. Target stock level
    6. Day's Supply
    7. available capacity
    8.Target days supply
    I don t know where i did mistake. can you correct me.
    Regards,
    Muthamil Murugan.G

  • Rough -cut plan with capacity requirment calculation

    Hi all,
    We checking SOP with rough-cut plan
    We created Rough-cut profile in mc35 for our bottle neck work center with base quantity -1 and time span - 1
    then we selected new work center (there is no existing cap req). and assigned base unit measure:min.
    and we assigned 1min for each day and saved the profile.
    Now we went to mc88 and checked the material's active version production plan. (period split- DAY)
    in View -> capacity situation -> rough cut planning -> show.
    System calculates some capacity requirement for our production plan.
    Say for tomorrow's date i given 1000 qty - production plan.
    but system showing capacity req
    Work center:  TESTWC3                  Plant: 0001         Capacity:  001
    Info structur  Material          Plant   Order qty     Unit     From              To          Capacity reqmts      Unit
    S076            TESTFERT14    0001  1000.000       EA    29.01.2010  11.02.2010   9000.000              MIN
    with 9000min and cap load more than 652% ( Actuallly  it has to show 1000min as per rough cut plan profile)
    Our available capacity of work center per day - 1380 min
    We cant understand the capacity requirement calculation in MC88..
    Help us out...
    Thanks in advance

    Hi,
    Rough cut planning is genrally done for the group of material say product group, group of workcentre rather than individual material or workcentre.
    As standard, in resource table whatever the value you enter that corresponds to no. of days. Each column represents one day.
    Pl. refer this link for clear understanding of the same.
    http://help.sap.com/saphelp_47x200/helpdata/en/a5/63212e43a211d189410000e829fbbd/frameset.htm
    Madhava

  • How to find the time stamp for delata

    Hi Analysts,
    I am loading data from R/3 to InfoProvider(Cube or ODS) with delta update.
    I have seen nodata was loaded to InfoProvider. But data was available at DataSource. then new delta is started. i want to load the last delta again.
    How to see the time stamp of delta?
    How to load that delta data?
    Please help me in this need.
    Hari.

    Dear Srihari,
    if your last delta failed then you can request it again by calling the same delta infopackage again, it will ask for repeat delta (in case last delta has failed), go and run it.
    this way you can have your delta figurs back, and do upload via PSA.
    Hope it helps.

  • How can we define custom error page in protal application

    How can we define custom error page in protal application, like we define "jsp Error page " in JSPs

    Hi,
    Check these:
    Customization of Portal Runtime Errors and portal standard error codes
    http://help.sap.com/saphelp_nw04/helpdata/en/9a/e74d426332bd30e10000000a155106/frameset.htm
    http://help.sap.com/saphelp_nw04/helpdata/en/ec/1273b2c413b2449e554eb7b910bce7/frameset.htm
    Regards,
    Praveen Gudapati

  • How can I define Double Click Processing in SAP Query ?

    The first question is : How Can I define drill-down for SAP Query report ?
    The second one :  How can I program Double Click in SAP Query report for Different columns like ALV Grid processing ?

    you can attach a repot or at tcode etc in an SAP query using report assignment in SQ01 but as far as i remember you cannot attach multiple reports.
    regards,
    khusro habib

  • How can I force Time Machine to make a complete backup of my Hard Drive.  I just installed a new external drive for Backup since my previous one failed.  Now when I back up, Time Machine only backs up my data folder and the Users folder.

    How can I force Time Machine to make a complete backup of my Hard Drive.  I just installed a new external drive for Backup since my previous one failed.  Now when I back up, Time Machine only backs up my data folder and the Users folder.
    When I start a backup. Time Machine says "Oldest Backup: None; Latest Backup: None", so it seems like it should do a complete backup, but it only does a partial. 

    Hi I'd like to jump in here. Your app showed me this:
    Time Machine:
              Skip System Files: NO
              Mobile backups: OFF
              Auto backup: YES
              Volumes being backed up:
                        Macintosh HD: Disk size: 749.3 GB Disk used: 453.81 GB
              Destinations:
                        Plastic Wrapper [Local] (Last used)
                        Total size: 999.86 GB
                        Total number of backups: 64
                        Oldest backup: 2013-07-24 23:25:11 +0000
                        Last backup: 2013-11-17 01:40:47 +0000
                        Size of backup disk: Too small
                                  Backup size 999.86 GB < (Disk used 453.81 GB X 3)
              Time Machine details may not be accurate.
              All volumes being backed up may not be listed.
              /sbin excluded from backup!
              /usr excluded from backup!
              /System excluded from backup!
              /bin excluded from backup!
              /private excluded from backup!
              /Library excluded from backup!
              /Applications excluded from backup!
    Aside from the size of my backup drive, which I will increase at some point, I'd really like to have time machine backing up all system folders, especially Applications. How to I reset this hidden exclusions?
    Thanks,
    Darcy

  • I am trying to update my time machine backup on time capsule, but time machine keeps trying to create an entirely new backup (evidenced by the 200GB backup size). How can I get time machine to modify my old backup rather than create a new one?

    I am trying to update my time machine backup on time capsule, but time machine keeps trying to create an entirely new backup (evidenced by the 200GB backup size). How can I get time machine to modify my old backup rather than create a new one?

    It must have found the old backup corrupt.. so you will more than likely have little choice. You can archive off the old backup if it is still useful.
    You can also verify it. See A5 http://pondini.org/TM/Troubleshooting.html
    He also has some info on this problem. eg C13.

  • How to print date & time stamp on photos?

    How to print date & time stamp on photos?

    Three methods:
    File>process multiple files>labels. Be sure to uncheck "same as source", or the originals will be overwritten. It is best to work on duplicate files, esp. while learning.
    Use the horizontal or vertical type tool to add the information manually to each picture file
    If the same information is to be applied to several pictures, e.g. a copyright notice, use  of a brush made in PSE is very efficient

Maybe you are looking for

  • Problem with win2000sp3 and Java web start

    I have JRE and Java web start (1.2.0_01, build b01) which come downloading file j2re-1_4_1_01-windows-i586-i.exe from sun. I have win2000pro running on my PC. I had updated win2000 to service pack 2 and everything was fine. Now i decided to update to

  • How do I get the Firefox icon to stay on the bottom bar of my Mac?

    How do I get the Firefox icon to stay on the bottom bar of my Mac computer?

  • Prevent javax.ejb.EJBException in log file

    I am getting javax.ejb.EJBException's in my code when I try to instantiate an EJB with a bad primary key. I have put the instantiation inside of a try catch, and caught the generic "Exception". I have also tried catching the javax.ejb.EJBException. I

  • Smartforms Currency format wrongly printing

    Hi All,   I'm facing a problem with printing the amount field on Smartform. I also tried it display in Document currency format eg., In the document amount displayed like 1,234.56 (in a standard transaction) When printing on the form it displayed lik

  • Error after lastest system update

    I downloaded the new update this morning and now after I start up the console if I play a game or access any of the settings. For some odd reason whenever I finish whatever i was doing the Playstation doesn't eject disks and I can't access anything e