How to Add the Cost Element in Existing Zreport Painter
hi friends
i have issue with report painter
one Cost Element is not picked in Z Report which was created in Report painter
transaction data could be found in standard reports.
please expain how to Add the missing Cost Element in Existing ZReport
Point will be awarded.
Thanks
Check your sets first, if the cost element is missing from there, then change the set using GS02
Cheers
Prakash
Similar Messages
-
How to Add the cost centre in the KSBB report
Hi Experts,
How can we add cost centre in KSBB report. Is it possible to add? if yes could any one guide me how to add the cost centre in KSBB report?
waiting for your replies,
RegardsHi,
I see only three possible explanations:
a) no data on this cost centre
b) authorizations
c) 'hard-coded' filter in the relevant report (only if it's user-developed report)
Regards,
Eli -
How to Add the Cost of manually created PR under Network/Activity
Dear All,
When I create a PR manually with Acc *** Cat as Q & enter the WBS Element & Network under acc *** tab, the cost of PR is going and sitting as WBS cost. But how can i add that cost under Network instead of WBS ?
regds,
CBin our project, generally sevice use "N", material use "Q"
-
How to delete cost element name from group after deleting the cost element
Hi,
Please let me know how to delete the cost element number from the Cost element group hierarchy.I have deleted cost element but still showing only the CE number---no valid master record.If I d not want this to be visible within hierarchy let me know what should I do.
ThanksHi
Go to change cost element group select the cost element click on select tab (3rd Tab from Left) it will take u to new screen in that screen select remove tab (1st tab from left)
Regards
Sandesh -
How to add the library of linphone into existing project ?
How to add the library of linphone into existing project ?
How to add the library of linphone into existing project ?
-
How to add a new element to a model node in the view controller?
View Context
myNode
attri1
attri2
myNode is a web service model node. How to add a new element to this node?
Regards,
Hui
Edited by: Hui Wang on Feb 15, 2008 12:05 PMSudhir Gorantla wrote:>
> Hi,
>
> myNode
> attri1
> attri2
>
> IMyNodeElement ele=wdContext.myNode().createMyNodeElement();
>
> ele.setAttri1("");
> ele.setAttri2("");
>
> wdContext.nodeMyNode().addElement(ele);
>
> Regards,
> Sudhir
Hi we need a model as an input parameter when creating a element for a model node. How to get the instance of the model?
Regards,
Hui -
How to add new row and update existing rows at a time form the upload file
hi
How to add new row and update existing rows at a time form the upload file
example:ztable(existing table)
bcent smh nsmh valid date
0001112465 7.4 26.06.2007
0001112466 7.5 26.06.2007
000111801 7.6 26.06.2007
1982 7.8 26.06.2007
Flat file structure
bcent nsmh valid date
0001112465 7.8 26.06.2007 ( update into above table in nsmh)
0001112466 7.9 26.06.2007 ( update into above table in nsmh)
000111801 7.6 26.06.2007 ( update into above table in nsmh
1985 11 26.06.2007 new row it should insert in table
thanks,
Sivagopal RHi,
First upload the file into an internal table. If you are using a file that is on application server. Use open dataset and close dataset.
Then :
Loop at it.
*insert or modify as per your requirement.
Endloop.
Regards,
Srilatha. -
How to add the new dep area in existing cod
Dear all,
how to add the new dep area in existing cod we are planing to implement the IFRS by using leading ledger and non leading ledger present we are using OL leading ledger
present we are using dep area 01 ,15
how to achive the parallel accounting in asset accounting how to add new dep area 30 in existing COD
if any document plz refer meHi Bhayyapu,
Please refer to the links given below.
New Depreciation area
Adding a New Depreciation Area to Existing Assets - Financial Accounting (FI) - SAP Library
Hope this will help you.
Regards
Eugene -
How to change the Validility period of the cost element
Hi All,
how to change the validity period of the cost element. In tranc code Ka02 only the text is allowed to change but i want to change the validity period of the cost element.
best Regards
stephenHi All,
Thanks for your response...........
My concern is, i have a document posted to 43100 GL Expense acct, which is also defined as cost element, GL field status G004(cost accts). But when the original document is posted no is no assignment of any cost object.
But i have to reverse the document and when i use FB08, the reversal is popping up with error " Assignment of CO object is neccesaary " Assign the cost center.
Is there any way we can update the cost center for posted docuemnt? if so how? and can i make the cost element invalid for previous month so that it will not ask for cost object and change the field status of the GL from g004 to G001 only for reversal and set it back after posting is done.
Appreciate ur feedback and suitab;le points are rewarded with points.
best -
How to deactivate Primary Cost Element
Hi,
A primary cost Element is already created. Now We would like to decativate it so that during posting an entry it doesnot prompt to enter a CO object.
How cdan we do this?
Regards,
MGHi,
For blocking the cost element you have two options
1 )if earlier posting are not made to that particular cost center or no records exist then you can diredtly delte the cost element.
2 )If posting is already made then goto KA02 in analysis period change the analysis period.
Regards,
Sreekanth -
Hello Guru's and Experts.
I am working on a change request , the change request is as follows
Once a cost simulation is run for a maintenance item and the data transferred to BI, it cannot be deleted from BI, only overwritten with an updated cost simulation. In the instance where the such items are no longer required to be included in the simulation, it must be made possible to delete the simulation costs in BI.
The current design in my project significantly increases the effort required to identify unwanted cost simulations and greatly increases the potential for incorrect data to be used in Budgeting and forecasting.
My question is how to add the delete functionality in the report. is it acheavable through the portal or WAD,
iam new to SAP BI , if possible can anyone kindly suggest me the steps to do this functionality.
Appreciate your quick response..
Thanks
Ravi.Hi Guru
Thanks for your valuable information.
We got the requirment changed now from the users , the delete button should display in the report, i mean in protal, Now the user wants to delete with the selection criteria, for example, once the user hits the row in the report, that means if he selects the Main work center, and selects the delete button , he wants all the data related to that main work center to be deleted. and another senario is what ever row the user selects the characteristics in the row, for example, if the user select for any row, i mean it can be any cost center or fiscal year, maintaiance item, cost elements, ..etc.
Once the user selects the row and hit the delete button, and he wants to hit the save save button in the report to make sure it deleted, the other way around , if the dont want to hit save, then he wants the data to be in the report.
In the above scenario's can you please suggest me with the steps how can we acheive it.
Please reply back if you need any other info., Apprieciate your quick response. its very urgent requirment which we have to start...
sorry to bother u..
Thanks
Ravi. -
working in Work order report, this report has different level , for example
0 level transaction
1 level transaction
in subtotal don't want to add 0 level transaction,
when I did the sub total it added all the level , so in sub total amount double up because of that
how to add the expression so I can the level 0 take out from sub total , so it does not include in sub total
can some one please help me with this
thanks in advanceHi Simon_ Hou
I tried the expr the way you suggested , it did not work getting error message, the exp I added is below
this the expression I added on sub total where is highlighted in Yellow, under Cost amount column,
I really appreciate the help
=Sum(IIF(Fields!COLLECTREFLEVEL.Value=
"0",0,Fields!CostAMOUNT.Value),"DataSet1")
please see below my QUERY, can you please help and let me know what I did wrong in my exp
SELECT PRODTABLE.PRODID, PRODCALCTRANS.COSTGROUPID, PRODTABLE.QTYCALC, PRODTABLE.PRODSTATUS, PRODCALCTRANS.COSTAMOUNT,
PRODCALCTRANS.COSTMARKUP, PRODCALCTRANS.REALCOSTAMOUNT, PRODCALCTRANS.CALCTYPE, PRODTABLE.DATAAREAID, PRODCALCTRANS.KEY3,
PRODCALCTRANS.CONSUMPVARIABLE, PRODCALCTRANS.REALCONSUMP, PRODTABLE.ITEMID, PRODTABLE.SCHEDDATE, PRODTABLE.FINISHEDDATE,
PRODCALCTRANS.KEY1, PRODCALCTRANS.TRANSDATE, PRODCALCTRANS.QTY, PRODCALCTRANS.KEY2, PRODCALCTRANS.COLLECTREFLEVEL,
PRODCALCTRANS.LINENUM
FROM PRODTABLE INNER JOIN
PRODCALCTRANS ON PRODTABLE.PRODID = PRODCALCTRANS.PRODID AND PRODTABLE.DATAAREAID = PRODCALCTRANS.DATAAREAID
WHERE (PRODTABLE.PRODSTATUS = 7) AND (PRODTABLE.DATAAREAID = N'AR1') AND (PRODTABLE.ITEMID = @itemid) AND
(PRODTABLE.FINISHEDDATE >= @Paramfromdate) AND (PRODTABLE.FINISHEDDATE <= @Paramtodate) -
How to add the entries and how to delete the entries from custom Z-table?
Hi Experts,
My requirement is I need to add the entries from program to three custom z-tables . Assume as zabc1,zabc2,zabc3.
Here how to add the entries from program to Z-table.???
And one more requirement is I want to provide a deletion checkbox in selection screen . Initial it was unchecked. If I am giving tick mark then the entries should be deleted from above custom Z-tables. this all will done in backgroung job?
Could you please guide me the logic how to crack this???
Let me know if you need more Info
Thanks
SanjuHi Sanjana,
What you can do is to use the ABAP keyword INSERT or MODIFY to add or modify records to a given database table. Here are the syntax taken from SAP documentation:
*Insert Statement
INSERT dbtab
Syntax
INSERT { {INTO target VALUES source }
| { target FROM source } }.
Effect
The INSERT statement inserts one or more rows specified in source in the database table specified in target. The two variants with INTO and VALUES or without INTO with FROM behave identically, with the exception that you cannot specify any internal tables in source after VALUES.
System Fields
The INSERT statement sets the values of the system fields sy-subrc and sy-dbcnt.
sy-subrc Meaning
0 At least one row was inserted.
4 At least one row could not be inserted, because the database table already contains a row with the same primary key or a unique secondary index.
The INSERT statement sets sy-dbcnt to the number of rows inserted.
Note
The inserted rows are finally included in the table in the next database commit. Up until this point, they can still be removed by a database rollback.
*Modify Statement
MODIFY dbtab
Syntax
MODIFY target FROM source.
Effect
The MODIFY statement inserts one or several lines specified in source in the database table specified in target, or overwrites existing lines.
System fields
The MODIFY statement sets the values of the sy-subrc and sy-dbcnt system fields.
sy-subrc Meaning
0 At least one line is inserted or changed.
4 At least one line could not be processed since there is already a line with the same unique name secondary index in the database table.
The MODIFY statement sets sy-dbcnt to the number of processed lines.
Note
The changes are transferred finally to the database table with the next database commit. Up to that point, they can be reversed using a database rollback.
Hope it helps...
P.S. Please award points if it helps... -
[Ai-CS4] How to add an art board to existing document ?
hi all,
can anybody suggest me how to add a new artboard to existing document? I didn't find any ArtBoard Palette in CS4. But in CS5 it is given.
thanks,
D.AThe Artboard panel is new to AiCS5. In CS4, a new artboard can be added by doing either of the two:
1. Pick the Artboard Tool and click-drag it in the canvas area of the Illustrator document.
2. Pick the Artboard Tool, click on the 'New Artboard' button in the Control Panel. Then select the desired size from the list of Artboard Presets in the Control Panel and then click in the desired area of the canvas to add a new Artboard.
Hope this helps.
Neeraj -
How to delete the last element of a collection without iterating it?
how to delete the last element of a collection without iterating it?
To add to jverd's reply, even if you could determine the last element, in some collections it is not guaranteed to always be the same.
From HashSet:
It makes no guarantees as to the iteration order of the set; in particular, it does not guarantee that the order will remain constant over time.
Maybe you are looking for
-
Will the iPad get a CF card adapter sometime?
The SD card adapter is cool if you have a normal digital camera, but SLR cameras usually have a CF card so is it best to get the USB adapter or will there be a CF adapter later on?
-
How to ManipulateJar File Content?
From another thread... Hi People, I have several probs with my application, which needs to manipulate jar files. Here's the background: There's a directory that contains 2 jar files - Prog1.jar and Prog2.jar. Prog2 is designed to change the contents
-
Hi friends, I have one problem with sapscript printing. When i am seeing the print preview of a form i dont have any problems with words overlapping. But When i prnt on local printer I am seeing words overlapping. Is there anything worng in my form o
-
I get the following, what's wrong?: LSNRCTL for Linux: Version 10.2.0.1.0 - Production on 18-FEB-2007 11:11:29 Copyright (c) 1991, 2005, Oracle. All rights reserved. Connecting to (DESCRIPTION=(ADDRESS=(PROTOCOL=IPC)(KEY=EXTPROC_FOR_XE))) TNS-12541:
-
Can't install:"1628: Failed to complete installation."
Upon double-clicking on OracleXE.exe (165.332.312 byte, production), I receive a dialog box stating "1628: Failed to complete installation". I have MSIExec.exe version 3.1.4000.1823 on my system. I've followed the instructions (looking for still-runn