How to build a gantt chart with BI Publisher

Hi everybody, I need to create a gantt chart with BI Publisher. I had a look to the document "Getting Gantty" from the blog:
http://blogs.oracle.com/xmlpublisher/2008/01/getting_gantty.html
but I don't understand in which way:
1. build the data template in order to replicate the XML code in the article
2. build and link the yellow bar which dynamically increases its length according to the meeting duration
Anybody already tried to implement something similar ? I didn't still found a real example about how to do it......
I need a help, please
Thanks in Advance
Alex

Yes that is the only option which we can stop a running report in BI Publisher
I suspect you'll need to ask your DBA to kill the session.
However, if you have DBA privileges yourself, you can do this by a few methods, some of which are described here:
http://www.oracle-base.com/articles/misc/KillingOracleSessions.php
Mark if helps,
Thanks,

Similar Messages

  • Gantt Charts with APEX

    Hello
    Has anybody managed to integrate Gantt Charts with APEX and got them working. I'm required to provide some similar reports.
    I understand Gantt charts are available in AnyCharts 5 but I need the XML to convert or at least a How To Do document.
    Any any other ideas would be appreciated.
    Cheers
    Ade

    Hi Ade,
    We have built an Anychart Integration Kit for APEX, if you take a look at -
    http://anychart.apex-evangelists.com
    and specifically -
    http://anychart.apex-evangelists.com/pls/apex/f?p=454:14:0:
    You'll see that anything is possible ;)
    We've concentrated on the core Anychart Functionality in the Integration Kit and will be releasing more powerful versions shortly.
    Hope this helps,
    John.
    Blog: http://jes.blogs.shellprompt.net
    Work: http://www.apex-evangelists.com
    Author of Pro Application Express: http://tinyurl.com/3gu7cd
    REWARDS: Please remember to mark helpful or correct posts on the forum, not just for my answers but for everyone!

  • Gantt chart with duration

    Hi Experts
    As a part of bidding, client need to produce Gantt chart to the customer.
    However, since this is presale process, the exact dates are not indicated but the duration of project to be specified. It means the schedule to show the duration from zero date.
    Is it possible to take print of Gantt chart with out dates but duration of individual activity or WBS?
    Warm regards
    ramSiva

    Hi Ahmed
    Thank you for your reply.
    The time scales in Gantt chart specifically shows the year, month and weeks from the start date of project definition or basic start of WBS.
    Since it is not a decided project, the Gantt chart need to show 0, 1st week, 2nd week, 3rd week etc.
    The actual schedule from PD start date can be produced on actual initiation of project.
    It means, i am looking for having Gantt chart for duration and not for specific start and finish dates.
    warm regards
    ramSiva

  • How to build a Google+ app with Aurora7? Fluid and WebRunner not compatible.

    How to build a Google+ app with Aurora7?
    Fluid and WebRunner not compatible.

    Hi,
    For portability issues always develop applications using sun implementation which can be configured for any vendor application servers.
    Web services developed with jwsdp will work in webloigc 8.1 simply, take the examples from sun and simply deploy it in weblogic 8.1 it will work like gem with simple settings.
    Just change the libraries with jwsdp ones.Place the
    jwsdp lib.How to do this is ; place all these jars in the classpath before the exisiting classpath configuration.
    Classpath=jwsdplibs;......
    This is enough for deploying the webservice server side.
    For using the client you have to change the default soap libraries used by weblogic with sun jar files.
    See example from bea for client implementation.override the system property.

  • How to build an OData Service with Gateway Service Builder (NO DDIC, BOR import)

    Hi Community,
    I hope to get an answer here to finish my project. I´m a newbie to the sap gateway service builder. Please provide me a helping hand.
    I have a problem I´m sure someone out there can help me.
    I need to create an sap ui app, which is monitoring our database behaviour (->transaction st06) is there someone who knows how to build a OData Channel with sap gateway service builder without importing a BOR- Object, or a DDIC?
    Or how to build an OData channel which exposes the database (monitoring) data from ST06?
    I would really appreciate if someone could help me.
    THANKS!
    JOE

    Hello Joe,
    If u do not want to import any Structure or BOR- Object, u can follow below steps :
    1. Create ur data model by adding the properties manually in SAP GW service builder with correct Edm    types.Doing this would be pain in my opinion ( sometimes we are forced to do this but no other option    doing this way )
       Create associations & navigation needed. 
    2. U can generate run-time objects.
    3. Go to appropriate classes and implement methods with ur Business Logic.
    4. Register ur service & consume.
    U can also import RFC to create data model and create mapping as per required by implementing correct method as well.
    once u do this generate objects and register service and consume it.
    Check this out for ur info :
    Detailed step by step procedure for Creating Gateway Service with all the CRUD Operations and testing them in Service Explorer Part1 
    Regards,
    Ashwin

  • How to download Project Gantt chart in to Excel?

    Dear Guru's,
              Can you please explain me How to download Project Gang chart in to Excel? Please explain me all the steps to download.
    Regards,
    Sai
    Edited by: Virendra Pal on Dec 8, 2009 10:02 AM

    hi,
    you mean Gantt chart.
    a gantt chart is basically a graphical representation of the activities/wbs element based on the dates/durations...
    it can be directly downloaded to ms project if you have open PS..
    however, if you are using excel, you can easily derive the gantt chart based on the start and finish dates (planned/basic/actual/forecast dates) of the objects...
    you can access CN41N then go to Evaluation > Export > Spreadsheet..
    with this you can derive the gantt chart based on the data..
    regards.
    Edited by: Virendra Pal on Dec 8, 2009 10:03 AM

  • Resource Gantt Chart with Multiple Series (Apex 4.1.1)

    Hi,
    I am building a resource gantt and I want to show different types of entry in different colours.
    My series query is:
    select null,
    time_record_id,
    username,
    null,
    to_timestamp(to_char(event_date + (start_time/24),'YYYY-MM-DD HH24:MI'),'YYYY-MM-DD HH24:MI') start_date,
    to_timestamp(to_char(event_date + (end_time /24),'YYYY-MM-DD HH24:MI'),'YYYY-MM-DD HH24:MI') end_date
    from
    oly_time_record
    where
    work_code = 'OFFICE'
    order by 5, 3;which works well to show me the times when a user is going to be in the OFFICE.
    I now want to add additional bars to the chart that shows me the times that a user is going to be 'WORKFROMHOME'.
    The 'OFFICE' time should show Green bars and the 'WORKFROMHOME' should show Red Bars.
    This is quite easy on normal charts, where you can add extra series but the Resource Gantt does not seem to allow more than one series.
    Does anyone have any ideas about how I can get what I need?
    Thanks,
    Martin

    Hi Martin,
    there are a lot of examples of gantt charts in this forum.
    Take a look here:
    http://apex.oracle.com/pls/apex/f?p=36648:60
    Markus

  • Scheduling and gantt charts with Apex?

    Hi,
    Has anyone created Gantt charts using Apex?
    Also, has anyone used Apex to create schedules?
    From what I can tell, Javascript would be the language to use to add such code to an Apex app, correct?
    Regards,
    Daveio

    Leo,
    Thank you, I appreciate the help!
    An example of what I would like to do with scheduling:
    - Jobs will be entered into the application with priorities, durations, and required resources
    - The application will determine when the jobs can be started based on priority and resource availability
    - If a priority is changed the job start/finish dates should change accordingly
    This is the information I would like to have displayed on a Gantt chart. I have a text explaining several scheduling algorithms that will help make this possible but I will need to learn how to write the code into Apex.
    Dave

  • SSRS 2008: how to show an empty chart with legend and x and y axis when no data available

    Hi,
    I am using SSRS 2008, I generated one chart in report designer with the data from Analysis Services (Cube).
    According to the dataset, there is no data returned when I run the query. so when I preview the chart, there is nothing but "no data available" showing on the chart.
    Here I want to know is there any possible to show an empty chart with legend and x and y axis?
    If it is possible, can you tell me how can I make it?
    Best Regards.
    Connie Zhu

    Hi,
    When there is no data, the chart displays the message "no data available". But using a little work around, you can display an empty chart.
    Please find the below steps given to achieve this
    1. Create a new dataset using TSQL to return 1 row of data having the category field and value field set to 0. Add the fields that are necessary for the category fields, series fields and datafields.
       A simple example would be like
       SELECT 'abc' as Category, 0 as Amount
    2. Add a new chart, set the category field to 'Category' and set the data field to Amount from above dataset created in step 1.
    3. In the new chart, right click the category axis and select axis properties, Click on the labels tab, check on
    'Hide axis labels' and then click ok
    4. Now set the Visibility property of both the charts depending on the rows returned from your main dataset
       a. click on your main chart and set its Hidden property to :
    =iif(CountRows("MainDataSet"),false,true) 
       b. click on the new blank chart added and set its Hidden proprety to (the opposite) :
    =iif(CountRows("MainDataSet"),true,false) 
       Note : Please change the dataset name in above expression "MainDataset" to the name of your chart's dataset
    5. Resize the new chart to the same size as your main chart, then position the new chart on the place as the main chart.
       (Note : You can set the position of new chart to be same by copying the location property from the main chart) 
    6. Now run and observe the result. When there are no rows returned by your main dataset, the new chart (the blank chart) should be displayed.
    I've added a working sample of this kind of a report
    here.
    Hope this helps. Please feel free to discuss if you have any questions.
    Please click "Mark as Answer" if this resolves your problem or "Vote as Helpful" if you find it helpful.
    BH

  • Gantt chart with null dates

    Hi,
    Kylie discovered here that you couldn't have null dates in the project gantt query
    APEX 4.0.2 Project Gantt Chart - Error Code: 2002 Message: Empty input
    As Valentina suggested, I found the actual dates are mandatory, while the chart tolerates missing planned dates - which is a complete reversal of what actual project data would have.
    baseline project gantt with parent-child relationship
    What I found though is if some planned dates are missing, the generated XML seems to default with data from previous rows.
    As detailed in this screenshot, my red lines indicate missing from/to dates (actual data also shown underneath chart)
    https://docs.google.com/file/d/0B_eVXQ_oe4tsRUFXUzA0NmNMUE0/edit?usp=sharing
    NAME    TASK_ID   ACTUAL_START  ACTUAL_END  PROGRESS  DUE_START     DUE_END
    line 1  1810794   07/MAR/2013   11/MAR/2013   100     26/MAR/2013   27/MAR/2013 00:00:00
    line 2  1810780   12/MAR/2013   16/MAR/2013   100     23/MAR/2013   27/MAR/2013 00:00:00
    line 3  1810779   17/MAR/2013   20/MAR/2013          
    line 4  1810773   21/MAR/2013   21/MAR/2013   50      24/MAR/2013  
    line 5  1810774   22/MAR/2013   10/APR/2013   93      16/MAR/2013  
    line 6  1810791   11/APR/2013   20/APR/2013          
    line 7  1810793   21/APR/2013   22/APR/2013   45      21/MAR/2013   The accompanying XML backs up the story, yet my query doesn't feed this data.
    <task id="1810794" parent="" name="line 1" actual_start="2013.03.07 00.00.00" actual_end="2013.03.11 00.00.00" baseline_start="2013.03.26 00.00.00" baseline_end="2013.03.27 00.00.00" progress="100" style="defaultStyle"/>
    <task id="1810780" parent="" name="line 2" actual_start="2013.03.12 00.00.00" actual_end="2013.03.16 00.00.00" baseline_start="2013.03.23 00.00.00" baseline_end="2013.03.27 00.00.00" progress="100" style="defaultStyle"/>
    <task id="1810779" parent="" name="line 3" actual_start="2013.03.17 00.00.00" actual_end="2013.03.20 00.00.00" baseline_start="2013.03.23 00.00.00" baseline_end="2013.03.27 00.00.00" style="defaultStyle"/>
    <task id="1810773" parent="" name="line 4" actual_start="2013.03.21 00.00.00" actual_end="2013.03.21 00.00.00" baseline_start="2013.03.24 00.00.00" baseline_end="2013.03.27 00.00.00" progress="50" style="defaultStyle"/>
    <task id="1810774" parent="" name="line 5" actual_start="2013.03.22 00.00.00" actual_end="2013.04.10 00.00.00" baseline_start="2013.03.16 00.00.00" baseline_end="2013.03.27 00.00.00" progress="93" style="defaultStyle"/>
    <task id="1810791" parent="" name="line 6" actual_start="2013.04.11 00.00.00" actual_end="2013.04.20 00.00.00" baseline_start="2013.03.16 00.00.00" baseline_end="2013.03.27 00.00.00" style="defaultStyle"/>
    <task id="1810793" parent="" name="line 7" actual_start="2013.04.21 00.00.00" actual_end="2013.04.22 00.00.00" baseline_start="2013.03.21 00.00.00" baseline_end="2013.03.27 00.00.00" progress="45" style="defaultStyle"/>Is this expected behaviour?
    Is this a bug?
    Is there a workaround - can I supply my own XML to hopefully override what is being generated?
    Scott

    Hi Ahmed
    Thank you for your reply.
    The time scales in Gantt chart specifically shows the year, month and weeks from the start date of project definition or basic start of WBS.
    Since it is not a decided project, the Gantt chart need to show 0, 1st week, 2nd week, 3rd week etc.
    The actual schedule from PD start date can be produced on actual initiation of project.
    It means, i am looking for having Gantt chart for duration and not for specific start and finish dates.
    warm regards
    ramSiva

  • Steps to create Resource gantt chart with hourly ranges

    Does anyone have an example of how to customize the default built APEX/Anychart resource gantt charts to handle a 12 hour range showing resources? I have tried going through a sample provided by anychart tech support, but the xml file seems to have different set of entries.
    What I have is a set of rows for resources in a shop over a 12 hr shift that I need to show. I have a standard resource gannt working, but I need to customize some of the xml settings to see the date/time ranges..
    Any help would be a blessing!!
    Thank you,
    Tony Miller
    Webster, TX

    I could post it up on Oracle's hosted site, but I am NOT seeing much help where ever it is located.. I also believe in helping up here because I can and It helps me....
    Thank you,
    Tony Miller
    Webster, TX
    On the road of life...There are 'windshields', and there are 'bugs'
    (splat!)
    "Squeegees Wanted"
    If this question is answered, please mark the thread as closed and assign points where earned..

  • How can I create geographic charts with Lumira connected to SAP HANA?

    Hello All
    I'm testing SAP Lumira and I want to make geographic charts with data from SAP HANA. This is possible when I use data from a local Excel-file. But not when I use data from SAP HANA. I was told it should work after installing Service Pack 8. But it still doesn't work. Maybe we have to turn something on, change a configuration file. Maybe it has to do with SAP Lumira, not with SAP HANA. Any help is greatly appreciated.
    Here are some technical details:
    SAP HANA Version: 1.00.81.00.392776 (NewDB100_REL).
    SAP Lumira Version: 1.19.0 (build 1099) (latest version).
    SAP HANA Studio Version: 1.00.81.0.
    Windows Version: Windows 7 Enterprise, Service Pack 1.
    Kind regards, Robbert

    Hello Antoine
    At paragraph 3.2.2 on page 73 it says:
    Creating geography hierarchies with latitude and longitude data is not currently supported for SAP HANA data sources.
    I think this explains everything. Well, almost everything. I created geographic charts with Lumira while connected with Excel or a csv-file. The question now is, am I waiting for an update of SAP Lumira or an update of SAP HANA? Or both?
    Kind regards, Robbert

  • How to build a tabular form with a by the user insertable primary key

    I have build a build a tabular form with the wizzard. Wat should I do to make the primary key insertable by the user.
    When I change the PK from 'hidden' to 'text field', I get a checksum error when i am trying to insert.

    Fred: When you use the tabular form wizard, notice the help text on the right hand side of each page. The help page where you define the type of primary key (Existing trigger, PL/SQL function, existing sequence) clearly states
    Tabular forms do not support user entered primary key values
    Makes sense when you think about it. The MRU process needs to determine whether to update a record or insert a new record. It does that by comparing the checksums (and/or) pk values from when the page was first rendered and then when you make changes and submit it. Newly inserted rows will have a blank PK/checksum.
    If you allow user to change the PK, how will the system know which rows are new and which ones are old?
    For example, lets say you have
    create table t
    pk int primary key,
    data varchar2(10)
    )You have 2 rows
    1 red
    2 yellow
    If the PK were to be editable, user could go in and change the above to
    2 red
    1 yellow
    Now what? Would you like the system to create a new row with 1/yellow or change the existing pk=1 row to yellow? Same with the other row.
    Bottom line: The built-in processes dont support this. You can always write your own manual tabular form and implement whatever you logic you wish in your After Submit processes.
    Hope this helps.

  • How to build a simple app with xcode

    I am new to coding and I could like to know the basics of xcode and how to build a simple app

    Then you're going to need to learn Objective-C, the concepts of object oriented programming, and a whole ton more.  Xcode is just a tool used to write and manage a software project.
    To learn to program, you must first get the compiler which you use to write and test programs.  Thus you need to get a copy of Xcode from Apple's developer site.
              * Find a book on xcode.  Be sure to get a book that covers the current version of xcode.  But before getting far into xcode, you must ...
    Next, you must learn the programming language used to create mac and iOS programs.
              * Read the book "Programming in Objective-C", By Stephen G. Kochan
              * Find a book on xcode.  Be sure to get a book that covers the current version of xcode.
    Next learn about Cocoa, the graphical environment and other support libraries that you need for OSX and iOS.
              * There are many books on this, check ratings and evaluations at Amazon books. 
    Once you have the basics, you really need to learn the technicals of programming, like design patterns, algorithms, data structures, concurrent processes.
              * University or college courses
              * Textbooks used in these courses, if you want to do it on your own.
    Although computer science majors at the college level take 4 years to learn their trade, the first three semesters cover the important basic topics of programming.  If you can take a course in Programming 1 at a local school that will get you started.  You can certainly do it on your own, but programming can be a frustrating trip and working with others is very helpful.

  • Click-enable Gantt chart with Business Graphic

    Hi all,
    I know that it's possible to create a gantt char with Business Graphic. But can you tell me if it's possible to add events to the elements of the graphic?
    Or maybe there are other types of object that allow this.
    In bsp there is the phtmlb:gantchart, is there a java package phtmlb?
    Thanks and Best Regards,
    Paulo Ruivo

    Hi Paulo,
    U have onAction event in view designer.Also refer this
    <a href="http://help.sap.com/saphelp_erp2005/helpdata/en/ed/258841a79f1609e10000000a155106/frameset.htm">Business Graphics Events</a>
    Hope it helps,
    Regards,
    Nagarajan.

Maybe you are looking for

  • LR 4.1 photos (still) MUCH darker than in PS CS5 - why?

    Right: Photo in LR4.1, shown using Process 2010 to be compatible (as good as possible) with PS and ACR 6.7 (a switch to 2012 shows a difference regarding darkness, but not too much) Left: Top the same photo opend via LR (it matches the LR version), b

  • Intergration of BI Publisher with OBIEE issues

    I am using OBIEE11.1.1.6.6 ,and having a cluster set up of 3 servers. I am facing issues with the intergration of BI Publisher reports. I get the following error .This doesnot happen always, but only on one particular server. 2013-03-11T14:38:18.539-

  • View my photos on a TV

    Can I view my photos on my TV after creating a Project on my Superdrive? What format should I set the Preferences to? PAL? For UK. I have iDVD v3. iDVD Help states: Only writes to 2.0 on general DVD-R discs. iMac G4 Mac OS X (10.3.9) iMac G4 Mac OS X

  • E2500 as an additional access point will not connect

    Hello, I have AT&T Uverse which provides Internet for my home.  The wireless capability of this router is pretty bad, I don't get good/reliable wireless reception upstairs in my office.  The solution was to buy a Cisco E2500 and add it as an access p

  • Regex question: How do I insert commas between meta data?

    Current search engine is being replaced with Google Search Appliance (GSA). It requires meta data to be separated by a comma + space, whereas the previous search engine required only a space.  For example: <meta name="C_NAME" content="Screen1 Screen2