Hi
How to create events in BW and assign to any process..
Like i want to complete a delta load and do the full load.
After finishing the delta load, full load has to be triggered.
So can anyone help to creating the events in bw and assigning it to the prcess.
Regards
Rak

Hi AHP
Thanks for the reply.. we are not using the process chains instead we are using the infopackage groups. I created the event in SM62, But how should i assign this new event to my delta load.
In full upload infopackage, in selection option i can give the event there in "after event"
But my doubt is how to assign my event to the delta infopack
"<i>you can just put the full load process type variant after the delta load, any consideration ?"</i>. Can you be more specific.
Regards
Rak

Similar Messages

  • How to create screen sequence and assign to material type

    Hi,
    How to create new screen sequecnce and how to assign it to material type, is there any link of Industry sector with this.
    regards,
      zafar

    how to assign it to material type and also what is use of industry sector
    Industry sector - it simply mean The industry sector groups companies according to activity, for example, plant engineering and construction, mechanical engineering, the chemical industry, and the pharmaceutical industry
    Field references are defined in Customizing for the Material Master in the activity Maintain Field Selection for Data Screens.
    for see field references run tcode OMs9.
    Assign Field references to Material Type by Tcode OmT3E, You can see in OMS2 in General data See Field references and SRef: material type

  • How to create a schema and assign roles with store procedure or function?

    Hi All,
    I am creating a webpage that will call oracle store procedure or function to create a schema and add roles. Please let me know if there a method to do that.
    Thank you

    Hi CristiBoboc,
    Thank you very much for your help. Here is my code to create a user:
    create or replace
    FUNCTION user_create (user_name IN nvarchar2, user_pw IN nvarchar2)
    RETURN number
    IS
    sql_stmt varchar2(200);
    sql_stmt2 varchar2(200);
    var_temp_count NUMBER(2);
    un varchar2(30) := user_name;
    up varchar2(30) := user_pw;
    BEGIN
    sql_stmt := 'create user :1 identified by :2
    default tablespace users
    temporary tablespace temp
    quota 5m on users';
    sql_stmt2 := 'grant developers to :1';
    EXECUTE IMMEDIATE sql_stmt USING un,up;
    EXECUTE IMMEDIATE sql_stmt2 USING un;
    select count(*) into var_temp_count from dba_users where username = UPPER(user_name);
    return var_temp_count;
    END;
    When I run, I get following error:
    exec :myvar :=user_create('aaa','12345');
    BEGIN :myvar :=user_create('aaa','12345'); END;
    ERROR at line 1:
    ORA-01935: missing user or role name
    ORA-06512: at "CSDBA.USER_CREATE", line 15
    ORA-06512: at line 1

  • How to create button programmatically and assign trigger for it and add code

    is that possible ?
    How can I create item a button for example programmatically (at run time)
    and create trigger (when-button-pressed) programmatically and write a code
    in the trigger body as well programmatically.
    thankx

    Hello David
    I used the way list and go button which is more safer than creating buttons because
    you can populate the list on fly.
         | dropdown list     \/
              | go button |
    PROCEDURE populate_user_function_list IS
         rg_list_id RECORDGROUP;
         ret_code     NUMBER;
    BEGIN
         rg_list_id := FIND_GROUP('RG_LIST');
         IF NOT ID_NULL(rg_list_id) THEN
              DELETE_GROUP(rg_list_id);
         END IF;
         rg_list_id := CREATE_GROUP_FROM_QUERY('RG_LIST','SELECT FUNCTION_ID, FUNCTION_ID FROM SMS_ROLE_FUNCTION WHERE SMS_ROLE_FUNCTION.DB_ROLE ='||''''||:GLOBAL.USER_ROLE||''''||' ORDER BY SEQUENCE_NO');
         ret_code := POPULATE_GROUP(rg_list_id);
         --Populate record group.
              IF ret_code <> 0 THEN
              bell;
              MESSAGE('Record Group could not be populated');
              RAISE FORM_TRIGGER_FAILURE;
              END IF;
         POPULATE_LIST('DYNAMIC_BLK.USER_FUNCTION','RG_LIST');
         DELETE_GROUP(rg_list_id);
    END;
    --this is the button to go the user selection
    begin
         if :DYNAMIC_BLK.USER_FUNCTION is not null then
              --go to selected form
              call_form(:DYNAMIC_BLK.USER_FUNCTION,NO_HIDE,DO_REPLACE,NO_QUERY_ONLY,NO_SHARE_LIBRARY_DATA);     
         else
              bell;
              message('Please select a function');
         end if;
    end;

  • How to create Match code and assigne it to main screen of MM03

    Hi,
    My req is as below,
    I have to create one new match code for Material serach  and i want to assign this match code on the main screen on MM03
    while searching the Material.
    Kindly Help
    Sachin Yadav

    solved

  • Create handling units and assigning them as Packing Proposal for Sales Orde

    Hi Friends
    How to create handling units and assigning them as Packing Proposal for Sales Order Items in the background.
    Could you please help to provide Input Parameters for BAPI_HU_CREATE for sales order OR is there any other program creating and assigning them to Sales Order line Items.
    Thanks in Advance.
    SR

    Hi Friends
    I created Handling Units with BAPI_HU_CREATE , Pack materials with BAPI_HU_PACK in to Handling Untis and assign handling units to sales order with BAPI_HU_CHANGE_HEADER . But These BAPIs are not doing packing sales order line items in to handling units . I have to go sales order and do sales order line item packing by clicking packing button.
    Could you please help on how to do packing Sales Order Line items in the background with BAPIs.
    Thanks in Advance.
    SR

  • How to create new user and How can i assign end user roles

    Hi,
    I am new to SAP, please explain how to create end users and their roles
    Thanks
    ravi

    Hi,
    Roles are decided by IT managers. Suppose if Persons who are working in shopfloor or production side
    give authorization to Production order create , change and Confirm like that etc
    1. In role maintenance (transaction PFCG), choose the Authorizations tab page.
    2. To change the authorization data for the transactions assigned to the role, choose Change Authorization Data or Expert Mode for Profile Generation. Otherwise, a dialog box appears in expert mode (see Regenerating an Authorization Profile After Changes).
    Please take telp from Basis person also refer this link,
    http://help.sap.com/saphelp_46c/helpdata/EN/52/6714a9439b11d1896f0000e8322d00/frameset.htm
    Thanks

  • How to create the event in the report for jobs scheduling.

    Hi Experts,
    i have a requirement like as follows:
    The following triggers for Batch Jobs in the SCM system will be created.i.     
    Background Processing Event = u201CAPO Background Processing Eventu201D. After sending the Event, write a Log Report line u201CEvent u201CAPO Background Processing Eventu201D sentu201D.
    Could you please suggest me how we create the Event or which transaction ?
    Please give me a steps for creating events so that based on these events we use
    CALL METHOD cl_batch_event=>raise
        EXPORTING
          i_eventid                      = p_bpeve
          i_server                       = p_server
          i_ignore_incorrect_server      = p_ignore
        EXCEPTIONS
          excpt_raise_failed             = 1
          excpt_server_accepts_no_events = 2
          excpt_raise_forbidden          = 3
          excpt_unknown_event            = 4
          excpt_no_authority             = 5
          OTHERS                         = 6.
    Right now i received message "APO Background Processing Event" is doesn't exists.
    Thanks in Advance.
    Puneet.

    Hi Puneet,
    Goto transaction SM62 and in there to BckProcEvents tab. There you can create the events.
    You just need to specify the name and Description of an event.
    Hope this serves your purpose.
    Thanks

  • How to create an Event & schedule a rpt based on results of that Event..

    Help,
    I need to schedule a report, that will run after an event is done. I only want the rpt to run if the event produces more than 1 record.
    I dont know how to create an event? I am assuming I can use a SQL qry as an event. I would like to use:
    select count(*) as RegCounts from [reg contact log] 
    where [due date] = date() +1 and [response due]=Yes
    Erin

    Help,
    I need to schedule a report, that will run after an event is done. I only want the rpt to run if the event produces more than 1 record.
    I dont know how to create an event? I am assuming I can use a SQL qry as an event. I would like to use:
    select count(*) as RegCounts from [reg contact log] 
    where [due date] = date() +1 and [response due]=Yes
    Erin

  • How to create the ICONS and SYMBOLS

    how to create the ICONS and SYMBOLS
    Title was edited by:
            Alvaro Tejada Galindo

    HI,
    Check this sample code....Not mine...
    REPORT SHOW_ICONS.
    TABLES: ICON.
    INCLUDE <ICON>.
    FIELD-SYMBOLS: <F>.
    SELECT * FROM ICON.
       ASSIGN (ICON-NAME) TO <F>.
       WRITE:   /(5) <F>, 20 '@',21 ICON-ID+1(2),23 '@',ICON-OLENG,
                ICON-BUTTON,ICON-STATUS,ICON-MESSAGE,ICON-FUNCTION,
                ICON-NAME.
    ENDSELECT.
    Also Try this,
    INCLUDE <symbol>.
    INCLUDE <icon>.
    Write:/ 'Phone Symbol:', SYM_PHONE AS SYMBOL.
    SKIP.
    WRITE: / 'Alarm Icon: ', icon_alarm AS ICON.
    For more information check out the following link it will help you.
    http://help.sap.com/saphelp_nw04/helpdata/en/9f/db9e4a35c111d1829f0000e829fbfe/content.htm
    Regards,
    Padmam.

  • PALM Z22 HOW TO CREATE CALENDAR EVENTS THEN UPLOAD THEM TO THE PALM Z22

    Hello, I would like to know if anyone can advise me on how to create calendar events in say, excel, and then upload them to my Palm Z22.  The reason I want to create them in excel is so that I can also update the file information to my cell phone as well.
    Thanks for your assistance.....
    Tony
    Post relates to: Palm Z22

    Hello Tony,
    If you want to use Excel, then I would suggest that you export your calendar spreadsheet as a comma separated values (.csv) file and then import that data into the Calendar application in Palm Desktop.  Then Hotsync your Palm.
    Alan G

  • Can any 1 tell me how to create budget journal and how to enter journal ?

    hi all+
    Can any one tell me how to create budget journal and how to enter journal against that budget ?+
    Regards+
    Yasir+

    http://download.oracle.com/docs/cd/A60725_05/html/comnls/us/gl/budjrnl.htm#index-Budget-journals-Entering--0
    Enter budget journals to maintain an audit trail for your budget balances. You can use budget rules to calculate budget journal amounts automatically.
    When you post budget journals, the journal amounts update existing budget balances. You can review and change your budget journals before posting them.
    Attention: When you use budget rules in Journal Mode, General Ledger calculates the appropriate debit or credit needed to achieve the balance you enter for the account type.
    Prerequisites
    1. Define a budget
    2.Open one or more years for your budget
    3.Define a budget organization
    4. Assign the "Entered" budget entry type to the accounts for which you want to enter budget journals
    To enter budget journals for a single account:
    1. Navigate to the Enter Budget Journals window.
    2. Specify the Budget Organization for the account to which you want to budget. If the budget organization is password-protected, you must enter the password before you can enter budget journals.
    3. Enter the Budget you want to update. You cannot use a budget that is frozen.
    4. Enter the range of Accounting Periods to which you want to budget.
    5. Enter the Currency of the budget amounts you are entering. The accounts must be assigned to the budget organization for this currency.
    6. Choose Journal Mode from the region poplist to enter budget amounts in a journal format.
    You can also use Single Row Mode or Worksheet Mode to enter budget journal amounts. However, you can only generate budget journals from these entry modes when you use the Enter Budget Journals window.
    Additional Information: When you use Journal Mode, Balance Type is a display-only field. It displays Budget when you are entering budget journals. In the Enter Journals window, this field displays Actual when you are entering actual journals.
    7. Enter or query the Account to which you want to budget. You can also switch to Worksheet Mode to easily query accounts, then return to Journal Mode to enter budget journals.
    8. Enter a Debit or Credit amount for each period. Do not enter journal amounts if you want to use budget rules to calculate and distribute budget amounts.
    9. Choose Create Journals to create a budget journal batch. If you are using budgetary control, you specify a funds action when you create the batch.

  • How to create process chains,and how to use process like and or xor

    Hi,
    How to create process chains,and how to use process like and or xor.
    can any one please give me a example in each.
    Thanks,
    cheta.

    Hi Cheta,
    Here is step by step procedure to create process chains
    Process chain is nothing but executing a process ..(or) loading the data any process we can do in background.. that means.. automatically we can execute our process based on Time or any event..
    Creating Process Chains
    Prerequisites
    If you want to include a load process in the process chain, you need to have already created an InfoPackage.
    You cannot load flat file data from a client workstation in the background. For this reason, you have stored your data on an application server.
    Creating Process Chains
    You have the option of creating a process chain in the process chain maintenance screen directly or by using a maintenance dialog for a process:
    Creating a Process Chain Directly in the Process Chain Maintenance Screen
    You are in the BW Administrator Workbench.
    1. Click on the Process Chain Maintenance icon in the AWB toolbar.
    The Process Chain Selection dialog window appears.
    2. Choose Create.
    3. Enter the technical name and a description of the chain, and confirm your entry.
    The Add Start Process dialog window appears.
    4. Create a variant for a start process.
    1. a. On the Maintain Start Process screen, choose whether you want to schedule the chain directly or whether you want to start it using a metachain.
    2. b. If you choose to schedule the chain directly, enter the start date value for the chain under Change Selections and save your entries.
    The Maintain Start Process screen appears again.
    3. c. Save your entries, return to the previous screen and confirm your entries in the Add Start Process dialog window.
    You are taken to the Plan View of the process chain maintenance screen.
    In the left-hand area of the screen, a navigation area is displayed. In the right-hand area of the screen, the process chain is displayed.
    5. Use the drag-and-drop function to add the relevant processes into your process chain.
    You use the Process Types function to select the processes. This sorts the process types according to different categories. You can also call up InfoPackages and processes for the data target from the separate InfoSources and Data Targets navigation trees.
    Hope this helps
    Regards
    Karthik

  • New user created. How to create Central Person and Business partner

    Hi,
    I got a new users created in SRM 5.0 .how to create Central person and business partner.
    Without CP & BP we cannot work. please guide.
    Regards
    G.Ganesh Kumar

    HI GANESH
    As you aware , assign the user to organisation structure via users_gen , the system will create a BP and Central Person , Position and user for you.
    br
    muthu

  • How to configure sales forcast and assign marketing budget

    how to configure sales forcast and assign marketing budget

    Hi,
    As per my knowledge i am telling forecasting is done by Historical Data { MM & PP Module }
    when you collect the data based that we have to plan every month how much you want to procure the raw material etc..,
    that should be entered in the material master under "Forecasting" tab there we have to maintain monthly wise forecasting values
    i think it should get some idea if i wrong please clarify
    Regards,
    Prasanna

Maybe you are looking for

  • Help with Importing and Editing an Image

    Hello All, I am working on a project where I need to import an image into LabView and edit it. The gist of my program is that I want to create a VI that generates an interactive floorplan. I want to be able to import the bitmap or png into my file so

  • Connecting my macbook with my iMac

    Is it possible to connect my Macbook mid 2010 til iMac late 2012, so the Imac works as an external monitor, i have tried with mini display to mini display, and couldn't get it to work, and been wondering if i need a Thunderbolt cable instead??

  • Application Navigator's Group By Category: How are categories determined?

    Hi, I'm new to JDeveloper and wanting to understand how the categories are determined in the Application Navigator's Group By Category. For example: Why are some items in the Applications Source folder, whereas others are in the Resources folder? I d

  • Swing classes not found

    I have installed RedHat Linux 7.1 on my laptop at home. I am trying to run a few small java programs. There is no problem to compile and run pgms with AWT classes. However, whenever I try to run pgms requiring swing stuff, I get an compilation error

  • Is NAT to blame.

    Here is my scenario. ASA acting as a VPN server for incomgin client connections.  The ASA outside interface has a 192.168.8.X address.  Infront of the ASA is a internet connected firewall that has a one to one NAT mapping from a public routable IP to