How to create work schedules for hours calculation

HI Experts,
We are working on payroll process which has to be consider  the number of working hours  for calculation.
Now we need to generate the workschedule based on hours.
What is the process of creation of workschedule  with respect to the consideration of number of hours.
Please share your ideas on creation of workschedules with respect to number of hours.
Thanks and regards,
Sairam.

Dear Siki,
I want to create a new work schedule for the employees for whom the  salary calculation to be based on  working hours.
Is there any preacautions to be maintained for the generation of work schedules in these directions.
Regards,
Sairam.

Similar Messages

  • How to create a scheduler for Batch  in MDM ?

    Hi ,
    I am working on MDM 2.0.1.4 . I have a batch called D1-IMD for auto-transition of one IMD state to another state
    I am able to run the batch manually (i.e Non-Timed Interval).
    So please suggest me how to proceed with some Timed Interval of scheduler.
    Thanks in advance.

    There is no scheduler in MDM (as there is in CCB). Oracle recommends that you use 3rd party schedulers, and most of our customers do this (MDM v1 and v2).
    If you only have very simple scheduling requirements, then you might consider using the OS based schedulers (e.g. CRON for Unix, Windows Task Scheduler).

  • How to create Subscription Schedule for a Contract created from Sales Order

    Hi Gurus,
    Need help in creating subscription contracts from Sales Orders.
    We know that Service Contract is created from Sales Orders by adding covered item and service item as two lines in a Sales Order.
    1. Does anyone know how to a create Subcription Contract by adding single item or BOM item(Model) to a Sales Order?
    2. Can we have a BOM item created as Subcription item and reference this to the Service Item in the Sales Order, so that we get the Service Contract created with the BOM item as Covered line.
    3. Whenever we create the Service Contracts from Sales Orders, the Billing Schedule Level is set to 'Top Level'. Can we get this changed to 'Equal Amount' by using any profile options.
    Please advise as we are in a critial design phase and need to make a decision quickly.
    Thanks,
    Sid

    Hi Mani,
    I have a similar requirement but i need to transfer the values to the same page... what then. I have seen the developers giude and the example shows how to tansfer values to another page but no clues what so ever if i have to transfer them to the same page different region. Do u have any suggestions ....
    Regards,
    Amit.

  • How can I quit the photos app? It has been trying to create a library for hours but nothing happens. when I try to quit, it won't let me.

    How can I quit the photos app? It has been trying to create a library for hours but nothing happens. when I try to quit, it won't let me. Have just upgraded from iPhotos so don't want to lose any content.

    How can I quit the photos app? It has been trying to create a library for hours but nothing happens. when I try to quit, it won't let me. Have just upgraded from iPhotos so don't want to lose any content.
    Force-quit Photos as recommended by Arsenal1607.
    Make backup of your iPhoto Library and run the iPhoto Library First Aid tools to repair the permissions on your library and rebuild the iPhoto Library.
    To launch the First Aid Tools hold down the  alt/option and the command key simultaneously while double clicking the iPhoto Library to launch the iPhoto Library First aid tools. You'd to hold down both keys firmly and long enough, until the First Aid panel will appear.
    Try both the options "Repair Permissions" and "Rebuild library".  Then try again to migrate the iPhoto Library to Photos by dragging it onto the Photos icon in the Dock.
    Make sure, you have plenty of free storage. Don't try the migration, if you are running out of storage.

  • Work schedule  for Ramzan on ehr reduction

    Hi
    Work schedule
    For Ramzan one hour reduction is there for all Muslim Employees,
    How to capture this on Time WS?
    In this case we need to classify employe based on community , which is not fare?
    how to resolve this?
    Also we are not considering login and logout time , so if they worked 8 hrs or 9 hrs same salary
    Kindly revert
    RX
    hi
    user do really haveing issue regarding it please let me know
    why   cant you have separate DWSR
    Edited by

    than
    than carry with the same configuration of DWS there in calendar their will be weekly off as per the policy
    but when the problem araises when an employee and employee finishes her work for 6 days  and continues for another six days
    than actually she has to take on leave but she take two leaves
    so in 2001 in the PWS it will be working day for her
    so try to create a substitute and when ever this kind of situation araises
    the end user will updates infotype 2003
    so we can change the work schedule of the employee

  • How to create Process chain for Aggregate for Master data

    Hello friends,
    I created Aggregates on Navigational Attributes.
    Now they are working fine, but i need to know that how shall i create the Roll up for Aggregates on Navigational Attributes.
    The point is the master data changes frequently a lot of time for e.g. for 0customer etc.....
    So if any one can send me the step by step documents so as to know how to roll up the Aggregates for Navigation attributes or for aggregates created on Master data....
    How to create process chains for the same ?????????
    Because if master data changes, then rolling up the aggregates straight forward will not help.
    So we need to write a process chain so that it deactivates the aggregate and reactivate again and fill up again..........
    If i mis interpreted something please rectify it.......
    Please advise

    Hello,
    the changerun that you have to schedule in order to activate the master data will adjust the aggregates automatically.  There is no need to deactivate them after master data loads.
    Best regards,
    Ralf

  • SAME Work Schedule for Both EE Sub Groups

    Hello Gurus
    We have 2 EE Sub groups which have the same work schedule - Flexible Working hours - 8 hrs/ day - 5 days a week. One of the EE subgroups will get paid Hourly at 80 hrs a week and the other will be paid salaried for 80 hrs a week.
    Can anyone please help me configure this with a step by step explanation ? I have already configured a holiday calendar.
    This is very urgent. Please help.
    Thanks and regards

    1. Create break Schedules which would be ur break timings and Paid or unpaid.
    2.create Daily workschedule which would be ur daily work hours by giving start time and end time and assign break schedules to that.
    2.Create Period workschedule in which U have to define 7 days daily work schedule.For Example Monday to Friday ur Workscheules having working hours and Saturday and Sunday Free workschedules(if u have Sat and Sun as off days of week)
    3.Then U have to configure work schedule rules and generate the workschedules.
    These are the basic steps to be performed.
    For further queries U can write to me.
    Award points if helpful.

  • Period work schedule for workmens

    hi all ,
          I am working on TM and have a requirement that there are workmens in compony having 3 shifts 7 to 1 1 to 8 10 to 5.but for them sunday is not weekly off fixed .when they complete there any shift e.g. morning shift for 6 days then they get a weekly off.this goes on continuing for a month .which shift should be assigned to workmen that department head decides on 1 day of the month .please share ur ideas on this.how to create period work schedule for them? how to configure this in SAP .
    thanks and regards,
    Raj.

    than
    than carry with the same configuration of DWS there in calendar their will be weekly off as per the policy
    but when the problem araises when an employee and employee finishes her work for 6 days  and continues for another six days
    than actually she has to take on leave but she take two leaves
    so in 2001 in the PWS it will be working day for her
    so try to create a substitute and when ever this kind of situation araises
    the end user will updates infotype 2003
    so we can change the work schedule of the employee

  • Doubt Regarding Creating Work Schedules

    Hello People,
    I have recently started taking SAP HR training and currently in Time mgt module...I am stuck up in the creation of work schedules.
    I have created a scenario /requirement where i have got 3 shifts in a day and i want my production people to work 24/7 in the factory as i dont want the manufacturing machine to be idle.I have created 3 shifts namely
    Shift 1- 7 am - 3 pm
    Shift 2- 3 pm - 11 pm
    Shift 3- 11 pm - 7 am next day
    I dont want the machine to be idle on any day ,so i want people to keep on continously working on the machine.Each shift has got 2 breaks.There are 3 batches of people(say 30) who are in the prod dept.
    Batch 1 will work from Mon - Sat(sun day off)
    Batch 2 will work from Tue - Sun (Mon day off)
    Batch 3 will work from Wed - Mon(Tue day off)
    Remember all the 3 batches will have one day off.i have not gone more further in time mgt(so wont be aware of shift planning ,dynamic work schedules) so will it be possible to create thework schedules for the above requirement.
    Please advise me how to create DWS,Period Work Schedules and how many should i create.If anybody can clear the basic concept of creating /how to create the work schedules .
    Help/Guidance would be highly appreciated.

    Hi,
    As Ravi said, I'd like to explain in more detail:
    3 DWS needed as follows:
    Shift 1:  7 am - 3 pm
    Shift 2:  3 pm - 11 pm
    Shift 3:  11 pm - 7 am next day
    Also create a DWS for the OFF day.
    Then apply these DWS' in PWS as:
    001- Shift A  Shift A   ShiftA   Shift A   Shift A   Shift A    OFF
    002-   OFF    Shift B    Shift B  ShiftB    Shift B    Shift B   Shift B
    003- Shift C    OFF      ShiftC   Shift C   Shift C    Shift C   Shift C
    While creating Work schedule Rules, we need to assign the 'Start point in PWS' field as 001 keeping 'Ref. date' field as any day which comes as Monday
    Use this Period work schedule in creating your Work schedule rule and generate the WSRs.
    Thanks,
    GowthamR

  • How to create a macro for a planning type in MC8b transaction

    Hi,
    I am presently working for a product allocation demand, which have a information structiure with characteristic and key field.
    the characteristic are production allocation quantity, incoming order quantity, and open order quantity.
    i have created a planning type in which the data updation takes from the excel file to the planning type in mc95.
    but i need to create a macro for this planning type .
    can any body give the details information how to create a Macro for a planning type.
    Thanks and regards
    GopalKrishna

    Dear Gopal
    May be the link would be helpful to you.
    [Planning Types and Macros|http://help.sap.com/saphelp_46c/helpdata/en/a5/631cc443a211d189410000e829fbbd/frameset.htm]
    Drill down the left tab once you opened the link, for more information.
    Thanks
    G. Lakshmipathi

  • How to create business operation for starting workflows

    How to create business operation for starting workflows from worklist?
    When I call methods that implements business operation from java class everything
    works fine(wlpi-ejb.jar is required), but when I call business operation from
    Studio I can't use classes from wlpi-ejb.jar.

    Business operation is called by WLIS. So, I include wlpi-ejb.jar into WLIS classpath.
    Studio uses deployed EJB from wlpi-*.jar, I don't know why Studio doesn't see
    methods from deployed EJBs when WLIS classpath contains wlpi-ejb.jar.
    "Andrew Pitonyak" <[email protected]> wrote:
    >
    When studio starts, what is your classpath? If you use the included batch
    file to start it, then your class path may not include this :-)
    Andrew
    "Raul" <[email protected]> wrote in message
    news:[email protected]..
    How to create business operation for starting workflows from worklist?
    When I call methods that implements business operation from java classeverything
    works fine(wlpi-ejb.jar is required), but when I call business operationfrom
    Studio I can't use classes from wlpi-ejb.jar.

  • How to create greater_or_equal condition for file_io storage

    Dear experts,
    Please tell me the how to create greater_or_equal condition for query in file_io as RationalOperatorType.GREATER_OR_EQUAL is not supported for file_IO storage.
    thanks n regards,
    Kapoorchand.

    Hi,
    not sure if I got you correctly, but in
    com.sap.ip.me.api.persist.query.RelationalOperatorType
    There is no condition available that you are looking for. Why do you not work with
    public interface Condition
    Represents a condition for a query. This can either be a single condition, as FIELD = VALUE and / or a composite condition, as ( ( FIELD1 = VALUE1 OR FIELD2 = VALUE2 ) AND FIELDE 3 <> VALUE3 ).
    Hope this helps!
    Regards,
    Oliver

  • How to create a validation for the project coding mask

    Hi,
    Would just like to ask how to create a validation for the project coding mask wherein the WBS elements hierarchy will be checked against the template saved. For example,
    project coding mask is XXXX-XXXXX-XX-X-X-X-00-X
    mother WBS should be XXXX-XXXXX-X and lower level WBS would be XXXX-XXXXX-XX.
    The validation should not allow a mother WBS to be XXXX-XXXXX-XX.
    How can we go about this?

    Hi Jacquiline Bersamin,
    You can use validation with the combination of the level and the coding mask.
    In the validation:
    Pre requisite: WBS level = 1
    Validation: Prps-posid = prps-posid :1-12:
    Message : Error
    If required you can give the parameters for your detail error message.
    Please let me know if this does not work.
    Thanks
    Regards
    Srinivasan Desingh

  • How to create a folder for a specific e-mail account?

    How to create a folder for a specific e-mail account?
    I'm using a POP e-mail account and I would like to create folders / sub-folders... how can I do this?

    You can right click on your Desktop and select New Folder.  In Finder File > New Folder should work too, not in front of my Mac.
    Welcome to back by the way.  You might find these websites helpful.
    Switch 101
    Mac 101

  • How to create  a datasource for 0COSTCENTER to load data in csv file  in BI

    how to create  a datasource for 0COSTCENTER to load data in csv file  in BI 7.0 system
    can you emil me the picture of the step about how to  loaded individual values of the hierarchy using CSV file
    thank you very much
    my emil is <Removed>
    allen

    Step 1: Load Required Master Data for 0CostCenter in to BI system
    Step 2: Enable Characteristics to support Hierarchy for this 0Cost Center and specify the External Characteristic(In the Lowest Node or Last Node) while creation of this Characteristic InfoObject
    Step 3: On Last Node of Hierarchy Structure in the InfoObject, Right Click and then Create Hierarchy MANUALLY by Inserting the Master Data Value as BI dosent Support the Hierarchy load directly you need to do it manually....
    Step 4: Mapping
    Create Text Node thats the first node (Root Node)
    Insert Characteristic Nodes
    Insert the Last Node of the Hierarchy
    Then you need to create a Open hub Destination for extracting data into the .csv file...
    Step1 : Create the Open Hub Destination give the Master Data table name and enter all the fields required....and create the transformations for this Open Hub connecting to the External file or excel file source...then give the location on to your local disk or path of the server in the first tab and request for the data...It should work alright let me know if you need anything else...
    Thanks,
    Sandhya

Maybe you are looking for