hello, everyone,
  Our factory have Two equipments , one is a new equipment A , the other is an old equipment B,
  they all produce the prodcut W , but the old equipment B consume electricity ,warm water and Raw material is much more than the new equipment  A.  So the cost price  of product W is different when they were produced by equipment B and equipment A.
  the Finacial Department and Sales Department want to know different cost price of product W via different equipments in the end of every month. Now we use two different material NO to deal with it(actually it is one product ) ,but this method take a lot trouble to stock, because  one product quantities were seperated by different material NO in Storage location.
  According to this requirement, we activate the split valation, but the customizing of  split valuation just supply one field for  val.type in-house prod, at the same time , the t-code CK11N screen has not the field vauation type. if we don't estimate the material cost price by CK11N, when we create sales billing ,the system can not post COPA document  and give a error that is :“Valuation with material cost estimate: error with product "1180119998"
   may you have a good method to deal with this type of business or you ever met this kind of  business . may you share it , I appreciate you for your help !!!
    Davis
    Best&Regard.

Hi
You can change the same through MR21
regards
Sanil

Similar Messages

  • How to Maintain two different prices for same material in different qty?

    Dear all,
    How to maintain two different prices for same material in different batch quantities in purchase order(ie.,info record)?
    (Vendor is supplying quantities in 2 different batches & also in different prices)
    Expecting valuable reply.
    Jeyakanthan

    In a PO you can create 2 items, and each item can be maintained with a different price in the conditions.
    In info record it is not possible to have different prices for the same period, except for scales.
    so if you have a price of e.g. 2 USD for 1000 kg and 1,90 USD for 2000 kg then you can maintain this in scales, but you still have to have 2 items in the PO so that each one can individually find its price.
    Alternative you can create contracts (as well with more than one item) to reflect the different prices and batches.

  • How to Control Finished Product Price based on Raw Material

    Hi Experts,
    Our client manufactures Steel Products where basic Raw Material is Steel.
    Customer will give annual contract/Sales Order on the rate prevailing on the contract date. But there is clause that if Steel prices increase / decrease by 5% then correspondingly Finished product price will change by 3%.
    How can this be mapped in SAP where by based on Raw Material price, Finished product can vary?
    Regards

    Hi Ajay,
    Please go through this link. you will get an idea
    Price list change according to raw material cost
    Thanks
    Dasaradha

  • How do I update standard cost for split valuation material?

    We are using split valuation on our maintenance material.  Maintenance material is held in an inventory account separate from our production material.  We have materials that are set up with a Parent material as variable, and child materials  which are NEW or REFURBISHED or CORE.
    The Child materials are set as standard cost.  Some of the standards are old.  Unlike our production materials, which have their cost standards on the Costing 2 tab of the material master, split valuation child parts have their costing on the Accounting 1 tab.
    I attempted to update a cost standard by loading a future price manually in the material master.   I was able to load a future price, but could not get it to release in CK24.
    I have been unsuccessful in finding a process or procedure that tells me how to update a child standard once is already exists.  There was one blog that said that the standards could only be released using CK24N if the quantity is zero.  I attemped to update costs on part with zero quantity on hand. This was also unsuccessful.
    I am looking for a process- ie 1) load a future cost using tcode XYZ, 2) Mark and release cost using tcode XYZ, 3) validate changed inventory value using tcode XYZ.
    Thank you in advance for your assistance.

    Hi Govind
    If your valuation variant reads MAP as the strategy sequence - Then average MAP will be taken... i.e. the MAP in the parent accounting view of the material will be taken
    However, if your strategy sequence is intended to look for info records, then follow the link given in the earlier reply
    Regards
    Ajay M

  • Canu00B4t use two step transfer with split valuation ?

    Hi people , i´ve activated split valuation for MaterialX , it has two Valuation types ( Production and Purchase ) . The problem arose when i tried to do a two step transfer between plants ( mov 303 ) and i got the following error msg :
    Use one-step procedure for transfer posting to mat. subj. to valuation
    Message no. M7048
    Diagnosis
    In the receiving plant, the material is subject to split valuation. For this material, a stock transfer cannot be carried out using the two-step procedure.
    Procedure
    Use the one-step procedure (movement type 301) or a stock transfer order for the stock transfer.
    The message is very clear itself , but... i just wonder if there`s actually any way to avoid this, considering that having to create a transfer order for each movement will duplicate work and using a one step transfer won´t be practical. I tried to change the error msg into a warning but couldn´t find it in customizing. Thanks for any comments on this !

    First of all , thanks everyone for the help.
    Csaba Szommer, Kunal ingale  , i read the OSS note and the pdf and indeed everything confirms it´s not possible to do the two step movement. So , i tried the stock transport order and something else appeared here. When creating this type of order , the system first ask for a Supplying Plant , then you can populate the material , quantity and the destination plant. But then it asks for the Valuation Type of the material involved, and it seems this field is Mandatory . Is it possible to make this field on the transport order as optional ? I couldn´t find this field at SPRO-MM-Purchasing-Purchase Order-Define Screen Layout at Document Level .
    I need this field to be optional for the following reason. In my company there´s a relation between two plants , Plant A ( from where products are dispatched to the customer ) and Plant B ( where the material is produced with valuation type "Production" and sometimes is buyed from vendors with valuation type "Purchase" ) . The idea is to run an MRP which will generate the material needs on Plant A considering the Sales Orders. This need will be then transformed (automatically by MRP ) in Stock Transport Orders with Supplying Plant "Plant B" and receiving "Plant A". The problem here is that , at the moment of the transport order creation it´s no possible to know which will be the valuation type of the material that will satisfy the need. I mean , Plant B ( production and buying plant ) will check the list of needs for Plant A and then will decide which material ( with which Valuation Type ) they will provide considering the actual stock levels at the time of the MRP run.
    In a few words, i see the only way to do a two step transfer of a split valuated material is using Stock Transport Orders , is there a way to make the field "Valuation Type" optional ?. The idea would be to choose the Valuation Type of the material at the moment of the Good Issue.  Thanks a lot , once again.
    Edited by: Christian  Len on Jul 7, 2008 3:16 PM

  • Different price for split valuation

    hai
    for split valuation material shal we define different pricing?
    for ex :
    materail - Pen
    we split the category is "colour "
    the valuation type is red , blue ,black (with different prices)
    red - 12 Rs
    blue -15 Rs
    black -10 Rs
    i know that we can maintain in material master record .
    But we need while doing THE P.O for red colour pen the price must be Automatically taken from the system as 12 Rs,
    and same as blue colour pen as 15 Rs , and for black colour pen as 10 Rs.
    i searched in "INFO RECORD" .we can only define the "valuation type " .we cant able to dife different pricing for split valuation material in info record
    where we have to maintain the different pricing for valuation material .kindly explain.
    regards
    christo.

    hi,
    you need maintain records for your pricing condition say (pb00).For that u need to create a table in m/03 with  combination of material valuation type , price.and  then assign the table in accesses sequence of the pb00. then maintain records in mek1 with key combination of the above created table.it will help u.

  • Inforecord for Split valuated materials

    Hi all,
    How can i maintain different prices for split valuated materials
    For Eg.  I have a material split valuated based on its Quality vendor supplies two diff quality materials with different prices
    how to maintain the prices in inforecords or any alternative to maintain both the prices.
    With regards,
    Krishna

    hi..
    Split valuation is for Valuation Purpose only...
    SAP does not support....Procuring same material with Diff. Split Valuation Type from Single Vendor is not allowed by SAP standard..
    You cannot Maintain Purchase Info for Material which is having 2 Split Valuation type......with One Vendor......
    Because For One vendor and One material combination, you can maintain One split valuation type only....
    Hope it works..
    Thanks..

  • Split valuation with batch management and project stock

    Dear Gurus,
    I need to combine two following requirements:
    1. split valuation with batch management (valuation type = batch number)
    2. project stock
    These two functionalities work fine separately but not together.
    I receipt PO for material with spiit valuation on a batch level into a project stock. Posting is OK and material document (MSEG table) seems to be OK (batch number, valuation type and project stock are in this table). The problem appears when I want to display material in this valuation type (MM03) or batch (MSC3n). They don't exist!!!  Short investigation showed that during goods receipt table MBEW (valuated stock) was not updated with this valuation type.
    But If PO is receipt into normal stock first and then posted into project stock everything is OK.
    Have you had or heart about such issue? I would appreciate any sugestion. 
    Thsnks in advance.
    Marcin Bernat

    Hi,
    As you already know ,u are using project stock and doing goods receipt against project, stock table QBEW will be updated and not MBEW. MBEW only updates in case of plant stock valuation. If u receive any goods against project stock it does not contribute to plant stock. Irrespective whether your material is managed in split valuation or not, If it is received against project stock it only updates QBEW. There is no need to update MBEW, if u r using split valuation in project. QBEW also have valuation type as another level like MBEW. If u want to see material price for project stock, it can be  seen in QBEW -valuation type and not in mm03.
    As u r receiving goods against project stock this is d only reason QBEW is updated and not MBEW.
    QBEW will store all information like MBEW for batch number, valuation type and project stock assignment.
    Hope it answers your question.
    Deepak.

  • Stock transfer between plants for split valuated materials

    Hi,
    I'm doing a stock transfer between plants without STO.
    The FG's are split valuated,which are transferred from central warehouse to other warehouse at different states.
    I'm trying to use mvt type 303 and 305 to transfer the FG.
    But getting error "Use one-step procedure for transfer posting to mat. subj. to valuation".
    Please suggest how to achieve the requirement.
    Is it possible to make 303 mvt type document to be parked and posted.
    Regards,
    Venkatesh

    << Moderator message - Cut and paste response from Error when doing two step transfer between Plants with split valuation removed and points unassigned. Plagiarism is not allowed in SCN >>
    Refer below link with same issue discussed,
    [two step transfer with split valuation |Canu00B4t use two step transfer with split valuation ?]
    Edited by: Rob Burbank on Feb 3, 2012 11:30 AM

  • Split valuation- material identification

    Hi, letus say we maintained grade1 price and grade 2 price thru split valuation for material x, say shaft. here material number and description is same for both grade materials. How to know which grade should be manufactured when the order comes from sales/ customer? Basically how to identify the material incases of issue to shop floor, receiving from shop floor or from vendor or to customer?

    When you activate spilt valuation for material then for posting inventory movement system will ask you to select the valuation type.
    If material is going to be procured from outside(Vendor) then while creating Purchase order you need to select the valuation type. Same will be considered at GR posting.
    At Issued stage also you need to select the stock from valuation type.
    Regards,
    Ajay Nikte.

  • How to estimate different cost via diffrent equipement to one product in SAP

    hello, everyone,
      Our factory have Two equipments , one is a new equipment A , the other is an old equipment B,
      they all produce the prodcut W , but the old equipment B consume electricity ,warm water and Raw material is much more than the new equipment  A.  So the cost price  of product W is different when they were produced by equipment B and equipment A.
      the Finacial Department and Sales Department want to know different cost price of product W via different equipments in the end of every month. Now we use two different material NO to deal with it(actually it is one product ) ,but this method take a lot trouble to stock, because  one product quantities were seperated by different material NO in Storage location.
      According to this requirement, we activate the split valation, but the customizing of  split valuation just supply one field for"  val.type in-house prod", at the same time , the t-code CK11N screen has not the field vauation type. if we don't estimate the material cost price by CK11N, when we create sales billing ,the system can not post COPA document  and give a error that is :“Valuation with material cost estimate: error with product "1180119998"
       may you have a good method to deal with this type of business or you ever met this kind of  business . may you share it , I appreciate you for your help !!!
        Davis
        Best&Regard.

    Davis,
    You can create different production order like one production order for new  equipment   Or Other For second old equipment  and old equipment order you can increase the material component quantity .
    or second  i agree with Mr. Biju K
    you can create two cost center
    old equipment : xxxxx
    new equipment : yyyyy
    you can create different work center base on two separate cost center so all cost book in separately in cost center.

  • How to use two split this method in my code

    How to use two split this method in my code
    if i got one string line which like this
    ("aa!bb!cc~ab!bc!cd") a
    nd want to use two split to spare ! and ~ this seal for my spare point how that output
    has come diff ?
    public static void main(String[] args) {
        String str = "aa!bb!cc~ab!bc!cd";
        String strs[]= str.split("~");
        String strE[]= str.split("!");
        int count =0;
        for(int j=0; j < strs.length; j++){
          for (int i = 0; i < strE.length; i++){   
              System.out.println(count + " " + strE);
    count++;
    the output how can it be like this
    0 aa
    0 bb
    0 cc
    1 ab
    1 bc
    1 cd

    Move your second slit inside the first loop, so you are splitting the substring, not the entire string.

  • Hi, when I upload music into itunes from a cd it sometimes appears in itunes as two different albums and split up the music in 2 or even three albums....how can i merge these albums...this is particularly true when one album may have different composers?

    Hi, when I upload music into itunes from a cd it sometimes appears in itunes as two different albums and split up the music in 2 or even three albums....how can i merge these albums...this is particularly true when one album may have different composers?

    Generally setting a common Album title and Album Artist will fix things.
    For compilations that aren't, select all tracks, Get Info, and on the option tab set Part of a Compilation to No. If it already says No tick the box alongside, then click OK.
    For deeper problems see Grouping tracks into albums.
    tt2

  • How to arrive same day two difference prices for same material/customer

    how to arrive same day two difference prices for same material/customer.pls give the solution
    thanks in advance
    Aravinthan.K

    Hi
    This is possible through some careful customization
    In your condition table you need to bring the field PRICE LIST
    That is customer/ Material/ Price list
    That is customer  ABCD / Material X / Price list 01---Price is Rs 10
    That is customer  ABCD / Material X / Price list 02---Price is Rs 20
    The condition records to be maintained like this
    So same material and same customer with price list 01 price is Rs 10 and with  price list 02 price is Rs 20
    Now in sales order you will find  price list field in item details SALES B tab
    Through incompletion log you can make this field as an mandatory field
    Now in sales order same material and same customer according to the price lists different price is picked
    In img-sd-basic functions-Maintain Price-Relevant Master Data Fields--here you can define different price lists
    Regards
    Raja

  • Split valuation for  material with two different price indicator S and V

    Hello Gurus,
    Is it possible to maintain split valuation for same material with two different price indicator S and V.
    For Ex. Material A is manufactured can be manufactured in house ,  procured from outside vendor and can be purchased from subcontracting vendor by providing raw material.
    We want to keep  Price control V for same material " A"  which is procured from outside vendor.
    And price control S for inhouse produced same material " A".
    Besically this material is semifinished and having BOM for subcontracting.
    Please advice.

    Hi
    When the material is split valuated, you maintain the accounting view for the material 1st with valuation category, here the price control should be V.
    When you will extend the material to valuation type "Inhouse mfgd" maintain the price control as S, for valuation type "Procured form outside vendor" maintain it as V.
    Regards
    Prasad

Maybe you are looking for

  • FCP Fails on Export of HDV Footage

    Here's my problem in a nutshell: I have a 75 minute edit that will not export from the timeline. I have 2 tracks of video - the first track is HDV (1080i60 - imported from JVC GYHD 100U), the second is a mix of HDV b-roll (1080i60 - imported from Son

  • Sort order in Photo Browser

    The sort order of photos appearing in Photo Browser while in Mail has been, until recently, showing the most recent photos first. Today, it started showing the oldest photos first. Any ideas about what I did to change the order, and how I can reverse

  • Posting periods not allowed

    HI experts, while doing Intial stock posting in MB1C 561 movement type it showing "posting only possible periods 2007/12 and 2007/11. I have checked in MMRV current period 12/2007 previous period 11/2007 pls advice me. It still showing the above erro

  • Themes won't render in iMovie06

    When I use some Themes in iMovie in order to make my Holiday-Videos a little bit more "interesting", I can choose all the themes and templates und drag them in the timeline. However they won't render, so that the red line won't change. Also saving my

  • Back up time duration - time machine slow

    I have a newish mbp. I have about 270 gig on it ot 750 gig drive. My Time machine bacup stalled and after researching it was suggest to clear the backup drive totally and start again. This i did. Backing up to G Tech 2 TB drive via firewire 800. Have