How to setup a routing rule for a specific file type for the content organizer?
Hello,
how can I set a routing rule for a specific file type, for example for "pdf" or for "docx", for my content organizer?
As standard I can only choose for the rules the content type, name and title of the file uploaded.
Thank you in advance!
JohnyG
Hi Johny,
Based on your description, my understanding is that you want to create a routing rule for a specific file type.
I recommend to create rules with the conditions as the image below shows for the Document content type(for example: .docx files):
Best regards.
Thanks
Victoria Xia
TechNet Community Support
Similar Messages
-
How to create custom audit rule for the following in jdeveloper ESDK
Hi,
I need customized audit rule which uses Oracle Jdeveloper 11.1.2.0 with ESDK extension. Can any one help me please.
The following is the audit rule I need.
I should not use any where "+" for concatenating more than one string in our project.
How can I achieve this.
Thanks in advance.
Lakshmi Narayanan.Hi,
see
http://blogs.oracle.com/jdevextensions/entry/don_t_fear_the_audit
http://blogs.oracle.com/jdevextensions/entry/don_t_fear_the_audit1
Frank -
How to config rewrite form rule for html content?
Hi,
How to rewrite the
"<form name="f01" method="post" action="http://10.64.36.102/AGC_SPAS_Dev/login/login_submit.asp" onSubmit="return DataChk(this)">"
to
"<form name="f01" method="post" action="http://www.xxx.com/http://10.64.36.102/AGC_SPAS_Dev/login/login_submit.asp" onSubmit="return DataChk(this)">" ?
And to implement the "http://www.xxx.com/http://10.64.36.102/..." URL, do I need to secure remote access add-on?
Thx
-Eagle LeeYes, I installed secure remote access pack. Don't I don't know how to config the rewriter and gateway. Anyone can help me? Thx
Regards
-Eagle Lee -
How to setup a global artwork for a TV Show
Hi, I've a TV Show composed by 45 episodes where each one have his artwork but I don't know how to setup a global artwork for the TITLE of the TV Show while retaining the 45s artworks.
ie. when watching the Tv Shows (library on iTunes) I would like to see the global artwork of the Tv Show that is different of the other 45s episodes contained.
Bye, Roberto.Sorry, I don't believe that you have had a good look at the Foundation framework. I'll now hold your hand while we go through the basics.
Here is the specific page http://foundation.zurb.com/docs/components/grid.html
The default values are
Em-base : 16px
Row width: 62.5em (62.5em x 16px = 1000px)
Columns per row: 12
These and other default values can be changed. The fact of the matter is that if you stipulate a section width of 2 or 3 or 12 columns, the widths will automatically be calculated for you.
In your case, if you want 7 columns, all you need to do is change the number of columns per row and the rest is done for you. -
How to write a rule for the scnario...
Hi ,
Any body please tell me how to write a HFM rule for the following scnario.
Pull<Parent Currency> value for base members from ACTUAL_EURO scenario and replaces <Parent Currency> value of for base members in ACTUAL scenario. At the end of this process, the actual scenario holds functional currency in <Entity Currency>, EURO in <Parent Currency>.
It's Urgent.
Thanks in Advance,
Mohansub calculate()
if hs.scenario.member="ACTUAL" then
Elist=hs.entity.list("","[Base]")
if hs.value.istranscur=TRUE then
if hs.entity.isbase("","")=TRUE then
hs.exp "A#ALL=A#ALL.S#ACTUAL_EURO"
end if
end if
end if
end sub
While running the Rule file getting the below error
An error occurred.
Error: 800456C8
Log:
Load started at: 12:06:02
Number of Errors: 1
Number of Warnings: 0
<?xml version="1.0"?>
<EStr><Ref>{151D9809-D203-45E2-BA63-EDDF93FF758C}</Ref><User/><DBUpdate>1</DBUpdate><ESec><Num>-2147214193</Num><Type>0</Type><DTime>6/3/2010 12:06:02 PM</DTime><Svr>ALVHYPW05</Svr><File>CHsvCalculate.cpp</File><Line>1773</Line><Ver>9.3.1.0.2042</Ver></ESec></EStr>
Load ended at: 12:06:02
Elapsed time: 00:00:00
Thanks,
RON -
How to setup gmail push notification for my iphone 5?
I'm using gmail. Prompt respond for mails is very urgent for me.
How to setup gmail push notification for my iphone 5?I switched from a BB to an iPhone a few days ago and I knew I was going to miss the QWERTY keyboard but then I also discovered that my GMail doesn't 'push' to my iPhone. I was used to 'push' for all mail accounts on the BB. I also missed being able to personalize text, email, and phone tones for individuals.
I tried the Gmail app for iOS and it does deliver Gmail to the iPhone app quickly but the text is tiny and when it is a web page it's almost impossible to read.
So, I have worked out a kludge to get around these problems.
I added my exisiting Gmail account to the iPhone.
Hotmail does push to iOS 7 so I created a Outlook account (could be hotmail or Live) using the web browser.
I added the hotmail account to the iPhone. I basically use this to give fast notification of important emails on my iPhone.
On my macbook email client I created a rule that 'redirects' incoming mail to the hotmail account. The 'Redirect' is important since the email will show up in the hotmail account on the iPhone as coming from the original sender and you can then respond to the original sender from the iPhone, though the sender will see it as coming from the hotmail account.
The other downside is that you will get a second copy of the email in the gmail inbox on the iPhone, probably 15 minutes later.
If you don't want all of the mail being redirected you can create a 'redirect' group in the Address book and then adjust the rule in Apple mail to only redirect the mail to the hotmail account if the sender is in the redirect group. You can add and delete contacts from this group depending upon which ones you consider to be important. You will still get two copies of the email on the iPhone, one in the hotmail inbox and one in the gmail inbox.
You can prevent this from happening temporarily by turning off, but not deleting, the gmail account on the iPhone. You could then edit the emails on the Apple email client before turning the gmail back on in the iPhone.
And finally if you use the VIP feature in email on the iPhone you can create a list of VIP contacts and then assign a different notification sound for the VIP's. So in effect important contacts mail will be redirect to the iPhone for quick notification and very, very important contacts will have a different notification sound.
I'm basically using the Hotmail account as a notification tool and basically delete all the emails in it since the original copy will be in the gmail account.
And best of all it's all free, except for the bandwidth. -
How can I activate the transfer rules for the ODS updating a data target.
We are on BW 3.5 and I'm loading data into the 0FIGL_O10 ODS and then uploading the data into the cube 0FIGL_C10. The data loads just fine to the ODS but when I try to <u><b>'update the data target'</b></u> I get a date & time stamp' error on the info-package transfer rules.
I then Replicate the datasource 80FIGL_O01.
I must then <u><b>'activate' the transfer rules</b></u>.
However I cannot get the transfer rules for 80FIGL_O10 in CHANGE MODE to activate them.
How can I activate the transfer rules for the ODS updating a data target.
The error text is as follows:
DataSource 80FIGL_O10 has to be replicated (time stamp, see long text)
Message no. R3016
Diagnosis
DataSource 80FIGL_O10 does not have the same status as the source system in the Business Information Warehouse.
The time stamp in the source system is 02/15/2007 10:42:33.
The time stamp in the BW system is 11/07/2006 13:11:54.
System response
The load process has been terminated.
<b>Procedure
Copy the DataSource again and then activate the transfer rules that belong to it. You have to activate the transfer rules in every case, even if they are still active after the DataSource has been copied.</b>
Thanks for your assistance.
DennyHi Dennis,
Try, using Business Content to activate your data source
hope this will help you
How activate business content?
http://help.sap.com/saphelp_nw04/helpdata/en/80/1a66d5e07211d2acb80000e829fbfe/frameset.htm -
How to setup a company code for material management
Hi,
While creating material in MM01, in sales org tab, when I gave plant XXXX, it is giving an error "Company code YYYY is not setup for material management".
So can you help me , how to setup a company code for material management
Help is appreciated
thanks
DILHello Sendil,
You can maintain it with trns code OMSY or MMPI/MMPV.
Hope this helps
Regards
Arif Mansuri -
How to setup a release strategy for store generated purchase order
Hi there,
Does anybody know how to setup a release strategy for store/plant generated purchase order? I have a request from our client, but I never cross this before. Please help and let me know the step with every single detail.
Greatly thank for your help.
Kind Regards,
2teaPlease go thru the below Release Procedure and check whether you have maintained all the settings properly.
PO RELEASE STRATEGY
The release code is a two-character ID allowing a person to release (clear, or approve) a requisition or an external purchasing document. The release codes is basically controlled via a system of authorizations (authorization object M_EINK_FRG).
Use SE12, structure CEKKO to check all the fields available for controlling the Purchase Order.
e.g. If the total value for the Purchase Order exceeds 10,000, release strategy 01 is assigned to the Purchase Order. There is only one characteristic created in this example. For controlling the Purchase Order type, create characteristic for CEKKO-BSTYP and the value NB.
CT04 - Create Characteristic e.g. NETVALUE
Click Additional data Table name CEKKO Field name GNETW and press enter
(for currency dependent field, you are prompt to enter the currency which the system then converts the currency of the Purchasing document into this currency)
In the Basic data (X refers to tick),
X Mutliple values
X Interval values
In the Value data, in the Char. value column, type >10000 and press enter
Save your data
CL02 - Class
Class - Create REL_PUR
Class type - 032
Click Create
Description - Release Procedure for Purchase Order
In the Same Classification section, click Check with error
In the Char. (characteristic) tab, type NETVALUE to assign your characteristics to the class
OMGS - Define Release Procedure for Purchase Order Type
Release Group - New entries
Rel.group Rel. Object Class Description
02 REL_PUR Rel. Strategy for PO
Release codes - New entries
Grp Code
02 01
Release indicators
Release indicators Release Description
0 Blocked
1 X Release
Release Strategy
Release group 02
Rel.strategy 01
Release codes 01
Release status 01
Classification Choose your check values
OMGSCK - Check Release Strategies
(make sure there are no error messages)
Once the Purchase Order is not release, buyers will not be able to print the Purchase Order.
Goods Receipts will be shown with Message no. ME 390 - Purchasing document XXXXXXX not yet released.
In 4.6c, Purchase Order with Release Strategy have a tabs at the end of the Header. This allowed the buyers to check the release status of the Purchase Order.
The person with the release authorization have to use ME28 to release the Purchase Order.
Regards,
Ashok -
How to setup a default direction for new divs in fluid grid layout in dreamweaver?
Hi,
how to setup a default direction for new divs in fluid grid layout in dreamweaver? I am an RTL interface user, I need my new divs to be inserted from right to left not Left to Right! could it be in dreamweaver?
Thanks.This may get me into strife, but my experience is that you are better off finding another platform for your RWD.
The framework that I tend to use is by Zub-Foundation http://foundation.zurb.com/.
A commercial product that I have come to appreciate can be found here http://www.projectseven.com/products/tools/composer/index.htm. Please do not mention me if you happen to choose this product. -
How to setup a default size for new divs in fluid grid layout in dreamweaver?
Hi,
how to setup a default size for a new divs in fluid grid layout in dreamweaver? I don't need the default size for new divs as a 100% width, I need them 13.69% as a one coulmn width only (7 coulmns fluid grids layout for desktop size 1000w).
This problem I've faced when I intended to insert dozens of fluid grid divs in the layout.Sorry, I don't believe that you have had a good look at the Foundation framework. I'll now hold your hand while we go through the basics.
Here is the specific page http://foundation.zurb.com/docs/components/grid.html
The default values are
Em-base : 16px
Row width: 62.5em (62.5em x 16px = 1000px)
Columns per row: 12
These and other default values can be changed. The fact of the matter is that if you stipulate a section width of 2 or 3 or 12 columns, the widths will automatically be calculated for you.
In your case, if you want 7 columns, all you need to do is change the number of columns per row and the rest is done for you. -
How to setup PCG Flow Rule Process flow with Business Event subscription
Hi,
How to setup PCG Flow Rule Process flow with Business Event subscription type?
When should Business Events be used?
The latest user guide does not provide ay information on this functionality of Flow rules.
ThanksYou should find it's usage noted in the new PCG user guide on page 3-26 under the heading "Configuring Workflow/Event Rules". This way you can have a Flow Rule call a business event component or a workflow. This would be kicked off within a process flow as one of the steps.
I hope that helps. -
How to set the default settment rule for the same kind project.
hi experts:
the project of the same kind of the project profile have the same settment rule to one account (G/L).
how to set the default settment rule for the project of this kind of the project profile.
regardsHi,
You need to define the settlement profile and allocation structure.
next you need to define the Strategy for settlement rule.
navigation-PS> costs> automatic and periodic allocations> settlement> Settlement rule for WBS
--> Define strategy for settlement rule.
Select the strategy and click on settings. in that new entries, check the Acc Assg element, enter Settlement profile and mention accass category as reposnsible cost center.
Save this transaction.
Now create a project assgin responsible costcenter for the WBS element in the project buider and save the transaction.
Now run CJB2 transaction for the project, settlement rule will generated automatically.
even you can configure the same for profitability segment.
Rgds
Sudhir Reddy -
My ipohne and ipad use the same account. My wife wants to setup her own account for the ipad and utilize family sharing. How can I change the account in my ipad?
Hi,
Are you talking about changing the Apple ID used for purchases in iTunes? If so go to 'Settings->iTunes & App Store-> then 'tap' on the Apple ID that appears and click Sign Out on menu that appears. You can now login with a different Apple ID.
Regards,
Steve -
How to set up automatic payment for the purchase order
Hi, All,
I have one question how to set up automatically payment for the Rent Office purchase Order?
There is the requirement from the client. They want to create one kind of purchase order for the Office Rent, then pay the fees in the certain time of every month to the vendor for the rent fees without any invoice. Whatu2019s the normal solution for this kind of purchase order? Is it ERS? Or something else?
Please give me the details and business flow. Also please tell me how to setup in the SAP and T-code.
Thanks in advanceEither you can set up ERS or you can pay directly from the FI side.
Prerequisites
Evaluated receipt settlement must be flagged in the purchase order item.
The vendor must be flagged as being subject to ERS in the vendor master record.
The goods receipt must refer to a purchase order.
Goods-receipt-based Invoice Verification must be defined for the purchase order item.
A tax code must have been maintained in the purchase order item.
The order price of the materials may not be an estimated price.
If you flag a vendor as being subject to ERS, the system sets the ERS indicator as a default in each item when you create a purchase order for the vendor. You can prevent this happening for certain vendors by flagging the info record for the material and the vendor as not being subject to ERS.
In Purchasing, you can delete the default ERS indicator in a purchase order item.
Choose Logistics Invoice Verification ® Automatic Settlement ® Evaluated Receipt Settlement (ERS).
The selection screen appears.
You can use the following criteria to narrow down selection of the transactions to be settled:
Company code
Plant
Goods receipt posting date
Goods receipt document
Fiscal year of the goods receipt
Vendor
Purchase order and order item
You can define the selection criteria for the invoice documents by:
Delivery
Purchase order
Purchase order item
Goods receipt document
Credit memo
Invoice
Currency
Choose Execute.
The system issues a log for Evaluated Receipt Settlement, which displays the following:
Settled
In line with your selection criteria, the system displays all the order items that were settled (or if you are working in test mode, which would have been settled).
Could not be settled
In line with your selection criteria, the system displays all order items for which ERS is defined but could not be settled. It also lists the reasons.
If the system reports being unable to invoice a transaction, you should exclude the transaction from ERS to avoid it being included in the log the next time ERS is run.
Select the item and choose Exclude from ERS.
The system also generates and possibly sends a message to inform the vendor(s) about the transaction settled, depending on the settings in Customizing.
You can display the following environment information for the order items selected. To do this, choose Goto ®:
Display purchase order
Display invoice
Display material document
Display long text
Maybe you are looking for
-
Error while activating Data Store Object
Hi Guru's, When I try to activate a data store object i get the error message : The creation of the export DataSource failed No authorization to logon as trusted sys tem (Trusted RC=2). No authorization to logon as trusted sy
-
Hi, I'm thinking of buying a new mac-mini to replace my current one which acts as an iTunes server and records TV programs using eyeTV. I connect using screen-sharing/VNC to be able to do stuff on it (like handbrake etc.) I have eyeTV with a satelite
-
Hard Drive Not detected after replacing DC In Board
So after more than a year of jiggling an easliy bent AC adapter in the port to get my ibook G4 to charge it just quit and would not charge. I suspected it was the slightly loose DC in port (having no idea what was behind the little hole) so I took it
-
I have a 24" iMac that's been great until the recent EFI update. When it goes to sleep I can't wake it. I have the wireless MM and kb, and they woke it before. I even plug in a usb mouse and keyboard, or hold the play/pause button on my front row rem
-
Problems with a waking up a labview executable after computer hibernation?
I am just wondering if anyone has had any problems with waking up a labview executable after hibernating a computer. The executable was running before the computer was hibernated and it seems to have frozen not crashed after the computer was woken u