How to terminate BCK ground jobs permanently

Hi all,
I have 2 jobs which are triggering every 3 mins as a background job and i have no clue about what these jobs are, it so happens that sometimes they take very long time to complete, and because of which the server acts slow during the DAILY TRACTION TIME line (main business hours).
The follwoing are the background jobs....
<i><b>POS_CHG_PTR_OB_20 and POS_CHG_PTR_OB_10</b></i>
FYI our landscpe is 2 system (DEV(sid: RT1) and PRD(sid:RT2)) and we also have <i><b>XI DEV and XI PRD servers</b></i> as this is a retail project.
I assume that these 2 bckgrd jobs send in data to the XI system from our R/3 PRD server, but no sure.
Now my point is can i DELETE THESE jobs permanently or not, if YES then how to cancel them.
<b>ECC 6.0, Oracle 10G and AIX (DEV and PRD servers)
ECC 6.0, Oracle 10G and Win 2003 (XI DEV and XI PRD)</b>
I highly appreciate if anyone can feed in some help and info on this..
I request you all to treat this urgent..
Reward points for sure ..
Thanks a million in advance
Regards
Hunky

Hi
go to SM37 --> enter the job name POS_CHG_PTR_OB_* --> check Released check box --> Execute
You will be seeing jobs in release status . Select the job and from Menu -->      Job -->  " Released --> Scheduled " , do the same for second job . Now the job status is changed to scheduled so it wont start every 3 mins. After detail analysis if you see this job isn’t required you can delete it. Get the required approval if necessary
thanks
Prince Jose

Similar Messages

  • How to analyse Back Ground Jobs in BI

    Hi,
    How to analyse Back Ground Jobs in BI
    RSDB2MA1 and RSDB2MA2
    My requirment is to check the error logs for these job
    How to navigate there
    Thanks

    Dear BW user,
    Sm37 and sm50/51
    1)Go to Sm37
    2) Give the job name and in user give as *
    3)press execute or f8
    4) Press job log in the screen..keep refreshing it for update
    5)Press job detaisl..get pid no and wp no..in it
    6) go to sm50/51
    check for given wp no... and pid no..job is running or waiting or not
    sm66
    1)go to sm66
    2)in sm66 you can see only the central instance job running in
    3)You cant find any application server in it
    Hope it helps you,Revert me back if you have any queries
    Assign points if helpful
    Regards
    Bala

  • How to terminate the next job step in Background job?

    Hi,
    I have the requirement from the user that want to terminate the next job step in the background job that currently running (Status Active).
    For example, Background Job A, contains 5 job step, once the background is running, we would like Job A not run thru job step 4 and 5, just run up to job step 3. 
    Anyone have any idea how can I do that?
    Thanks
    Nattawat S.

    Hi,
              Try to delete instead of cancel in SM37.
    To cancel and active job, select the job from SM37 and Click on STOP button in application toolbar. You can refer to your other thread for more info.
    Regards

  • How run the back ground jobs

    Hi Experts,
    I have one scenario .
    I have scheduled on program in back ground.
    now that in back . when i excute that back job program.
    I need to  tranfer that data to application server.
    please suggest me how to do this.
    Ramesh.
    thanks in advanice.

    there is a system variable sy-batch which recognises if the job is running in background or not..
    OPEN DATASET p_file FOR OUTPUT IN TEXT MODE ENCODING DEFAULT.
    IF sy-subrc NE 0.
    MESSAGE e001(zsd_mes).
    EXIT.
    ELSE.
    *---Data is downloaded to the application server file path
    LOOP AT it_tab2 INTO wa_tab2.
    TRANSFER wa_tab2 TO p_file.
    ENDLOOP.
    ENDIF.
    *--Close the Application server file (Mandatory).
    CLOSE DATASET p_file.

  • How to define front-ground job

    Hi
    I know to use SM36 to define background job. but there is some formal problem if we run ABAP rerport in background. So, I want define a job in front-ground at night.
    anybody can tell me that how to define a job in front-ground at night!
    Thanks
    Henryr

    It sounds as if you need to change the print format settings so the report will fit on the page, or remove columns from the report.
    You can change the print specifications in SM37 via the "Print specifications" push-button in the job step creation dialog. In the "Background print parameters" pop-up, select your printer and then the "Properties" push-button. That leads to a pop-up where you can change the print format i.e. the number of columns printed on the page.
    best wishes
    Ed

  • How to Schedule Back Ground job For every 30 Min...

    Hi friends,
    Please Tell me the steps...
    How to schedule BACKGROUND Job for every 30 Min.
    Please Help me ..its urgent.
    Thanks & Regards,
    Vasu.

    Hi Vasu,
       Goto SM36, here you can create your own jobs and schedule them accordingly.
    Hope this is helpful to you. If you need further information, revert back.
    Reward all the helpful answers.
    Regards
    Nagaraj T

  • How to set Back ground job & get my desired output layout in sm36 & sm37 ?

    Hai SAP ABAP/BASIS Gurus,
    I am currently taking ME2N PO Pending value Report by setting variant in input screen & setting my own output layout  ie only four field ie.Plant, Material,Currency,Still to be delivered value will be visible in output screen
    I set Back ground in sm36 using my variant & i saw my output in sm37.. But I cant get output as my desired field..
    This is my problem..
    1) I Cant Get the Same output in shedule job [sm36 & sm37] like When i run in foreground for ME2n.
        I am using ALV Scope of list..
    2) If I use BEST Layout in Scope of list means i get the desired Output field layout as same as my foreground output field..
    I want to get the output layout as desired & also in ALV format[ Useful for excel work]
    Kindly guide me.
    Thanks in advance..
    swetha
    Edited by: Swetha SAP Girl on Jul 2, 2009 5:06 PM

    Hi Swetha,
    To get the missed fields in the spool, while creating the background job(execute in background option) you can see the printer setting block at the end of the background job settings window, in that check the 'Spool Request Max. Width 255 char' check box and then continue. It will generate the spool list with maximum width and you can see all the fields in the spool output.
    Thanks,
    Muthu
    Edited by: Muthu Prabakaran Selvam on Jul 3, 2009 2:35 PM

  • Delete Background JOB permanently.

    Dear All,
    How can i delete schedule background Job which is defined in SAP Systems,
    when i check through sm37 i found that there is one job schedule on hourly period & showing status Cancel,.,
    JOB Name is SAPOSCOL
    also please find details of this Job,
    Massage Text
    JOB Started,
    Login of User basis in Client 800 failed when starting a step.
    How can i delete this job permanently.
    Regards,
    Jiitendra.

    Hi,
    The job is getting cancelled because the login BASIS with which the job is scheduled is failing to start it and this might because the ID is locked or password expired. Kindly check that to resolve the issue. But, if you want to delete the job then do it as said above by selecting the job with scheduled or released status.
    Regards,
    Sharath

  • How To Handle With Back Ground JOB From WEBUI When Click On "Appove"

    Hi
    How To Scheduled A Job Through ABAP Report In back end  Of CRM when i click on "Approve" Button in WEBUI  From result list.
    As per My requirement I have a Search View and Result View
    In Search View I have  Below Fields
    ITC Vendor ID    
    Claim Status
    User status (date status changed)
    Model
    Serial Number
    Date completed of Service Completion
    Based on Search Criteria I will get Result In Result View.(Suppose 10 Records I got In Result View)
    In the Result View I need to Add one Button As "Approve"
    When i Click On Approve button One Pop up Message Need to Open And In that popup window I need to Display Below Text
    "Approve  Claim Job Has Started In Background  
    Note: Only Claims Which are in Submitted  Status  Will be  Approved. you May Close This Window"
    In SAP CRM System  Back Ground Job Need To Start When Click On "Approve" Button In WEBUI .
    In the Back Ground ABAP Report which will validate based on Result List Records"
    In the Result List we may have all types of Claims which are status in "Submitted" "Pending" "Rejected" "Approve".
    I need to collect all records from Result list and validate Those Records who's Status in "Submitted
    1)Sort all the claims based on ITC Vendor ID.
    2)Grouped all the submitted claims against each ITC Vendor ID from the search result
    3)Change the status of the selected submitted claims to Approved.
    4)Displays information messages as mentioned whenever a claim is approved, the same message will be captured in the job log.
    ‘Claims <ClaimID 1>,…<ClaimID N> now approved for ITC Vendor ID’.
    5)Sending Email to each IRC.
    6)Capture all the approved claims in the below format (Format Attached "Screen Shot Attachment")
    7)Store the file in the Application Server AL11 in .csv format
    Please Find Attachement For Reference.
    1)ITC Claim Screen Shot
    2)Screen Shot For Attachment
    Thanks
    Raj

    Hi,
    You can add the following code in on approve method to show popup to the user,
    IF req_edit IS NOT BOUND. " gloabl attribute in impl class of the view
        REFRESH lt_buttons.
        lss_button-id  = 'btnyes'.
        lss_button-text = 'YES'.
        lss_button-on_click = 'YES'.
        APPEND lss_button TO lt_buttons.
        CLEAR lss_button.
        lss_button-id  = 'btnno'.
        lss_button-text = 'NO'.
        lss_button-on_click = 'NO'.
        APPEND lss_button TO lt_buttons.
        CLEAR lss_button.
        CALL METHOD comp_controller->window_manager->create_popup_2_confirm
          EXPORTING
            iv_title          = 'ATTENTION'
            iv_text           = 'Are you sure you want to edit this document?'
            iv_btncombination = '99'
            iv_custombuttons  = lt_buttons
          RECEIVING
            rv_result         = req_edit.
        req_edit->set_on_close_event( iv_event_name = 'EDIT' iv_view = me ). "#EC NOTEXT
        req_edit->open( ).
        RETURN.
      ELSE.
        lr_node ?= req_edit->get_context_node( 'OUTPUTNODE' ).
        lv_outbound = lr_node->get_event_name( ).
    *  CLEAR ptc_pricing_status.
    *    lv_outbound = req_edit->get_fired_outbound_plug( ).
        IF lv_outbound = 'YES'.
    you can use the submit report code here and you can al the validations here
        ELSE. " No
    if user clicks no nothing to do..
        ENDIF.
        CLEAR req_edit.
      ENDIF.
    Best Regards,
    Dharmakasi.

  • How to find the back ground job details

    Hi All,
       I have a back ground  job running from many days, now we would like to know when this job was created on what date this job actvlly created and schuduled.
               Please informe me how to check this.
    Thanks & Regards,
    Muralikrishna

    On SM37 screen there is plenty of options are there:
    This is what i got from SAP help
    Explanation for each selection field:                                                                               
    o   Jobname: Name of the job as an identifier.                                                                               
    o   Username: Name of the user who designed and planned the job.                                                                               
    o   Start date: The start condition of the job, which could be a time 
    frame or an event that the job is waiting for. Specifying both will   
    yield jobs whose starting condition is  either of the two             
    conditions.                                                                               
    ABAP program step: Name of an ABAP program that acts as a step in a   
    job.                                                                               
    Status selection: The current status of the job. By default, the      
    SCHEDULED option is not marked. To see the scheduled jobs, you must   
    explicitly check this.
    also give the proper values in Job Satus also.

  • How to download the application file to local file by back ground job?

    hi:
      can any one tell me how to download the application file to local file by back ground job? thanks in advance..
    Monson

    Hi,
    In order to download a file from application layer to a local file in background,
    first write a report(ZREPORT1) in which do the following steps:
    OPEN DATASET g_file_1 FOR INPUT IN TEXT MODE ENCODING DEFAULT.
    loop the g_file and append all the data into another internal table.
    end of this report you shd have all the data in the application layer file into your internal table.
    Now create another report(ZREPORT2) and submit this report in background.
    that is,
    JOB_OPEN
    JOB_SUBMIT and
    JOB_CLOSE
    and in job_submit submit ZREPORT1 which downloads the file in application layer.
    Please reward points if helpful.
    Regards,
    Arul.

  • How to reschedule a Back ground job in Normal ABAP from Web Dyn Pro abap application??

    Hi Experts,
    How to reschedule a Back ground job in Normal ABAP from Web Dyn Pro abap application??

    Can you give us some more information? Background jobs primarily don't have anything to do with Webdynpro.

  • How to terminate background job for MRP

    Hi dudes,
    how to terminate background job set earlier and i want start again with fresh scheduling. as user discontinued using the MRP process.
    thanks inadvance for quick response.
    Robert.

    Robert,
    Just though of sharing the alternate way to do this work, instead of DELETE use CHANGE option.
    1. Execute transaction SM37 for the program "RMMRP000" and Job name what you have specified with job status "Scheduled" check box activated. Job Overivew screen appears
    2. Now select the job in the Job Overivew screen and use Menu bar: Job--->Change or Ctrl+F11. Change Job Screen appears
    3. In the change Job screen Hit the function button Start Condition (Green Flag). Start time screen appears.
    4. In the Start time screen define your Job schedule and save the time parameters and save change job screen. Now your job is scheduled with new parameters what you have entered.
    Regards,
    Prasobh

  • If i want to schedule back ground job on dtp how to do

    if i want to schedule back ground job on dtp how to do

    I have got a link that perfectly matches your requirement
    http://help.sap.com/saphelp_nw04/helpdata/en/fa/096e51543b11d1898e0000e8322d00/frameset.htm

  • How to download data which comes in back ground job to presentation server.

    HI ,
    I am creating one job which has to download data to presentation server.
    for back ground jobs gui_download will not work..
    plz sugest the alternative for this...
    thakns in advance,
    khasimsa

    there are so many posts in SCN , please search .
    write data to application server in background and then download to presentation server online.

Maybe you are looking for

  • How do you plug a VGA monitor to a Mac mini (mid 2011)

    I used my older Mac mini (mid 2007)  with a VGA LCD monitor through an "DVI to VGA" adapter with no problems. However, this older adapter does not fit in the "HDMI to DVI Adapter" supplied with my new Mac mini (mid 2011). There are no receptacles (ho

  • PPCs4 Shutting Down

    And to think I almost went a couple'a months without any issues! A few days ago I had a new graphics card installed, a Radion HD 46xx as well as a PSU. I have been using Photoshop, After Effects and Audition since then without a problem. However toda

  • How to read cluster data

    How can I read in separate paramters from a cluster? (plz see the attached VI) It could be a simple problem, but I cannot figure this out. plz help! BR, Attachments: aggressor config read.vi ‏57 KB

  • Is there a way to get a PPRO CS4 project into ADPE8

    To the clever users of ADPE8 is there away to open / transfer / edit a CS4 project in ADPE8.....? Instead of exporting the final to a DV or other file format. Thanks Gavin

  • Windows vista don´t detect my zen mic

    Hello I have a problem with my zen micro 5gb. I get a new pc with windows vista and not detect my zen. All time say how the zen is not conected. I am installed al drivers, i did the support from the page, but the problem continue. please, help me Hol