Icon in Data View in Planning Book

HI
   For one of the requirements in our project in SCM 7.0, in the background SNP run we  select the option of "Location (Heuristic) + Take into account found components in planning run". When we want to run interactively in the Planning Book, we want an icon to replicate this selection combination of "Location (Heuristic) + Take into account found components in planning run".
I am aware that I do not want to use "Multilevel Heuristics" icon in the Planning book because "Multilevel Heuristics" icon corresponds to "Network (Heuristic) + Take into account found components in planning run".
I would appreciate if anyone could provide an insight.
Thanks
Sam

Hi Sam,
What you are asking might be resolved with some enhancement. In this case, the location heuristic in interactive planning would take care of components as well.
Is this what you are looking for?
Also one opinion on this - unless this interactive planning is required very frequently, it's advisable not to touch the interactive planning. Your changes could be global (need to check this after finding out a Badi), meaning that whenever network heuristics is run, it would ALWAYS consider components for planning.
PS: Having a different icon is only possible using a macro, which means you create a macro which runs heuristics and also takes care of component level planning. Might be possible, but I would advise against this, as you could possibly have many issues in trying to replicate the standard Heuristics scenario, plus your system performance also could go for a toss.
Thanks - Pawan

Similar Messages

  • Purchase requisition date in SNP planning book and product view not in sync

    Hello Experts,
    We have an issue with display of purchase requisition date in SNP planning book.
    We are manually entering the PR's for a perticular week from Monday - Sunday(01.09.2014- 07.09.2014), when the last PR is entered on 07.09.2014, it does not appear on the same day in planning book(cell becomes empty) and moves to 06.09.2014, thus quantity on 06.09.2014 is the summation of the quantities present on 06th and 07th.
    The PR dates are appearing correct when we click on display details in planning book and they are correct in product view, MD04 as well.
    Additionally, this is the same date on which daylight saving time comes  into effect.
    Kindly advise if anyone has faced similar situation earlier.
    Many thanks,
    Aditi

    Hi Aditi,
    Check the time zone that you have in your location in ECC and APO.
    Also note it is recommended that you maintain the same system time zone in APO and in ECC. (check tcode STZAC in both systems).
    Different time zones should generate this kind of inconsistencies.
    Kind Regards,
    Mariano

  • Read data from SNP planning book

    Hi Frnds,
    We are faced with a situation in which we need to read certain key figures such as PIR's, Goods Issue from SNP Planning book.
    We tried using BAPI "BAPI_PBSRVAPS_GETDETAIL" to retreive data. But it seems that we are giving wrong input data to the BAPI. Could you please let us know what to be fed into the BAPI in simple terms? If there is any example code for the same , would be very much appreciable.
    Orelse if there is some other way to retreive this data kindly suggest us accordingly...
    Many thanks in advance.
    Regards,
    Karthick

    Hi Karthick,
    The parameters for calling BAPI_PBSRVAPS_GETDETAIL really depends on your Planning Area and Planning Book configurations. The planning book configuration will limit what Characteristics and Key Figures will you be able to read using BAPI_PBSRVAPS_GETDETAIL. Let me give you an example.
    Assumptions: The planning book is configured as follows:
    Name = ZPB1
    Data view  = DV1
    The DV1 data view contains the characteristics 9AMATNR and ZCNTRY and Key Figures ZKF1 and ZKF2.
    Assuming also that we have the following data currently in livecache:
    9AMATNR-ZCNTRY-ZKF1-ZKF2
    000001234-PH       - 143  - 567
    000007891-PH       - 245  - 782
    000007891-US       - 124  - 890
    Let's further assume that you want the data aggregated to country level (e.g. char ZCNTRY), you have 1 planning version 'ZPAV1' and you only want the data for Country=PH, then here are the parameters that you need to pass to  BAPI_PBSRVAPS_GETDETAIL:
    PLANNINGBOOK = 'ZPB1'
    DATA_VIEW = 'DV1'
    SELECTION =  9AVERSION I EQ ZPAV1, ZCNTRY  I EQ 'PH'
    GROUP_BY = 'ZCNTRY'
    KEY_FIGURE_SELECTION  = ZKF1, ZKF2
    Hope this helps. Please post again if you have any questions. I can give you sample code if you can post your email address.
    Message was edited by:
            Emmanuel Nepomuceno (added planning version to selection)

  • Display of aggregated data in a planning book

    Hello,
    I am trying to display aggregated data for a characteristic value in the planning book even when i am on a detailed level. 
    Example :
    I have 3 products belonging to 1 material group.
    I have 2 customers.
    For customer A, i want to see the quantity of all detailed products.
    For customer B, I want to see the quantity of the materialgroup (on aggregate level) even if I only select 1 product.
    Help is more than welcome
    Frederik
    Edited by: Frederik Verhaeghe on Dec 26, 2007 4:12 PM

    Hello Srinivas,
    Here a more detailed explanation of what I want to achieve with the macro builder.
    Three materials are beloging to the Material group 001 in this example. (FV_2 and FV_3)
    My intention is to display the quantity of all the material group for the value POOL, and not only the qty for FV_1. Even when I only diplay FV_1, I want to see the total POOL qty for FV1, FV_2 and FV_3. 
    Best regards,
    Frederik
    Edited by: Frederik Verhaeghe on Dec 26, 2007 5:43 PM

  • Date view changes

    Hi
    I am in  process of changing description of Data view in planning book.
    i am not able to save the description and getting massage as
    maintain time for columns visible from field.
    i have a tick on visible field and the dates are blank.
    what i am suppoze to do , and what will be impact of this
    please help

    Hi
    If its DP planning book you can have tick on visible field and from field information from which you want to see the period visible in APO DP planning book.
    For example you are expecting sales history for last 3 year than tick on visible field and put the date like 01.11.2007
    if you do not put the date, it will now show you the data in past.
    If its SNP planning book , do not use this field but directly put time bucket profile.
    I hope this will help you to solve the respective issue.
    Thanks

  • DP Security for certain data view

    Hi all,
            Did anyone know if there is authorization object for a specific data view in planning book ? I want user to have access to just a certain data view not all of them in the planning book.
    Thank you in advance for your help,
    Paranee

    Hello Paranee -
    <b>Planning Area, Book</b>
    <b>C_AP0_PB</b> - Planning book
    <b>C_APO_SEL3</b> - Selections in planning books
    Authorization objects C_APO_SELE (Release 2.0) and C_APO_SEL2 (Release 3.0 up to Support Package 9) still exist in the system. They are however obsolete. If <b>C_APO_SEL2</b> has been assigned to a profile, set all field values to "*".
    <b>C_APO_IOBJ</b> – Key figure
    <b>C_APO_CPY</b> – Copy function in data realignment
    <b>C_APO_ RLG</b> – Realignment, maintain realignment table
    <b>Authorization Checks in SDP</b>
    All authorization checks in SDP are performed by the function module
    <b>/SAPAPO/MCP_PERMISSION_CHECK2</b> for individual data objects and<b> /SAPAPO/MCP_PERMISSION_SELECT</b> for a range (table) of objects such as products, locations, or planning books. This second function module incorporates the first one.
    If you want to adjust the result of the check, or program your own authorization check, you can do so by using user exit <b>/SAPAPO/SAPLMCPR_015</b> in function group <b>XDMUSER</b>.
    Hope this Helps.
    Regards,
    Suresh Garg

  • Data available in RRP3 view but not coming in SNP planning book

    Hi All,
    I am facing an issue in SNP book. I can see forecasts in RRP3 view. But when I load the same data in SNP planning book, the forecasts are not coming there (forecast KF)
    I ran LC Cons check, PA cons check, OM17, but still the same result.
    Any pointer would be highly valuable.
    Regards,
    Manotosh Bhattacharya

    Hi
    If you look at the standard Forecast KF 9ADFCST in your planning area, it is usually assigned the Category Group of DF1. This category group only contains the category FA for forecast. If you create Forecast in /SAPAPO/RRP3, this will create Additional Forecast or category group FC. Therefore any forecast generated this way will not appear against the standard planning book KF.
    So you have two choices, if your forecast is only FC category then use the KF 9AAFCST Forecast (Addittional) in your data view or create a new Category Group with both FA and FC assigned to it and then assign this Categotry Group to 9ADFCST in your planning area.
    Regards
    Ian

  • Excel upload data to planning book not working

    Hello Gurus,
    i have checked the online resources first before posting this thread here as this is most old topic relating to upload of excel data to planning book key figures.
    Here is what i have done so far
    1) from the planning book, i chose a view and downloaded the file to desktop and saved it as CSV. i populated the key figure values and saved the csv file as-is back to desktop
    2) i had to remove the hdeader from the file as APO threw back an error that it could not interpret the period (header) as the number
    3) when i took out the header i simply pasted the values and the file was ok
    4) i went to planning book, loaded the file, checked the file and it said that the data was read and i clicked on upload the file
    5) everything was green, then but i do not see the values in the grid of the planning book
    what else i'm missing.
    can someone please help me
    thanks
    Ravi

    Hello DB and Ada. Thank you for your valuable suggestions. I know i might be missing something silly here. If i keep the header that i downloaded from the planning book into csv file, i get an error while uploading the file back to planning book that unable to interpret 11/2014 as a number.
    P11/2014 is the header, Period 11/2014 is the fiscal period. we plan in fiscal periods.
    if i take out the header from the csv file and just populate the key figure values, then i do not get any error when i load the file back to planning book, but then the values do not show up in the planning book grid.
    i'm keeping the planning book in the change mode while uploading the file as i got that error saying that i need to keep the planning book in change mode for the file to load data properly to planning book.
    Thanks
    Ravi

  • Missing Selection Icon (Flower Icon) in ELM planning book..Can anyone please help

    Missing Selection Icon (Flower Icon) in ELM planning book..Can anyone please help

    http://scn.sap.com/thread/3235153
    Hello Shahin,
    As suggested by Kapil, Please check for authorization error. You can also view SU53 immediately after you enter into Planning book.
    C_APO_FUN is the authorization object which has two key functions C_SELECTION and C_SELORG.  User of C_SELECTION is -  If user is not assigned C_SELECTION function then selection icon does not appear in Planning Book. 
    Also please read this SCN thread which will be useful -
    Hope this will help.
    Thank you
    Satish Waghmare

  • Dynamic update of Planning Start Date in Planning Book

    Hello.
    Has anyone ever created a program to update the Planning Start Date of a Planning Book dynamically to the next Friday of the month for example?
    The help information available for this field mentions a PDATE userexit, but I can not find it. Has anyone ever used it and has some examples to share?
    Many thanks.
    Aline Passos

    Hi there,
    I have never done this earlier. However i know that planning start date is stored in table /SAPAPO/PBDVWHDR-TBID_START. I tried changing this entry in the table and it correctly updated the dataview plannig start date.
    So you may write a small program to update this field and it shall update the dataview.
    Please let me know if this helps you.

  • APO Cube data is not showing in Planning Book

    Hi All,
              Please help me with the following issue.. We use to load the data to APO cube manually from Flat file by executing BW (Backlog, Historical) reports every week. (not a good practice). That time Planning book was working fine.. And now we automated this process by creating the data marts from BW ODS to APO Cube and the loads are successful with process chain.. But I don’t see cube data in Planning book.. In this process the existing info objects properties (Alpha has been removed) has been changed on APO side for mapping and loading purpose.. So when I load the data , the load is successful but I don’t see the data in the Planning book(Note : the cube was refreshed and I guess I need to generate CVCs and do some thing in TSCUBE).. Please explain me the details steps. I am BW consultant and don’t know much on APO.Present status i see the data in APO cube and not in Planning Book
    Thank you
    Arya
    Edited by: karan s on Apr 3, 2008 8:58 PM
    Edited by: karan s on Apr 3, 2008 8:59 PM

    Hi karan
    have you loaded the data from APO cube into the Planning book with TSCUBE ? you can add this step in your process chain also.
    If you have made changes in the strcture of BW data mapping then you dont need to change CVCs.

  • Error in reading data from planning book

    Hi Guys,
    I am facing error in reading data from SNP planning book .
    When i try to read single product data for simulation version , it gets loaded correctly.
    However, when i try loading data for more than one product, then i get error "Product does not exist".
    I checked all products are assigned to model-version.
    I tried running consistency check as well and after it finished got message as "All inconsistencies can not be corrected".
    Please let me know if any one had faced this error.
    Thanks.

    Hi,
    Consistency check should solve the problem in this case. Try running it specifically on the version you are using. It should work.
    Regards,
    Guru Charan.

  • Display Planning data (for demand planning) in another UoM

    Hi All,
    The Planning area UoM is in "L". We have products whose base UoM is KG and some in L. In BW we convert all to L and load into Planning area.
    The Product master is CIFed to APO and has the conversion between L and KG.
    we have a requirement to view the planning data in Kilo tons i.e 1,000,000 KG.
    Have maintained a Mass UoM called ZKT in CUNI transaction and maintained the conversion that 1ZKT = 1,000,000 KG. Also have defined an ISO code for the same.
    Now when we load the data in the planning book the default UoM is L. When we go to user setting and maintain alternate UoM as Tons "TO", the system converts the data to tons and displays it. no matter what is the criteria used in header selection.
    But when we try to display data as ZKT UoM get a error msg that conversion from L to ZKT is not possible as the conversion is not maintained in Product master.
    But when we select material code (SKU) as the show condition and also in the filter condition use material code (SKU) and make a selection, the system converts the planning data from L to ZKT.
    The question is when the system can convert L to TO at any character level as long as the product master has the L to KG conversion, why is not able to convert L to ZKT.
    Why is the system able to convert L to ZKT for individual SKU's and only when the show condition is Material code (SKU).
    Would appreciate your quick reply.
    Thanks,
    Nitin

    Hi Nitin,
    We have same scenario right away in our system. Some of our material have a conversion in R/3 for example: 1Unit=10BULTOS, then CIFing into APO.
    The scenario is that, once we planned already in APO- we dont want to go back in r/3, any changes should be remained in APO. What we did is that we maintained the CIF user setup. Maybe you can try this as well without affecting other Uom.
    Cheers!

  • Ability to call selection profiles in planning book using popup box

    Hello does anyone know if it is possible to call a selection profile in a planning book using a popup box?
    i.e. perhaps using a macro ?
    Any help is greatly appreciated.
    Thanks
    Edited by: Ballance Agri-Nutrients on Feb 17, 2009 3:10 AM

    Just wondering what is the business need this pop-up, based on user settings list of selection profiles already filtered and displayed in the planning book. User can select the profile just by clicking the list of selection profiles provided.
    For the web enabled users, they can select data view, and selection profiles before they view the planning book screen. Check with your technical person they should be able to tell you if the same can be used and built a pop-up.
    Hope this helps

  • How to manually enter forcast/demand in SNP Planning Book

    Hi experts,
    Kindly help me there are two questions on my mind. First
    1. How to create manually forecast in SNP planning book? and also in RRP3? (if the product is in house it automatically creates planned order, if externally procured PREQ but how about forecast using product view?
    2. If the forecast is in the past but I want to upload that in the SNP Planning book?
    Even if I change the period structure date it does not reflect the past dates in the planning book.  Since the planning book of SNP is standard how am I be able to change the planning book time bucket start date.
    Thanks and Best Regards!!!!

    Hi,
    in /SAPAPO/SJKTST04 you set the type of order FCST, then you planning area and version, keyfigure to populate (your forecast keyfigure, probably 9ADFCST), the order type (usually FA)
    In the details you set product, date to start, in horizon - the number of orders to create, if you set 10, you'll get 10 orders starting from your start date).
    Unfortunately through here, you gan create orders with fixed quantity only and also for only one product/location combination.
    If you already have DP available, even for testing I find it more easy to release forecast from there.
    For your second question - at least for 4.1 (I don't have a 5.0 system to check) you cannot have past dates in a column other than "Initial"
    Hope that helps,
    br,
    Mikhail

Maybe you are looking for

  • Photo resolution in iMovie

    I'm trying to make a presentation using 30 short video clips and several hundred photos. The video clips look great, however when I import the photos into iMovie, the resolution is terrible and extremely noticeably different than the same photos in i

  • Duplicated titles

    Hi. All my songs have somehow become duplicated,during a laptop change. One of the songs plays and the other doesn't. I need to delete, in block, the titles that don't play. How do I do this?

  • Reinstall Photoshop 8, Serial Number MIA

    I have had PhotoShop Elements 8 installed on my late 2009 MacBook for several years.  2 years ago I got 11, when I installed it, 8 didn't go away, but it didn't seem to cause any problems.  A few weeks ago I had a few things that were opening with 8

  • Why doesn't the iPod classic sync properly, and how do I fix it?

    Notes Before anyone mentions the lame suggestion of "Restoring", let me add that I have done that. Alot. I'm pretty good with computers, so please get as nerdy as you want, just as long as you're only trying to help me. This disscussion should only b