IDOC BOMMAT: Wrong validity-from dates for components

Hi all,
I am currently loading BOMs via IDOC BOMMAT for a data migration project. Unfortunately I am having problems to load the BOMs with the correct validity-from date for components. The data is correct when I check in LSMW, but after the load of the IDOCs the validity-from date of each component is the same as the validity date of the BOM header!
System Version is SAP 4.7.
Thanks for your help and Best Regards
H.

Has anybody any ideas?
Thanks a lot!

Similar Messages

  • Help reqd on Changing the Valid from "date"  for both BOM & Routing

    Hi all...
    Pls advise me how to do the changing of Valid from "date"....
    Is there any process in CC01 or ECM???....
    pls reply me in detail step format (step by step analysis)....
    I wrongly created in CS01 and CA01 as 05.10.2007 as my valid from date instead of 01.10.2007.....
    How to change to my actual one......
    I dont know how to change it exactly.....as im beginner in SAP...pls take this into consideration...and post ur replies imm.
    Pls reply me in detail....will be rewarded at the end while closing this issue.
    thanks & regards
    sankar

    Dear Sankarbabu,
    IF there's no setting for Date Check in OS54 - Engineering Change Management
    Control Data,then you can create a change number with past dates,and also to
    use the same one for changing BOM.
    Tell me one thing you are saying you want to use ECM.Was the earlier one
    created without BOM was created without an ECN?
    See already if you have created your BOM with an ECN,then remove the date
    check setting which I have mentioned in OS54.
    Now goto T code CC02 ,enter the Change number and give the valid from date as
    01.10.2007.
    After that check in CS03 whether this date(01.10.2007)is getting reflected or not.
    I'm sure this will solve your problem.
    Regards
    Mangal

  • 'Valid to' dates for both the Header & the components in the BOM report.

    Hi Experts,
    My Requirement:
    Need to display the 'Valid to' dates for both the Header & the components in the BOM report.
    Right now we are using the Functional modules 'GET_STKO' & 'GET_STPO' for the header
    & the components respectively. The report gives the correct output for the all the BOM alternatives
    which exist. But for the BOM alternatives which have been deleted(updated in STKO-LKENZ)
    'Valid to' dates are displayed as'00/00/0000'.
    (Note:ECM is used for BOMs)
    Is there any Logical Database that I can fetch the 'Valid to' dates of both BOM Header & components
    which are deleted?
    Regards,
    Mahesh

    Dear Mahesh,
    In my understanding I dont think you cannot get the valid to date for BOM header,unless a ECN,(engineering change number) is
    used to set the deletion flag.In otherwords none of the business sets for all these BOM's the valid to date(which means the
    default valid to date 31.12.9999 is taken).
    Check with this FM, CS_BOM_EXPL_MAT_V2 whether can you get the valid to date for the components(infact here also the
    valid from date given in the input screen impacts the report output).
    Check and revert back.
    Regards
    Mangalraj.S

  • BOM "valid from date" in transaction CSKB

    The business process is like this -
    1. We create sales order ( VA01)
    2. In sales order, we enter configurable materials as items.
    3. Then we freeze/change the BOM for sales order and line item through t-code CSKB.
    The problem is in CSKB, "Valid from date" of order BOM components is defaulted using the "required delivery date" in Sales Order. We want to default current date (system date) as the "valid from date". Please suggest how it can be done.
    Regards,
    Bijay

    Shailesh,
    While creating the BOM have you used the change number ...? if yes then display that change number and check wheather do you have any alternative date mention in it.
    check validity date of change number as well as BOM validity.
    another reason can be you need to apply SAP note 1278790.
    https://websmp130.sap-ag.de/sap(bD1lbiZjPTAwMQ==)/bc/bsp/spn/sapnotes/index2.htm?numm=0001231930
    check it out and revert back for further discussion.
    Hope it helps you.
    Regards
    Ritesh

  • How to get valid from date in KONH Table

    Hi ,
          I am sending COND_A idoc for MRP. Now when I create a record using VK11,the valid from date is fine.
    But while changing the same using VK12 changed date does not reflect in KONH Table (when the new valid from date is greater the the previous one) .I understand the SAP Logic behind this from previous threads .
    But my issue is this :
    Suppose I have a Material X created with Valid from = 10.01.2011 & valid to = 31.12.9999
    Now I change this Valid from = 28.01.2011 & valid to = 31.01.2011.
    Now how can I send the data for 28.01.2011 in my I-doc , as KONH still has 10.01.2011 as valid from date.

    even if you send the data for 28.01.2011, it should pick up the condition record because the start date for condition record is in past? why do you think it is a problem? now if your concern is that if your input date is 27.01.2011 and it should not pick this condition (that is a different matter altogether)...

  • X-distr.chain status in combination with valid from date

    Hello I am using MM02 X-distr.chain status in combination with valid from date, to give materials a certain status in the sales order depending on the delivery date of the orderline.
    How can I enter multiple statuses with future validation dates?
    example following status with validation dates where entered in MM02 for a material
    - material should have status A valid from January
    - material should have status B valid form April
    - material should have status C valid from July
    - material should have status D valid from September
    When I enter a sales order with delivery date in January system replies with status C.
    When I enter a sales order with delivery date in April system replies with status C .
    When I enter a sales order with delivery date in July system replies with status C .
    When I enter a sales order with delivery date in September system replies with status D.
    So only the current  ( or previous status when current is not valid yet) is retained by the system.
    How could multiple statuses be used?
    Thanks in advance
    Joos

    Hello Jalo,
    Thanks for your reply,
    My customer sell season relevant materials so they want to control order entry and delivery creation based on predefined dates.
    Status A  = material is blocked for order entry and delivery creation
    Status B  = material is allowed for order entry, delivery creation is blocked
    Status C  = material is allowed for order entry and delivery creation.
    Status D  = material is blocked for order entry, delivery creation is allowed.
    I had hoped to use standard functionality with this status field, it meets most of my customers requirements but at this moment the only alternative is to create a new table where this data can defined and create some abap logic in the user exit to set the status base on the table information.
    Regards
    Joos

  • Committed Date For Components in Production Order

    Dear All,
    I m facing this,  Committed Date For Components in Production Order,
    the date appeared as 31.12.9999,
    How can i make this correct.
    please tell me..
    Thanks
    Raghu

    Hi, Thnkx,
    You Are correct, I got this while doing Availability Check, 2 dates.
    Requirement Date, and Committed Date.
    I tried your solution,
    I change the Quantity of one of my BOM , I tried to change the Quantity by Change Number,
    So in CS 03 I can see the Validity of that component up to 01-09-2010,
    I run MRP agian, new planned Order, tried to convert, the question is same.
    I still get the date as 31-12-9999.
    Thanks
    Regards
    Raghu

  • VALID FROM DATE IN EQUIPMENT CREATION

    Hi PM experts
    Im new to PM ,While creating Equipment which date should we use in VALID FROM and what is use of this date.
    Regards
    ek

    ek s
    Valid from date is the date on which the Equipment was installed at the location.
    Keeping this date as installation date ensures that all the activities executed on machine are recorded in the system from that date.
    One of the use of this date is, we can maintain the history as to when the machine was installed at the location (In Equipment Usage).
    Secondly, the valid from date is used to restrict the creation of Maintenance order for that particular Equipment. For ex: If you have mentioned Equipment Valid from date as 01.03.2015, and you try to create Maintenance order of this Equipment with date as 01.02.2015, it will give an error that Equipment is not valid (or active) for that particular period.
    Hope this reply helps.
    Chin2.

  • Valid From Date in CT04

    Hi,
    We are on ECC 6.0. When I try to create a Characteristics in CT04, the Valid From date defaults to the System Date. If I change this date to any other date in the past, it saves the system date only.
    How do I make the Valid From date to something else?
    Regards,

    Dear Shameek,
    why do you want to create the characteristics for a past date?
    This is possible by creating a change number in CC01 with the valid from date as say 01.07.2011 and include the check box for
    characteristics in the object type(active) and use the change number in CT04 and check the results.
    But the drawback in this procedure is the system always expects a change number during the next change for that
    characteristics.
    Check and revert back.
    Regards
    Mangalraj.S

  • Change of valid from date in routing

    Dear All,
    How can i change the routing "valid from date".
    When i am creating a prod coder in co01 its throwing a message that routing is not found so when i wwent to co02 it is showing that valid from 09.01.2012 but i need production order from 01.01.2012.
    Plz help.
    Thanks.

    Hi,
    There is a work around to change the validity of routing without using ECM in this particular situation
    1) While creating routing in CA01 you can change the key date to some past date say 01.01.2012.
    2) If already routing exists (one GC available) for same material and group number you can create another GC with past date and use the new GC for Production order by changing the old GC status to 1
    Be sure of implications of creating master data in past and may not be a standard practice.
    you can try and hope useful.
    Regards,
    Brahmaji D

  • Valid from date in ECM and BOM.

    Hi All,
    I create a Change master with release key and assign a material as an object whose BOM will be changed. I save the Change number.
    I go to change BOM main screen of the same material and enter the change number created, by default the valid from date comes as todays date. But when i hit enter to go inside the change BOM screen then the date dissapears from the field and i get an error as "please enter valid from date" even if the date of ECN is valid and that of BOM is also valid.
    Can somebody help in this?
    Thanks
    Shailesh.

    Shailesh,
    While creating the BOM have you used the change number ...? if yes then display that change number and check wheather do you have any alternative date mention in it.
    check validity date of change number as well as BOM validity.
    another reason can be you need to apply SAP note 1278790.
    https://websmp130.sap-ag.de/sap(bD1lbiZjPTAwMQ==)/bc/bsp/spn/sapnotes/index2.htm?numm=0001231930
    check it out and revert back for further discussion.
    Hope it helps you.
    Regards
    Ritesh

  • Start up date and valid from date in equipment

    Hi,
    If we put start up date before valid from date in the equipment master record,will there be any significance?

    Hi,
    Start up Date => Date from which the Equipment is used for operation or in any activities. This will be used for MTTR / MTBR analysis, as Thyagarajan told.
    Valid from date => Date from which that equipment is valid for the existing structure. In case, if Superior FL / Equipment has been changed for the equipment, valid from date will get changed according to that.
    Regards,
    Maheswaran.

  • Business partner change Valid From Date field

    How can I change the Valid From Date field in tables:
    BUT000
    BUT020
    BUT0BK
    BUT100
    Currently the of date of creation of the business partner is in this tables' Valid From field.
    In transaction BP the Address of the Business Partner is  valid from 01.01.1990 but still I get a warning that the business partner is not valid for date 01.11.2011.

    Sounds like the problem is the valid to date.  What is that date set to?

  • Default Valid from Date in CS01 & CA01

    Hi PP Experts:
    Please give me the solution for:
    I am getting current date 17.04.2015 in valid from date field as default in CS01 and CA01 but i want to set 01.03.2015 as a default date.
    So, how can i do it?
    Thanks & Regards,
    Vivek Bhojak

    I have maintained all these things but getting error ''Change number 1 does not exist'' in CS01.
    BR,
    Vivek

  • Wants to change the validity from date in BOM

    Hi,
    We have created BOM by mentioning valid from date 21.08.2018.
    Now we need to change that valid from date 21.08.2018 to 21.08.2008.
    How can we do that?
    thanks/regards
    vish

    Hello,
    If you are creating the BOM wr.to change number & if the change number date is lying in future. System allows you to change the effective from date for the ECN, which in turn BOM effective date also get change automatiocally. T code CC 02 for changing the date through ECN