IMG setting for REM Planning Table

Hi Gurus,
Can any one throw light on following IMG settings-
Path -
IMG --> Production --> REM --> Planning --> Planning table --> Maintain Row selection --> Reciepts Other version
Relevance of "Other version - in IMG setting for visible rows in planning table".
Planning table output does not change with check or uncheck of version.
Which check or unchecking, planning table is considering all the production versions of the materials maintained.
What is purpose of having a check or uncheck, if system is giving the same result.
Regards,
Srini

Hi Srini,
We create production version to OPTIMIZE the production. We mention the routing and the BOM in the production version. Actually speaking, in the REM scenario we don't even need a planned order. Production order is absolutely not needed. So in the planning table, it shows the production data for all the versions that you have created, irrespective of whether or not you check the indicator. During planning run, the system will take the first production version by default. So in the planning table you can see the optimum production and you can do leveling also, possible through the row selection option in IMG. Hope this sheds a light on your concern.
Regards,
Sreekant.

Similar Messages

  • Splitting in REM planning table

    Hello,
    I am presently working with REM planning table.In planning table there is functinality of splitting the monthly quantities to daily quantities or weekly quantities.
    When you split the quantities what calculation system is doing internally?
    How system determines the start and end dates for the splitted orders.
    If I want to split the quantities on the basis of fixed percentages that is 18  % first week , then 23 % second week , 25 % third and rest percentages for last week.
    Can this weekwise varying distibution is possible in Planning table ?
    Waiting for reply from the REM Gurus.
    Regards,

    Hi ravindra,
    if u are working with longer lead time planned order, u can use various functinality to split the order qty for day or shift wise.
    The Avilable Capacity of the workcenter plays important Role.With refernce to this Avilable capacity the sytem schedules (spilts) order qty as per your need.
    Lead time scheduling will be carried out to determine start and end date of planned orders.
    For example u want distribute planned order day wise, system schedules the planned order with reference to Daywise Avilable capacity of WC. if the capacity requirements of planned order exceeds the avilable capacity of one day, system will automatically spilit the order qty for next day for remaining capacity requirements.
    This is way, system works to spilit the order. Before that u have to select correct scheduling data under "scheduling" tab of planning table.
    For your last question, system will schedule planned order according to Avilabale capacity and capacity requirements.
    i think u can spilit manually accorting to your need .Since  u have Avilable capacity for full week why do u want to spilit with some percentage.
    Regards
    pradeep

  • REM Planning table - Capacity requirements and Levelling.

    Hi i have few queries in REM planning table.
    In REM planning table MF50 my selection is based on entire plant. Here in total capacity data tab for any particular plant it will show the list of work centers which are maintained in particular plant to know the capacity details as per our requirement.
    1.When i select any WC line and click on change capacity display from CRP it is giving break up with required and available capacity hours for any particular WC available time is assume 22.5 hrs per day which is given in operating time in capacity header in WC but in MF50 it is showing 23hrs.I have defined shift sequence in OP4A and assigned in capacity header grouping which have 3 shift with 30 mins break in each shift which results in 22.5 hrs working for a day so in shift sequence and operating time it is mentioned as 22.5 hrs is the time available for day but in MF50 it is showing 23 hrs available for day?
    2.What is due% in MF50 total capacity data for any work center and how required time would be calculated?
    Appreciate if any one has any example.
    Cheers
    KK

    Hi bump for any suggestions?
    i have noticed one thing the time available is a round up value actual time available as per capacity header is 22.5 but in MF50 it is showing as 23..if i change to 21.5 then it is showing 22hrs available per day is this the standard behaviour?
    can anyone tell me how the required time is calculated?
    Cheers
    KK

  • Status "Inactive" set for maintenance plan.

    Dear all,
    while doing
    Maintenance plan-->functions-->Activate<-->Inactive-->Deactive for maintenance plan
    which field and Table  we can able to get the details,Status "Inactive" set for maintenance plan.
    Required
    Changed by, Changed on , Deactivated field
    Regards,
    U.Linganathan

    Please refer MPLA table to OBJNR value.
    Refer JCDS & JEST tables to get the Inactive Maintenance plans.
    If Status I0320 is active in JEST table, then that Maintenance plan is Inactive.
    Pass INACT is not equal to "X" & OBJNR = "WO*" to get all Inactive Maintenance Plans OBJNR values. Pass that in MPLA table & get WARPL value.

  • Dispatching problem in REM Planning Table

    Hi,
    I have encountered a problem in REM planning Table, from REM planning table when i m accessing Bar char planning table and try to dispatch the planned order it is not dispatching the order. I have checked the scenario is previously it was working fine but now it is not working with same settings can u guide me tht which settings affect the planning table dispatch. neither it was showing the capacity requirements, i have maintained the rate formulas is work centre and formula was working fine, i doubt it relate to SPRO settings kinldy give me hints where i can check n wht standard settings i have to make for planning table..

    Plz give some suggestion on this....

  • MRP setting for Purchase (Planned Order ) Requirement date

    Dear Sir,
    During the MRP run , we desire that the genertaed Planned Orders for the Purchase related items , should have requirement date as either the current date or the current date plus procurement lead time defined in the Material Master against the item .
    To achive the abobe requirement , we request you to pl guide us as what setting / parameters are required to be set in the MRP setup .  Or if there is some other alternate approach , pl suggest the same .
    With Thanks and Rgds
    Sonia Agarwal

    Dear
    Generally , during MRP run , system will genarted Planned order for Purcahsed item if it is opening period .
    The opening period for the planned order represents the number of workdays that are subtracted from the order start date in order to determine the order opening date. This period serves as a time float, which is available for the MRP controller when converting a planned order into a purchase requisition.
    You define the opening period for the planned order in Customizing for MRP in the IMG activity Define floats (scheduling margin key) and assign it to the material in the Scheduling margin key field (MRP 2 view) in the material master
    Now if you want to have Planned order for purchased item with requirement date as current date , then maintain Demand date like Sales Order requirement date as curent date in VA01 or PIR date as current date.
    Where as MRP will consider the Planned Order based on planned opening date , lead time , GR processing time from MRP2 view .So for current date requirement , u should keep Lead time and GR processing time as 0.
    Regards
    JH

  • Problem in REM Planning table.

    Hi PP Gurus,
    We created one material with REM profile 0004 with MRP1, 2, 3, 4, BD1, 2, Accounting 1, 2, Costing 1, 2 and Work scheduling views. In Work scheduling view weu2019ve not maintained any Production Scheduler and Production Scheduling Profile except Production storage location. Whenever weu2019re accessing Planning table (MF50) getting the errors
    1.     Date adjust. level incorrect: Plant 1001 /ord.type PE / prod.sched. *
    2.     No lead time scheduling: Plant 1001 / order type PE / prod.sched. *
    3.     No capa. data determined: Plant 1001 / Ord. type PE / Prod. sched. *
    One more thing. If we donu2019t put any sales order OR PIR using MD61 Planning table is not showing any details in Material Data rows of Planning Table. And system is not allowing to create any Planned Order manually. What might be the problem?
    If we put any Sales order or PIR using MD61 though the Rows in Material Data get visible but system is not showing any calculation changes in u2018Complete capacity datau2019 rows. We mean to say system is showing Available capacity but not showing any Required Capacity at Production line.
    Thanks & Regards,
    Abu Arbab

    Hi,
    In OPU5 Rate base scheduling active tick mark for scheduling and generate capacity with selection ID 02.
    Scheduling level -rate-based scheduling
    Scheduling type- Backward.
    Then check the planning table section parameter
    SPROProductionRepetitive ManufacturingPlanningPlanning Table--Maintain Entry Parameters.
    Please check scheduling level and other parameters?
    I hope u have not maintained any prod scheduler at work scheduling view.
    Please change this and try again run MRP with planning mode -3 deleted and recreated with lead time scheduling and check the result
    The production line what u have selected at planning table should be same with, production line define at "production version"
    Regards,
    R.Brahmankar

  • IMG Setting for Fleet Management - Set Reference Object for Vehicles

    On other SAP 4.7 systems I have been able to access in the IMG "Set Reference Object Screen for Vehicles" under the "Settings for Fleet Management".  I am currently working in a system that doesn't have that option in the IMG.  What do I have to do to get this menu in the IMG?

    Hi,
    All the extra features provided by business functions in PLM are documented in note [1389108|https://service.sap.com/sap/support/notes/1389108]. See the pdf attachment in that note.
    -Paul

  • LoadBalancer and BIG IP Setting for Workspace/Planning

    Hi,
    I recently migrated our Planning applications from System 9.3.1 to System 11.1.2.1 successfully. One of the things we setup in this process was a virtual IP Address to which two server IPs were assigned as well as the 19000 port. This was done to divert reduce the load of logins on one server as well as prepare for a server crash.
    The virtual IP address was created successfully and the loadbalancer is able to divert multiple connections to a default algorithm set on the loadbalancer hardware.
    However, when i login to the Workspace via my IE. I see that under Navigate->Planning->Application, there is a long string that is displayed instead of "Planning". I was asked to ensure "Persistence" is setup on the loadbalancer and it was confirmed that indeed "cookie persistence" was setup. However, the issue still exists.
    I also tried to change a few files residing in the Oracle Folder on the Planning server and the issue still exists. Lastly, i changed the "cookie persistence" to "IP Persistence" with "Source address"persistence as the default setting. The issue still exists.
    I have asked Oracle for any documentation that recommends the proper setting and unfortunately there is one and it is for "EPMA" and not for Planning (As i assume the issue is with the "Planning" label.
    Anyone else who has come across this issue and what is the best way to resolve this?

    Hi,
    we had also some difficulties with that buttons and now we solved it with a command bar with different buttons and menus  coded in vba.
    Was a bit tricky but its was the best way to have a lot of functions on a single workbook.
    We used the standard analyzer buttons to do maintain the sequences on a hiden sheet and in vba we connected the buttons/menu entries with vba:
    For generatig a command bar in vba but in a module:
    Set sb = CommandBars.Add("NAME_OF_COMMANDBAR")
        With sb
         .Visible = True
         .Top = 400
         .Left = 400
        End With
    Set TopMenu = CommandBars("NAME_OF_COMMANDBAR")
         With TopMenu
         .Controls.Add(Type:=msoControlButton, before:=1).Caption = "SAVE" '4
         .Controls("Sichern").FaceId = 270
         .Controls("Sichern").OnAction = "Tabelle4.BUTTON_11_Click"
    End With
    Best Regards,
    Thomas

  • Selection profile sets for capacity planning

    Hi,
    Could you please explain me in details about different sets in selection profiles configuration (work center set, order set, capacity category set, initial set) thorugh OPA2  and how they are related to sets in OPD1 configuration (Object, filter sets).
    Does these sets will effect capacity availability check calculations or they only for different display options for user.
    Please provide if there is any detailed document available since I have a problem where CM01 list is not matching with overall profile used for capacity availability check while creating orders.

    run t-code OPD0 and make adjustment for your overall profile (change a control profile)

  • Setting the plan table

    any way to do set the explain plan table sqlDev version 1.2
    Thanks

    Again, what is the problem, and why running @?/rdbms/admin/utlplan would not suffice? If you don't have access to the source on rdbms server, there is still a million ways to do it. You can copy plan table as create as select from plan_table@dblink, or find plan table definition on the web and run it in sql worksheet.

  • Error message in capacity planning table

    Hi,
    I am  using REM planning table.I enter the planning table by giving the selection criteria of Plant and production line.
    System is giving following error message,
    the error message and dignosis of the error message is given here.
    'No prod. dates for material MTI_FERT011, version 0001, production line 2279'
    Message no. REMPT315
    Diagnosis
    The planned order has no production dates for the combination of material, production version and production line you specified.
    This may be as a result of the following, for example:
    The planned order was scheduled but not using the production line you selected. (The production line is determined by the production version you entered in a planned order.)
    Procedure
    One possibility of finding out what is causing the problem is:
    To access the planned order from the detailed dialog box in the table via "Change" and reschedule the planned order. Check the scheduling log by choosing "Goto --> Scheduling log". More information is displayed in the log's warning or error messages.
    But which master data to be corrected is not known.
    Experts please guide me.
    Regards,
    Ravindra

    Hello,
    I had the same error while working with the REM planning table, despite the consistency of the data.
    Another cause that can lead to the error message REMPT315 is that in the production version detailed screen, "Planning data" table you have entered the routing next to rate-based planning. You must enter the routing (number of the group and the group counter) on the line detailed planning.
    After that, choose check again and try to introduce new quantities in the planning table. It worked for me!
    Irina

  • Planning Table MF50

    Hello experts,
    Can some one please explain the purpose of the planning table MF50 and how to use it for capacity levelling. I am in a REM environmnt.
    Thanks
    Raman

    HI
    1)In Repetitive Manufacturing, the master plan is represented by the planning table. The planning table is a tool for operative planning and is used to plan the production quantities:
    2) In a repetitive manufacturing environment, planning and control is usually carried out in a period and quantity basis. The layout of the planning table has been designed to support this requirement and is also based on periods to provide a very clear, easy-to-interpret overview of materials and production lines.
    3)The planning table is the planneru2019s/MRP controlleru2019s most important tool for planning the production quantities. At a glance the planner can check production quantities, monitor the available capacity of the production lines and check up on the availability situation of the products produced on each line.
    4)You can directly enter and change production quantities in the planning table. You can assign u2018non-assignedu2019 production quantities to the production lines or you can reassign production quantities to alternative production lines.
    5) You create the production quantities or assign them to the production line in the planning table.
    6 )You can also use the planning table with capacity planning. Here, planning is based on lead time scheduling. The basis for lead time scheduling is the routing. You can access the capacity planning table directly from the REM planning table.
    Regards
    Anupam Sharma

  • Clear the History Data Automatically in Production Planning Table MF50

    Dear Friends,
    I have the problem to set the Production Planning Table (Txn MF50) to
    clear the history data automatically. Currently, all the history data
    in the planning table has to be cleared manually.
    Appreciate your help.
    Rgds
    Zahari Yusof

    instead of just removing the whole history like private browsing do, i just want to remove browsing/download history and form&search. i didn't want to remove cookies and active logins, heheh. thank you

  • Cycle sets in Counter plan

    How is it possible to create two cycle sets in one plan. I create one counter plan with one cycle set and save. Plan no is generated. Then how can i create a second cycle set for same plan no as the system is designed for Internal numbering of plan.
    Please explain me the real use of cycle set in multi counter plan. where it is used and when . for what purpose and steps on how to create two cycle sets for one multiple counter plan.
    Thanks in advance
    Murad shaikh

    Hi ,
    Check your config setting as given below
    Plant Maintenance and Customer Service> Maintenance Plans, Work Centers, Task Lists and PRTs> Maintenance Plans> Configure Special Functions for Maintenance Planning.
    The check box should be ticked.
    This allows the maintenance of multiple cycle sets in one plan. Thus you can define different cycle sets, and thus cycles, for calculating the dates within a plan. You can use the assignment between cycle sets and the maintenance item to control that only certain maintenance items generate a call object for certain dates. In the simplest case, a cycle set such as A - B - A - B can be defined. "A" leads to a small inspection and "B" leads to a big inspection.
    Also check below link
    http://help.sap.com/saphelp_di471/helpdata/EN/c9/fccf28f79611d4961300a0c93029cf/content.htm

Maybe you are looking for

  • Lost all Outlook e-mail after crash and reset to factory. How to restore e-mail?

    Firefox crashed and offered to reset my computer keeping my current tabs. I didn't think it would erase all of my Outlook inbox e-mail and all the e-mail stored in my folders. I tried Outlook recovery, but could not get it back. Is all lost forever?

  • Icon with question mark

    I have a iMac I bought last year.  ts a 27 inch quad core i5 with 8 gig of ram and 1tb hard drive.  I went to put snow leopard on it last night and something went wrong.  i put in the disk, used the disk utilites to format the partition.  I went back

  • Where are the "Display As" templates?

    I am using the Blue Grey theme on an application. On some forms there are fields that are not updateable and have the Display As set to "Text Disabled, ..." In the Blue Tan theme fields that are set to Display As "Text Disabled, ..." are grayed out.

  • Generating DME File - RFFOBR_U

    Hi Could any one explain about the program RFFOBR_U? How the DME file is generating and storing? Especially the include RFFRIY2? It will be very helpful to me. Thanks, Ezhil.

  • How to make swatches persistent from one document to the next?

    I want to have a custom swatches in my  workspace each time I open a document. How can I make swatches persistent in InDesign?