IMovie 10.07 change clip duration default to less than 1s

I have 100 picture stills to put on the time line.  I want each to appear less than 1 second, say 0.2s.  I can't use the clip slider to slide to less than 1 sec.  Is it doable?  Thanks.

Try setting the frame count to less than that for a full second.

Similar Messages

  • My iphone 5s has no signal. I already tried the reset. but no change. I bought it less than 2 months. What can I do?

    My iphone 5s has no signal. I already tried the reset. but no change. I bought it less than 2 months. What can I do?

    I will. thanks

  • Can you change still clip duration default setting?

    I create wedding videos, and at the end of my movie I add about 100 still clips as edited highlights. In older versions of imovie you were able to alter the length of still clips created in the preferences to whatever time you wanted. In this newer (better?!?) version when I have created all my still clips I have to click on each one individually to alter the time duration. The default setting is 5 seconds and I can't find anywhere that you can change this. It takes me AGES to do this individually, anybody got any ideas of a better way? Cheers.

    I can't necessarily recommend this for it can lead to project corruption. It's possible to manually edit the text of the iMovie project file, changing the playtime duration of all your still clips to the duration you want.
    1. In iMovie, double-click on one of your still clips. Write down the name of its source file. Quit iMovie 6.
    2. In the Finder, make a duplicate of the project. Work on the duplicate.
    3. In the Finder, open the duplicate project package. (Control-click on the project icon and choose "Show Package Contents" from the popUp menu.)
    4. You'll see two iMovie project files loose in the window that opens, plus some folders. One of the project files has a tilde (~) in its name and one does not. Our goal is to edit the file that does NOT have the tilde. (The tilde file is type of backup.)
    5. Launch TextEdit. (In your Applications folder.) Drop the non-tilde project file onto the TextEdit icon in the Dock.
    6. Use TextEdit's search function to search for the string that defines the play-time of each still clip, now 5 seconds. For PAL, that string is "<integer>125</integer>". For NTSC, it is "<integer>150</integer>".)
    7. For each still, you want to change the 125 to some other number. For PAL, the number you want is 25 X the number of seconds to play.
    If the only clips in your project that play for 125 are your stills, you can safely use the Replace All command to replace all with the strings at the same time. Be sure to include the tags <integer> and </integer.
    If there are others that play for 5 seconds, you'll need to examine each clip individually, using the sample name you wrote down to see if the clip uses a similar name.
    8. Save the modified file and close that TextEdit window.
    9. Go back to the Finder and double-click on the project package to open it in iMovie 6. If everything worked as intended, all your stills should play with a new length.
    Karl

  • Batch change clip duration - multiple photos in iMovie 11

    Hi everyone,
    Many thanks to anyone who can help. I know about clicking on the cogwheel to adjust the duration of a single photo, or to apply to ALL photos, but what I'd like to do is select a group of photos out of all the ones I've already added to my movie, and I'd like to adjust the duration of just those photos. Any ideas??
    Again, thanks so much if you can help!
    Frizzy

    Hi AppleMan1958,
    I tried what you suggested to batch-adjust clip length with 'Show Advanced Tools' checked, but under 'Paste Adjustment', there's still no 'Clip Adjustment' option. None of the available options under it (All, Video, Crop, Video Effect, Speed) works.
    This problem is very frustrating!
    Is there a setting to allow you to change clip lengths and transition as you progress through the slide show? And if you make changes in the middle section of the project, then the part ahead of it simply shunts back and forth, instead of changing clip length and transition duration on its own.
    I use a MacBook Pro running OS X and iMovie 11.
    Regards,

  • Change clip duration iMovie

    Changing the duration of a clip in iMovie.  If 4 seconds was there originally and I want to extend it to 6 seconds then it will change to 8 seconds?

    Try setting the frame count to less than that for a full second.

  • Can no longer access iPhoto from the iMovie camera browser..not working. Also the Inspector tool not working properly. Cannot change clip duration.

    How can I fix the INSPECTOR Tool?   Clip duration is not working properly, it is very erratic.  You type a number and a different one comes up on the clip.
    Suddenly the iPhoto Camera browser in iMovie is not working properly either.  Can not access my iPhotos to include them in iMovie project.

    Have you tried this?
    From the "HOME" screen, go to "SETTINGS > PRIVACY > PHOTOS" and see if iMovie is listed in the "PHOTOS" page. If it is, then tap the iMovie switch to "ON"
    Now your Videos & Photos should be accessible in the iMovie App.

  • Can't fully change clip duration...

    Hello all
    My students and I are doing a claymation type project and I am having some difficulty changing the clip durations once I've imported the photos into iMovie. I can get them in and changed down to 0:00:14 but not any shorter. I should be able to set them as fast as 0:00:03... If I change the clips individually, I can set them to 0:00:03, but if I try to change more than one at a time, the lowest is 0:00:14. With 500 odd photos for each group, changing the length one clip at a time isn't really a feasible option. Any suggestions?

    Yes, the pics have to be in the Timeline before they can be adjusted.
    Great that it's now working for you. As a retired teacher myself, I know what it feels like when things don't work as they should, and you have a disgruntled class breathing down your neck! Good luck with the project - sounds interesting.
    Here's an explanation of PAL and NTSC:
    http://en.wikipedia.org/wiki/PAL
    They are Television Broadcasting formats - your part of the world uses NTSC, many other parts use PAL, and some others eg France uses SECAM. They use differing frame rates, so are largely incompatible with each other.
    Message was edited by: catspaw

  • Can't change clip duration Motion 5

    I have tried all of the work arounds I have been able to find in the Support Commnity and still I can't change the duration of source clips in Motion 5.  I have trashed plist, rebooted, repaired permisions, changed timing of project, changed name of clip, used the Timeline clock instead of the Instpector window.  Cleared all In / Out points and reset them to slightly different values. I have changed Timing to Variable and back again.  I can open clips in a new project and change duration.  I have opened new project and copied some layers from working project, the problem persists.  Is reinstall the option left available to me?

    BenB,
    The specifics: Motion 5.0.4 Timeline is set to 6 minutes, the Media is 5:59;21 (QT,mp4, H264,1280x720, 24fps). Imported via File Browser into Layer Group (Group In / Out points are 0 and 6 mins, as is Play Range).  At one time the clip was in it's full duration.  Afterr a crash / restart it is only 01:52;27.  I can not Drag the clip to its full length. I cannot change it's duration thru the Inspector, not the Timeline Clock. 
    In an effort to isolate the issue I opened a new Project (same time setttings as original Project, imported the clip, which plays to it's full duration, and then, one at a time, copied and pasted all Filters and Parameters and Objects from the original Project; all play fine.  Then I copied the original Layer Group in it's entirety to the Test Project, and the clip is still limited to 01:52;27.  I then used Replace Media to select a random clips (same format) with varying Duration (all longer than 01:52;27) and got the same result every time; Duraton 01:52;27. Not one element of the Test Project has an In / Out set to anything other than the full Duration of the Project.

  • Problem changing clip duration

    Hello All;
    I am able to increase the duration of individual clips in my timeline but for some reason, I can't decrease the duration (I get a beep and the change doesn't take place). Am I doing something wrong ?
    Thanks.
    Tim

    OK I completely rebooted and it was working for a while but then started to no longer let me decrease the duration. Here are some screen shots.
    The duration of these clips varies but generally about 6:15 seconds to 7 Seconds and I am trying to change all to 6:00 Seconds.
    Here are two ways I tried to change the duration. I am not sure if I can upload photos here so I'm going to provide a link to my server -
    Method #1 -http://www.dedula.net/Picture%201a.png
    Method #2 -http://www.dedula.net/Picture%202a.png
    When I tried method #1, I got the following error message which may be a clue to what's happening here ...http://www.dedula.net/Picture%201.png
    I did not receive any feedback after hitting OK for method #2 - just a beep and it reverted to my previous duration and did not change.
    Any ideas ?
    Tim

  • How can I move a clip on the timeline less than one frame?

    I need to move an audio clip on the timeline to match the video but it snaps one frame at a time and I need to move it less than that.?

    I've just had a look.
    Try
    Edit
    Keyboard Shortcuts
    Panels
    Program Monitor Panel
    Program Monitor Panel Menu
    You should then find this:
    You can then set up your preferred shortcut key.

  • Changing web server refresh to less than one second

    I just set up another PC on our network to display our engine test VI.  Is there any way to increase the refresh rate to less than one second.  I tried entering .5 sec on the config screen, but it changed back to one second.  I'm using LabVIEW 8.5.1.
    Thanks,
    Todd Munsell
    Wood Group Pratt & Whitney Industrial Turbine Services
    Todd Munsell
    Turbine Engine Test Technician/IT Tech
    Wood Group Pratt & Whitney Industrial Turbine Services, LLC
    Plattsburgh, NY

    Thanks again.  I'll try that.
    BTW, I just spoke with out rep from Daytronic Corp. who was testing the comm cards with his System 10 and PC.  They worked fine for him.  The only difference is that he is using LabVIEW 7.0 and we are using 8.5.1.  They don't have any subVIs written for the newer LV versions.  That may be the cause the the issue we're having with using the comm cards to access the DAQ.  They do not have the time or money to update their subVIs for the newer LV versions, but I'd have to think that there is a way to change them myself to make them work.  Ideally, I want to use a modified version of the app I'm using on another PC without having to bother with the network to pass the data.  I already have a cable made to connect the other PC to the System 10.
    I almost forgot something.... I found a version 8 System 10 subVI package using the NI search, but it didn't work either.
    Do you know what might have changed in the newer LV versions that could cause this issue?  I've attached a zip file of their subVIs.  Like I mentioned earlier, LV works fine using the main (built-in) comm port on the System 10 DAQ.  It's just the additional cards that do not work correctly.  They seem to establish the comm link OK, but the binary data that the System 10 sends is not interpreted and displayed correctly.  It's usually all gibberish on the screen.
    Of the Daytronic subVIs, the subVI that I use to test with is the "example.vi", which is used for binary data.
    The "simple terminal" subVI works fine, but I can't use it to test the data link since it's configured differently.
    When I use the main System 10 comm port, the simple terminal doens't work and the example.vi does.  Why wouldn't it work with the other ports/cards?
    Could you please check these out when you have the time and see if you can find something that isn't configured correctly?  I may be overlooking something obvious, since I'm still learning LV.
    Thanks
    Message Edited by tmunsell on 07-28-2008 09:18 PM
    Todd Munsell
    Turbine Engine Test Technician/IT Tech
    Wood Group Pratt & Whitney Industrial Turbine Services, LLC
    Plattsburgh, NY
    Attachments:
    labvdr7.zip ‏891 KB

  • BOM quantity change (STPO-MENGE) resulting quantity less than 1

    Hi,
      Anyone have done a BOM quantity change (STPO-MENGE) where the resulting quantity is less than 1.  Please help.
      Thanks,
         Hazel

    Do you mean base quantity by saying header quantity?  I'm running variant configuration.  The base quantity is restricted to 1.  Moreover, changing the unit of measure is not an option.  Each is the official base unit of measure.
    Sample Scenario/Requirement:
    An order for a qty of 1000 requires a total 84 plates.  Each plate can yield a qty of 12.
    SAP uses the equation -->
    Current Component Qty =
                (required qty/base qty) * saved component qty
    Calculations:
    Step 1) Derive Current Component Qty
    Let required qty = order qty (VBAP-KWMENG),
              base qty = max yield per plate (given)
    Current Component Qty =
                 ceiling (VBAP-KWMENG/max yield per plate)
              = ceiling (1000/12)
              = ceiling (83.333333)
              = 84
    The Current Component Qty (84) is the qty used production orders and is equal to the Requirements Qty of the component (RESBD-MENGE)
    Step 2) Derive save component qty.  In Variant Configuration, save component qty is equal to STPO-MENGE.  Base quantity of 1 is assigned to the KMAT (configurable material).
    Since Current Component Qty =
          (required qty/base qty) * saved component qty
    by substitution -->
        84 = (1000/1) * saved component qty
    saved component qty = (84/1000)
    saved component qty = .084
    Issue/Problem:
    I have the above calculations correct in Variant Configuration.  To run a check, I do a production order simulation (CO01S) for a Total order qty of 1000 with today's Finish date.  When I click for components overview, it gives me a Requirements qty of the component of 83 and NOT 84.
    I'm not sure how SAP does the calculation in the background, but I was thinking; maybe, by increasing the number of decimals from 3 (.083) to 6 (.083333) would give me the 84 that I needed.
    Roberto

  • Transitions changing clip duration

    I have laid out all my clips on the timeline to tightly coordinate with the audio track. I have added a number of transitions... mainly cross dissolves, without problem but then I add one more and all my clips have miraculously shortened their duration... If I try to readjust the duration using photo settings and click update all is good, the clip resizes itself in the timeline, but then until after it renders and it then reverts back to its shortened duration. I suspect this is not normal behaviour.
    I've trashed my imovies preference file, but the problem persists. I'm using iMovie HD 6.0.3 (267.2) and running OS 10.5.6 . Any thoughts on a likely fix for this annoyance would gratefully received.
    many thanks

    hmmm.... If I understand the logic correctly it would be as if I had two clips each with a duration of 5 seconds and I then put a cross dissolve of 2 seconds between them.. which would result in a sequence of 10 seconds comprising one four sec clip, the 2 sec dissolve and then the second 4 sec clip...
    However on closer examination this isn't what I'm experiencing... for example: I have two clips a) 6:13 and b) 5:11 the point in the timeline at the end of clip b) is 19:05. I put a cross dissolve of 0:24 between them... a) has now been shortened to 5:19 and b) to 4:17. So it would seem that each clip has been shortened by 24 frames...however the timeline at the start of the transition is now 13:00 and at its other side is 13:24 and the point at the end of clip b) is now 18:11. Therefore it seems to be that a 0:24 cross dissolve is in fact cutting a total of 1:18 from the clips while only adding in 24 frames of dissolve... net net the project shortens.
    So... is this normal functionality or is something amiss?

  • TS3999 Change minimum duration to something other than 30 minutes

    When scheduling an event in iCloud calendar, can you set the minimum duration in the pull down menu for "from" to something other than 30 minutes?
    For example, if you schedule an even at 9:00 AM, the shortest time available in the pull down down menu will read "9:30". I know I can manually type any time I want, but I was looking for a way to change the default options.

    Maybe you can try to build something in Front Row, although I do not think it will allow this flexibility in time frames.

  • IMovie 09 uses up 4GB of RAM in less than 2 minutes

    Hi,
    The topic says it all i think..
    To be honest i don't know if i had this issue before Snow Leopard i have only been using it for about a week. I have a MacBook Pro (Early 2008) 2.6GHz with 4GB RAM installed. I have never had any issues with the RAM being used up this fast before ever (and i'm a pretty heavy photoshop user and gamer).
    With just a simple project and little events i make a short clip, some transitions and a background tune. Then i minimize iMovie to check my Mail or another app and notice the mac became horribly slow and minimizing takes a good minute. Then i check Activity Monitor and iStat Pro to find within just a few minutes i not only used up 4GB of RAM but only am well into 4GB Swap File usage, i need to restart to turn my Mac back into the fast Mc it was before i started iMovie.
    Before writing this i did a few tests with garageband and a couple of other apps including Adobe Suite etc... i still have a little over 2GB RAM free. Then i start iMovie, open my project and mess around a little.... wham, RAM gone, is this what's known as a memory leak ?
    Any thoughts on this? I started experimenting / learning iMovie because i have a wedding DVD to make soon, i need this software to work right.
    Thanks in advance
    Jay

    MPEG2 and AVCHD are two different codecs. Your footage will be one or the other, but not both. MPEG2 is used more often in standard definition cameras.
    Having said that, your memory problem is unusual. iMovie uses a lot of memory, and if you are constrained on memory, it uses swap files. However, mine has never used up 4GB of real memory in 2 minutes. It looks like you have a memory leak somewhere (which could be a bug in iMovie).
    I don't know how to find it since I can't replicate it on my system.
    One thing that may help you monitor this is the free application called [MemoryStick|http://www.tidbits.com/matt>. You can install it and monitor your swapfiles real time. You can also see how much real memory and virtual memory iMovie is using at the moment through Activity Monitor (which I presume you are already doing.)
    With MemoryStick, if I notice that I have 5,6, or 7 swapfiles going, and they are over 2GB (they have been as high as 4GB) then I know it is time to re-boot.

Maybe you are looking for

  • Why does text box info get cut off in certificate

    I am using Captivate 7.  When a student enters his name and pharmacy license number in the field is is ok, but when it is reproduced in the certificate (and the name also in the "Hello NAME welcome to the program") it cuts off the name if it is too l

  • Duplicate todos

    Hi, My todos have recently started duplicating themselves inside Mail.app (strangely there are no duplicates in iCal!). Can anyone suggest why this might be happening? I have an iPhone syncing 'over the air' with MobileMe. I don't have any other sync

  • Detecting END or Stream turned off in OSMF  -- Live Stream

    Hi all i am using the OSMF player to stream live events.  When the stream ends or if the feed is turned off the player throws a BUFFER state change which my code catches and shows a loading spinner, but how do i detect if the stream has ended or turn

  • A question about Adobe Illustrator and saving layers....

    I use illustrator to create animation art.  Basically, I use each layer as create a seperate frame of art - it's a great wayto constanctly check to see if my character's movement is smooth. However, this often to leads to files that are hundreds of l

  • How to install R3 4.7 ON win2003

    HI I m very new to SAP. I learninng , anyone can help to install R3 4.7 on my pc pls tell me in which seq. i should install ,i mean oracle, java, sapint pls send me step by step process Thanks Hiral