In Material Master Screen,functionally what is Safety time and safety time
In Material Master Screen,functionally what is Safety time and safety time indicator in the MRP Screen.Pls explain its functionality
Hi,
The safety time / actual range of coverage ensures that the planned warehouse stock covers the requirements of a defined number of days. It therefore serves as a time float and thus works alongside the safety stock, which acts as quantity float.
The system simulates bringing the requirements forward by the specified number of days and the planning for the receipts, created for these requirements in the planning run, is also brought forward by this number of days.
Prerequisites
· You have set the Safety Time indicator in the material master record (MRP 2 View) to define whether the safety time is only to apply to independent requirements or to all requirements.
· In the material master record (MRP 2 View), in the Safety Time/Actual Range of Coverage field, you have entered the number of workdays by which the requirements are to be brought forward.
· If, in addition to this actual range of coverage, you also want to define a different number of workdays in certain periods or a safety time less than one day then, in Customizing for MRP in the activity Define Period Profile for Safety Time/Actual Range of Coverage you can define a period profile and assign it to the material in the material master record.
Regards,
Vijay
Similar Messages
-
In Material Master Screen,functionally what is BAckward Consumption period
In Material Master Screen,functionally what is BAckward Consumption period & Forward Consumption period in the MRP Screen.Pls explain its functionality
Hi,
The safety time / actual range of coverage ensures that the planned warehouse stock covers the requirements of a defined number of days. It therefore serves as a time float and thus works alongside the safety stock, which acts as quantity float.
The system simulates bringing the requirements forward by the specified number of days and the planning for the receipts, created for these requirements in the planning run, is also brought forward by this number of days.
Prerequisites
· You have set the Safety Time indicator in the material master record (MRP 2 View) to define whether the safety time is only to apply to independent requirements or to all requirements.
· In the material master record (MRP 2 View), in the Safety Time/Actual Range of Coverage field, you have entered the number of workdays by which the requirements are to be brought forward.
· If, in addition to this actual range of coverage, you also want to define a different number of workdays in certain periods or a safety time less than one day then, in Customizing for MRP in the activity Define Period Profile for Safety Time/Actual Range of Coverage you can define a period profile and assign it to the material in the material master record.
Regards,
Vijay -
In Material Master Screen,functionally what is Requirement Group in the MRP
In Material Master Screen,functionally what is Requirement Group in the MRP Screen.Pls explain its functionality
Hi,
The safety time / actual range of coverage ensures that the planned warehouse stock covers the requirements of a defined number of days. It therefore serves as a time float and thus works alongside the safety stock, which acts as quantity float.
The system simulates bringing the requirements forward by the specified number of days and the planning for the receipts, created for these requirements in the planning run, is also brought forward by this number of days.
Prerequisites
· You have set the Safety Time indicator in the material master record (MRP 2 View) to define whether the safety time is only to apply to independent requirements or to all requirements.
· In the material master record (MRP 2 View), in the Safety Time/Actual Range of Coverage field, you have entered the number of workdays by which the requirements are to be brought forward.
· If, in addition to this actual range of coverage, you also want to define a different number of workdays in certain periods or a safety time less than one day then, in Customizing for MRP in the activity Define Period Profile for Safety Time/Actual Range of Coverage you can define a period profile and assign it to the material in the material master record.
Regards,
Vijay -
In Material Master Screen,functionally what is Picking Storage type in the
In Material Master Screen,functionally what is Picking Storage type in the Warehouse Management Screen.Pls explain its functionality
This indicator points to the customizing of picking strategies. This way SAP knows which picking strategy to take for a particular material, as the picking strategy may differ from material to material
-
In Material Master Screen,functionally what is Mixed MRP in the MRP Screen.
In Material Master Screen,functionally what is Mixed MRP in the MRP Screen.Pls explain its functionality
THis indicator will define whether the material is available for the following....
Subassembly planning with final assembly
Gross requirements planning
Subassembly planning without final assembly -
Material master screens requirement
Hi guru's,
I've a unique business scenario and would like to get your inputs on this.
Here is my business scenario:-
Our material master screens/tables are hugely customized. We have lots of custom fields on mara, marc, mvke and mbew. We have been using custom screen sequence (yz) for material master for a long time and not any of the SAP provided standard screen sequences. Lot of the these custom fields are put in yz screen sequence screens. We have lot of materials on production with these custom fields populated. We got a business requirement to activate material ledger now and requirement is to put back 21 standard screen sequence. But 21 screen sequence doesn't have any of the custom fields.
I know one way is to setup new screen sequence(copying 21) and put these custom fields but I would like to get your expert advise before moving forward.
What are other ways to achieve this ? Any easy ways ?
Can we just modify accounting view on yz ?
What other impacts are we going to have for material ledger activation from MM point of view and during go-live ?
Sorry I've not worked on Material ledger activated environment before.
hope to hear some inputs.
Thank you in advance.can anybody post their input please ?
-
Hi Experts,
How to go to material master screen in SAP ECC6.0 and how can I choose information on material (1300-260, IDES system)?
Thanks,
ManjujayHi,
Use transaction MM03 SELECT MATERAIL selectVIEWS Basic / Purchasing whichever you want to view
Put the plant 0001 in IDES and storage 0001 and you can see material master
Thanks
Diwakar -
I have just sought to update my lightroom and am now unable to access the develop function and get a note stating that I have reduced functionality what it this about and how do I get my product back
Hi there
I have version 5.7 and every time I opened it I was told that updates are available and to click on the icon to access these. Instead it just took me to the
adobe page with nowhere visible to update. I then sought to download lightroom cc and this is when I could not access the 'develop' section due to reduced
functionality It was apparent that my photos had been put in cc but no way to access them unless I wanted to subscribe.
I have since remedied the problem as my original lightroom 5.7 icon is still available on the desktop and have gone back to that. I do feel that this is a bit
of a rip off and an unnecessary waste of my time though.
Thank you for your prompt reply by the way.
Carlo
Message Received: May 04 2015, 04:52 PM
From: "dj_paige" <[email protected]>
To: "Carlo Bragagnolo" <[email protected]>
Cc:
Subject: I have just sought to update my lightroom and am now unable to access the develop function and get a note stating that I have
reduced functionality what it this about and how do I get my product back
dj_paige created the discussion
"I have just sought to update my lightroom and am now unable to access the develop function and get a note stating that I have reduced functionality what it
this about and how do I get my product back"
To view the discussion, visit: https://forums.adobe.com/message/7510559#7510559
> -
I am having a problem with my brand new MacBook Pro. After opening my laptop the other day I noticed a straight green line from top to bottom near the center of the screen. What is this from and how do I get rid of it? It is most annoying. Please Help!
"What is this from and how do I get rid of it?"
Such symptoms bode serious hardware issues and you shouldn't think about fixing it yourself when you are still in waranty. Get to an Apple Store, like the other poster suggests. -
My iphone is stuck on the apple boot logo screen. What do i do and i already tried to restore but it comes with an error
Try this
http://support.apple.com/kb/TS3125 -
What is safty delta and safety interval
Hello,
PLease tell me What is mean by Safety Delta and Safety Interval?Hi,
Safety interval should be set so that no document is missed even if it was not stored in the DB table when the extraction took place.
Example for Determining Selection Intervals with a Generic Delta:
1. If delta field is Date (Record Create Date or change date), then use Upper Limit of 1 day.
This will load Delta in BW as of yesterday. Leave Lower limit blank.
2. If delta field is Time Stamp, then use Upper Limit of equal to 1800 Seconds (30 minutes).
This will load Delta in BW as of 30 minutes old. Leave Lower limit blank.
3. If delta field is a Numeric Pointer i.e. generated record # like in GLPCA table, then use Lower Limit. Use count 10-100. Leave upper limit blank. If value 10 is used then last 10 records will be loaded again. If a record is created when load was running, those records may get lost.
To prevent this situation, lower limit can be used to backup the starting sequence number. This may result in some records being processed more than once; therefore, be sure this DataSources is only feeding an ODS Object
https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/84bf4d68-0601-0010-13b5-b062adbb3e33
Assign points if this is needful.
Rgs,
I.R.K -
If our company would like to design a device that can meet AirPlay function, what's the process and requirement?
Contact Apple instead of posting to these user to user support forums.
-
My MacBook Pro has been having difficulties at startup. It sometimes locks and doesn't get past the white screen. It has also locked up several times and gotten a green stripes across the entire screen. What is causing this and how do I fix it?
You don't, take it to Apple for repair.
This might interest you if it's too old to fix.
My computer is not working, is my personal data lost? -
Safety stock and safety period
Can anybody help me in understanding the effect of safety period in MRP..
CAn anybody give me an explanation with numbers so that i could test and understand..
Please help me out..Dear
There are plenty of earlier posting on Safety stock and safety periods .
Safety Stock : This is one kind of Un-restricted stock which will be used to full fill the un-expected damand for any material apart from the normal stock .Safety Stock calcuation depends on requireiment .It can be pre-defined ( manual safety stock -MRP3 view-Safety Stock ) or Automatic Safety Stock based on the MRP Type set up in OMDQ.If you want automatic safety stock , then it will calcuated based on Forecasting view parametrs , forcast model , MAD, BASIC value calcualted wheil excuting Forecasting collectively or individually .
Safety Stock Calcualtion happend based on following CONDITION :
1.MRP type should be Forecast Base MRP -VV,VB,VS,V1,V2.Here MRP type calculates the Automatic Safety stock based on the Forcasting View Maintained in MM02 with proper Consumption History .( 261,501 etc update control in MMR through OMJJ set up --Please check MMR Forcasting View -Cosnumption Histry at least 6 months are there or not ?)
2.In MRP Type -SPRO-MRP-Check MRP Type -Select any one of the MRP Type like VV , you will find that Calcualtion of Reo-Order Point and Safety Stock Check Box Ticked .Based this set up and above Forcasting view , safety Stock will be calcualted with certain formaul .Here in the Material Master MRP3 view u need to maintain Service Level Percentage of that Material whcih will be consideredr as Service level factor to calcvualte the Safety Stock automatically based on the MAD and Basic Values calcualtion in Forcating View Individually (MM02) or collectively in MP38 .
Hope this above facts will help you to understand the calcualtrion of Safety Stock .
Formula : Safety Stock = R x Sq.rt. W x MAD
Safety Stock = R x W x MAD
Refer our earlier posting on the similar issues :
Automatic reorder point calculation
safety stock and min safety stock
Hope it clarifies
Regards
JH
Edited by: Jiaul Haque on Feb 21, 2011 10:31 AM -
GR Processing Time and Delivery Time not coming in CS11 Output screen
Hi,
I am executing a BOM explosion report using CS11.
In the CS11 report output I added columns for GR Time and Delivery Time using change layout option.
After changing layout when I see the details in columns of GR Time and Delivery Time all the values are ZERO '0' for all the components in BOM.
I checked the material master for component items and find that in MRP view values are maintained in GR Time and Planned Delivery Time field which are also seen in MARC table.
I do not know from where CS11 is fetching the values for display of GR Time and Del. Time.
How can we populate the values in CS11 report out put for GR Time and Delivery Time? Am I missing some master data maintenance apart from Material Master?
Regards...Hi Prasobh,
I looked at the note 101262 and it seems that it is suggesting us to create a new Z report by copying existing report and then modify the WRITE Bloack in new report to display GR Time and Del. Time.
Is my understanding correct? If yes can you share with me the steps in some more details then mentioned in note 101262 that I need to follow for addressing this requirement.
If no can you suggest any solution that you know by which it is possible to include GR Time and Del. Time in CS11 output without Z development.
Regards,
Maybe you are looking for
-
Send email from SAP to external
hi experts, My code triggers Email from my SAP program to external Email ID.This functionality is working fine. Below is a snippet of my code: TRY. Sender config obj_send_request = cl_bcs=>create_persistent( ). obj_sender = cl_sapuser_b
-
I've searched, but either I'm not searching correctly, or no one else has asked about this. When I connect my Mac Mini to an NTSC TV (using the DVI adapter to get S-Video out) and go into "Display Settings," there's no restriction on the display mode
-
I am trying to have a smaller window to open. You can see from the script that this window has a size. Which for me makes sense when someone needs to fill up a form. I do not want repeat do not want a pop up window.
-
Migrating C/C++Development environment from Solaris 6 OS to Solaris 10 OS.
Hi, I have several questions. Hope i can get some advises. I am tasks to do a migration for my current Development environment from Solaris 6 OS to Solaris 10 OS. Current Scenaros: ============= My Development environment is on Solaris 6 OS machine (
-
Best WorkFlow For Replicated Disc
I come here, as I am certain others do, as much to help as to learn. My question for a replicated disc. Is it best to encode to test DVD R at bit rates consistent with compatibility? And then once everything works, reencode at maximum bit rates of 9