In-process inspection in repetitive mfg-  Inspection type - 13

Hi there,
             Can any one please tell me what is the differrence between the inspection type -03 & 13.
As per my understanding the only diff is that 03 is used in discrete mfg & 13 in repetitive mfg...
what is the other differrence ........??
Regrads
Kaushik

Hello Kaushik,
actually you have already found out that 03 is for descrete and 13 for repetive manufacturing. What is the difference?
03 Descrete Manufacturing : Limited production numbers and can be assigned to a customer order. Example: A computer built with various extras (built to order).
Accordingly inspection plans and inspection points assigned can be configured rather freely.
13 Repetitive Manufacturing: Production lines produce the same product in an unlimited number over a longer period of time. Example: Screws M8 x 40 mm (Mass production). In this case inspection plans need a relation to either time, numbers etc.
I hope that this information answers your question.
Regards
Isabelle

Similar Messages

  • Quality inspection in repetitive mfg

    Hi
    I have some queries in quality inspection setup for REP MFG.
    1. Setting up inprocess inspection
    2. GR Inspection from production
    3. At what stage the QM lot is generated .
    The inspection types used for PP-P1 03 and 04 hold good for above or should I take other inspection type.
    Best wishes
    Murali

    Hi Bhramankar,
    I have not got chance to work on the REM Live environment. But I am very anxious to work over it if I will have chance.
    I have posted the thread regarding the same about the Order when I read the process scenario form the Library material on [Repetitive Manufacturing|http://help.sap.com/saphelp_46c/helpdata/en/8a/1a1eff4e4211d182be0000e829fbfe/frameset.htm].
    Where the last line have link to capture the Quality inspection for REM.
    The [Link|http://help.sap.com/saphelp_46c/helpdata/en/8a/1a1d794e4211d182be0000e829fbfe/content.htm] may have leaded me to write such.
    If have misguided him, I sincerely APOLOGIES for that. And deeply regretted for the same.
    I truly request you to posture some focus over in process inspection in REM and cultivate our information.
    I again thank you for your inputs.
    Dear Dharam,
    The SAP standard inspection type is 13 for REM.
    How to capture it? I have a [Document|http://help.sap.com/saphelp_46c/helpdata/en/8a/a5aadd4adc11d189740000e8322d00/frameset.htm] it may help you.
    Regards,
    Shyamal

  • Inspection in Repetitive mfg.

    Dear Sir,
    In repetitive mfg. i m using T-code MFPR
    PLease give me the next steps?
    Points will be rewarded

    Hi Sonal,
    In REM, you need to use the inspection type 13 to be activated in the material master QM-view. Also, you need Production version for the material MRP4 view. Goto MFPR, give material, Production verion and plant. Drill down the line item and select the material and click on Create Inspection Lot. Inspection lot will be created. Inspection Lot size obtained will be that of the value which you`ve specified in the production verion. Goto QA32 do results recording and take usage decision asually.
    One thing you need to note is that only one inspection lot can exist for a combination of material , PV and plant. New lot can be created only after UD has been taken for earlier lot.
    Reward if cleared and close the thread.
    Keerthi

  • Repetitive mfg - In-process inspection

    Hi,
    Can we do in-process inspection in repetitve mfg. 
    Regards,
    Sravan Kumar

    Dear,
    Inspection Type 13 Repetitive Manufacturing: Production lines produce the same product in an unlimited number over a longer period of time. Example: Screws M8 x 40 mm (Mass production). In this case inspection plans need a relation to either time, numbers etc.
    In the material master record for the finished product, you must set the indicator for quality inspection in the Quality Management view. Moreover, in the QM inspection data, you must also select and activate an inspection type with the origin 13 (repetitive manufacturing).
    Regards,
    R.Brahmankar

  • In Process Inspection for Repetitive Manufacturing

    Hi All,
    I'm trying to perform in-process inspection for repetitive manufacturing. I have a semi finished material which has the inspection type 13 activated in the material master. Rate routing for it has also been created. Characteristics have been assigned to its operation and the routing is attached to a production version. When I o to MFPR to create a lot, I specify the material, plant and production version with QM active (tried the other 2 options as well) but when I execute, nothing shows up in the list. When I click on create inspection lot, it says, "either select versions or place cursor on versions now" but there's nothing in the list?
    Regards,
    Bilal

    Hi,
    Please check whether the repetitive manufacturing check box and REM profile is defined in the MRP4 of material master.
    Please define that and try to run the transaction MFPR.
    It should solve your problem
    Regards,
    Sumit Gupta

  • Triggering Repetitive manufacturing inspection lot - insp type 13

    Dear Expert,
    I have activated 13 insp type for my semi-finish material,
    in the routing also for the last operation control key has maintained.
    Finally in the production version also we have selected the the same routing.
    I am not able to create Inspection lot for repetitive manufacturing.
    Please tell me what settings need to be done.
    Thanks
    DON

    Dear DON,
                   Before posting thread please refer to earlier created theards you may find some thing which you were looking for related to your query.
    you will definatly find the solution,If the threads are not there then post the new thread with your query.Our great Gurus will help the needy.
    please refer to
    [In Process Inspection of Repetitive Manufacturing;
    for your repetitive manufacturing
    if this is not enough,follow this as given below.
    MM01/MM02
    Activate inspection type 09 at the time of material creation. AND enter the number of days in the field "Inspection interval" in QM view.
    This field indicates at what frequency in days you need to trigger the recurring inspection lot.
    QA05
    Define a variant for recurring inspection lot generation. Refer the below pasted link for the same.
    Related Thread
    It will trigger the inspection lots according to the date of next inspection date in he Batch.
    QP01
    You need to keep a inspection plan ready to record results for this lot.
    QA32
    Record Results for the inspection lot.
    Perform UD for the lot.
    To create variant through QA05 will not enough. You need to schedule the job, and release them also.
    To check whether you have successfully scheduled the job or not.
    Run QA05, here you will be able to see a line item for the variant you have created. correct?
    1}
    So select that line and click on the button "DISPLAY SCHEDULING", if the scheduling is not carried out, it will through the "Message no. 38001 - No jobs found in the display client" else will show the it will show "Recurring insp: job planning: list of scheduled requests."
    2}
    To schedule the job, select the variant line, and click on the button Schedule, it will lead you to the screen Recurring insp: job planning scheduling; start time.
    here you need to define "Job start date" and "Batch job start time", then click on "Schedule Periodically" and enter the at what frequency you want to replete the job run.
    At the this frequency (e.g. if you select day 1) then it will run the job daily at the time you have entered at "Batch job start time".
    3}
    Then replete the 1} to view your scheduling details. And the job is not released then release them else it will again not run and you will not have the lot.
    Edited by: vijaysap123 on Jan 25, 2010 11:33 AM

  • Inspection Lot generation for Movement type 101-O

    Hi
    I would like to know, which config / Master data need to generate Inspection Lot for Movement type 101-O.
    I enter subcontract vendor number and set 'SC Vendor' indicator in purchase order delivery address tab and I created QM data in Material Master.(Insp.Type 01)
    While doing GR with reference to purchase Order, stock is Posted to Material provided to vendor - Quality inspection stock. But Inspection Lot
    is not generated.
    Pl suggest me, What should i do to generate Inspection Lot.
    Thanks in Advance.
    RRS

    hi
    Soln 1) Just check whether Inspection is active for 101 - O in SPRO settings if not, activate the same.
    Path: Inspection Lot creation/Inspection for Goods Movement
    Soln 2) As you flag "SC Vendor" in PO and make GR all stocks will be shown against the Vendor.
    From your question I assume that you would like to do inspection for materials coming from Subcontactor end to your Plant:
    If this is the case you dont flag "SC Vendor" in PO, make a normal Goods Receipt for the Subcontracting PO, based on Insp setup in Material Master for 01 Insp type Insp lot will be created.
    Regards
    DC

  • Error  while giving the production line in repetitive mfg

    Hello friends,
       When i am maintaining the production version in material master for repetitive mfg, and in production line when i am giving the workcenter which is in operation of rate routing, system giving me the error message that "REP01(which is my workcenter) is not maintained in plan (planning type = plant = smp1)".Message no. is CFVO90.
          Though i have got the solution of this message, but i am not able to understand the solution.
          Actually while creating the production version in material master, for task list data i was only maintaining the task list type, Group Number and Group counter for  Rate Based only as Rate Routing.And when i would give the workcenter which is in operation of rate routing then  system would give me the error.
           Later on when i maintained the Task list type, Group Number and Group counter for Detailed scheduling, Rate Routing, and Rough cut scheduling and than maintained the workcenter in production line,system didn't give the error.
          My question is as we are doing the repetitive mfg, and as we have maintained the rate routing, so why it so that in Detailed scheduling and rough cut scheduling also we have to maintain the Task list type, Group Number and Group counter.
         Plz guide.

    Hello pravin,
    Thanks for the reply.
      Actually if i give the details of Task list type, Group, Group counter for Rate based scheduling only in production version and if i maintain the workcenter which i have given in the operation of Rate Rounting in production line then system is throwing the error mentioned above.
        Unless and until i mention the details of Rate Routing for all i.e. Detailed scheduling, Rough cut scheduling and Rate based scheduling, system is not allowing me to save the production version.
           As per your answer, even i am confused that as i have ticked the repetitive mfg in mrp 4 view and as i have given REM profile, so system should not give me the error when i only maintain the rate routing data in Rate based scheduling in production version.
          Is there any other way to solve this error.If not than whats the logic behind it.
               I hope u have understood my query.

  • Caution: Info structures S026 and S226 are active for repetitive mfg

    Hi,
    When I run the standard report MCRO - Material Usage Analysis: Repetetive Manufacturing, I am getting the message
    Caution: Info structures S026 and S226 are active for repetitive mfg
    How to overcome this.
    thanks and regards
    muru

    Hi,
    Try Thi - might work.:
    1) Before running the tcode MCRO - (i.e type MCRO in the commond prompt and then do the next steps)
    2) Menu- Got to- User settings
    3) Default your user name will be there.
    4) Now start selecting key figures and charecteristics.
    Save and try to execute.

  • Inspection Points for Inprocess Inspection

    Hi all,
    My client is doing In process Inspection during Production process.
    They are inspecting based on the Inspection Points (Shift wise).
    If I add Inspection point referrence at Header level in routing, after adding the MICs in the required operation, while saving it gives an error message stating that "Maintain Inspection Point referrence at Operation level".
    Task List contains error. You want to save or cancel.
    How can I achieve this with out error.
    Thnx in advance
    Sam

    Hi Sam,
    Go to Routing and select the operation, and double click the operation. Then system will popup the new screen here under Quality management Inspection point tab choose No relation. and save the routing.
    Check and give the feed back.
    Regards,
    S.Babusingh

  • Inspection plan for inprocess inspection

    Hi QM Gurus
    please let me know can I use an inspection plan for inprocess inspection
    Thanks
    TR

    Dear,
    Inspection Plan is similar to routing, which will indicate what are all characteristics need to be checked / inspected when you receive a material. Is a master data. Once the inspection lot is created we will check the inspection plan and perform the inspection and give the defects recording and usage decision for the inspection lots.
    So for inspection type 03 use routing with usage as 1 and status as 4 and control key as PP04 to specify the inspection characteristics.
    when u cofirm that perticular operation it will ask to record the results. Inspection lot get genarated during order release this we can see in the order header data assignment tab. PP04 assignement says this operation is relevent for inprocess inspection and we need to assign MIC's for this which are relevent created in QS21 for this also sampling procedure created in QDV1.
    Regards,
    R.Brahmankar

  • Is it possible to create  inspection plan for "Inprocess Inspection"

    Hi,
    Is it possible to create  inspection plans for "Inprocess Inspection".
    If yes , what would be the "task List Usage".Is it "1"?
    If no ,then how to map this requirment?
    Regards
    Vemula

    Hi
    Vemula
    Generally as Per SAP std Routing is used for inspection of 03 type of inspection.
    but you can also customize the Inspection task list Usage for Inprocess Inspection.
    This is possible through
    QCC0>Quality Inspection>Insp lot creation>Assign Insp type to origine>
    here informt of 03 inspection type you can assign
    Task list type:Q
    Usage:either 1(Production) or 3(Universal)
    save
    Regards
    Poonam

  • ASA app layer inspection and CX IPS inspection

    ASA application layer inspection is critical for protocols such as FTP and SIP for well known reasons.  When implementing a CX module, my understanding is that either the ASA implements inspection or the CX implements inspection.  For instance, if I want my CX to inspect HTTP I need to forward that traffic via a policy-map to the CX engine and ensure that the ASA is not configured to inspect HTTP.  Easy enough.
    What I am unclear about is if it is desired for the CX to inspect protocols such as FTP and SIP.  In my case I'm running the CX IPS which does list some FTP and SIP threats.  If I direct this traffic to the CX for IPS inspection, where would the app layer inspection occur for processing SIP embedded IP addresses or FTP secondary channels?  Or, is it necessary to ensure these protocols remain inspected by the ASA?  Finally, does the answer change for the WSE license?   

    Hogoqo,
    Thanks for the reply. Does this config mean that "default-inspection-traffic" will not be sent to the IPS module?
    What I initially wanted was to send ALL traffic to the IPS module, and also use statefull inspection for the default-inspection-traffic.
    Is this a bad practice (to send all traffic to the IPS module)?
    The ASA is configured with 3 interfaces (inside, outside, dmz), with an e-mail server in the DMZ. In the future, there will also be e-commerce servers in the DMZ.
    Should I send to the IPS module only traffic that has the destination as one of the DMZ servers?
    I am new to IPS, and kind of confused.
    Thanks!

  • Assigning a different inspection plan to an inspection lot

    Hi,
    I have a situation where the incorrect inspection plan is assigned to an inspection lot. Is there any mechanism to assign a different inspection plan to an inspection lot i.e. without having to reverse a goods receipt.
    Regards,

    >
    Shyamal Joshi wrote:
    > Hi Kaushal,
    >
    > There are more than one reason for this error. Check the followings.
    >
    > - The key date for inspection lot should be later than the key date for the inspection plan, later then the date when you assigned the material to the plan.
    > - The usage of lot and inspection plan should be same.
    > - The status of inspection plan must be released.
    >
    > Regards,
    > Shyamal
    Why are you not checking these things I am sure the reason would be there only. If dont wana check it is your wish. Any ways best of luck

  • Required Outbound Process Code for MessageType LOIPRO (Basic type-LOIPRO01)

    Hi EDI Gurus,
    I need to know the outbound Process Code for MessageType LOIPRO (Basic type-LOIPRO01).

    Hi,
    there is no process code for MessageType LOIPRO .
    check the below link u will get the clear idea.
    Re: Process Code for Outbound Production Order??
    Reward if helpful.
    Regards,
    Nagaraj

Maybe you are looking for

  • Safari 5.1 crashes on opening new tab - OS 10.6.8

    thanks for helping crash report: Process:         Safari [1022] Path:            /Applications/Safari.app/Contents/MacOS/Safari Identifier:      com.apple.Safari Version:         5.1 (6534.50) Build Info:      WebBrowser-75345000~1 Code Type:       X

  • HT1384 My Ipod Classic syncs and charges, but stops charging once it's done syncing.

    I just got a new laptop with Windows 8 and downloaded the new itunes on it.  My Ipod classic syncs fully and while syncing charges the battery, but when the syncing ends so does the charging of the battery.  Is there a setting I need to fix in Itunes

  • Music app in iPhone 6 deletes music artwork and songs

    I have spent hours trying to fix this, but have had to restore factory settings and replace 10,000+ songs to the phone twice now. I use a MacBook Pro with iTunes 12..0.1.26. I bought the 128GB iPhone 6 for the purpose of playing my large CD collectio

  • No INBOX Selection for the Partner

    Hi Experts, Could someone please tell me where we can configure a Vendor for "No INBOX Selection for the Partner". Is this at some transaction level or in the Shopping cart. We have this field in the table CRMD_PARTNER,  Field - DISABLED Due to this

  • Purchased Creative Suite 6 Design and Web Premium but Photoshop will not install

    I purchased CS6 and all programs install successfully except Photoshop.  I keep getting an install error even after I completely uninstalled the creative suite and then reinstalled it.  Can you please help?