Infotypes during MSS implementation of My Staff

i was trying to implement My Staff. I did almost every configuration on r/3 and portal side but it didn't worked. then i underwent the procedure again where it was written "B.     Have an SAP R/3 user attached to the IT105 of an employee.
C.     Be in a position that is a Chief of an Org Structure."
these 2 are the prerequisites need to be done before your My Staff iViews work.
where IT105(an infotype) needs to attached with the r/3 user; which properties i need to play with on the portal side and please let me know the settings to be done on the r/3 side.

Hi Ena,
What did not work? Do you have employees listed in "My Staff" homepage? Or do you get an error message?
What happens is that the portal user (in your case a manager) is send to r/3. There the user will be looked up in the Organisational Structure IF it is a manager.
Transaction PPOME (Organisation and Staffing Change) will help you setting up the manager. Select the manager, check "Head of own organizational unit".
Hope this helps,
Noel
PS. Please consider awarding points for helpful answers. Thanks in advance!

Similar Messages

  • Portal Runtime Error - MSS Implementation

    Hi,
    I am getting the following error in an iView for a MSS implementation (Workset: Employee Review/ Employee Document). The iView does not display correctly and I am showed the following error inside the iView:
    <i><b>Portal Runtime Error
    An exception occurred while processing a request for :
    iView : pcd:portal_content/com.singaporeair.test/com.singaporeair.MSS/com.singaporeair.MSS_Roles/com.singaporeair.MSS_CRP/com.sap.pct.hcm.mystaff/nf_2/com.sap.pct.hcm.eereview/com.singaporeair.MSS_Employee_Document/com.sap.pct.hcm.employeedocuments
    Component Name : null
    Page could not create the iView.
    See the details for the exception ID in the log file</b></i>
    Any help on the above would be greatly appreciated!
    Thanks,
    Aniruddh

    1st question would be.. does that iview in that path actually exist.  If it does it may be worth delting it from the page and then adding it again.  if it doesn't, well that's your problem.
    If it does exit then try previewing it. Looking at the error (Component Name : null) it could be that the par file has not deployed properly, in which case it is basically pointing at java code that doesn't exist.  If that is the case look for any .err files at OS level, rename then to .par and restart j2ee.
    Paul

  • During the Implementation project....

    Hi experts,
    can you provide us your thoughts/opinions to the following threads
    1.during the implementation after uploading the trail balance into sap system what further immediate action will take as a consultant? please tell us total process?
    2.What are the entries generated for GL, Vendor, Customer, Asset balances when upload the trial balance from legacy to sap (in implementation) ?
    sure will assign good points
    thanks
    VK
    Edited by: VK on Jan 21, 2008 1:29 PM

    Hi VK
    Normally there will be a mapping between old data and SAP data, therefore you will need to reconcile that the total balances and do spot checks of certain GL accounts. If you are just entering a balance per GL account this should be easy, however if you are taking line items per GL account you need to be more detailed.
    Regarding balances of sub ledgers, these will be updated when you upload the line item details, so open items for Customer, Vendors that kind of thing.
    You will need to post to a suspense account, you may use a few so these will need to be reconciled as well.

  • Critical Issues During SAP Implementation or After Golive

    Can anybody tell me one of  the most critical/ challenging issues During SAP Implementation or After Golive
    in these modules:-
    MM implementation
    PP implementation
    SD implementation
    FI/CO implementation
    PS implementation
    QM implementation
    HR implementation
    BI implementation
    XI implementation
    Thanks and regards
    RS

    hi,
    I will list out few of critical issues in
    Implementation :
    1 . Ensure 100% mapping of business process for all modules with SAP(avoid customization in support phase)
    2.  Unit & Integeration testing should be through with all validations
    3.  Master datas(Vendor,Customer) care must be taken will uploading datas thru LSMW,
    If there are common vendors for all plants,Create a vendor for a plant extend it to other plants
    4. Check tax procedures are customized according to requirements.
    5. Complete all print document customizations before go live
    6. Complete end user training(2 or more cycles) should be top priority before go live(This will avoid
    cancellation/reversal of documents after post go live)
    7. Ready with standard MIS reports & customized reports for business decision making
    8. Excise opening balance updation in tables for RG1 register in tables(Note 951955) on go live
    9. Check all tables datas are updating correctly
    10. Declare go live to SAP Support
    11. Check All user authorization should be correct according to their roles.
    12. Centeralize all master datas creation(avoid duplication)
    13. Create transaction variants to avoid entires in unnecessary fields & make certain fields mandatory.
    14. Ensure document numbering is completed for all documents
    15. Validate accounting entries are hit properly according to requirement in quality client with FI CTM(Core team member).
    After Go live :
    1. Missing authorization for users will play key part here,For ex : PGI while doing delivery,Excise capture & post in MIGO/J1IEX.
    2. Do internal audit every month,identify transactions if there will possibility for misuse or wrong entries,requires validation,identify users weak in certain areas.
    3. Identify there is enhancements to be done in transaction process(By step-2)
    4. Prepare a list of month & year end activities to be performed for all modules give to users
    5. Prepare  a list of frequently used transaction codes module wise give it to users
    6. If there is subcontracting,ensure challan creation,GR,reconcillation should be done regulary(monthly)
    7. Train the users,take reports in respective modules.
    8. Additonal customization might be done in print documents.
    9. Instruct users/CTM's to adapt SAP Standard practise
    10. Update excise tax rates after every indian budget
    Hope it helps.
    Edited by: Jeyakanthan A on Apr 29, 2010 6:48 PM

  • A question about ESS / MSS implementation.

    Hi All,
    Just a brief again about our landscape as:
    1. We have an ERP ECC5.0 system which has J2EE6.40(add-in) without the 'EP' usage type and the present Support package level of the relevant ESS and MSS components are as follows:
    a. J2EE6.40 Support Package level is '17'.(We are going to deploy the XSS components here)
    b. ERP ECC5.0 system's Software Components details are as follows:
    SOFTWARE COMPONENTS RELEASE LEVEL HIGHEST SUPPORT PACKAGE APPLIED
    SAP_BASIS 640 0016 SAPKB64016
    SAP_ABA 640 0016 SAPKA64016
    SAP_APPL 500 0009 SAPKH50009
    SAP_HR 500 0019 SAPKE50019
    EA-HR 500 0005 SAPKGPHC05
    2. We have a separate NW2004s(Dual stack(ABAP7.0+J2EE7.0) installation having EP7.0 with Support Package level is '16'. (We are going to deploy the Business Package for ESS & MSS here).
    Here are my questions?
    1. what is the best 'Support Package' level recommendation or combination is applicable for all the components(J2EE6.40,SAP_BASIS,SAP_ABA,SAP_APPL,SAP_HR,EA-HR...etc.,) involved in this type of mixed landscape - ESS & MSS implementation?
    2. If we apply the higher Support Packages 'only' for the ERP ECC5.0 software components such as: SAP_BASIS,SAP_ABA,SAP_APPL,SAP_HR,EA-HR - what other ERP ECC5.0 software components would get impacted from functionality prespective ?(let us say if we keep the current Support Package level for other software components as untouched)
    3. Is there any dependency exist from the Support Package point-of-view between the ESS MSS Business Packages and with XSS components(PCUI_GP; ESS; MSS)
    4. Is there any dependency exist from the Support Package point-of-view between XSS components and ERP ECC5.0 software components such as "SAP_BASIS,SAP_ABA,SAP_APPL,SAP_HR,EA-HR"
    Kindly address my above concerns.
    Regards,
    Vijay

    Hi Vijay
    To answer your questions
    First you should check note 1007341 which helps consultants proposing this type of landscape
    To answer some of your questions
    1) For SPs you have to patch ERP 2004 components following ERP 2004 stack and patch
        ERP 2005 components following the ERP2005 stack recommendations at www.service.sap.com/sp-stacks
        in terms of equivalence levels I would select SP levels from each stack with similiar release dates
    2) Presumably you will be using ERP2004 components in the front-end in some capacity therefore these
        ERP2004 components must be patched in line with ECC 500 stacks
    3) There is dependancies between Business Packages and XSS
    4) There is dependancies between back-end components SAP_HR and EA_HR and XSS/BP
        SAP_HR and EA_HR also have their own dependancies with the other back-end components listed
    Best wishes
    Stuart

  • During the implementation in 2nd phase - BBP Document

    Hi Friends,
    During the implementation diff. modules are tobe implemented. Each module has 1 consultant i.e., FI, MM, SD, CO consultants. here my question is.....
    Each consultant will be prepare AS-IS & TO-BE documents for their respective modules i.e.,
    - FI Consultant - 1 AS-IS & TO-BE
    - CO               - 1  do
    - MM              - 1  do
    - SD               - 1  do
    these 4 bbp's are mixed and finalized and finally 1 bbp gets ready for further phases. is it correct, pl suggest me?
    What is the role of each consultant in AS-IS & TO-BE(BBP) in the above example?
    it would greatful help me and sure will assign points
    Thanks
    Edited by: Anita on Jan 24, 2008 6:12 AM
    Edited by: Anita on Jan 24, 2008 6:12 AM

    Dear Anita,
    Yes u r right that Each consultant will be prepare AS-IS & TO-BE documents for their respective modules but these BBP's are not mixed up.
    The rules of each consultant in phase 2 i e Business Blue Prints is to created bbp's or say Document which is going to configure in the SAP system along with core users.
    AS - IS means what futures client's are using in the Legacy System
    TO- BE mean what futures we are giving to client according to thier Legacy System
    Hope u will Undersatnd.
    Regards,
    Javeed

  • Role & Responsibilities of an ABAPer during SAP Implementation

    Dear Friends,
    Shall anyone of you kindly let me know of a link or send a document addressing the Role & Responsibilities of an ABAPer during SAP Implementation?
    Regards,
    Alok.

    Hi,
                  ABAPer is required after installation and business study by functional consultant...
    In case of upgrade project, ABAPer is required during upgrade (Basis activity) itself in SPAU and SPDD step.
    Otherwise, ABAPer has following role in their area:
    1. Business study in brief. (To resolve simple issue and to understand logic)
    2. Coding for User exits / enhancements to co-operate with functional consultant.
    3. Custom reports / Program developement (Normally print programs and some analytical reports)
    4. Upload program implementation thru' BDC / BAPI / LSMW
    etc.
    5. Interface developement if required. (in case of legacy system integration projects)
    These are the major tasks of ABAPer in implementation project.
    Activities that form the SAP implementation process are:
    1. Project Preparation
    2. Sizing and blue printing
    3. SAP Functinal development - here abap comes into picture
    4. Final Preparation
    5. Go live
    Have a look at below link. It will give you more details abt the same.
    http://en.wikipedia.org/wiki/SAP_Implementation
    <b>Reward points</b>
    Regards

  • MSS implementation questions

    Hi guys!
    I'm in trouble with my MSS implementation. There are a lot of threads of this topic, but no complex information about setup.
    Is there also an implementation guide, as it is for ESS?
    If yes, could you send me a link please?
    My questions are:
    a, Is it necessary to have set up SSO with the R/3 backend, or is the usermapping enough for MSS?
    b, My connection to R/3 from System administration->SLD->connection test worx. I have created also SAP_R3_HumanResources alias for this system. In spite of this i get an error, that app can not connect to backend. What can be wrong?
    c, Are there needed same setting also in J2EE admin?
    d, I have read about SAP_R3_HumanResources_Metadata alias.. What is it good for?
    Thanx for answer! Points are guaranteed!
    Peter

    Hi Peter,
    there is some documentation in the help.sap.com and also in the Portal Content Portfolio (see files at the top right; they contain some useful links...)
    You didn't write about the version of you portal, the ERP and the MSS version. Please do that if you want useful help.
    JCO: it is not necessary to install/ upload JCO in Netweaver.
    If you have issues with the connection from the portal to the ERP then there is some problem with the configuration;
    take a look to the ports and also use the fully qualified domain name and not the IP address (easier for later SSO config). Use first the user mapping to verify that you can connect.
    Regarding the SAP_R3_HumanResources_Metadata. that is an JCo property you have to define where you deployed the MSS  webdynpro part. The MSS portal package contains only "pointers" to the Web Dynpro components, which reside on the ERP side.
    Regards,
    Kai

  • Way to modify the employee's information (enhanced InfoType) in MSS?

    In MSS General Information/ Related Activity area, the manager can modify the employee's information (Addr. Family Member, etc.), as it is a standard module.
    Now we have an enhanced InfoType in ECC backend, and want to make it can be modified by the manager through MSS like the other information(Addr. Family Member, etc.).
    Is there a way to realize this?
    Thanks very much.
    ps. We don't have the NWDI environment. EP 7.0  SP10.
    Weiming

    General notes
    1. You really should have error checking after most lines
    2. You don't need to get the field ids every time.
    Something is wrong in your implementation or description. Or both.
    You are attempting to get an object from the array. Then you modify the data in it. Then you set it back into the array.
    You don't create a new object anywhere.
    So which is it? Is the array empty or is it populated with objects and you are just setting the data in each? The code suggests both (obviously illogical.)

  • Assign field symbols in infotype 0021 BADI implementation (HRPAD00INFTY )

    Hi there,
    In PA30 infotype 0021, i have to change the value of T_VIEW_REPID by implementing BADI HRPAD00INFTY [Program MP002100->screen 2000->MODULE BEFORE_OUTPUT->PERFORM badi_before_output(sapfp50m)]. I'm trying to use field symbols (as below) to change the value of T_VIEW_REPID and getting SY-SUBRC = 4 after the Assign (LV_WA) To <FS_REPID>. Can somebody please help.
    method IF_EX_HRPAD00INFTY~BEFORE_OUTPUT.
      Data: LV_WA(20) Type C Value '(MPPDAT02)VIEW_REPID'.
      Types: T_VIEW_REPID Type T582V-REPID.
      Field-Symbols: <FS_REPID> Type T_VIEW_REPID.
      Assign (LV_WA) To <FS_REPID>.
    endmethod.
    Thanks.

    Try like this
    method IF_EX_HRPAD00INFTY~BEFORE_OUTPUT.
      Data: LV_WA(20) Type C Value '(MP002100)VIEW_REPID'.
    Types: T_VIEW_REPID Type T582V-REPID.
      Field-Symbols: <FS_REPID> Type T_VIEW_REPID.
      Assign (LV_WA) To <FS_REPID>.
    endmethod.

  • ESS / MSS Implementation for ECC 5.0 (ERP2004)

    Hello,
    We are preparing to implement ESS/MSS for ERP2004.  We are using EP6.0 SP9.  The notes for both ESS and MSS business packages refer to OSS Note 761266 regarding the versioning of XSS components.  Are the patches for the XSS components supposed to be deployed to the portal environment, the ERP2004 environment, or both?  The three patches mentioned are:
    PCUI_GP05_1.sca 
    ESS05_1.sca
    MSS05_1.sca
    Should these be installed in the portal, ERP2004, or both?
    Thanks,
    -Matt
    Since the patches are stored under the ERP2004folder in the support packages area of Service.SAP.com, I assumed they would be applied to the ERP environment, but I want to confirm this.

    Thanks for the clarification James.  I thought the patches should be applied to WebAS for the ERP2004 environment, but the OSS note is vague about that fact.
    Chuckie, We are implementing ESS version 60.2.  ECC 5.0 refers to Enterprise Central Component 5.0, which is how SAP refers to the Core R/3 product in the ERP2004 suite.
    -Matt

  • System configuration for ESS/MSS Implementation

    Hi,
    I am stuck while configuring the systems for XSS configuration. I have completed following:
    1) Installed Portal 7.00 (based on NW2004s) which uses the backend ERP2005 system as a User Master source.
    2) Implemented the business packages for ESS 1.0 (SP6), MSS 1.0 (SP6) and SAPPCUI_GP 600 (SP6).
    3) Configured the SLD ( we have SLD running on a separate XI system)
    4) Configured JCO destinations (tested ok).
    5) Configured Systems for Portal and the ERP systems with system aliases.
        For Portal System:   I have only configured the WAS properties (i.e. hostname, path and protocol).and User management (using UDIPW as the logon method)
    The system alias is SAP_WebDynpro_XSS
        For ERP System:  I have configured connection, user management and W.A.S. properties. The system aliase is SAP_ECC_HumanResources
    However, when I perform the connection tests for both systems, they both fail for "Connection Test for connectors" test.  It gives the message "Connection failed. Make sure the user mapping is set correctly and all connection properties are correct".
    Any help is greatly appreciated.
    Regards.

    Hi Kristoffer,
    I have tried as per your suggestion but it still gives an error.
    The connector properties for my ERP system are as below:
    Application Host  : C1BL1 (also included the domain)
    Gateway Host   : C1BL1
    Gateway Service  : sapgw00
    Logical System Name   : ER1CLNT210    
    Remote Host Type -  3
    SAP Client   : 210
    SAP System ID (SID)  : ER1
    SAP System Number  : 00
    Server Port  : 3200
    System Type - SAP_R3
    System aliases for ERP system are:
    SAP_ECC_HumanResources and SAP_R3_Financials.
    I have not maintained any W.A.S. properties for this system.
    For my Portal system: WAS properties are:
    Web AS Description  : EP_Portal
    Web AS Host Name  : C1BL3:50100
    Web AS Path   : /webdynpro/dispatcher/
    Web AS Protocol - http
    I had not maintained the connector properties for this system before, but I have now maintained as following:
    Application Host  : C1BL1 (also included the domain)
    Logical System Name   : ER1CLNT210    
    Remote Host Type -  3
    SAP Client   : 210
    SAP System ID (SID)  : ER1
    SAP System Number  : 00
    Server Port  : 3200
    System Type - SAP_R3
    The system alias for EP is: SAP_WebDynpro_XSS
    In the UME configuration --> User mappings, I am using SAP_ECC_HumanResources system as the reference system.
    Please let me know if you need more info.
    Regards,
    Nilesh

  • MSS Implementation on mySAP ERP 2005 & Portal 7.0

    Does anyone know what has happened to the appraisals functionality in MSS BP 1.0 mySAP ERP 2005?
    The BP documentation indicates that the Appraisals Overview, Edit Appraisals, Appraisals Inbox & Status Overview functionality has been replaced by the new Appraisals iView with an underlying application to support it.
    The new appraisals iView will display appraisals overview data but there seems to be no way of creating, editing or generally interacting with the appraisal documents once they are displayed in the table.
    Am I missing something here (i.e. the other iViews have not been fully migrated to Web Dynpro and still require HTMLB) or am I just missing some back end config / implementation steps somewhere in ERP 2005?
    Thanks in advance,

    Peter,
    Did you stick with the Team Viewer (MBO) iview?
    I wondered if there was a way to configure the 'Employee Search' iview by linking the HAP_STATUS columns in the OADP config to a BSP service, but there's no documentation on how to start on this.
    Roger.

  • Tasks/activities of a Basis consultant during SAP implementation

    Hi,
    Could someone share the list of tasks/activities of a Basis resource to handle during an SAP Implementation project.
    Thanks in advance,
    Srinivas

    HI,
    i think these are the simplest Basis activities in an sap implementation.
    1. Preapration of the Landscape of the systems
    2. Connectivities btw. different systems like SAP R/3 - BW and so on
    3. Transport Administation i.e TP creation, release, importing to QA - PRD and so
    4. configuration of RFCs and TRFCs if needed
    5. Config. of Data Transmissions
    6. Config. of IDOCs and Message Types
    7. Cutover plan preparation for the Go-Live
    8. System back ups and Logs Maintanance
    9. Installation of all required Patches and Notes
    10. system down time estimatations and planning
    Rgds
    Radhakrishna D S

  • Real time issues faced during Sap Implementation.

    Hi All,
    Please let me know some real time issues faced during SAP end to end implementation. Hw did u get over the issues.
    Issues faced during Production Support.
    I have an F2F interview. Please help me out.
    Regards,
    Somya

    Hi,
       This is Srinivas If u dont mine can u help me in Sending me the solutions to me what type of issues we will face in sap/bw implementation like issues and defeacts  can u send to my mail  [email protected]  can u give me solution for error9,error8,return8 can able to plz help me .
    Regards,
    Vasu.

Maybe you are looking for

  • How to get value of a elementId in a form

    Hello In a form, I can use a name for a input field or checkbox <input type="text" name=studentName" /> then I can use: request.getParameter("studentName") to get value of that name when the form is summitted. Now I want to use id instead of name. <i

  • Access jsp pages in WEB-INF directory

    Hi, I've a problem with my jsp web project; practically I've created a web project that uses jsp pages and servlet. I never use links to jsp pages, directly in my web pages, but I call always first servlet; the servlet call jsp pages. My project is c

  • How can I buy a ringtone in the iTunes store for my iPhone?

    I want to get a ringtone for my iPhone 5.  How can I download one in itunes? Or can I not do that anymore? What is the best way to get a ringtone for a popular song? Thanks

  • Excise Error while GR

    Hi, Error while  doing GR Please check excise base for the item is zero ! Plz suggest where i went wrong

  • Drop Zones Not Appearing

    The drop zones on the main menu of the DVD do not appear. I open the Drop Zone editor and it has a box for the Menu, but not a box for the drop zone. However, the sub menus are the same theme and have drop menus. I have tried Command-I and click the