Inspection lot generation after every 5th goods receipt

Dear Gurus,
There is a scenario in my project. There are some materials for which the inspection is done on every 5th goods receipt. The inspection of the material will be done for the first time it is coming in the company's premise and for the next four time it will be forwarded directly to the production without any quality inspection. Is it possible in sap to create inspection lot after every 5th inward delivery? Or can anyone suggest me a way to capture this scenario in sap..
Regards,
Abhishek

Hi
This is possible by using DMR in Task list.
Go to tcode QDR1-->Create a DMR with
follwoing steps;
Dyanmic modification : on Lot level
F5
Stage 10 Inspection seviarity :4 Skip :balnk ist: tick  Text:first stage
OK
No of Inspectin:1
Max. skip duration:Blank
New insp. stage:20
NOT OK
Rejections           1
New insp. stage:10
Stage 20 Inspection seviarity :blank  Skip :tick  ist:blank  Text:second  stage
No of Inspectin:5
Max. skip duration:Blank
New insp. stage:10
NOT OK
Rejections           1
New insp. stage:10
SAVE
Now use this DMR in task list header at Lot level.
Attach this task list to inspection lot
make sure that you have ticeked on Skip & Auto UD in QM view.
Then in QA16 schecule for Auto UD after every 10 mins or 30 mins.
at plant level also make auto UD & skip 30 mins.
This will skip the 4 lots & UD will be taken in background.
After that it will come to QI
Revert back for More querries.
Regards
Sujit

Similar Messages

  • Can we create 2 inspection lots at the time of goods receipt.

    Hi experts,
         Can we create two inspection lots at the time of goods receipt from vendor.I will assign two inspection types in material master
    suppose 01,02.Both are releated to goods receipt.For one inspection lot when we take usage decision stock should not post into usage decision.for other inspection lot stock has to be posted.Is this possible?if possible how to do configuration?

    I think I made this recommendation in a previous post concerning this but this is exactly what reference operation sets are created for.
    Create the reference operation set for the characteristics that are used for all the materials.  You create this once.
    When you create the sepcific plan for the individual materials, you include the reference operation as one of the operations, (probably the first one in your case).  You don't have to add characteristics, modify or change it.  All the characeristics and settings come from the reference operation.  If you need to make a change you edit the reference operation and make the change once.   The change is immediately seen in all newly created inspection lots.
    In a second operation of the plan, you add the characteristics specific to the material.
    You can add different workcenters to the operations if you want.  That way you can set up security on the workcenters and control who can record results against which operations.
    Aside from creating lots manually, you can't create two lots at the same time from the same GR.
    Craig

  • Inspection Lot Creation after GR

    Dear PP/QM Masters,
    I have question regarding inspection lot creation after goods receipt.
    There will be GR once at the end of the shift with batch number. As batch generated during shift will be different, there will be multiple GR entry. But for every material only one result recording per shift is required and not for all batches generated. So, how to avoid creation of so many inspection lot? Automatic Inspection lot creation is required hence no question of manual creation of inspection lot.
    I checked function module ‘QAPP_CUST_IP_CREATE’ for inspection point functionality but its description “You can use the available function module to generate inspection points for the inspection during production already when the inspection lot is created.” Can I use function module ‘QAPP_CUST_IP_CREATE’ for restricting creation of inspection lot after GR?
    Request all Masters to help me in solving this.
    Thanks and regards,
    Devang

    Dear All,
    First of all thanks a lot for your response.
    I checked ‘Control Inspection Lot’ setting but even that can not solve my problem as in our case though GR with confirmation will be once in a shift (though in system shift is not defined) but batches will be different and hence material document will be separate. And requirement is to have single inspection lot per shift even if batches and material documents are separate.
    One option is to have multiple line items for GR in MB31 or MIGO or in COR6N. But all this transaction allows only one line item for GR against process order. So, can you suggest any function module or option to have multiple line items for GR.
    Thanks and regards,
    Devang

  • Inspection Lot Creation after UD

    Dear PP/QM Masters,
    I have question regarding inspection lot creation after UD for the same batch number.
    There will be several GR during one shift for one SKU with the same batch number.
    F.E. shift (6 am to 2 pm) at 7 there will be first GR of finished good. Inspection lot is automaticly created and QA at 9 will make UD for this lot. If production will made GR after that a new inspection lot will be created for the same production batch.
    Is there any possibility to make only one inspection lot even if UD is taken.
    Thanks and regards,

    I guess what bothers me is that for your selection of "2" you include date. Our standard SAP system does not include date on that key choice.  Just material/batch/storage location.
    I re-tested one just to be sure.  Created a new process order for 30. Reveived 15.  Got an 04 inspection lot created.  Processed the lot, posted out the 15 to unrestricted and made the UD with an Accept code.
    Then I GR another 10.  These went straight to unrestricted as I expected.  Then I posted the final 5 in a 3rd GR.  Same result.. straight to unresticited.
    I'm not sure why your not seeing the same.  Again, seeing that 'date' in your number # choice is bothersome.  If some modified that to include the date of receipt and included the time stamp in that, then your going to get new inspection lots.
    Are you sure they didn't post it to a different batch on the second or third posting.  And of course, this does refer to the same process order.. correct?  You not using three different process orders for this are you?
    Craig

  • Inspection Char without Inspection lot generation

    Hi
    We are trying to model a customer requirement in PP for which a few production steps have a few characteristics to be monitored (status checked); for example - in a process of "spraying fertilizer", qty of 4 fertilizers have to be noted in the operation. Now these cannot be included in the BOM for some costing issues. We are apportioning the cost using an internal order in FI.
    Can these be modelled in PP as inspection char. for which values (readings) have to be noted without generation of inspection lot?
    Any ideas?
    Deepak

    Hi Deepak,
    One thing you need to clear is that without inspection lot generation you cannot record the values. Instead, you can create the inprocess inspection lot which does`nt effect the actual production, you can record results such as quantity etc.. for each operation for ur reference.
    The secong thing you can do is select any field or the text box that you are not usingit currently in the confirmation and enter the characteristics in that field.
    Final option is to create a document and save it with reference to ur order no. , bom etc..
    Reward if cleared and close the thread.

  • Inspection lot creation after receipt of certain quantities?

    Gurus,
    My user requires the creation of an inspection lot of 1 piece after the receipt of 200 pcs in stock as a kind of audit. This is not a goods receipt feom production as it will be done for each piece. .but was is needed is an event to create a lot woth piece for after receiving 200 pcs ( these receipts most provably will be on different days & in different material documents)
    Can I apply this requirement through sap standard or user exit ar abap?
    Thanks in advance,

    Hi,
    Rephrasing it,
    each piece will be assigned to a batch in a one to one relationship
    One piece represent one batch, Correct? And when GR is done against production for this batch, you get an inspection lot. QA personal do the inspection and material moves to Unrestricted stock.
    Beside, the goods receipt from production that will be performed as mentioned, the user may re-inspect one piece already present in the unrestricted use as a kind of audit. the user wants this auditing lot to be generated automatically for every 200 pieces instead of creating it manually.
    After the initial inspection is over and material is lying into Unrestricted, user would again inspect each of them and need automatic creation of inspection for every 200th piece/ batch. Correct?
    Is this what you are looking for?
    If that is the case, I don't think automatic lots can be created since there is no movement involved. User is simply doing retesting but nothing in system then how would SAP understand that an inspection lot is required?
    Even if some development is done to generate an inspection lot for every 200th batch received into Unrestricted, you would still need an inspection type to be activated against the material and some movement to be triggered.
    ntn

  • Inspection lot summary after UD and stock posted

    lot summary level '2' had maintained in material record, when GR, lot summary work rightly.
    But after UD and stock post to unrestricted stock and new GR, no inspection lot generated and stock were posted to  unrestricted stock  directly.
    My question is ,why system does not generate new inspection lot?
    I also found it in document that , lot summart does not take place if "A previously created inspection lot has already been completely credited from the stock", is that means system will create new lot in this situation?
    Regards,
    Denis.

    Denis,
    After UD
            If the UD is accept, SAP will not create new inspection lot.
            If UD is reject SAP will create a new inspection lot.
    If UD is not made but 'Qty to be posted' is zero then also SAP will create new inspection lot for subsequent goods receipts.
    AKM

  • Inspection Lot Generation

    Hi Gurus,
    I want to generate inspection lot numbers plant wise while doing goods receipt.  Is there any user exit available to do this or can we do this in standard transaction?

    Hi,
    If you want to view the inspection lots plant wise (eventhough the number range is same) then you can do so by entering the plant number in the initial screen at transaction code QA32 / QA11 / QE51N. These inspection lots are generated / reported / analysed plantwise eventhough the number range is not plantwise.
    Regards,
    Prashant

  • Inspection lot generation notification

    Hi All,
    when an inspection lot is genertated upon good receipt is ther anyway were i can create a notification to the concerned user for inspecting the lot.secondly if ihave 50 inspection lots generated in a day dou have any option through which i can assign the ispection lots to the concerned users or Quality inspectors.
    Suggestion willbe worth appreatation.

    Hello
    1) Alert Management is an SAP function. You will need an ABAPer to develop this functionality. You can either specify that alert should trigger to these many people or it can be particular role based so that alert to goes only to those persons who has those roles.
    please check this link for information on
    Link: [http://help.sap.com/saphelp_nw2004s/helpdata/EN/42/ed08baf3401a61e10000000a422035/content.htm]
    Link: [http://www.sdn.sap.com/irj/scn/index?rid=/library/uuid/60c24b82-6da9-2a10-5a93-f1f729d89787&overridelayout=true]
    2) What you mean assigning inspection lot to an inspector? What is the exact requirment ? Normaly who is doing the result recording is taken as the inspector. If you use inspection point you can record who was the inspector
    Regards
    Gajesh

  • Inspection Lot generation for Movement type 101-O

    Hi
    I would like to know, which config / Master data need to generate Inspection Lot for Movement type 101-O.
    I enter subcontract vendor number and set 'SC Vendor' indicator in purchase order delivery address tab and I created QM data in Material Master.(Insp.Type 01)
    While doing GR with reference to purchase Order, stock is Posted to Material provided to vendor - Quality inspection stock. But Inspection Lot
    is not generated.
    Pl suggest me, What should i do to generate Inspection Lot.
    Thanks in Advance.
    RRS

    hi
    Soln 1) Just check whether Inspection is active for 101 - O in SPRO settings if not, activate the same.
    Path: Inspection Lot creation/Inspection for Goods Movement
    Soln 2) As you flag "SC Vendor" in PO and make GR all stocks will be shown against the Vendor.
    From your question I assume that you would like to do inspection for materials coming from Subcontactor end to your Plant:
    If this is the case you dont flag "SC Vendor" in PO, make a normal Goods Receipt for the Subcontracting PO, based on Insp setup in Material Master for 01 Insp type Insp lot will be created.
    Regards
    DC

  • Inspection lot cancel after UD made.

    Hello all,
               For one MIGO Inspection lot is created and material was accepted. now it is in FI module for payments. But FI people found that it was wrong Vendor. MIGOwas done for a wrong Vendor. So now i want to reverse the Inspection Lot. Please provide me a solution.
    With Regards,
    R.Mahendiran.

    You can no longer reverse goods movements that were created from the
    transactions of the usage decision.
    This function is not currently provided in the standard system.
    If you want to reverse the Usage decision & stock posting ? ,  Apply SAP Note- 175842.
    SAP Note 175842 - Inspection lot: Reversal of goods
    movements from UD
    R Karthikeyan

  • Auto Inspection lot generation

    Dear All Experts,
    I have created new inspection type as Z01 by copying the 01 and I have maintain Inspection Lot Origins and Assign Inspection Types under 01. After that I have assigned my new inspection type Z01 to material master and activated it with material post to quality. Up to this it is working fine but after GRN system is not creating the lot. Even thou material is posting to the quality stock but no lot is in QA32.
    But if I Create the lot wih QA01 it working fine and I'm able to do the UD also. But for no automatic lot generated for purchase order.
    Please provide the details how to resolve this issue?
    Thanks and Regards,
    Manish
    Edited by: manish gurnule on Feb 17, 2009 5:39 AM

    Dear,
    Yes it is there and I have copied insp type 01 to Z01. and material master setting are also there.
    Please help.
    Any others inputs
    Regards,
    Manish
    Edited by: manish gurnule on Feb 17, 2009 7:26 AM
    Edited by: manish gurnule on Feb 17, 2009 8:21 AM

  • VL32N Change inbound delivery quantity after a partial goods receipt

    Dear.
    I have created an inbound delivery using VL31N from a purchase scheduling agreement.
    I have executed a partial goods receipts using MIGO for the inbound delivery.
    I need to reduce the delivery quantity for the inbound delivery using VL32N but the system donu2019t allow to change the delivery after a goods receipt.
    How can I proceed ?
    Thanks for your help.

    Hi,
    When a (partial) goods receipt has been posted to an inbound delivery item, the possibilities to change this item are restricted.
    If the delivery quantity is the same as the goods receipt quantity, then the item is fully posted goods receipt. No change of quantity is possible.
    If the delivery quantity is still higher than the goods receipt quantity, you can create one or several new TO's for the rest and
    confirm, if needed, with differences.
    You have also the chance to adjust the delivery quantity to the picked (and already posted) quantity with VL32N and menu:
    Edit => Copy Putaway Quantities as Delivery Quantities
    Please also have a look at note 796053.
    Hope this can help
    Regards
    Mauro

  • Inspection lot generation for 343 movement type.

    Hi,expert,
    My client's requirement is to generate inspection lot when a specific type of material is transferred from block stock of a storage location to unrestricted stock of another storage location i.e. movement type- 343, can anybody please explain how to generate the inspection lot and what are the settings, master data to be maintained? thanks in advance.
    rgds
    rajib

    Hi Rajib,
    In first place you need to have Quality infor record for material and vendor create through QI01 t code.
    QM must be activated for mvt type 343 in SPRO --> QM --> Qual Insp --> Insp Lot Creation --> Inspection for goods movements.
    Check the box "QM Proc. Active" in Mat master in Quality tab.
    Activate inspection type 08 in mat master.
    Then do the transfer posting you will get mat doc number.
    Go to display mode of mat doc,
    You will find Ins lot number created in Quantity tab at item level of material document.
    Thank You,
    Anand K

  • Inspection Lot display after Order confirmation

    Hi All,
    My requirement is to display Inspection Lot no under assignment tab in display prod. order after GR.
    How to get Inspection Lot no?
    what are the settings to be done?
    Rgds,
    Yogesh

    Hi
    The Inspection lot no will be displayed in Prod order only if insp type 03 (In Process Inspection) activated in QM view of Material Master for a material when the prod order is released.
    For Insp type 04 (GR after Production) we can see the insp lot in QA32. It can not be displayed in Prod order.
    Regards
    Brahmaji

Maybe you are looking for

  • How can I convert an existing table to IOT

    Hi, My Oracle version is 10.2.0.4 Below is my structure of my test_table . It has 1141580 rows. I want to convert this into index Organized table. It has no secondary indexes. How can I convert an existing table to IOT. CREATE TABLE test_table (    C

  • IPod Nano 3rd generation: Only plays songs recently downloaded to my iTunes Library

    iPod Nano 3rd generation (Version 1.1.3) for Windows Any song that I download onto the iPod shows up in its library, but when I try to listen to the songs, they won't play. The only songs the iPod will play are those that have just recently downloade

  • Restore from time machine to other drive

    I have a new iMac with the SSD drive inside - I have an 'old' Time Machine backup of my older computer - I already used Migration Assistant to move and update etc. the Applications themselves on the SSD -- but I want to restore the DATA from the TM b

  • Problem in using nested dependent items with jheadstart 1013

    Dear JHeadstart Team, Suppose we We have 3 following tables ( z is child of y and y is child of x) and we have a view object which have joined all 3 tables together. we have mad a page on this view. x ( code1 PK ,Name y ( code2 PK ,x_code Z ( code3 P

  • How to create no-broadcasted guest account?

    How can make my guest account SSID from being broadcasted like my master private account?? this for New 2009 Airport Extreme and Time Capsule. sorry if already asked and answered, please don't flame:) thanks!