Integration with cfolders and cprojects

Dear Experts,
Provide me cookbook for integration of cfolders and cprojects through KM.OR can anyone guide me about how we can do ?
Rewarded for the answer.
Thanks

Hi,
WebDAV interface enables a connection to be set up between cProjects or cFolders and SAP KM in the Portal.
Please find the below helpful links,
http://help.sap.com/saphelp_ppm400/helpdata/en/1b/8688428b42c553e10000000a1550b0/frameset.htm
https://forums.sdn.sap.com/message.jspa?messageID=7916774
Regards,
Vasu

Similar Messages

  • Integration of cfolders and cprojects with KM

    Dear experts,
    can anyone guide me and tell the process or cookbook material for cprojects.
    My requirement is ..
    1) what is cprojects and cfolders what are its benefits in organisation ?
    2) How it can integrate with KM?
    Thanks in advance and provide you valuable marks for gud answer.
    Regards
    RS

    Hi RS,
    1. cProjects has additional functionality over Project Systems in being web based (webdynpro) so can be accesses externally to the organisation (hence the "c" for collaboration projects). It follows a stage gate methodology and has better resource management functions that PS. cFolders is complimentary to cProjects for sharing project documentation, which is better than say using DMS in ERP.
    2. cFolders can integrate to collaboration rooms on the Enterprise Portal and hence to KM. There is standard Portal content for this.
    Hope this helps.
    BR
    Dave

  • CRM 5.0 Integration with Twitter and facebook

    HI Experts,
    i am working with SAP CRM 5.0 version,
    My existing client want to set up SAP CRM with twitter and Facebook specially customor services ,
    Does SAP CRM 5.0 has tight integration with twitter and facebook ,
    if yes will you please share iinformation in terms of
    1)Effort Estimation :manpoer
    2)Costing details 
    Thanking you in advance
    Pravin shete

    @sherrysarath:  Could you share some documents to understand how standards works for this issue? And if there aren't standards requirements, could you share your custom solution.
    @pravin wipro : Could you explain what are your requirements?

  • DMS integration with PP and PS.

    Hi SAP PLM experts,
    I would like to know how mySAP PLM's DMS module  is integrated with PS and PP module.
    Any small scenario with T codes and configuration help is highly appriciated.
    If you guyz have any documents/materials for this question, please mail the same to sudhu03 at gmail dot com.
    Thanks in advance,
    S.Achar.

    It is only through the object linkwhich you provide.
    In the business perpective, we attach the contract documents, design drawings and other doucuments to the project for ready referance.
    You can create the DIR directly from PS transaction or you can create it in DMS and attach it to the Project.
    We do have the red lining to identify teh changes reqd in the document.

  • Quality Center 11 (ALM) Query - Integration with Subversion and Jenkins

    Hi OHPCPaT Forum,
    Are there any restrictions to enabling the QC integration with Subversion and Jenkins when the QC server is a SaaS cloud instance? Is there any additional config I should be aware of?
    Thanks in anticipation

    Hi,
    Yes all the users are facing the issue. Please find more details for the issue.
    Currently we are upgrading Quality Center 10.0 to 11.0 with HP Enterprise Integration module for SAP applications. The project successfully upgraded from QC 10.0 to 11.0 but there are some error popup for the project for which Application Module and Enterprise Integration for SAP applications Version 2.6 was enabled
    Quality Center Details:
    HP Application Lifecycle Management 11.00
    ALM patch level: 07
    Quality Center 11.00 Enterprise Edition
    Component     Build
    OTA Client     11.0.0.6051
    User Interface     11.0.0.6051
    WebGate Client     11.0.0.6051
    Test Run Scheduler     11.0.0.6051
    Execution Flow     11.0.0.6051
    Site Administration Client     11.0.0.6051
    Extension Version     
    Enterprise Integration for SAP applications     2.6.0.3232
    Sprinter     11.0.0.6051
    Application Model     2.6.0.917
    Installation Steps followed:-
    1.Installed HP ALM
    2.Installed Patch Service Pack 2 (Patch 2,3,4)
    3.Installed Patch 6
    4.Installed Patch 7
    5.Installed the Extensions HP Enterprise Integration module for SAP applications using Extension Deployment Tool by following the steps provided in the Addin Page
    6.Created new project in HP ALM
    7.Login to the project (no issue)
    8.Enabled the Project Extensions
    9.Login to the project (able to access the project but error message is popup when we access Test plan and Defect module)
    Note: There is no error when we access the project for which the HP Enterprise Integration module for SAP applications EI not enabled. QC 11.0 is not integrated with any tools.
    Let me know is there any step we missed or we need to do any manual steps we need to do before enabling EI

  • Exchange 2013 owa integration with ADFS and cooexistance with exchange 2007

    Team,
    I have successfully integrated adfs 3.0 and Exchange 2013 owa and ecp.  However, we have a coexistence environment with exchange 2007.  When you access owa, which then redirects you to adfs, sign-in, and then get redirected back to owa. If your
    mailbox is still within exchange 2007, you get a blank login page.  If you mailbox is in exchange 2013 then you successfully get the owa page for 2013.  The problem is that all exchange 2007 mailbox users get blank pages at login. So I have determined
    that exchange 2013 cas is not doing the service location lookup on the mailbox to determine if a redirect to the legacy owa address is needed.  Is there a configuration setting that I might be missing? Or does the integration with adfs and owa not support
    the much needed mailbox lookup for a coexistance environment?  A side note: if we enable FBA with owa, both login scenarios work just fine (legacy and new 2013). The legacy namespace has been created, and applied to the exchange 2007 urls.  

    Hi,
    Try using AD FS claims-based authentication with Outlook Web App and EAC
    http://technet.microsoft.com/en-us/library/dn635116(v=exchg.150).aspx
    Thanks,
    Please remember to mark the replies as answers if they help and unmark them if they provide no help. If you have feedback for TechNet Subscriber Support, contact
    [email protected]
    Simon Wu
    TechNet Community Support

  • SRM Category Management - cRoom Integration with cFolders

    Can anyone please send me the configuration guide to integrate cRooms (SAP Collaboration Rooms) with cFolders (c Project Suite SAP PLM).
    I've got both (SRM-Category Management and PLM-cProjects) the business packages installed on EP and I need to integrate them both.
    Suitable points will be rewarded.
    Regards
    Sreenivas

    From ERP using transaction CFE02 you can export the DMS document to cFolders.
    These documents can undergo changes in the cFolders.
    then via CFI02 you can get back the latest version of the documents from the cFolders into DMS.
    In SRM in a bidding scenario, where in you upload all you tendering documents into cFolders which will create a cFolders collaboration in a competitive scenario.
    All you docs are put in the public area, then you could create individual areas for you vendors in the same collaboration with atmost security (you can even hide the names of the vendors in the create/changed by columns in the overview tables) .
    None of the vendors can see each others information but the public area is visible to all the vendors. Vendors then place their bids in the respective private areas.
    You can alternatively use the Portal to create collaboration rooms, which is to upload some docs and download then you would loose the advantage of managing/structuring the bidding process from multiple vendors. Then also the integration aspect with SRM.

  • Integration with cFolders

    Hi all,
    How to integrate cFolder with Microsoft Windows File Explorer Practically.
    I used transactions CFI01 , CFE01  for Back-end Integration since i don't know how to create a cProject and cFolder i cant proceed can anyone help me to come out of this problem.
    Thanks in advance.

    Hi Shounak
    As I have a problem regarding the integration with windows explorer and C folders, I have taken this chance to enter this conversation.
    First of all I have done the acticities that you have stated:
    1. Activate the SOAP handler in the SAP Web Application Server, by activating the
    /sap/bc/soap/rfc node in transaction SICF.
    2. Execute the Specify URLs for Windows File Explorer Integration activity in Customizing
    for Collaboration Projects.
    The activity is also relevant to cFolders.
    3. Assign the users who are to work with the Windows File Explorer the appropriate RFC
    authorization in the user profile.
    Function group CPRO_API
    Authorization object S_RFC
    4. Activate the function in your personal settings as the user and execute the installation
    file:
    The only thing, that I haven't been able to do os to assign the function group CPRO_API. I have asked my authorization contacts, but they couldn't help me.
    Can you tell me how to do this?
    Furthermore I have a problem when trying to upload a document from my windows explorer. Even though it says that the upload has been succesfull, no update is happening when I look in the C folders application.
    Thanks for your help in advance
    Maria

  • SUS-MM integration with cFolders

    Hello!
    I'm using the SUS-MM scenario and I'd like to give the suppliers the opportunity to see and redline documents of the latest version delivered by cFolders. Does any standard integration between SUS and cFolders exist? What other possibilities are there?
    Thanks for your help,
    Barbara

    Hi
    Please go through these links ->
    Re: cFolder + mySRM 4.0
    Re: SUS-MM-C-folder
    CFolders intergration with SRM
    Re: Attachment, ECC to SRM.
    Implementing cFolder
    cFolder 3.10 Authorization Issues with SRM 4.0
    Bid submission deadline restriction for document upload in cFolders
    Bidding Engine / Cfolders available after SRM 5.0 upgrade??
    System generated bid document is not opening in cFolders
    cFolders
    http://help.sap.com/saphelp_srm50/helpdata/en/6d/0f343e47fd6b2ee10000000a114084/frameset.htm
    OSS Note 888725 - SUS-MM scenario
    OSS Note 868192 Consulting solution: SUS-MM (SUS-MMSRV) service procurement
    Regards
    - Atul

  • Excel integration with Entry and Approval for SSM not working

    Iu2019m having trouble getting excel integrated with E&A for being able to enter large number of historic data points into a cube-built model u2013 Iu2019ve gone through all the docs several times and there is no good concrete explanation on how to do this. I keep getting the following error message:
    Error opening Excel Automation server can't create object. This can be caused by:
    1. - The application is not installed on your machine
    2. - The browser security does not support ActiveX scripts.
    3. - Your were prompted to run ActiveX and you said No, if that is the cause close all browser instances and reopen.
    However, I've done the following:
    -          Iu2019ve installed the excel add-in on both the server and my local machine, and Iu2019ve enabled the add-in part in Excel on my local machine.
    -          The browser security is definitely set to accept all active X scripts
    -          I am never prompted to run activeX when I select u201CHistorical Datau201D within entry/approval. I just get the above error message.
    -          Iu2019ve flushed cache and restarted listener several times.
    What am I missing? I donu2019t see it in any of the docs.
    Thanks!

    Robb,
    Looking at what you've done, there doesn't seem to be an obvious answer. The best suggestion I can make is to fill out a support ticket on this. There must be other factors at work here that will require a deeper look.
    Regards,
    Bob

  • SocialMiner Integration with Linkden and Whatsapp

    Hi Everybody,
    One of my customers wants to integrate Cisco SocialMiner with Linkden and Whatsapp but I did not find integration information in product guides. One of my team members told me that we can achieve Linkden integration through REST APIs, but I am still doubtful because it was not mentioned anywhere in the documents. So please guide me, how can we achieve it.Thanks in advance 
    Cheers :)
    Regards
    Qamar Khan

    I had the client implement a DMZ and have part of the public IP block be assigned to the it. We then placed the SocialMiner server in the DMZ and only opened the necessary ports from the OUTSIDE to DMZ and from the DMZ to the INSIDE. PDI said that doing NAT to the SocialMiner server is not currently supported. Also, we are doing this without setting up the optional proxy server.

  • JSF integration with Webwork and Freemarker ?

    My company is investing a lot in an application that uses Webwork and Freemarker. I'd like to reuse chunks of that but with JSF components for new development. I know it's possible to link to and from external URLs using JSF's navigation, but I don't think that buys me much in this case. Is it possible to use the JSF View (as in Model-View-Controller) with someone else's (Webwork's) front controller? I'm guessing JSF can coexist with Freemarker as it does with JSP and HTML. Or, does anyone know of any successful approach to Webwork integration anywhere?
    thx!

    My company is investing a lot in an application that uses Webwork and Freemarker. I'd like to reuse chunks of that but with JSF components for new development. I know it's possible to link to and from external URLs using JSF's navigation, but I don't think that buys me much in this case. Is it possible to use the JSF View (as in Model-View-Controller) with someone else's (Webwork's) front controller? I'm guessing JSF can coexist with Freemarker as it does with JSP and HTML. Or, does anyone know of any successful approach to Webwork integration anywhere?
    thx!

  • Integration with IP and other 3rd party procurement apps

    I don't know about the rest of you, but one of the primary hurdles that we have to get past with target customers is that most of the big ones already have procurement systems that produce POs. Ideally, they'd like to post those POs as either an RFQ/Auction or directly as a PO for a particular supplier. This is particularly true for big manufacturers who initially want to bring their OEM suppliers and contract manufacturers into an on-line procurement environment and then expand that to auctions and RFQs later. The scenario refers primarily to those trading partners that do not have their own back-end systems and EAI solutions.
    We think we have come up with a workaround by taking the EDI produced out of the buyer's system into our Hub, transforming it into our cannonical form, then turning the data into an OEX OAG XML auction document, uploading it through a dummy account for that buyer, once the bid is placed by the supplier, automatically accepting, and generating a final PO as a PO Akn back to the buyer's system. It is a little hokey, but it is the best we've been able come up with. (Of course, once the PO message from the buyer's system is sent, the buyer wants nothing to do with it after that. They just want to receive a PO Akn back).
    Any ideas?
    David Luper
    [email protected]
    415-325-5028

    David,
    It sounds like you are hitting on two of our critical issues. Specifically, our issues are the following:
    1. We have customers with existing procurement systems containing requisitioning/workflow/approval functionality. They want to continue using this functionality while using our Exchange for sourcing/bidding/tabulation/etc. This gives us the requirement for integration to these procurement systems (iP, SAP, Peoplesoft, etc). We need the ability to load to the Exchange all the parameters for an Auction (open date, close date, type of auction, etc), line items, and potentially even suppliers. We envision that this document load generated from the requisition system could even be flagged to open the auction immediately without the buyer ever having to go to the Exchange. The buyer would then go to the Exchange to see bids and to do the award process. Once the bid was awarded, this would generate a document back to the requisition system for issuance of a PO by the procurement system.
    Our second issue is the ability to simply issue a manual PO. This could be done within the Exchange and/or a procurement system. Right now we are missing significant transaction volume due to the inability for a buyer to go issue a direct PO to a vendor on the Exchange without going through the auction or catalog process. If the goods the buyer wants to buy are under their threshold for required bidding and are not in the catalog, they go around the Exchange with a paper PO. This eliminates all the benefits of integration and our chance to charge for this transaction
    Both of these issues are extremely critical for us. Dee, what can you tell us about the integration capabilities with procurement/requisition systems or the manual PO functionality? We have heard multiple conflicting reports about the availability of integration with iP.
    Thanks!
    John Alexander
    Way2Bid
    [EMAIL][email protected][EMAIL]
    417.447.5042 (Voice)

  • ESS-portal integration with Time and Travel management(HR) in R/3

    Hi,
         Im doing with ESS-portal configuration with Time and Travel Management in R/3,So please kindly send me Documents for integration part.I'll b so thankful if u people send me docu as soon as possible.
    send me documents to [email protected]
    thanks
    pavi

    Hi
    Please go through this functional module HRMS_BIW_EXTRACT_PY1 in r/3 side to know the exact table where u r getting the data.
    There are lot of tables involved in HR-payroll info types.
    As far as your problem is concerned you take one employee and go to PA20 and analyse the payroll for each week or twice a month (depends up on ur client)
    run the report on the payroll cube and find out exactly what u want.
    Thanks
    Roopa
    Assign points if help full

  • Portal integration with workflow and contracts

    gurus,
    are there any whitepapers on the integration of the portal with oracle workflow and oracle contracts.
    it would be great help ...
    has anyone done this before ...?
    pls reply ...
    thanx a bunch ...

    reposted for attention ...
    has anyone done this ??
    oracle contracts integrated with oracle portal ...

Maybe you are looking for

  • Psd layered groups

    I'm using Motion 4 and PS CS5. I've created a psd with grouped layers. I want to import it into Motion with the groups and layers intact. When I do File, Import I get the option to merge the layers, all layers or individual layers. In the individual

  • BEA-149505  -The administration server was unable to establish JMX Connect.

    hello Getting the following error, trying to access the weblogic admin server ( Linux x86-64 RHL50) after a fresh install. BEA-149505 The administration server was unable to establish JMX Connectivity with the managedServer at the JMX Service URL of

  • After Effects error: Creating a resource file

    Hi everyone I'm administrating a machine with several users mainly using After Effects. The machine runs on Windows 7 64 bit. I recently had to install videocopilots Optical Flares. Everything runs fine on my admin account but if i open AE on a user

  • Mirroing in ASM

    Hi All, The ASM defaultly use the striping method, now i want to use the Mirroing also, now can i do that, and what is the minimum requirement for that. Regards S.Senthil Kumar

  • SL500, Product recovery function has been removed from this sytem

    I upgraded my SL500 from Vista to windows 7 OS several years ago and lately the OS has been acting weird (freezing, very slow at times) so I am thinking something is corrupted somewhere and want to restore it back to the manufacturers state.  However