Is it required to cost the materials with Price control "V" ?

Dear All,
Would like to know if we have to consider the items with Price control "V" during the cost run in CK40N..?
Since the system automatically updates the price of the item for price control "V", do we also require to update through cost run?
Please help me understand.
Best regards,
Praveen

Hi,
Materials with price control "V" is dynamically updated with value whenever there is a receipts.  The system will calculate average rate by dividing total value by total stock.  Hence, cost the materials for this price control is not relevant.  It is recommended to have price control "V" for all externally procured materials.
Best Regards,
Madhu

Similar Messages

  • Actual Cost of Product with Price control "S"

    Dear Gurus,
    Is there any report available where we can know the Actual Costs of Materials with Price Control "S".
    In the material master field the actual cost in the "Moving Price Tab" of the material with Price Control "S" is available, but is there any report available for plant level?
    Thanks & Regards,
    Amit Dhanurdhari.

    Hi Amit,
    -- Under Standard Costing, you value your inventory at Standard Costs and any variances in Production Process will be settled to Price Difference Account. You will not be able to find out actual cost per unit. In Multi-level BOM scenario under Standard Costing (CO-PC), variances don't get rolled-up to the next level, only costs get rolled-up.
    -- Under Actual Costing - Material Ledger, You will be able to find out the Actual Cost per Unit. Variances get rolled-up to the next level.
    To explain difference between Standard Costing in CO-PC and Material Ledger briefly....
    You have given Price Indicator as "S" in the material master of "X" material (semi finisher or finished) and you are doing Standard Cost Estimate for arriving at Standard Cost per tonne. Let's say, the Standard Cost per tonne is Rs.1000/-
    Now, when you created production order for 10 tonnes and received output of 10 tonnes (GR). But the total cost incurred on that production order is Rs.1100/-. In this situation, actual cost per tonne is Rs.110.
    But, because you are following Standard Costing, When you post GR against this Production Order, inventory will be posted at Standard cost only, i.e., Rs.1000/-. and the balance of Rs.100 will be posted to Price Difference Account. (and parallally the variance of Rs.100/-) will flow to COPA.
    So, it is clear that, though, at Production Order level you can see the actual cost, at "material" level, you will not be able to see the actual cost per tonne.(as long as you are using only Product Costing and Standard Costing)
    Alternatively, if you maintain Price Indicator as "V", you will able to get the Actual Cost per tonne at material level, but there will be no scope for establishing standard cost and comparison with actual thereof.
    But, the same is possible if you are using Material Ledger (CO-ML). If Material Ledger is active, you will be maintaining "S" in the material master, still, the variances will be settled inventory and you will be able to get the actual cost per tonne. (bothe Standard cost estimate, actual cost per tonne will be possible).
    Pls revert back for further explanation
    Srikanth Munnaluri

  • Production costs for material with price control V

    Dear all,
    Can anyone pls tell me, how will the costing occur for a material produced in-house and having price control 'V' ? I am not able to see the target costs.
    Also kindly tell me the settings to be done in CO, like target cost version, valuation variant, costing variant, etc.
    Thank you,
    Shrenik

    Rather than giving my own versions I have compiled here SAP inputs. Pl let me know if you require any clarifications:
    Costing variant has the following components:
    <b>Define Costing Types
    Define Valuation Variants
    Define Date Control
    Define Quantity Structure Control
    Define Transfer Strategy
    Define Reference Variants</b>
    <u>Costing type:</u>
    In the costing type, you define the purpose of a material cost estimate by specifying, for example, which field in the material master record the costing results can be transferred to:
    Update Cost Estimate
    Standard price Standard cost estimate (01)
    Tax-based price Inventory cost estimate
    Commercial price Inventory cost estimate
    Price other than std price Modified standard cost estimate or
    current cost estimate
    No update Any cost estimate
    Define Valuation Variants:
    Define Valuation Variants
    Here you create a valuation variant containing the parameters required for valuation of a cost estimate.
    You also specify which costing sheet should be used to calculate overhead.
    Valuation Strategies
    Material valuation
    Here you define the sequence in which the system searches for prices from the accounting view or costing view of the material master record to valuate materials. You can also access prices from purchasing info records and condition types.
    For material cost estimates, you also specify whether additive costs can be added to the selected price.
    With configurable/configured material components and with procurement alternatives, the sequence defined here is ignored if the strategy "price from purchasing info record" was selected, in which case that strategy is always executed first. For more information, refer to the SAP Library in the component Product Cost Planning under Raw Material Costing or Mixed Costing.
    Activity Types / Processes
    Here you define the sequence in which the system searches for prices in activity type planning or actual activity price calculation in Cost Center Accounting or Activity-Based Costing to valuate the utilized activity types and business processes.
    You also specify which plan/actual version is used.
    Subcontracting
    Here you define the sequence in which the system searches for prices in the purchasing info record. In purchasing, quota arrangements are used to create a mixed price for materials that are manufactured with external vendors with parts provided by the customer. You can specify whether the quota of the individual vendors that are entered in the source list for the material to be processed should be determined through the planned quota arrangement or the actual quota arrangement.
    External processing
    Here you define the sequence in which the system searches for prices in the purchasing info record or routing operation for valuation of the external activities.
    Strategy Sequence
    You define the individual valuation methods for the valuation variant as strategy sequences. For the valuation of the material components you define a strategy sequence that reads the fields of the material master record in a particular sequence such as:
    1. Planned price 1
    2. Standard price
    3. Moving price
    The first price that is not zero is used to valuate the material component.
    Target versions:
    Target cost versions  are used in the following ways:
    In variance calculation:
    To control which variance (total variance, production variances or planning variance) is calculated
    To valuate unplanned scrap( scrap variance)
    Unplanned scrap is valuated in the period-end closing activities when the variances are calculated. You can specify in a valuation variant for WIP and scrap which cost estimate you want to use to calculate the target costs for the valuation of unplanned scrap. You assign the valuation variant to target cost version 0 if you want to include it in the valuation of scrap.
    When you are using a cost object hierarchy with active distribution, you use the target cost version to control which cost estimate the system uses to calculate the target costs, which are used as the basis for determining equivalences for actual cost distribution.
    The actual costs collected at the level of the hierarchy are distributed across the orders in accordance with these equivalences. This distribution is proportional to the target costs for the cost element under which the actual costs are written. Actual costs for material costs are distributed in proportion to the target costs for the origin group, such as for the material, if you have entered an origin group in the costing view of the material master record and have set the indicator Material origin, for example.
    If no target costs were calculated under this cost element, enter a cost element group in the target cost version. The actual costs are distributed in proportion to the target costs for this cost element group. This cost element group should be complete. If costs were updated under a cost element that is not in this cost element group, no distribution is possible.
    You can calculate equivalences on the basis of SAP standard target cost versions 0, 1 and 3.
    The standard system supplies the following target cost versions:
    Target cost version 0 ( total variance)
    The amount of the total variance generates a posting in Financial Accounting during settlement.
    For this version, select actual costs as the control costs and standard cost estimate as the target costs.
    Target cost version 1 ( production variance)
    For this version you choose actual costs as the control costs and planned costs as the target costs.
    Target cost version 2( planning variance)
    With target cost version 2, the costs from the preliminary order cost estimate are interpreted as control costs.
    For this version, select planned costs as the control costs and current cost estimate as the target costs. You cannot calculate planning variances for the product cost collector.
    Target cost version 3 (production variance of the period)
    You compare the planned costs of the period calculated on the basis of an alternative material cost estimate (such as a modified standard cost estimate) with the actual costs of the period on the basis of the yield delivered to stock in the period.
    The base quantity for variance calculation is the yield.
    For this version, you choose the actual costs as the control costs and the alternative material cost estimate as the target costs. To determine the alternative material cost estimate, enter a costing variant and choose a costing version.
    The target cost version specifies which data is to be compared. The target cost version also specifies which variance variant is used and therefore which variance catagories are calculated. You can define a different target cost version for each controlling area

  • Adding additional costs to Material with price control "V"

    Good Morning Gurus
    We want to add some additional cost to materials. How to do this ?
    These materials are valuated at MAP.
    Actually there are some delivery costs which were not inventorised correctly to the materials. The materials are undervaluated, we want to add this additional cost to the materials. We donot want to hit the price control account.
    Is there any other way ??
    Thanks
    Regards

    Hi,
    You can alter the Costing variant and valuation variant according to your scenario. Check the costing variant in OKKN and valuation variant OKK4. You will find the indicator for additive cost there.
    Regards,
    Jigar

  • Cost Run should not be getting executed on Material with Price Control V

    Raw & Packing materials are with price control V in MM as company wants to keep them on moving average cost. Somehow finance users executed cost run on one such material and cost run was executed and the difference was posted in price difference. As far as I know, system shouldn't be allowing cost run on materials other than those having S as price control.
    Question is: How to ensure system sends error if cost run is attempted to be executed on materials with Price Control V?

    Hi
    If you are executing cost run using CK40N, it releases the cost for all the materials i.e. both for the header and the components
    the components may be usually valuated at V. So, the std price update for these will be only for information purposes and it wont revaluate your inventory for sure... This cant post to price difference.... Price diff upon std cost release will apply only to those materials which have price control S
    However, if you dont want to release the cost for V items, you can specify them in the exclusion list... In Ck40N selection parameters you specify your plant/material, etc...  While specifying the materials to be costed in the multiple selection screen, , you can also specify the ones not to be. Then std cost wont be released in those cases
    Regards
    Ajay M

  • Moving average price calculation logic of material with Price Control "S"

    Dear Gurus,
    As you know that there is a Moving price and standard price icon in the material master.
    I want to understand the calculation logic of the moving average price of the materials having price control "S"
    How the system calculates the MAP for standard price materials? The receipt from the process order I suppose is valuated at the process order cost after settlement, but if the issue has hapened for the material does the system recalculate the issue price also?
    Below is the sample process order receipt and issue scenario:
    Receipt from process order 161000000223
    300 kg and GR at standard cost value is Rs 5892
    Issue to process order 162000000294
    250 kg and GI at standard cost value is Rs 4910.
    Thus the balance at period end is 50 kg and balance at standard cost value is Rs 982.
    Here in process order 161000000223 the actual cost is 10 Rs. Then how will the system calculate the MAP?
    Thanking You,
    Amit Dhanurdhari

    Hi
    Try the following calculations,
    One of them will work depending upon your version and support pack
    Expected MAP calculation ( As with price control V)
    = ((Qty before transaction*MAP + Transaction Qty * transaction
    Price)) / quantity after transaction
    New Method ( when price control is S)
    = Old MAP + (Price Variance w.r.t Standard Price/Qty after transaction)
    Also go through the following notes,
    Note 1225167
    1253944
    518485 FAQ: Valuation of goods movements
    212286 Overview note: Valuation during goods movements
    209864 Moving average price is disproportionately large
    202166 Collective note: Statistical moving average price
    185961 Moving Average Price Calculation
    I have done extensive research on this, let me know if you need to know something specific.

  • How do i reset my mac completely? I have parental controls and cant seem to get to time machine cause i bought the computer with parental controls on it and they did not have the password. How do i completely reset my macbook pro?

    how do i reset my mac completely? I have parental controls and cant seem to get to time machine cause i bought the computer with parental controls on it and they did not have the password. How do i completely reset my macbook pro?

    If you have a rescue email address (which is not the same thing as an alternate email address) on your account then the steps on this page will give you a reset link on your account : http://support.apple.com/kb/HT6170
    If you don't have a rescue email address (you won't be able to add one until you can answer your questions) then you will need to contact Support in your country to get the questions reset.
    Contacting Apple about account security : http://support.apple.com/kb/HT5699
    When they've been reset (and if you don't already have a rescue email address) you can then use the steps on this page to add a rescue email address for potential future use : http://support.apple.com/kb/HT5620
    Or, if it's available in your country, you could change to 2-step verification : http://support.apple.com/kb/HT5570

  • TS3474 I purchaed the earpods with mic & controls and they don't work with 6th generation nano.  Are the features supposed to be compatible with this model of nano?

    I purchased the earpods with mic & controls and the features don't work with 6th generation nano--is this normal?

    Hi there,
    According to the product page:
    The remote and mic are supported by all models of iPod, iPhone, and iPad (not all models support volume up/down functions). Audio is supported by all iPod models.
    Your iPod Nano may be one of the models that does not support the volume up/down function. Take a look at the page below for more information.
    Apple EarPods with Remote and Mic
    http://store.apple.com/us/product/MD827LL/A/apple-earpods-with-remote-and-mic
    -Griff

  • CK40N - Update for material with price control 'V'

    i Experts,
    When im running standard cost estimate in CK40N, say for material types semi finished. The components that is raw materials of the SFG is also updated with the price, meaning for a raw material with price control 'V' has a price of 10, after
    releasing the cost estimate for the SFG, when i look into the material master of raw material, the price of 10 is also updated
    in the standard price.
    I am not sure why this is happening, i believe it should not happen. Because in the valuation variant, if i give the strategy as standard price, this price is easily picked up. And more over with price control 'V', i can change the standard price. Can anybody throw some light on this.
    Best regards
    gj

    Hi Rakesh,
    Thanks for the information. But i do agree even during release there is no impact on the inventory. But in my cost variant, say in PPC1, if i give the strategy say 1. standard price 2. moving average price, during cost estimate run, its going to take the standard price for the material irrespective of the price derived automatically for moving average price. For eg in our case for raw material with price control 'V' after sce run if the standard price is 10 and moving average price is 14, as per strategy of PPC1 above its going to take 10 and not 14.
    Is there any other way to avoid this. Please correct me if i had went wrong somewhere.
    Best regards
    gj

  • Deleting all the materials with deletion flag

    Hi all.
    How is it posiible to delete all the materials in the system that have a deletion flag using tcode MM71?
    Regards, Nikolai.

    MM71 is an archiving transaction. You have to do customizing for archiving.
    Create logical and physical file names and paths. Define the size of an archive. and define what you want execute in what sequence.
    Create a variant with your selection.
    But if you want delete material masters that were already in use, then be prepared that your success may be very limited. As you would have to archive all dependend data first.
    Materials are the very last step in an archiving cycle.
    Click the network button right of the executing button to see what objects you have to archive first, to be able to finally archive a material

  • How to send Materials with Prices in IDOC

    Hy SAPExperts,
    I've following use case, I want to send materials with material price with an IDOC to a external system. How can I proceed this?
    I found the IDOC PRICAT01, but to use this IDOC i must create a pricebook, is this a good way to proceed my use case? Does companys work with Pricebooks? Or is there another way to proceed my use case without craeting a pricebook?
    Thanks,
    Frederic

    Hi Alec,
    this Keys are Toggled with SendVKey
    for example 
    {enter} means -> sendVKey 0
    There is a Listing in the Scripting Help which shows all V-Keys
    hope it helps
    greetings
    Thomas Br

  • *How to change the Valuation Category & Price control in material master*

    Hello SAP Gurus,
    I have a requirement to change the valuation category from 'X' to '  ' in accounting view of material master.
    -> I have cancelled all the open PO's & SO's for the material
    -> I have ensured that there is no stock for the material in that valuation area.
    But still I get an error message that batch already exists for the material. When I check entries in MCHB I find that there are previous entires in MCHB with zero stock.
    I have gone through the SAP note 155874 which recomends the archiving the effected objects.
    Please let me know is there any work around to change the valuation category from 'X' to '  ' & price control 'V' to 'S'. I also need to change from '  '  to 'X' for a few materials.
    Thanks for your advise.
    Best Regards,
    Narayan.

    Note 155874 cleary describes what has to be done to be able to change.
    There is no workaround, and if you change anything in the tables directly, then this will cause inconsitencies, as described in this note as well.

  • Split valuation - material with price control V

    Hi,
    I have created material with split valuation ,ie val category as Z (auto batch).. and i did gr. and in mm03 i have maintained the pr control as V .. and later po and gr .  when i checked in MM60 its showing the parent material and the child mat ie valu types/ batch materials are also in V... it suppost to have with S.. is there any customization need to have S price control for the child/ val type materials?? pls suggest

    Hi UJ ,
    Different price control are possible for different valuation types based on Valuation category , but this doesn't hold good for Valuation Category X- Auto Batch as there are no valutaion types linked to it in Config.
    Therefore system proposes the same price control as that of parent material incase of Valuation Category(X)- Auto Batch
    Regards
    Ramesh Ch

  • Table required to check the charecterstics with values

    HI Gurus,
    i need to get the dump of charecterstics with associated values which are usind for release procedure,
    i have checked the tables CAWN & CAWNT , but it is not giving straight away,
    is there any other table to get values with charecterstics
    rgds

    HI,
    Please check the Table CEKKO , here all the values that rel;ated to the Relaese procedure has stored.
    This is Structure, so Go to SE11 and enter CEKKO .
    Regards,
    Andra

  • UPGRADING THE S110 WITH MANUAL CONTROL DURING VIDEO RECORDING

    I was shooting with the S100, then upgraded to the S110. The S110 is an amazing camera. Along came the Sony RX100. Notwithstanding the RX100 one inch sensor, Canon could still trump the RX100 if it came out with a firmware upgrade for the S110 that allows manual control of focus, aperture, and shutter speed while recording video, all of which can be done with the RX100. Has anyone heard this is in the works?

    Welcome Cosmicphoto!
    There aren't much product rumors in this forum, but that does sound like a cool feature. 

Maybe you are looking for

  • No. of Worked days in month

    Hi friends, I would like to know how i would be able to find the number of paid days for an employee in a particular month. Regards, Prashant

  • How can I select part of a word?

    This is really, really dumb. I'm in Illustrator CS5 on Mac OC X 10.7.3. I have a word.        PIPIIonline I just want to select the "II" and make them Italics, like:        PIPIIonline but Illustrator will not allow me - no matter what I try to selec

  • Trouble compiling cldc 1.02

    I'm trying to install j2me, and I downloaded midp, j2mewtk, cldc, and midp-palm. Where I'm having the most trouble currently is trying to build cldc. I'm running NT4, but I don't have cl, which the build wants to use. I do have g++. Can anyone help m

  • Weak Audio Signal in Capture

    Anyone see this? I am recording sound from an external mixer connected to the line in port on the Mac. I get a good strong signal when I go to system preferences, sound dialog box, and set input level. But in FCP I see a much weaker signal in the Log

  • How to autopopulate UDF based on calculation

    hi, I am very new to SAP B1 2007B. I have created a UDF named - BAGS in row details of sales order. As I insert a Item in sales order, I want the UDF : BAGS to get auto populated with - ITEM QUANTITY * 20 as soon as I enter the Quantity. Pls give me