IS Mill functionality in ECC 6.0
Hi experts,
I wanted to use an IS mill specific functionality of PRT capacity planning in ECC 6.0. How can I do this?. Is it possible to activate only this functionality of IS Mill in ECC6.0. Is there any implication by doing so?
Request you please revert back.
> I wanted to use an IS mill specific functionality of PRT capacity planning in ECC 6.0. How can I do this?. Is it possible to activate only this functionality of IS Mill in ECC6.0. Is there any implication by doing so?
Start transaction SFW5 and check the dependencies for that specific functionality.
Markus
Similar Messages
-
New functionality in ECC 6.0 with Enhancement Package 3
Hi Experts,
Can any one tell me what new functionality is added in Enhancement package 3 (ECC 6.0)?
Thanks & Regards,
SimarHi,
There no new functionality in ECC 6.0 for auto clearing of bank clearing account. Still you need to depend on Manual / Electronic bank statement to clear them.
Thanks
Prasada -
New functionality in ECC 6.0 and problems during sap implementation
Dear Gurus,
may i know the details of the New functionality in ECC 6.0 on (MM,SD,PP,QM,PS,HR,PM,FI/CO,BI,XI,DMS ) or what is the problems coming at the time of implementation of ECC 6.0.
THANKS AND REGARDS
RSRitesh,
Question is bit confusing
may i know the details of the New functionality in ECC 6.0 on (MM,SD,PP,QM,PS,HR,PM,FI/CO,BI,XI,DMS )
That means you are going to upgarde from some earlier version .what is that version ?
Then you might find some specific information at
https://websmp102.sap-ag.de/uda -
>Upgrade Dependency Analyzer
what is the problems coming at the time of *implementation* of ECC 6.0.
If its a new implemenation you will not face problem , but you need to configure everything accordingly.
Problem depends upon what all you are using from standard and customizing.
Above provided link will help you.
Just add up
http://wiki.sdn.sap.com/wiki/display/ERPLO/NewfunctionalityinECC6.0%28+MM%29
Regards, -
ABAP routine in infopackage that runs function in ECC
Hi All
I need to have dynamic filter in the info package
I have program in ECC that brings me the value that I need to filter in my info packege
I want to use ABAP routine in infopackage that runs function in ECC and brings the value that was received from the ECC function
Is that possible?
ThanksHi All
my CTO found the following option
function module that is "remote-enabled module "
then you call CALL FUNCTION 'Y_FM_IDOC_CATSDB' DESTINATION 'SAP4.7E'
you need to define it in SM59
code example
data: BEGIN OF IT_SOBSL OCCURS 0,
SOBSL(2),
END OF IT_SOBSL.
DATA: ls_range type STANDARD TABLE OF rssdlrange WITH HEADER LINE.
SELECT /BIC/ZSPEPROCI FROM /BIC/SZSPEPROCI INTO TABLE IT_SOBSL
WHERE /BIC/ZSPEPROCI NOT BETWEEN 'AA' AND 'ZZ'
AND /bic/zspeproci ne '' .
BREAK-POINT.
LOOP AT IT_SOBSL.
ls_range-IOBJNM = 'SOBSL'.
ls_range-LOW = IT_SOBSL-SOBSL.
ls_range-SIGN = 'I'.
ls_range-OPTION = 'EQ'.
APPEND ls_range .
ENDLOOP.
loop at ls_range.
append ls_range to l_t_range.
endloop. -
New functionality in ECC 6.0 for auto clearing of bank clearing account.
Is there any new functionality in ECC 6.0 for auto clearing of bank clearing account.
Regards,
KishoreHi,
There no new functionality in ECC 6.0 for auto clearing of bank clearing account. Still you need to depend on Manual / Electronic bank statement to clear them.
Thanks
Prasada -
SPED functionality in ECC 6.0
Can anybody throw some light on the new SPED functionality in ECC 6.0. Would appreciate any documentation.
Thanks
Andrew1. From the SAP Easy Access menu, choose Tools ® ABAP Workbench ® Development ® SAP Business Workflow ® Definition tools ® Events ® Event Creation ® Message Control (transaction code: NACE).
2. Select V2 (Shipping) and choose the Condition records pushbutton. The Output Types dialog box appears.
3. Select the required output type (for example, SPED or SPER) and choose the Condition records pushbutton at the bottom of the popup screen.
4. Enter the delivery type (for example, NL for intra-company replenishment deliveries, or NLCC for cross-company replenishment deliveries).
5. Choose Execute.
6. Make the following entries on the Change Condition Records (SPE ID Delv Creation): Fast Change screen:
· Partner Function: SH (Ship-to party)
· Medium:8 (Special function)
· Date/Time: 4 (Send immediately)
7. Choose Save. -
Empties Management Functionality in ECC 6.0
Hi all,
Can any one please tell me empties management functionality in ECC 6.0??
Best Regards,
AI.Hi,
Go to help.sap.com weblink
http://help.sap.com/search/highlightContent.jsp
Enter Empties Management.
You will find Empties Management Functionality in ECC 6.0.
Please let me know if you need more information.
Regards
Sridhar M -
Benfits or added functionality in ecc 6.0
Hello All,
Can any one list down the benfits or added functionality in ecc 6.0 from abap point of view.
ManyThanks,
VibhaHi
Refer this link for ECC 5.0 & 6.0:
http://help.sap.com/saphelp_erp2005/helpdata/en/43/68805bb88f297ee10000000a422035/frameset.htm
A similar post
/message/1783778#1783778 [original link is broken]
You can go through the Release Notes for each of the versions after 4.6B (4.6C, 4.7 , ECC 5.0 & ECC 6.0)
http://help.sap.com/saphelp_erp2005/helpdata/en/43/688055b88f297ee10000000a422035/content.htm
For 4.7 SAP R/3 http://help.sap.com/saphelp_47x200/helpdata/en/12/9d78d6d8f74043a32e82be87e433b7/content.htm
Release Notes on SAP Web Application Server 6.30
http://help.sap.com/saphelp_47x200/helpdata/en/2b/64fc3e9d3b6927e10000000a114084/content.htm
http://solutionbrowser.erp.sap.fmpmedia.com/
Check these links
https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/790e690c-0901-0010-7894-de8b3d91d78e
http://help.sap.com/saphelp_nw04/helpdata/en/94/c65839bec58b27e10000000a114084/frameset.htm
http://help.sap.com/saphelp_nw04/helpdata/en/a8/b9623c44696069e10000000a11405a/frameset.htm
http://help.sap.com/saphelp_nw04s/helpdata/en/c1/1253164e665b4fa635af38b66dc166/frameset.htm
http://help.sap.com/saphelp_nw04/helpdata/en/f5/a9673e42613f7ce10000000a114084/frameset.htm
http://help.sap.com/saphelp_nw04s/helpdata/en/dc/6b7f2f43d711d1893e0000e8323c4f/frameset.htm
Reward points for useful Answers
Regards
Anji -
Does SRM support Vendor Partner Functionality from ECC?
Does SRM support or sync up with Vendor Partner functions in ECC such as OA, VN, PI, etc.?
Initial look at SRM does not suggest that SAP has made it easy to replicate partner functions in SRM.Hi,
See these related threads:
Partner function Payee in SRM
Adding Partner Function to R/3 PO from SRM in Classic using BADI
BR,
Disha.
<b>Pls reward points for useful answers.</b> -
SRM PCard functionality in ECC MM
Hi Friends,
The standard PCard functionality is available in SRM.
We are not going for SRM at the moment, but would like to incorporate the PCard functionality in the ECC environment.
Is it possible to have PCard functionality in ECC? Where the statement can be uploaded via IDOC, vendor entry is posted at this time, further it goes to custom build workflow, and after approval the expense account is hit.
Can we achieve this in ECC?
Any idea
Regards,
Sandeephave you already checked the SAPHelp?
http://help.sap.com/erp2005_ehp_04/helpdata/en/f0/ca4666260211d28a430000e829fbbd/frameset.htm
br,G -
GTS functionality in ECC 6.0
Hi Experts,
I've a following requirments in GTS.
1. How to enable GTS functionality in ECC 6.0 and what are all the areas will be affected?
2. How to set SPL (Denied party list) block in the sales order subsequently release approval required?
3.Country specific Embargos block in the sales order and subsequent release approval?
4. How to handle US (ECCN) and EU embargos?
since I am new to GTS Kindly give me information on the above areas.
Regards,
Ayusri1. How to enable GTS functionality in ECC 6.0 and what are all the areas will be affected?
Tcode: /SAPSLL?MENU_LEGALR3 for ECC
2. How to set SPL (Denied party list) block in the sales order subsequently release approval required?
Check IMG in GTS system
3.Country specific Embargos block in the sales order and subsequent release approval?
Check IMG in GTS system
4. How to handle US (ECCN) and EU embargos?
Check options in IMG in GTS system
Would recommend going through the configuration guides available in service market place.
Regards, -
Customer exit is not functioning after ECC upgrade/support package
It seems our customer exit is not functioning after ECC upgrade/support package. I tried to activate the project again, no use. please help. Thanks! (see below for the enhancement info)
COZF0002 Change purchase req. for externally procured component
EXIT_SAPLCOZF_002
INCLUDE ZXCOZU02
*& Include ZXCOZU02
CONSTANTS: lcc_eban(25) TYPE c VALUE '(SAPLCOBC)EBAN'.
FIELD-SYMBOLS: <fs_eban> TYPE eban.
DATA: l_fkstl TYPE prps-fkstl.
Move values from the LUW to the Internal Table
ASSIGN (lcc_eban) TO <fs_eban>.
If the field symbol is "NOT' empty then proceed
IF ( <fs_eban> IS ASSIGNED ).
if WBS work order, get cost center from PRPS
IF ( caufvd_imp-auart = 'ZM05' ).
SELECT SINGLE fkstl INTO l_fkstl FROM prps
WHERE pspnr = caufvd_imp-pspel.
IF ( sy-subrc = 0 ).
WRITE l_fkstl TO <fs_eban>-zzfistl.
ENDIF.
if not WBS WO, move cost center minus leading zeros to funds center
ELSE.
WRITE caufvd_imp-kostl TO <fs_eban>-zzfistl.
ENDIF.
ENDIF.Did you mean set a break point in the follow code?(Include ZXCOZU02), I tried set a break point in this code, but It didn't stop .
*& Include ZXCOZU02
CONSTANTS: lcc_eban(25) TYPE c VALUE '(SAPLCOBC)EBAN'.
FIELD-SYMBOLS: <fs_eban> TYPE eban.
DATA: l_fkstl TYPE prps-fkstl.
Move values from the LUW to the Internal Table
ASSIGN (lcc_eban) TO <fs_eban>.
If the field symbol is "NOT' empty then proceed
IF ( <fs_eban> IS ASSIGNED ).
if WBS work order, get cost center from PRPS
IF ( caufvd_imp-auart = 'ZM05' ).
SELECT SINGLE fkstl INTO l_fkstl FROM prps
WHERE pspnr = caufvd_imp-pspel.
IF ( sy-subrc = 0 ).
WRITE l_fkstl TO <fs_eban>-zzfistl.
ENDIF.
if not WBS WO, move cost center minus leading zeros to funds center
ELSE.
WRITE caufvd_imp-kostl TO <fs_eban>-zzfistl.
ENDIF.
ENDIF. -
Is there standard functionality in ECC 6 that will handle the quotation of scale pricing?
Inquiry and quotation functionality assumes that the quote to the customer will be for a specific material and quantity. Is there standard functionality in ECC 6 that will handle the quotation of scale pricing?
Thank you for the question. In our scenario, we are not quoting a specific quantity. We are quoting the scales. Below is a theoretical example:
Customer: 12345
Validity period: 21.03.2014 - 30.06.2014
Material: 123456 Widget with order UoM of EA
Price:
Up to 10,000 EA: $2.25/1EA
10,001 EA to 50,000 EA: $2.00/1EA
50,0001 +: $1.75/1EA
I am very familiar with inquires and quotations, and I understand that we can maintain scale price condition records and the price routine will determine the price based on the quantity of the inquiry, quotation, or order. Unfortunately, I do not have a quantity to enter in the quotation. I only have the scales. I do hope this clarifies the question.
Best regards,
Mark -
New Functionality in ECC 6.0
Hi All,
Can any one guide me about the new functionality of "Work Center for Purchasing Documents" in ECC 6.0?
Regards
Edited by: sapsarang on Jan 12, 2011 7:15 AMHi Sarang
Please refer the release notes with the following link
http://erp.fmpmedia.com/Default.aspx?alias=erp.fmpmedia.com/english
Here you select
Source release version as SAP ERP 6.0
Target Release Version as SAP enhancement package 4 for SAP ERP
Solution Area as Procurement and Logistics Execution
Then click search
You find Release availiable and delta functionality
On Page 4 you find Work center for purchasing documents
Cheers
Kris
Edited by: KRISHNA AKULA on Jan 12, 2011 8:23 AM -
Kanban issue - Setting for new Kanban functionality in ECC 6.0
Hi, I am facing a problem while recieving stock from a production order. The system does not create a transfer requirement or a TO.
Let me give you a brief background.
This is a new functionality introduced in ECC 6.0 for working with kanban in WM.
Supply area is created for WM location.
Control cycle is created for material, supply area. Warehouse, storage type and Bin is maintained in control cycle record. When the GR is done for production order material is recieved in this bin.
1) Now when the Kanban is set empty a production order is automatically created.
2) Once the production order is confirmed the material automatically shows up in the bin.
A material document is created which shows IM movement type 101 and WM movement type 103. Also in material document Immediate auto TO checkmark is blank.
3) PROBLEM - System does not create a TR or a TO. the material automatically shows up in the Bin. How can we enable an auto TR and TO creation.
Following are the settings which I have already checked:
1) In IMG, WM movement type 103 has auto TO indicator set.
2) IM-WM interface for 102 movement type and 103 movement type is maintained.
The main problem is: Although the material document displays WM movement type 103 and the stock lies in WM bin, System never created a Transfer requirement or a Transfer order.
I would really appreciate if anyone can help me in this.
ThanksHello,
I am not sure about your settings, please refer below sap link
[Kanban Replenishment |http://help.sap.com/saphelp_47x200/helpdata/en/95/e81fa4f57011d194aa0000e83dcfd4/content.htm]
Regards
Pradeep Kumar
Maybe you are looking for
-
i was thinking that it would be cool to have a ipod that i could sit in class and wirelessly play a game with a friend and listen to my music. plus have a wireless docking port so the ipod is almost like a palm pilot with out the memos and buttons. l
-
Sun Ray connector interface is invalid
I think I have some kind of configuration problem with my Sun Ray server. When I try to run the utadm -A "I.P. address" command, it comes up at the end with a message about the "Sun Ray connector interface is invalid" or something like that. The prob
-
Just noticed a gap between the fade out image under the nav bar and the main body of my website. This doesn't happen in IE6 but seem to be a problem in all other major browsers. Any ideas how i get rid of it? Files: http://www.hillview-brean.co.uk/ C
-
Hello experts. I would like to know if assigning a particular CPU level to the group, will affect as well the DDL operations that are performed by users in this group (in my case it's dropping partitions, creating them, rebuilding indexes, make table
-
After Effects did not install with the rest of CS4
I purchased the Student Edition of CS4 Production Premium. When I ran the installer I selected "custom" and AE was unchecked and it would not let me check it. I did regular install and it did not install AE. I used all 4 discs in the box. Any thought