Issue of Quality Inspection for consignment return delivery

Hello,
I am doing a returns delivery(from a Sales Order) from a Customer Consignment.
I am getting a error when I do a Post Goods Receipt(PGI). QM is active for that material.
The error I am getting is
"Change the inspection stock of material XXX in QM only"
Procedure says
"Check both the QM inspection setup data and the movement type for material XXX in the quality management view of the material master"
The movement type used in the returns delivery is 655(GD returns for QI).
What is the solution for this error. Do I need to change/add new Inspection type based on the Movement type?
Please let me know ASAP.
Thanks
Regards
SAP Fan..

Hi,
You can read this link for inspection for customer return [Inspection for customer return|http://help.sap.com/saphelp_47x200/helpdata/en/92/b808b1d52a11d2962200a0c930e04c/frameset.htm]
It looks the material master is set-up inspection type with 06 - returns from customer. Also the movement type 655 moves the goods into QI stock.  In this case, the Quality personnel needs to change the inspection stock type using transaction code QA32. They will change the usage decision on the customer returns.
Once the change the inspection type is changed, you can do the post goods receipt.
Regards

Similar Messages

  • SD delivery goods issue of Quality inspection stock

    Hello, anyone know whether SAP allow goods issue of quality inspection stock?
    If stanrdard customizing not possible, any user exit ?

    Hi
    No sap not allows GI for QI stock
    Beacuse Once Stock in QI without inspection we can't issue goods
    Hope ths helps
    Please reward points
    Sunil

  • Transaction code to know stock lying in quality inspection(for UD)

    Hi,
    Pl let me know transaction code to know stock agaisnt materials lying under quality inspection ( for UD ) for more than one materials or plant wise or pgrp wise or sloc wise ....
    Thanks
    Arul Murugan

    Hi,
    In QA33 Transcation code ,Enter the lot creation ,In list settings select ,Only lots without usage decision and execute.
    In the layout select Quantity to be posted(Quality stock).This will give the list of Inspection lots against the material to be posted to Unrestricted or blocked stock.
    Manoj.N

  • Quality inspection for external opearatio

    Experts
    One of my product having one operation in externel
    Once it coming back after the externel operation confirmation is happening(here material number is not changing)
    In this point i want to create a inspection lot on confirmation
    how we can achieve this what is the inspection type we want to give
    Give me a details step
    Faisal

    Hi Friend ,
    Procedure for Quality inspection for external operation is :
    1) Assign the operation in routing which is done external processing
    control Key : PP02 ( External processing )
    Click on indicator : Insp char. required.
    Hence when production order is released for above scenario , double click on the operation and click on create PR.
    Than PO from PR.
    material is relaesed for external processing agianst PO .
    when material is get external processing and come in through GR . Material goes to quality stock.
    after quality ok , its come in unrestricted stock.
    Regards
    Vinod

  • Quality Inspection for a Movement Type 103 , change batch when doing QA11 .

    Hi all,
    I activated Quality Inspection for a Movement Type 103 .  When do MIGO(GR 103) reference to PO ( include material A, qty 100 PC), it will  create insp lot. Material  A  needs batch management.
    1st time use QA11 to post  50 PC  to stock, it will create a new batch( or you can select a exist batch ).
    2nd time use QA11 to post another 50 PC to stock, it will use the batch 1st time used, and you can't change this batch number .
    The question is : how to change  batch number at the 2nd time ?
    Thanks.

    Hi,
    Pls. check that how u have configured the new batch number in configuration for goods movement.

  • Single Excise Invoice for Multiple Return Delivery

    Suppose we have multiple number of material documents against a single PO and the excise invoice posting has been done. After quality inspection the material gets rejected and we create a return delivery using 122 movement type. In this situation, is it possible to create a single excise document for all the return delivery documents  ?

    Can you spell out clearly whether you are talking about sales return or vendor return ?  If it is for sales, please let me know whether the materials were left out or not.
    G. Lakshmipathi

  • Goods issues to Quality inspection

    Dear friends,
    I have deactivated QM not active(Removed the check ) in IMG/Quality management/QUality inspection/Deactivate movement types for QM for the movement type--103.
    So while GR-MIGO-ins.lot is created and QA32--QM people placed in Unrestricted stock.
    So through 105 automatically material is placed in Quality inspection.
    Requirement is that for Goods issues also Material has to be inspected by QM.
    Then I deactivated for movtype-201, Then Qualty inspection lots are created.
    But I do 201,material stock is reducing but Quality inspection lot is creating.
    But Material shall not be issued,it shall be through QM after relasing only issued to cost center, similar to Goods reciept.
    How it can be done,
    please suggest.
    Regards,
    Canand

    Hello Anand,
    if I understand you correctly you are creating Inspection lots of the 02 inspection origin, and you want these to be stock relevant.
    This is not possible only certain inspection lot origins are stock relevant i.e. 01, 04, 05 and 08.
    I hope that this puts more light on the issue.
    Regards,
    Isabelle

  • BAPI for creating Return delivery to vendor using transaction MIGO

    Hi All,
             My requirement is to create Return delivery to vendor using transaction MIGO.
    In MIGO transaction to create return delivery, the following steps needs to be followed.
    i) Select the option A02 Return delivery, R02 Material document,
        Enter Material document xxxxxxxx.
        Reson for movement:xxxx
        By selecting the option item ok and via delivery check box, then save.
    After saving return delivery needs to be created.
    Is there any BAPI/FM exist for this requirement?
    I made lot of search in sdn, but i could not find any thing helpful.
    Appreciate quick help.
    regards
    surya

    Hi
    In VL02n->Extras->Delivery Output->Header
    Check if you see any message type (LD00 ?).
    If you do not see any, insert a message type LD00.
    If you want to check the IMG settings, see Txns : V/71 (for delivery types RL/RLL) and V/73 (for Item category RLLN)
    Best regards
    Ramki

  • Quality Inspection for the 1st time Receive of Batch

    Hi all.
    My requirement is just to do the quality inspection when the Batch(MCHA-CHARG) is received in the first time in MIGO.
    No quality inspection is required for next & consequtive goods receive for the same batch.
    for the 1st time receive, the stock will go to quality inspection stock for any batch of a material. From the next time , the stock will go directly to unrestricted stock without quality inspection. is it possible? plz advice.
    Thanks
    pabi

    Hi Pabi,
    I am not sure if this will help you, but here are the three options that you might want to consider:
    - Source inspection. The idea here is that an IL is created for a purchase order prior to GR. All subsequent receipts for this PO can be configured to skip inspection.
    - Control if insp. lot in material master (insp. set-up). In this case, the system will not create new insp. lot, if there's already one open for the same batch - it will merely add the qty of the new GR to the same open insp. lot.
    - With dynamic modification you can let the following receipts of the same material from the same vendor to go without QI, but you can't fine-tune it by batch.
    I know this is not the same what you want, but I can't recall at the moment a function that will satisfy your requirement exactly.
    BR
    Raf
    Edited by: Rafael Zaragatzky on Aug 7, 2011 4:32 PM

  • No Quality Inspection for Stock Transfer

    Hi,
    There is a scenario now in which a material is activated for quality inspection. This same material is also used for Stock transfer from other plant with same company.
    So if material if received using STO, how can I deactivate Quality Inspection and just transfer to unrestricted use.
    Thank You,
    Raymond

    Hi
    check user exit.
    QAAT0001 Inspection type determination different from variant 01
    You can install enhancement QAAT0001 ,the function modules contained in this enhancement are called up in the
    programs in which you can access the master inspection type if necessary.
    The inspection lot is then created with the inspection type that was
    determined using the enhancement.
    logic will be for STO it will consider Z mvt type of origin 08 ,for STO material activate a Z mvt type & do not tick on Post to inspection.
    For normal stock trnsfer system will create 08.
    I hope this will add some value
    Regards'
    Sujit

  • IDoc type for LR Returns delivery

    Hi all,
    I want to use SHP_OBDLV_SAVE_REPLICA02 IDoc type to distribute LR delivery for a return SO to Decentralized WM. With this IDoc type, I get the error "IDoc type SHP_OBDLV_SAVE_REPLICA02 cannot be processed by  IDOC_OUTPUT_DELVRY"
    IDoc type DELVRY05 work fine but I want to used SHP_OBDLV_SAVE_REPLICA02. Is this possible?
    Thanks,
    Nick

    Hi,
    Message type is DESADV
    Basic type is DELVRY01 to 03 (can check the latest version or supported version)
    Function module : BORES_IDOC_INPUT_DESADV1 or IDOC_INPUT_DESADV1
    This is used for creating outbound deliveries, shipping  noticfication etc.
    Regards
    vk

  • Quality Inspection For WBS & Network Activity

    Hi All,
    In one our project scenario it is required that the qaulity inspection has to be perform for WBS or Network activity.
    Can anybody explain me the steps.
    Thanks,
    Vishal

    Dear Vishal
    QM in projects I dont think SAP has any solution currently available for this. Option available can be
    1) Create a WBS itself as Quality Inspection. You can capture all the QM activities in this particular WBS
    2) Create manaul inspection lot with reference to WBS and record the results.
    Regards
    Gajesh

  • Document termination error for sales return delivery

    Dear all,
    I got this error while doing PGR, for sales return.
    Acthually the material is with serial number,
    error description
    Update was terminated
    System ID.... DPT
    Client....... 900
    User..... SDUSER
    Transaction.. VL02N
    Update key... 4E371CE1527FF187A5B9001A64D1FE3E
    Generated.... 12.05.2010, 18:38:55
    Completed.... 12.05.2010, 18:38:56
    Error Info... Update program: I/O error Error; function Update, RC= 4, key
    pls help

    Check this thread which may be of helpful to you
    [Update termination error while doing PGR|Update termination error while doing PGR;
    G. Lakshmipathi

  • Quality inspection for the items issued for Sales order

    Hi, How to map the qc for the items issued for sales order?

    Dear Yadav,
    -Activate insp type 10 in the Material Master-QM view insp setup (MM01)
    -Create Inspection plan (QP01) with usage as Goods issue & assign Insp characteristics
    -Create Sales order (VA01)
    -Delivery against the Sales order (VL01N) or through sales order menu. Delivery Insp lot gets created after Delivery is made.
    -Do results recording and take usage decision (QA32)
    Note:
    -This inspection is non stock relevant inspection. There will be no stock posting through Quality Management.
    -Post Goods issue in the delivery can be made only after taking the usage decision.
    Regards,
    Keerthi.

  • Quality Inspection lots during returns

    Hi,
      We need to generate inspection lots when there is a inbound delivery done.The neccessary setting's has been done and insp lot is getting created.But when we do PGR within Inbound delivery we get a error as ''Status of inspection lot 600000000000 / partial lot 000000 does not allow good issue''.We need to do PGR and then process the lot.
    Appreciate your help in this regard.
    Thanks

    Hi Shanawaz,
    Please process the inspection lot and make Usage Decision, then you will be able to do PGR.
    Tcodes: QA32 - Inspection lot selection
    QE51N - Results Recording
    QA11 - Usage Decision
    Thanks and regards
    muruegsan

Maybe you are looking for

  • Error creating a multisource data foundation with generic odbc connection

    Hi all, we've created a generic odbc datasource connection to a Pervasive database. When creating a single source data foundation and universe with this connection everything works fine. When we try to create a multisource data foundation we can add

  • How do i get a replacement fan for my imac

    my CPU fan has recently gotten too loud for my confort and i want to replace it. Everytine I go to the Apple service request form and fill out all the answers, I get to a part where it states and there are no billable parts and gives me a number. I c

  • Why is there only one Operating Concern defined in GBI?

    Hi all, I have the following question: when looking at the CO structure of the GBI case study, why is there only one, global operating concern defined? According to the definition of an OC, it is the level whereupon profitability analysis is performe

  • LabVIEW Simple operator interface deployment

    Hi All, I try to deploy a TS 3.1 application with a LV 7.1 Simple OI. I successfully (no errors) built the OI executable and created an installer with default options. I also built the Deploy TestStand System and created an installer with default opt

  • Columns with same height in a repeating frame

    Hi!, In Report Builder I have a report with a repeating frame with three fields. Each field is a colum in frame. First field always have two lines and second and third only have one line. I want second and third fields have the same height as first,