Item in transfer process for long

Experts,
I have a typical situation where in some of the carts have the status " Item in transfer process"  they have been approved and showing the status approved .
I checked the Monitors  and it reads. Spooler communication error " communication error transferring xxxxxxxxx item. Can you throw some light into how to deal with spooler communication errors, and what could the probable error.
Thanks a lot,
Manyam

Hello Experts ,
I have the same problem as described by Mariam   and still i do not have any solution for it .
Everyday  some some shopping cart end up in item in transfer process and we have dump written into SRM for all those shopping cart .
However the next day those shopping cart  status is changed  to "Error in transmission" and then we are able to transfer those shopping cart from monitor shopping cart which result in PO .
The problem is every day 20-30  dump are wriiten into our system. the dump is of type "RAISE EXCEPTION" and the  dump has search term mentioned as
"RAISE_EXCEPTION" C
"SAPLBBP_BS_PO" or "LBBP_BS_POU01"
"SPOOL_PO_CREATE"
Searched for all oss notes  and we have implemented
854478,884058,892274 , 918194,937119,already in the sytem without any success.
Have someone experienced  such problem ??  waiting for  an early response for minimal  manual  job.
we are on SRM 4.00 patch level 6 . backend is R?3 4.6C patch level 49.

Similar Messages

  • I1111 for SC (Item in Transfer Process)

    Hi,
    Business is using SRM 3.0 ECS.
    Scenario is that User is creating Shopping cart thru Catalogue and there is Approval process for SC. Once the SC gets approved PO is created by the system.(I1113).For this perticular SC error is Item in transfer process and "Follow on doc not transferred".
    User has created another SC(with same data inputs) but that SC is thru.
    Can anybody suggest about this error?
    Brgds/Gopesh

    Hi Gopesh,
    Since its a Catalog item and your sourcing condition might be Sourcing never carried out or Carry out sourcing w/o assigned source of supply.
    So whenever you create a SC for catalog item after the approval process P.O gets created automatically and that P.O should get replicated in R/3 as yours is ECS scenario.
    As you might be aware that P.O gets replicated to R/3 using RFC call, the Error in process might be coming because the RFC link is down or R/3 server is down or for some reason the system could not connect to back end system through RFC.
    So once in a while you may find this kind of issue. You can get the exact reason for this by anayzing the Application monitors and error logs.BASIS guys also can help you in this regard.
    Hope this makes you more clear. Clarifications are welcome.
    Award points for helpful answers.
    Rgds,
    Teja

  • SC status stuck in I1111 Item in Transfer Process

    Hi Friends
    We're using SRM 7.0 SP03.
    I got a question about SC status update, let me describe it with an example:
    1) firstly, i found a SC became Error in Process due to some data problem;
    2) then, i reprocessed it in Application Monitor by click the button of "Create Follow-on documents";
    3) when checking it in BBP_PD, i found this SC item status became I1111 Item in Transfer Process, and looks like it stuck in this status for a long time(more than 5 or 6 hours);
    4) the second day, i found it turned to status I1112;
    Here comes my question, what activity updated this SC's status from I1111 to I1112?
    I tried program CLEAN_REQREQ_UP and BBP_GET_STATUS_2, i believe this change was not updated by this two programs, and I checked almost all batch jobs running in my system, nothing found.
    It has been bothering me in the past month, what's the mechanism of this status update?
    Could anyone give me a clue, i'll highly appreciate, thanks.

    Hi Nikhil
    I read this notes before, program BBP_ALERT_SB_NOTTRANSFERED only include SC after a certain time. My error SC is an old one, created several weeks ago, I checked the time stamp in table BBP_CONTROL, I think this SC is not include in BBP_ALERT_SB_NOTTRANSFERED run.
    Btw, about program BBP_ALERT_SB_NOTTRANSFERED, there's a default parameter:
    "Add. Time for CLEAN_REQREQ_UP             7,200"
    What's this used for?

  • Item in Transfer Process

    Hello,
    I tried to replicate a Vendor for a PO with BBPUPDVD, but it didn't worked this time for some reason. So I tried to add the PO manually in the SAP Cockpit-->SRM Administration-->Supplier-->Supplier Data. There was an error "Partner xxx already assigned: Backend MSGP50100 vendor". Then I tried to delete the logical system, which didn't worked, so I switched the logical system to some fictional system in order to save the PO. My plan was to change it back after I have saved the PO. Obviously the logical system is now blank and I can't even save the old logical system: "Partner xxx already assigned: Backend MSGP50100 vendor". Now I am getting the error "Item in Transfer Process" with all Purchasing Organisations for this supplier.
                          Status         Description                         Inactiv                      
    HEADER        I1015          Awaiting Approval                  X
    HEADER        I1021          Created
    HEADER        I1038          Complete
    HEADER        I1106          Shopping cart ordered
    HEADER        I1129          Approved
    0000000001   I1111          Item in Transfer Process       X
    0000000001   I1112          Error in transmission
    Header links and Item links are blank.
    Would be really nice if somebody could help.
    Best Regards
    Jochen

    Hi Konstantin,
    thx a lot for the fast reply. It was a Vendor that is in our system for a long time. Just had to add a PO, which didn't worked for the first time and when I tried to add him manually I really ruined everything
    With the help of your message I could narrow it down:
    I am now having different PARTNER_GUIDs for the same supplier in VENMAP and BUT000. The one in BUT000 is the old one that worked before.
    Is there any way to change the GUID at VENMAP manually?
    Best Regards
    Jochen

  • Item in Transfer Process : Re-submit FM-BBP_PD_SC_RESUBMIT

    SRM Experts,
    We are using SRM 5.0 and using classic scenario, so Purchase Order/Purchase Requisitions are created in the backend system.
    Some of the SC's gets stuck in item in transfer process, so we applied OSS note-1022756 and 1040878 in our system to re-submit the SC's by executing the FM-BBP_PD_SC_RESUBMIT. We are passing SC number and Backend Document number in the input parameters of the FM.
    It works fine in most of the stuck shopping cart except following scenario.
    Information:
    When we use the Outline agreement with the vendor in the sources of supply field, then SC is converted to Purchase Order in the backend system otherwise it creates Purchase requisition in the backend system.
    Problem:
    If SC has multiple line items using the different Outline Agreements in the Sources of supply field, then SC will create different purchase order for each line items of the SC. When these types of SC's are stuck in item in transfer process,
    then we re-submit it through FM-BBP_PD_SC_RESUBMIT.
    This FM doesn't have an option to input multiple backend document number, so we pass the one backend document number and SC number which results into creating one Purchase Order for all line items of the SC
    which is not correct. It should have created different Purchase Order for each Outline Agreements used in the SC.
    And if pass only SC number in the re-submit FM, then we are getting short dump.
    Is there anyway Re-submit FM can create multiple PO's for each Outline Agreement used in the SC or is there any other solution to this problem?
    This is an urgent problem. Please help!
    Thanks in advance!
    Points will be rewarded.
    MP

    Hi,
    I would suggest you use the FM BBP_PD_SC_TRANSFER to send the SC instead passing in the SC guid ID which you can get from transaction code BBP_PD.
    Regards.

  • Status in BBP_PB   --------    I1111- Item in Transfer Process

    Hi all,
    I have seen lot of threads on this issue but non of them giving final soultion which leads to me create one new post....
    I am working with Extended classic scenario with SRM 4.0.
    I have created SHC which gone for approval and it has been approved by approver.
    Its a limit item. But still that shopping cart is not available in sourcing cockpit.
    I have checked BBP_PD where I found status of shc is I1111- Item in Transfer Process.
    Here I have checked all item as well as header tables but no entry found there.One thing is that source type is EP as well as Source_rel_ind is Y which means cpmleted for Sourcing but in actually there is no followon document created yet.
    Also I have gone through SM58 where I didn`t find any error.
    All batch jobs are also running properly.
    So could any one please let me know the solution for this...
    Regards,
    Navneet

    Hi,
    Pls see the foll threads.
    Re: Sourcing relevant indicator getting set to 'Y'
    Re: Carts sent to Sourcing Cockpit Even Though PO created
    BR,
    Disha.
    Pls reward points for useful answers.

  • SC item still in status "Item in Transfer Process"

    Hello,
    We have some SC that are still in status "Item in Transfer Process". THey have no error but we don't get the R/3 document. In our case we must get Purchase Requisition but we have nothing. We can"t transfer manually the SC in the monitor because the button is disable for those SC. Can someone help us?
    Thanks.

    Hi
    Which SRM and R/3 versions are you using ?
    <b>Please have a look at the following OSS notes, which might help.</b>
    <u>550071 FAQ: EBP - Shopping Cart
    757625 Incorrect Status I1112->analysis report
    990767 Service: Name of requester not in back-end purchase order
    988490 Name of requester not in back-end purchase order
    755769 Status I1113, no item or header relations->analysis report
    958395 Termination during transfer from template
    890481 Cleaner job: Do not delete processed entries 
    772778 Creation of local PO from external requirement: => Alert
    140846 BBP: No purchase order generated although data complete
    751022 Monitor Shopping Cart: Item deletion causes termination 
    573493 ECS: Error for SC item without plants
    815721 Multiple transfers of shopping carts
    781260 Incorrect purchasing group for catalog item
    774596 Deleting shopping cart item: Items are transferred 
    610601 Shopping cart monitor: Check status after transfer
    765432 Shopping cart: Old PO / template with hierarchy
    753787 Monitor shopping cart: Shopping cart with deleted items
    729967 Shoppng cart:Status I1111,no follow-on docs->analysis report
    670346 Favorites from catalog: Price 0 during transfer
    623415 Shopping cart monitor: Icon / status for the shopping cart
    566546 No local procurement process with activated ECS 
    504831 Shopping cart: search help goods recipient from note 448598
    609610 Deleting incorrect shopping cart items in monitor and status
    534653 Shopping cart monitor: Display of deleted items
    486452 Unloading point in shopping cart
    580548 Shopping cart: BBP_DOC_CHANGE_BADI - account assignment data
    507278 Incorrect storage location in the shopping cart
    540635 SC: no BE doc., no message if error in recipient data
    522620 Shopping cart monitor: Customer enhancement / BADI
    519519 Shopping cart monitor: Deleting shopping cart/icon inactive
    513030 Description disappears after calling the input help
    499013 RZ20: No re-submit or deletion of items
    493478 Transfer the item from the catalog without account assignmnt
    432434 'Item in the transfer process' for reservations</u>
    Regards
    - Atul

  • Shopping Cart status " Item in transfer process"

    Dear Friends,
    A shopping was created and it went to approval as per the Workflow designed.
    It got the approval from all the required levels. But in the SRM system when checked with the chopping cart number with tcode BBP_PD the status is showing as " AWAITING APPROVAL" . and when it is check in the SRM Portal at Monitor shopping card at header level the status is same as above but in item the status is showing as  " Item in transfer process".
    And in BBP_PD its displaying the created PR number. But when this PR is checked in SAP, then its displaying missage no PR exist.
    Please guide me in resolving this.
    Thanks in advance.
    Vamshi Sreerangam

    Hi Vamshi,
    Can you check error log in RZ20 for this shopping cart?
    Regards,
    Nikhil

  • Item in transfer process ( Really Urgent)

    Hi All,
    I am working on extended classic scenario and the problem is that after the Shopping cart is approved,the line item has the status "Item in transfer Process".
    When I check the SC in t-code BBP_PD,I get the status as:
    000000001 I1111 Item in Transfer Process (Active)
    when I checked the item detail in table BBP_PDBEI, I found that the logical system is the SRM system i.e the system is trying to create a local PO
    I also checked in RZ20 but could not find any log about the error. Also the background jobs CLEAN_REQREQ_UP and BBP_GET_STATUS_2are running smooth.
    I even checked out for dump in ST22 but could not find it
    I am on SRM version BBPCRM 4.0 SAPKU40007
    R/3 version 4.6 C SAPKH46C47
    Regards,
    Raj

    Hi
    Please go through these details ->
    Re: SC item still in status "Item in Transfer Process"
    Re: Shopping Cart is not creating Purchase Order
    <u>Some related SAP OSS Notes -></u>
    Note 1040670 Requirements are greyed out in the sourcing cockpit
    Note 1022756 BBP_PD_SC_RESUBMIT: transfer status still active after error
    899006 Status I1112 and I1113 even though subsequent doc exists
    757625 Incorrect Status I1112->analysis report
    755769 Status I1113, no item or header relations->analysis report
    631513 Shopping cart in status 'Erroneous transfer' without alert
    980017 Follow-on document not created
    949162 Follow-on documents exist, status I1111 and I1113 active
    892274 Appl monitor: Shopping carts cannot be transferred
    Note 900142 BBP_PD_SC_RESUBMIT: All items set to status I1111
    <b>Please open a new Customer OSS Message with SAP on this as well for faster processing.</b>
    Hope this helps
    Do close the thread if your query is solved.
    Regards
    - Atul

  • Sho[pping cart error 'Item in transfer process"

    Hi All,
    I created shopping cart for stock materials giving product id.(Quality system)
    This should create reservation as a follow on document.
    But reservations are  not getting created, instead it is showing error as 'Item in transfer process'.
    Please help me on this issue.
    Thanks.

    Hi,
    The status I1111 means, that an error happened during the transfer, and now the SC is stuck with this status (normally one of the following status has to be set I1112 or I1113). In this case the system should create an entry in the alert monitor. Than the administrator has the possibility to retransfer or delete the SC.
    Is there any alert created for that specific SC in the alert monitor? If there is no error in the monitor, you can create this via the report BBP_ALERT_SB_NOTTRANSFERED, as in the note 441768 described, and than the administrator will have the possibility to retransfer or to delete.
    But please note, that till the original problem of the transfer error is not solved, the reservation can not be created.
    Please check if the number range is correctly set both in the SRM and backend side, check also if you are able to create manually the reservation with the same data in the backend system.
    Is the problem thereby not solved, you will need to debug the SC transfer.
    Regards,
    Peter

  • Shopping cart with  I1111 - Item in Transfer Process.

    Hi All,
    I have a shopping cart in our Production system with 5 line items, all had the status "I1111 - Item in Transfer Process". I have run report BBP_ALERT_SB_NOTTRANSFERED and 4 out of 5 items have changed the status from "I1111 - Item in Transfer Process" to "I1112 - Error in transmission". We could delete 4 line items but the first line item is still with the same status "I1111 - Item in Transfer Process" and we are unable to delete it from the system.
    There is no alert in the Monitor also.
    Is there any suggestion to delete this line item? because the USer has already created a new shopping cart for all these lines and we need to delete this old one.
    Any help appreciated.
    Thanks!

    Hi,
    please do a last try with the report BBP_ALERT_SB_NOTTRANSFERED. This selects only the SCs, which were created since the last execution; the last execution is controlled by a time stamp in the table
    bbp_control.
    In the table bbp_control you will see an entry like this: 20.090.519.225.722 (which means 2009.05.19. 22:57:22 ). Please turn back this time stamp (hard in the debugger) before the creation date of the SC, and execute BBP_ALERT_SB_NOTTRANSFERED once again.
    Is this SC item still not selected, the easiest way is to set the deletion indicator on the database level.
    Regards,
    Peter

  • Shopping carts in  'Item in Transfer Process',approval completed but no PO

    HI Gurus,
    We have some Shopping carts( which are in  'Item in Transfer Process'...) for which approval workflow has completed but the PO is not being created, and the status of the Cart is approved and of the item is
    'Item in Transfer Process'.
    I have tried running the function module BBP_REQREQ_TRANSFER
    and Report CLEAN_REQREQ_UP but it failed to generate any PO.
    Also there are no alerts in neither BBP_PD nor RZ20.
    Kindly assist.
    Thanks in advance,
    Regards,
    Ankur Bakshi

    Hello,
    Try FM "BBP_PD_SC_TRANSFER" in SE37
    give RFC of yr backend and SC guid from BBP_PD
    execute
    check whether " bbp_document_tab " hold entry for the SC
    "clean_reqreq_up" is meant to clear entry from this table
    in BBP_PD put the alerts on "Check Document" & "Find Alerts" by putting X and see if you are getting any hints.
    In the admin log on for yr SRM client (user with SAP_BBP_STAL_ADMINISTRATOR) check the application monitors for SC
    BR
    Dinesh
    (Reward if helps)

  • Shopping cart - item in transfer process

    Hello All,
    We are using SRM 5.0 and the problem is that after the Shopping cart is completely approved,the line item has the status "Item in transfer Process". So, SRM PO is not created for these carts.
    I have checked almost all the old threads related to this topic and tried all the possible ways suggested in those threads but the issue is not resolved.
    I have collected the data for these carts, and most of the carts went into this status when large dump was created in st22. I couldn't find another other information in RZ20.
    Below is the status for one of the carts in BBP_PD.
                         Status         Description                                            Inactiv
    HEADER       I1009          Held                                                         X
    HEADER       I1015          Awaiting Approval                                   X
    HEADER       I1021          Created
    HEADER       I1038          Complete
    HEADER       I1106          Shopping cart ordered
    HEADER       I1129          Approved
    0000000001 I1111          Item in Transfer Process
    Please help in resolving it.
    Thanks in advance.
    Muzammil
    Edited by: muzamil24 on Sep 5, 2010 5:07 AM

    Hello Muthu,
    Yes, the clean job runs in the system. We are in SRM 5.0.
    There was one requirement for one of the shopping cart which was in item in transfer process status. So, i created another cart with the same details and it processed successfully.
    This issue is not with all the carts, but it is with only particular carts. I am unable to recreate this
    Below are the answers for the questions you asked:
    -- No, it is not a limit shopping cart
    -- Source of supply is not fixed. It is chosen from the vendor list applicable for the product category selected in the SC.
    -- Assignments of Cost center and other things  is set up in the customised approval matrix table.
    -- The approval flow is designed based on the value of the SC and the matrix type.
    -- Matrix type is defined as 1,2 ,3....such that each type will have various levels of approvers.For example in type 1 there are 4
    -- two approvers cannot have same set of cost assignment dimensions
    Please let me know if any more information is required.
    Thanks,
    Muzammil

  • I1111 item in transfer process problem

    Hi experts,
    I am using SRM 5.0 and ECC 6.0 classis scenario
    When we create SC, status shows "Approved" , but no follow on documents (Purchase Order) created
    in BBP_PD I got status
                        Status         Description                    Inactiv
    HEADER     I1015          Awaiting Approval              X
    HEADER     I1021          Created
    HEADER     I1038          Complete
    HEADER     I1106          Shopping cart ordered
    HEADER     I1129          Approved
    0000000001 I1111          Item in Transfer Process
    No error in RZ20 and BBP_MON_SC
    in BBP_DOCUMENT_TAB and BBP_PDBEI I got a PO number from backend system
    When I run FM SPOOL_PO_CREATE manually, system will create PO in backend system
    My problem is why PO is not create automatically after I approved SC.
    Now I have to run FM SPOOL_PO_CREATE manually everytime whether I need to create a backend PO.
    Please help me.
    Thank you in advance
    Regards,
    Theerat

    Hi Theerat,
    OK, the control parameter settings seem to be good.
    There are a lot of steps in the transfer, therefore is hard to say where exactly the error could happen. Maybe it would be easier to check the recieved BAPI data of the backend PO. If you execute this BAPI in the backend, there will a message appear with the error.
    For creating this test data in the BAPI_PO_CREATE1, please do the following:
    Activate the FBGENDAT for the BAPI_PO_CREATE1 (or BAPI_REQUISITION_CREATE if the follow-on document should be a PR) as in the note 539978 described, and send a new SC into the backend to fill the test data. As in the note described, please:
    - set the Parameter FBGENDAT 'X' in the backend system for the RFC user of the SRM system
    - execute the report FBGENDAT for the BAPI_PO_CREATE1 in the mode 'A' or 'B'.
    - Start the SC transfer from the SRM system by creating a new shopping cart, and check whether a test data record was generated in the Function Builder (SE37) of the backend system for the BAPI_PO_CREATE1.
    - Deactivate the generation of test data records by deleting the entries in report FBGENDAT and resetting the user parameter.
    Execute the BAPI_PO_CREATE1 with the created test data (you need to doubleclick into the test data and F8), and check what is filled into the parameter RETURN.
    Have a luck!
    Regards,
    Peter

  • SC - Item in transfer process - PO is not get created

    We are in extended classic senario , SC is showing status as Item in transfer process - PO is not get created .
    Could you please give me any pointer for the same
    Thanks in advance .

    Hi,
    Other customer has also reported this issue and the fact that it is       
    happening sporadically. Hence Development has created a report for this   
    issue, please see the below note:                                                                               
    729967: Shoppng cart:Status I1111,no follow-on docs->analysis report                                                                               
    Please run the above report and then check the effected shopping carts.                                                                               
    Also I would recommend the following note to be implemented:                                                                               
    1233037: BBP_MON_SC: Shopping cart transfer ends in status I1111                                                                               
    Please implement both notes and run the report. This should help with     
    this issue.                                                               
    I hope this helps,
    Kind Regards,
    Lisa

Maybe you are looking for

  • *** Can't get my text to load as text - still loads as an image

    I have an iWeb site I've done and I'm still having trouble with some of my text being displayed as an image. This is an issue for me because it is slowing down the loading of my site. I have 1 page where I converted the text to Georgian and it loads

  • Print monitor locks up if there are multiple documents printing

    I have a HP Laserjet 3015 and a iMac G5. I reinstalled the newer hp drivers recently. Since then, when I am printing in OS 9, if I have more than one document in the print monitor, the print monitor locks up, then if I force quit it and delete the do

  • IPad camera kit error "device uses too much power"

    Got the camera kit....when I attach it I get an error that says the device uses too much power. I've shut down and restarted the iPad several times and still get the same error. Anyone know what I can do?

  • Duplicate albums in iphone music

    Hi, I've just updated my iphone with some new music I've purchased and for some reason I have one album which is appearing twice. However, one of the folders only has some of the tracks in it. I think it's something to do with the cloud as the tracks

  • New Editor downloadable??

    Hello folks, on de Euroforum was announced, that a new Editor (supporting for example syntaxhighlihting ) for the Forte IDE is available on forte.com. I was searching e few times but I did not find anything. Can somebody help me? Greetings F. Samland