Link to an asset up sampled

I get this msg  (the doc contains a link...) and have read the other blog about going back and upsampling, however, how do know which images is the problem?

In the Assets panel, you will see a small icon that looks a bit like a colored checker board. Right click on this and choose "Go To Asset". This will zoom on the image and select it for you.

Similar Messages

  • How do I fix error message "This document contains a link to an asset being upsampled. You should resize it smaller or right-mouse click on the asset in the Assets panel to see additional options." Which asset is it?

    I ab in Muse. How do I fix error message, This document contains a link to an asset being upsampled. You should resize it smaller or right-mouse click on the asset in the Assets panel to see additional options.

    You should ask in Help with using Adobe Muse CC
    This Cloud forum is not about using individual programs
    This Cloud forum is about the Cloud as a delivery & install process
    If you will start at the Forums Index https://forums.adobe.com/welcome
    You will be able to select a forum for the specific Adobe product(s) you use
    Click the "down arrow" symbol on the right (where it says All communities) to open the drop down list and scroll

  • 'This document contains a link to an asset being upscaled'

    When opening two separate Muse sites I have received the warning message, 'This document contains a link to an asset being upscaled. You should resize it smaller, or relink to a larger asset using the Assets panel'. However, none of the assets that the site links to have been amended.
    Does anyone know why this might be?
    Thanks.

    I believe the warning you're referring to is "This document contains a link to an asset being upsampled."
    Upsampling refers to the fact the image has been resized to a size larger than it's original pixel dimensions. For example a 72x72 pixel square image may have been placed then resized to 100x100. Such an image will be exported by Muse, but it will not have an optimal appearance in the browser due to being larger than it's original dimensions. (It's been "upsampled.")
    In general you want to have all the images in your site be the same size or smaller than the original placed/imported image data in order to avoid upsampling. Slight upsampling can result in an image that looks dull or slightly blurred, depending on the browser being used. A large amount of upsampling will result in an image that appears pixelated in the browser.
    This message is a warning. Whether or not the result of the upsampling is acceptable is a judgement call only you can make.
    The Assets panel displays an icon next to any image that's being upsampled.
    One other case where this will be reported is for any image that is larger the 2048 pixels in width or height. Muse initially limits image data to a 2048 maximum in either dimension. If you have an image that is larger than 2048, you need to select it in the Assets panel, right click and choose "Import Larger Size" from the context menu. This will pull in the additional image data for whatever size the image is in Muse and thus avoid any upsampling.

  • "...link to an asset being unsampled..."

    On opening Muse to my site (not published by any host yet), a window appears saying "this document contains a link to an asset being unsampled...".  I've checked my assets and only one seems of disparate size: the arrow to the dropdown menu giving subpages.  I simply cannot change or remove it.  Tried removing the whole menu and remaking it, same problem.

    Hi,
    Check the Assets panel for any other image which has this symbol next to it,
    Regards,
    Abhishek Maurya

  • Link between Fixed Asset and Purchase Order Tables

    Hi,
    I am working in Fixed Asset Report. I have a folllowing Doubts.Please clarify.
    1. How to link the Fixed asset tables with PO_HEADERS_ALL
    2. I took the Asset_Account field from FA_ASSET_DISTRIBUTIONS_V . But how to link with this table to other Fixed asset tables.
    Please give me the link between these tables. It will be grate helpful for me.
    Thanks,
    Prakash

    Hi,
    This should be mentioned/explained in [Oracle eTRM|http://etrm.oracle.com/] website (which is down for now). Others who already know the exact link may be able to help.
    Regards,
    Hussein

  • Link to .pdf asset is jumping to top of page instead of opening .pdf

    I am going crazy trying to figure out why one of my pages won't open its links.  It appears in the lower left corner of the browser to be linked to the correct asset, and if you right click the link and select to open the link in a new page it opens the .pdf fine.  But when you left click on the link then it just jumps to the top of the page as if it were anchored to the top of the page or something.  I don't understand it.  I've tried erasing the link, erasing the asset and relinking but it I can't figure it out.
    Here is the site:
    http://www.generationsprimarycare.com/physical-forms.html#peforms
    On the right column, the top link is fine, the rest of the links that are linked to .pdfs in the right column don't work correctly
    Thanks a bunch to anyone who can help.

    https://addons.mozilla.org/en-US/firefox/addon/grab-and-drag/
    this addon is solution, finally found it ;)
    greetings / pozdrawiam

  • Is there a way to link PM and assets

    Hi SAP experts,
    Is there a way to link PM and assets?
    For instance, if on assets we create an equipment as an asset, can it automatically create on SAP pm.
    Kind regards
    Emanuel

    Yes it is possible.Have a look in config under SPRO > FI > Asset accounting > Master data > automatic creation of equipment master.
    Regards
    Narasimhan

  • Asset Manager sample - Custom Query Interface

    Greetings Ladies & Gentlemen -
    I've pretty much reproduced a custom query page in my application
    (copied from the Asset Manager sample application) and it seems to
    perform as expected - well almost !
    When I arrive at the page I get an error message where the
    report would display that reads -
    failed to parse SQL query : ORA - 00936 : missing expression.
    It goes away when I press the Go button, and it reappears when I press
    the Reset button.
    I've set the default for the shuttle and I've created all the same processes for the page.
    Any ideas where this page needs to be corrected ?
    Thanks for your valuable time in advance.
    Brian

    Any suggestions?

  • Linked file in Asset folder won't read css

    I have put a secondary navigation on my master page. Muse automatically uploads the file into an Asset folder on my server. The linked file in the asset folder does not display the css. I tried loading a second css file into the Asset folder (tried uploading both with css folder and by itself to no avail). I also tried linking it with the full url http://www.... but this doesn't work either. The only way to show the link with style sheet is to export the site to Dreamweaver and strip out asset/. My site has 30 pages total and I am adding information on it daily so this is not a good work around.

    Nope, as noted in above posts:
    All icons look correct (and "get info" shows the proper apps);
    I've copied to other drives, zipped, copied, unzipped and opened.
    I'll try taking some over to my old G5 and see if there's any luck there.
    It seems like in some way the folder was damaged in copying. I need to upgrade my Disk Warrior to work on this OS, that would adjust any directory/database problems.
    I suppose I can pay Apple for their support time, but this one is pretty bizarre.

  • Re-linking After Effects assets inside Premiere

    I have a premiere project that has a dynamically linked After Effects project. I wanted to rename the folder that all my footage resides in. When I do that I relink all my footage / After Effects files when I open the project. That all works great. However, the After Effects project itself is referencing the footage in the old location resulting in bars and tones showing up. How do I tell After Effects where the footage is now?
    If I open up the After Effects project and double click on one of the missing assets to relink it, it trys to browse my hard drive looking for what I named the sub-clip inside Premiere. I need it to reference a clip inside Premiere.

    That does work: you don't need to reference a clip inside PrPro, 'cos a clip inside PrPro is just the link to a footage on your hard drive. When you replace a clip or a group of clips in PrPro timeline with dynamically linked comp, AE creates a new composition and imports those clip(s) into the project. But then again, those clips are just links to original footages on your hard drive with properly set In and Out points in the newly created composition. Hence, select a missing clip in AE Project panel, right-click and choose Replace Footage -> File..., locate the original footage on your hard drive and open it up. If all missing footages are in the same folder, AE will automatically find the rest.

  • Inventory Link to Fixed Assets

    Hi,
    I need some clarity on how the Oracle Inventory (INV) module is integrated with the Oracle Assets (FA) module.
    My understanding is that the Mass Additions integration to FA is only from Oracle Payables (AP) and Project Accounting (PA). If this is true and one is not implementing PA the only available link to FA would be from AP.
    In this scenario, I am stuck with a problem. Suppose 20 km of feeder equipment is purchased for a particular CIP and the Invoice entered in AP with the appropriate CIP Clg a/c, the Mass Addition line would appear in FA (presuming all the required conditions are fulfilled). This Mass Addition line can then be prepared and worked on in FA. However, if the organization purchases in bulk and stocks it in INV, it would be wrong to push it to FA from AP as CIP. As and when the issues take place to the CIP the lines should move to FA. However, in such a case AP would be effected only when the invoice is processed and not subsequently at the time of the issues. How does one handle this business scenario which is very common in the Telcom industry? Is having PA the only solution to link Inventory issues to FA?
    An early response to the issue would be highly appreciated.
    Thanks in advance.
    Amit

    Check for three things:
    1) The distributiion account in Payables is a Asset clearing account
    2) Track as an asset flag is updated to "Yes"
    3) The Payables Invoice has been accounted and transferred to GL

  • Links to ADF Oracle SRDemo Sample Application

    Hello,
    in document "The Oracle SRDemo Sample Application (ADF BC Version) Introduction"
    http://www.oracle.com/technetwork/developer-tools/jdev/srdemoadfbc-101834.html
    and "The Oracle SRDemo Sample Application"
    http://www.oracle.com/technetwork/developer-tools/jdev/srdemo-095882.html
    the links (hyperlink "here") to download the demo application navigate to an empty page:
    http://www.oracle.com/technetwork/developer-tools/jdev/center-131167.xml
    and
    http://www.oracle.com/technetwork/developer-tools/jdev/center-131167.xml
    respectively.
    The demos are still accessible through the JDeveloper Help -> Check For Updates though.
    Regards,
    Didier.

    Hi,
    try and catch http error 408 in the web.xml file
    <error-page>
    <error-code>408</error-code>
    <location>faces/welcome.jspx</location>
    </error-page>
    Frank

  • Linking error on invoke.c sample

    Hi !
    I try to invoke the JVM.
    I use the http://java.sun.com/docs/books/tutorial/native1.1/invoking/invo.html sample .
    I try to compile with Dev C++, and the VsStidio.net the file "invoke.c."
    And alway get the error message from the linker.
    somthing like "unrefenrenced..." or "undefinied".. (dont't remenmber but if need I write here exactly). Anyway after thet 2-3 words the problem is with :
    "JNI_GetDefaultJavaVMInitArgs(&vm_args);"
    and
    " res = JNI_CreateJavaVM(&jvm,&env,&vm_args);"
    just this 2 function.
    The include files was founded,added...(from ..jdk/include), I use WindowsXP, jdk1.5.0(not updated).
    What can I do to start my program from my C program? - I think this example must work to start MyJavaApplication from My_C_Applicationn or not?
    Another question: is correct to set the vm_args.version to 0x00010005; or use 0x00010004 with my jdk?. (Or set or not : have the linker error)

    hi.
    I have the same problem.
    I tryed:
    cl -IC:\Java\jdk1.5.0_05\include -IC:\Java\jdk1.5.0_05\include\win32 -IC:\Java\jdk1.5.0_05\lib\jvm.lib -MT invoke.c -oinvoke.exe
    and get :
    error LNK2001: unresolved external symbol __imp__JNI_CreateJavaVM@12
    error LNK2001: unresolved external symbol __imp__JNI_GetDefaultJavaVMInitArgs@4
    what can I do??
    thanks

  • Linking Project to Asset and Legal Entity

    Hi All,
    I am developing a CIP reconciliation report which shows the beginning balance, additions, transfers in/out and ending balance of CIP or capitalized portion of a capital project in the Oracle Project Module and reconciles the CIP balance to the balance sheet in the General Ledger.
    My report Columns are :
    Legal Entity--Project Number--Task Number--Asset Name--Asset Category--Beginning Balance--Ending Balance
    Total CIP Amount in GL =
    Could you help me as to which Oracle base tables should I use?
    Thanks,
    r2

    Would this be run just at month end, after closing? Or might this reconciliation be run at any time during the month? I am thinking that it would be run after a month has been closed? The answer to that question does make a difference as to what tables you might use. On the G/L side you could look at GL_BALANCES or GL_JE_LINES. On the projects side, you could start with PA_EXPENDITURE_ITEMS_ALL and PA_COST_DISTRIBUTION_LINES_ALL. PA_PROJECTS_ALL is the projects master file, where you will probably find out the project type (if CIP or not CIP). You would have to poke around and play with your data to see what might work. Every Oracle installation can do stuff in their own ways, so it is tough to give a good answer when we cannot see your data nor know how your company processes transactions. But those tables should be good starting points for looking at. Hope this helps a bit.
    John Dickey

  • Linking of Group Asset from Asset class

    Dear All,
    i have a requirement,
    when a user is creating an Asset in the asset master (as01),the Group Asset has to Pick up or Update auomatically in the Group asset field from the Asset class.
    How to configure this ,
    regards
    Man

    Hi,
    Consider a group asset no 20000 already exists.
    Now you are creating an asset in AS01 to which the group asset 20000 is to be assigned.
    So you want this group asset no. to be populated automatically while creating a normal asser in AS01.
    Please clarify whether my understanding of query is right.
    Regards,
    Ashutosh M.

Maybe you are looking for