Long running jod in SAP BI best practice installation..................

Hi,
    Im installing the SAP Best practice for Financials. The job "Activating Business Content: InfoObject Catalogs" is running for a long time (Nearly 2 hrs).
Reference: B03 - General Settings for BI Integration.
Can anyone tell me how long this job will run?
Any help reg this is appreciated.
Regards
Santhosh kumar.N

That depends on how many objects are getting activated and also the job log can tell you something about what is going on...
Arun

Similar Messages

  • SAP ASE Best Practice latest update

    Hello experts,
    just wondering if somebody already reviewed thoroughly latest guide for best practices on SAP Sybase ASE?
    I am talking about the document from note 1680803 - SYB: Migration to SAP Adaptive Server Enterprise - Best Practice (former note 1722359 - SYB: Running SAP applications on SAP ASE - Best Practice).
    The guide for normal runtime operation was merged with the guide for migration, but there are some contradictory statements.
    Apart from that the study case is again designed for server with huge memory and lot of CPU cores (so not so real case normally, I wonder who setup so often such huge servers...), I have found some inconsistencies.
    E.g. in part "Reconfigure Engines and Parallel Processing", they talk about to limit ASE engines to 16, but the command configures 32.
    alter thread pool syb_default_pool with thread count = 32, idle timeout = 2000
    No change to the previous setup for migration. Is this just typo? I understand it should be 16, and then also number of network tasks for normal operation would be 4 (as mentioned in the beginning of guide that normally you set up 1 per 3-4 engnes). If this is not typo, then number of network tasks is wrong as it should be 8.
    Also they introduced idle timeout, but only talking about ERP and possible lower value for Solman - does this mean that for BW you keep default value (which if I am not mistaken is 100)? As per ADM540 you should even decrease this timeout when SAP system is sharing server with database - I know that document is old, but is again contradictory, not saying that it is wrong, but not well explained.
    If anybody checked new version of guide, please let me know, I think it is bit messed up and is bit difficult to distinguish what you should set up for migration case and what for normal operation case.
    Thanks!
    Regards,
    Matus

    Actually, quite a few customers run with that many engines/memory.   In fact, it is difficult these days to even buy a server with less than 128GB of memory and 16 cores/32 threads.    Pretty much the only time we see less is when the install is in a VM.   Interestingly, we had comments from the first version suggesting the numbers were not realistic given the typical size of systems being deployed were much larger....    In addition, in my experience with customers on SAP systems, they were not aware of how  much memory was necessary to really support medium to large systems based on the configurations they were attempting.
    I am sorry that you feel some of the examples are contradictory.  You are correct in pointing out that the text refers to 16 engines and the example configures 32....   So yes, for that specific example, it should have been 16. 
    Secondly, not having seen ADM540, but I think there is a bit of a problem if they suggest that.   I my opinion (and I have spent a lifetime tuning ASE), the idle timeout for ERP and BW should likely both be 1000+ and 2000 is not unreasonable.   The comment in ADM540 is likely due to if ASE and a NW CI are sharing the same cores - e.g. you have a 4 core box and ASE is running on 2 cores (we will ignore threads for this discussion) and you have 30 NW worker processes - which obviously will need to bump ASE off the cpu in order to run.   This may be fine in a test/dev or even a solution manager system, but bumping ASE off the core is NOT a good thing for a production system.  In fact, I would encourage using numactl or similar to fence off the the cores used for ASE from NW worker processes if at all possible.   We have seen cases of overloaded NW installations with multiple CI instances with hundreds of worker processes each starving cpu away from ASE......sooo....I would tend to actually be a bit more than firm on suggesting that 100 is a very bad starting point.   Given the number of client side joins that SAP uses to avoid [DBMS proprietary] temp tables, it is critical that ASE's (or any DBMS) response time be minimized as much as possible.....having ASE yield the core practically as soon as it gets done processing one task (and puts it to sleep pending an IO) just really causes things to run slow.   Think of a typical query that returns 10 rows - say wide enough that each row fills 1 packet.   If the packet transmit time (and client ACK) takes more than 100 microseconds on CPU (almost a given for network interactions...as clock ticks are in nanoseconds and networking is minimally milliseconds - 1000 microseconds), ASE would yield the CPU every time it sent a packet.    When the client wanted the next packet, the OS would have to wake up the ASE process (an interrupted sleep) which is a nasty heavy weight operation.   Hence it is best for ASE to hang out on the CPU until reasonably sure that nothing more is going to happen very soon....and on current cpus...and having it run for 1-2ms (1000-2000 microseconds) shouldn't be a hardship.     If you created a separate thread pool for batch worker processes, then I could see maybe using a lower idle timeout such as 200 or 250......100 is just plain too low in my mind...it is like saying ASE is expecting an odd query every few seconds vs. a steady workload.  Basically at that level, there had better be a task in the ASE job queue or one on the way on the network already, or that engine is going to sleep.
    While I state that with regards to ADM540 itself, I have not seen the class (perhaps)...one customer did show me the notebook of a class (ASE Sys Admin) they went to and it was really targeted at non-SAP installations more than SAP installations - from a reality/experience aspect.   Part of the issue with the class the customer showed me was it borrowed liberally from the old SY classes as a starting point, but at the point the class was developed there was not a lot of experience with running SAP installations on ASE to really point out the fine tweaking areas such as idle timeout.
    However, the document was really aimed primarily at Business Suite vs. BW systems or a Solution Manager install (which are much smaller) - there are a lot of other considerations for BW the guide doesn't get into - although some of the sizing is a better start than the defaults provided by SAPINST
    The former runtime guide essentially was just merged in to the Post-Migration Steps section.
    May do a quick refresh in the near-future (due to some recent experiences), so if you have other specific examples of the text and SQL not aligning - please let me know.

  • Where i got SAP- XI Best Practices?

    where i got SAP- XI Best Practices? Can any one send link or doc

    Hi,
    Mentioned hereunder are some of XI Best Practices:-
    ASAP methodology:-
    https://websmp206.sap-ag.de/~sapidb/011000358700004919702004E
    http://help.sap.com/bp_bpmv130/index.htm
    Realtime Case Studies-
    http://www.sap.com/usa/search/index.epx?ct=international&mode=quick&q1=BestPracticesof+XI
    This blog will give more broader view
    /people/marian.harris/blog/2005/06/23/need-to-get-a-sap-netweaver-component-implemented-quickly-try-sap-best-practices
    Regards.
    Praveen

  • SAP BEST PRACTICES INSTALLATION on ECC 6.0 IDES Version

    Hi All,
    Can we implement SAP BEST PRACTICES on ECC 6.0 IDES Version? I was informed that the IDES version is already preconfigured with this. Please let me know on this.
    Thanks & Regards,
    Satish Shetti

    Hi
    You can check this link for better understanding [SAP BEST PRACTICES INSTALLATION |http://help.sap.com/bp_hcmv1600/HCM_US/HTML/index.htm] -->What is the difference between SAP Best Practices and IDES?
    Regards
    Uday

  • SAP CRM BEST Practices

    Hi All,
           Please provide some links to download SAP CRM BEST Practices.
    Please provide valuable info.
    Regards,
    Srini.

    Hi Srini,
    you can follow the below path, it leads you to the best practices.
    http://help.sap.com/
    click on SAP Best Practices
    click on Cross-Industry Packages
    left hand side = Customer relationship management
    Right hand side = Select english
    In new page, select Technical Information
    Building Block Library
    You can download the relevant best practices like  for versions  6.0( v1.2007), 5.2(v1.52), 5.0(v2.50) & 4.0(v3.40). Building blocks are nothing but the best practices and these are the only best practices available for SAP CRM.
    regards,
    kalyan

  • Best Practices Installation Problem

    Hi I am trying to install the sap best practices package V1-4.6000 (LATAM)
    I run the transaction code /n/smb/bbi, later I import the layer 0
    building blocks and try to activate the building blogs.
    When I try to activate the B32 (MX) Building block, an error occurs, the message is the following.
    "Activation finished with errors"
    When i check the Pre-requisites the component
    /SMB99/CHECK_O010_B32 (check operating concern) is not activated.
    Could you help me with this issue?

    Hi Adarsh
    In the Best Practices CD, there are a Folder named DOCU in this folder exists an Add-on Installation Guide.
    Overview of the installation
    1) You need to install the Best Practices Installation Assistant, this add-on is in 600\BPINSTAS\DATA folder
    2) You need to install the Best Practices Add-On, this add-on is in 600\ERP\DATA
    3) Follow the installation guide based in your country, for example for me, I followed the word file name BL_Quick_Guide_EN_MX.doc, this file is in the folder 50085672\BL_Mexico\documentation
    Regards

  • Looking for best practice / installation guide for grid agent for RAC

    I am looking for best practice / installation guide for grid agent for RAC, running on windows server.
    Thanks.

    Please refer :
    MOS note Id : [ID 378037.1] -- How To Install Oracle 10g Grid Agent On RAC
    http://repettas.wordpress.com/2007/10/21/how-to-install-oracle-10g-grid-agent-on-rac/
    Regards
    Rajesh

  • How to use best practices installation tool?

    Hello!
    can anyone share me some useful links/doc which can guide me how to use best practices installation tool (/SMB/BBI) ?
    any responses will be awarded,
    Regards,
    Samson

    hi,
    will you please share the same ?
    thanks in advance

  • ECATT: SAP's Best Practice For eCATT

    Hello All,
    If multiple projects are handled on same server, then the master data keep on changing due to which the screen sequences of transactions may change and hence causing the failure of earlier automated eCATT scripts.
    What is the best practice recommended by SAP for such situation both in long term as well as short term considering project deadlines?
    Thanks & Regards.

    Hi SAP Developer,
    as far as I know there are no best practice guides for that from SAP.
    But from common experience in automating testing one can propose:
    For long term:
    - organize your processes to be tested aligned as a number of szenarios; do a test case design also incorporating test data to be used; on that base derive (master) data that can be used in common by all szenarios; all other data should be used from single szenarios exclusively;
    - use scripts also for creation of (master) data;
    - try to use internal number assignment or create numbers in your eCATT script, so that every process run uses new new data accroding it's needs
    - try to check customizing using CHETAB or BC Sets, stop the process if important settings are not there
    The target of all this is to ensure, that neither customizing nor master data properties can raise different screen sequences.
    Another option is to make your scripts more flexible regarding 'small' sequence changes like upcomming popups etc. when using SAPGUI command. This can be achieved by setting the 'Active' option of 'ProcessedScreen' elements.
    If you use 'O' like optional, eCATT will only process the ProcessedScreen branch if the programm and dynpro number are matching the screen currently shown by SAP Gui.
    Hope I could help a bit.
    Best regards
    Jens

  • SAP to Non-SAP Integration best Practices

    Hi Folks,
    Recently I demonstrated to few of my managers the integration of our SAP ISU with a 3rd Party MDUS System via SAP PI. A question which was repeatedly asked is 'Why SAP PI'? Isn't there any other way to do it? They did mention BAPIs and doing things directly in ABAP but I couldn't really answer as to how weigh one on the other in this particular scenario.
    I do know that there are standard ES Bundles for achieving integration with 3rd Party Systems via SAP PI, We can do the interface and message mappings but
    is it possible to achieve this integration with the 3rd Party MDUS System without using PI?
    3rd party MDUS can only integrate via its web Services so how would they get called?
    Whats the trade-off in case of Performance, Development Cost?
    I am looking for best practices, recommendations, trade-offs and possibilities. Your input is very much appreciated.
    Regards,
    Adil Khalil

    Hi Adil,
    The below blog might be useful
    Consuming Services with ABAP
    regards,
    Harish

  • SAP Best practice Installation for IS-H

    Hi ,
       We are implementing SAP IS-H module for one of the client.We configured SAP Best Practice for Beseline package US with EHP 5 with V1.605 version.Now we are trying to configure SAP Best practice for Industry specific package for Health Care (IS-H).But in service market we got the best practice for IS-H with latest version of EHP 3 with version V1.603.I am not sure whether we can install successfully  BP for ISH with verison V1.603 in a system which already has SAP BP with baseline package verison V1.605.Please clarify the same.
    Thanks,
    Vigneswaran S

    Need your inputs experts.
    Thanks,
    Lasya.

  • SAP Adapter Best Practice Question for Deployment to Clustered Environment

    I have a best practices question on the iway Adapters around deployment into a clustered environment.
    According to the documentation, you are supposed to run the installer on both nodes in the cluster but configure on just the first node. See below:
    Install Oracle Application Adapters 11g Release 1 (11.1.1.3.0) on both machines.
    Configure a J2CA configuration as a database repository on the first machine.
    Perform the required changes to the ra.xml and weblogic-ra.xml files before deployment.
    This makes sense to me because once you deploy the adapter rar in the next step it the appropriate rar will get staged and deployed on both nodes in the cluster.
    What is the best practice for the 3rdParty adapter directory on the second node? The installer lays it down with the adapter rar and all. Since we only configure the adapter on node 1, the directory on node 2 will remain with the default installation files/values not the configured ones. Is it best practice to copy node 1's 3rdParty directory to node 2 once configured? If we leave node 2 with the default files/values, I suspect this will lead to confusion to someone later on who is troubleshooting because it will appear it was never configured correctly.
    What do folks typically do in this situation? Obviously everything works to leave it as is, but it seems strange to have the two nodes differ.

    What is the version of operating system. If you are any OS version lower than Windows 2012 then you need to add one more voter for quorum.
    Balmukund Lakhani
    Please mark solved if I've answered your question, vote for it as helpful to help other users find a solution quicker
    This posting is provided "AS IS" with no warranties, and confers no rights.
    My Blog |
    Team Blog | @Twitter
    | Facebook
    Author: SQL Server 2012 AlwaysOn -
    Paperback, Kindle

  • SAP Adapter Best Practice Question for Migration of Channels

    I have a best practice question on the SAP adapter when migrating an OSB project from one environment (DEV) to another (QA).
    If my project includes an adapter channel that (e.g., Inbound SAP Proxy listening on a channel), how do I migrate that project to another environment if the channel in the target environment is different.
    I tried using the search and replace mechanism in the sbconsole, but it doesn't find the channel name in the jca and wsdl files.
    What is the recommended way to migrate from one environment to the other when the channel name changes?

    I have a best practice question on the SAP adapter when migrating an OSB project from one environment (DEV) to another (QA).
    If my project includes an adapter channel that (e.g., Inbound SAP Proxy listening on a channel), how do I migrate that project to another environment if the channel in the target environment is different.
    I tried using the search and replace mechanism in the sbconsole, but it doesn't find the channel name in the jca and wsdl files.
    What is the recommended way to migrate from one environment to the other when the channel name changes?

  • SAP JDK - Best Practice

    Hello Experts,
    We are in process of upgrading our JDK from 17 to 22. We are wondering about the best practice. We checked SAP note 718901 and 731269.
    After checking this note, we are wondering about best practice. How JDK should be installed?
    We are using Windows 2003 with Oracle 10.2.0.2.  When you install JDK it goes by default to C:\j2sdk1.4.2_17-x64. If we upgrade to 22, it creates new folder c:\j2sdk1.4.2_22-x64 and we need to reconfigure JAVA path and JAVA_HOME all places i.e. SDM, Config Tool and Visual Admin.
    We are wondering if we install JDK to C:\JDK and during upgrade if we provide that path, we shouldn't have to change JAVA_HOME in all places.
    Is it possible?
    We tried making changes as per note 718901 with option 1 but it doesn't change in all places in config tool for JAVA_HOME. As per note 731269 both the JDK should be available for startup to sync file system and database. We are kind of confused.
    Thanks in advance.
    Thanks,
    Miral.

    Hi Miral,
    >
    > We are wondering if we install JDK to C:\JDK and during upgrade if we provide that path, we shouldn't have to change JAVA_HOME in all places.
    >
    > Is it possible?
    >
    This is not possible.
    > We tried making changes as per note 718901 with option 1 but it doesn't change in all places in config tool for JAVA_HOME. As per note 731269 both the JDK should be available for startup to sync file system and database. We are kind of confused.
    >
    First you have to change in instance profile and in environment variable. Then change in startup batch file of visual admin, config tool and SDM.
    Thanks
    Sunny

  • SAP Best Practices Installation (Baseline Package US 1.604)

    Hi All,
    I need to setup a 4 system landscape of SAP ECC 6.0 EHP4 with the SAP Baseline Package
    (Best Practices for Country US - V1.604). Landscape is as below:
    Sandbox - (1 client) - Configuration Sandbox
    Development - (2 clients) - Config. Master and Development
    Quality - (4 Clients) - Quality Assurance, Integration Testing, Training and Pre-Production
    Production - (1 Client) - Production Client
    Can you please assist with the below queries:
    1. Do I need to Install/Activate Best Practices software / building blocks for each client of every system?
    2. Can I Install and activate best practices for 1 client of Sandbox system and then perform the client copies to development to quality to production? Will this work?
    Appreciate your help.
    Thanks.
    Best regards,
    Kaushik Sethna

    Hi,
    > 1. Do I need to Install/Activate Best Practices software / building blocks for each client of every system?
    No, you need to need to activate in all clients. Just activate this in one client and create another clietns with copy from this client.
    > 2. Can I Install and activate best practices for 1 client of Sandbox system and then perform the client copies to development to >quality to production? Will this work?
    >
    Don't copy development client in production client. You should activate it manually in production system. I will recommend same to you for quality system as well.
    Thanks
    Sunny

Maybe you are looking for

  • Dispalying different field at SMART FORM report

    hi, i have created a code for displaying GRTXT i-e(Reason for Movement) in smart from from table T157E.This is the code: SELECT SINGLE GRTXT FROM T157E   INTO GV_GRTXT   WHERE GRUND eq '1'   or    grund eq '2'   or    grund eq '3'   AND   SPRAS eq 'E

  • AHHH! Auditing doesn't work!

    Hello everyone, I am trying to audit my users access. For example, i entered this command: audit select table by access; And it said it was successul. So i go and do some selects in a users account. I then do this: select username, timestamp, obj_nam

  • IPhone will not connect to home WiFi

    new iPhone 4 6.0 will not connect to home wifi--other apple products (iPad & other iPhone 4) will connect to home WiFi--I experienced this problem with first iPhone 4 received 11/13--got new phone 11/26 and STILL can not connect

  • Syncing to ms outlook &  ms calendar

    before i buy an iphone can someone tell me if the iphone will sync to ms outlook & ms calendar? thanks

  • FI-GL New Implementation

    Hi BI Guru's I have been assigned to FI_GL New project and I am looking in to 0FI_GL_4(Line Items) and 0FI_GL_10 (Totals). Can anyone help me in what are extractors, Function Modules and how to customize the above Datasources. Thanks, Ravi