Hi Amit,
About Work Center : Work Center is a person, a group of persons, a machine or a group of machines.
Just understand the above lines. this is the basic defination of work center independent from any PP or PM work center.
Now, if work center is created to perform Maintenance tasks with * work center category 0005 * those work centers are called maintenance work centers.
( Generally persons or group of persons are created as work center in PM)
If work center is created to perform Production tasks with * work center category 0002 * those work centers are called PP work centers.
(Generally Machines or group of machines are created as work centers in PP)
In Plant maintenance, work centers can be defined in Hierarchy i.e. work center heirarchy is possible.
take an example: you have created a work center with a group of people. you need to define who would be person responsible for this group & also you can define the persons heirarchy with the integration of HR.( e.g. Manager-Senior Engineer- Engineer-Associate Engineer- Senior Fitter- Fitter)
The difference in one word is : Both are work centers but having different category & being used to perform different kind of tasks.
For the trasaction : i would only like to say that while creating from PM nodes by t-code IR01, system give you default work center category 0005.
I hope i am able to solve ur query for some extent.
Thanks,
PMGURU

Similar Messages

  • PM Order - Change "Work Center" on operations to "Main Work Center"

    Hi Experts,
    We have prepared a tool for client, which create Maintenance Plan and order in the background.
    The order created is having "Main Work Center" defined at header and "Work Center" at the operations level. In the current scenario the "Main Work Center" and "Work Center" are different say 'ABC' & u2018XYZu2019.
    Client has the requirement that work center maintained at operations should be same as the main work center.
    We need to implement the solution to take care of work center to be same as main work center while creation of the order in the background.
    Has anyone worked on the similar requirement before?
    I checked for existing USER EXITS for IW31/32/33 and found only one IWO10012. This doesnu2019t seem to be much useful.
    Please suggest any possible solution.
    Thanks,
    Ankur Sharma

    Hi Tilak,
    Thanks for the response. The current situation is that we are creating the order in background using the Z-program. The scenario is creating order with operation entries having work center not equal to the main work center.
    I am not functional, so just talking in terms of technical terms.
    Is there a way the work center at operation level can be changed to main work center in background?
    Thanks,
    Ankur Sharma

  • PM Order - Change operations Work Center to Main Work Center

    Hi Experts,
    We have prepared a tool for client, which create Maintenance Plan and order in the background.
    The order created is having "Main Work Center" defined at header and "Work Center" at the operations level. In the current scenario the "Main Work Center" and "Work Center" are different say 'ABC' & u2018XYZu2019.
    Client has the requirement that work center maintained at operations should be same as the main work center.
    We need to implement the solution to take care of work center to be same as main work center while creation of the order in the background.
    Has anyone worked on the similar requirement before?
    I checked for existing USER EXITS for IW31/32/33 and found only one IWO10012. This doesnu2019t seem to be much useful.
    Please suggest any possible solution.
    Thanks,
    Ankur Sharma

    Hi,
         The work Center entered by default comes in operation work center, u can do validations while saving the Order :-using user exit : IWO10009 PM Order: Customer Check for 'Save' Event.
    regards
    pushpa

  • Table Link for EQUNR (Eqpt Number) and GEWRK (Main Work Center)

    Hello,
    I need to fetch the main work center from equipment master. I need a direct table link between the equipment number and mainwork center. We are getting a link of equipment number (EQUNR) to work center (ARBPL) and a link of work center (ARBPL) to main work center (GEWRK). But the problem with this scenario is - main work center is not getting fetched from equipment master once work center is missing.
    We want a direct link through some table between EQUNR and GEWRK.
    Puneet

    Hi Puneet,
    Appreciate your problem !
    Many a times in such a situation (which I presume exists where no direct link is available between fields); we have 2 clear cut approaches -
    Approach 1:
    Develop a SAP Query, Functional Area/Infoset, and User Group ( using T code :SQ03,SQ02,SQ01 respectively )
    While developing Functional Area feed in these 2 tables (Table 1- equipment number (EQUNR) & work center (ARBPL) and Table 2 - work center (ARBPL) to main work center (GEWRK) with  work center (ARBPL) as the Primary Key- bridge to join these 2 tables.
    In SAP Query Development; you may take Plant as the Selection Field or any other field as per business requirement to make a search in the query.
    Now when you execute this query, you will get a complete Download of (EQUNR),work center (ARBPL)  and main work center (GEWRK) in one table.
    For SAP Query, you may also approach your ABAP Team Member. This is a cleaner approach than the other one.
    Approach 2:
    Take SE16 download of the Table 1 and Table 2 and join them in Excel (using vlookup if required).This approach is however limited to the data volume that you have to process.
    Please let me know, if you get stuck !
    Thanks,
    RAVI.

  • Where can i find Main work center field value in il03 transaction ??

    Hi experts,
    Where can i find <b>Main work center</b> field value in il03 transaction.
    Iam looking for the table from where that value will be filled.
    thanks
    Suresh

    Hi anji reddy,
    No that filed is not avaiable in that . can please tell some other soulution ...
    ASAP...
    thanks,
    Suresh

  • BAPI_FUNCLOC_CREATE : Main work center and plant associated

    Hi,
      I'm trying to create Functional locations using BAPI BAPI_FUNCLOC_CREATE. I got almost all the fields except 'MAIN WORK CENTER' and 'PLANT  Associated with main work center'. Please advise me the relevant fields in the importing parameters of this BAPI so that I can upload the same.
    Thanks:
    Gaurav

    Hi,
      Thanks for your response. Actually after doing further R&D, I saw that work_ctr requires the object key of the work center. I fetched the OBJECTKEY from CRHD & passed. It automatically updated both work center & plant associated.
        Awarding you points for your help.
    Thanks buddy!!!

  • Replace Main work center for maintenance order

    hello
    I have to change the work center maintenance orders to 1000.
    Is there a standard transaction to make this change in mass?
    or I'll have to create a LSMW?
    thanks
    Paulo Picarra

    Hi Paulo
    though you have closed this thread I would like to tell you that In standard T- code IW38 there is a carry out mass change option available through which you can change many data including Main Work center. Pl check the following steps
    Select the orders through IW38 & click on order (at the top menu) & select carry out mass change (or CTRL+F11)
    you will get a popup screen for selection of fields to be changed.
    Pl check & give feedback
    Regards
    Shakti

  • Download notifications based on main work center and edit based on task level person responsible

    Hi Experts,
                   My requirement is to download notifications based on main work center.The downloaded notifications contains task level person responsible.If the notification contains four task assigned to different persons.Let suppose one task is assigned to the mobile user and other three task to another user.Now the first mobile user should able to edit the task  assigned to him ,but he should able to see all other task in disable mode that are assigned to other user.Iam using agentry work manager 5.3
    Please help me to achieve this requirement as soon as possible.Thanks in advance.
    Thanks & Regards,
    Sravanthi Polu
    Tags edited by: Michael Appleby

    Please refer my earlier posting for Work Order related requirement similar logic can be extended even to your Notification requirement.
    Also refer.
    Work Order and Notification Assignment Types Supported In Work Manager 5.3
    Thanks
    Manju

  • How to change the main work center and  work center of each operation when generating work order by maintenance plan

    Dear experts,
    I face a problem that system get main work center from equipment master data as a default main work center in maintenance plan when creating maintenance plan. however, if main work center in equipment is changed later, the change will not synchronize to related maintenance plan. if work order is generated from maintenance plan, main work order in order is defaulted from maintenance plan instead of updated work center in equipment.
    another problem is that, for those orders generated by maintenance plan, the work centers in  operations is defaulted from task list in maintenance plan. in most case, work center in task list is dummy. Actually the work is done by work center in equipment master data.
    My expectation is how to auto replace the main work center and work center of operations in work order with the one in equipment master data if order is generated by maintenance plan? is there any standard configuration or enhancement/BADi that can help with this requirement?
    thanks!
    Wesley

    Wesley,
    Sorry - development is the only way.
    Another option is to create a batch program that runs before your IP30 run(s) and updates any maintenance items and task lists with the correct work centres.
    PeteA

  • Main work center  for notification

    which table stores main work centers  for service notifications stored and how do i link work center table with notification table

    Hi,
    <b>CRHD  - Work Center Header
        QMEL  - Quality Notification   [/b
    U can link this 2 table with the field QMEL-ARBPL = CRHD-ARBPL
    Reward Points if it is Useful.
    Thanks,
    Manjunath MS

  • Automatic assignment of Main Work Center in WO's

    Hi gurus,
    We massively uploaded PM plans and launched the WO's.
    Per default the system assigned the Work Center at Equipment level. Any idea how to change this setting?
    Thanks,
    VL

    Hi VL,
    In ECC 6.0 tcode IW38. execute tcode as per your required input parameter and get out put.
    For output at top go to Order>>>>Mass Change.
    There you will get option to change maintenance work center for all order.

  • IW51-52 - Updating fields Main work center and Maintenance plant

    Hello Experts.
    I Have a task which includes recieving a file and using the data to create new notifications. I need to update the fields above (Data elements GEWRK & SWERK ) but i can't find the right BAPI or Function which will do this work for me.
    Thanks for your help.
    Motty Gal.

    Hi,
      Thanks for your response. Actually after doing further R&D, I saw that work_ctr requires the object key of the work center. I fetched the OBJECTKEY from CRHD & passed. It automatically updated both work center & plant associated.
        Awarding you points for your help.
    Thanks buddy!!!

  • Plant change for main work center

    Dear all,
    Can i change the Plant of work center

    Hi Shahanawaz,
    Alternative way to over come this problem is you can put deletion flag to current W/C , Before that pls check exixting order related to that W/C and check Task list too.
    To mass change for orders use T code CA85.
    After that U need to create new W/C for diffrenet plant.
    Hope this will help you.
    Riyaj

  • Work center decision

    Dear all,
    Ex- Reactor is main work center main  , under this we r having different type of reactors like R1,R2, R3
    my client want to maintain main rector(work center) in master recipt, and they  will take a perticular work center decision at time of creation of process order. means they will change work center reactor to R1 or R2 as per avaibility of machin
    I suggested, Initially sytem copy  std. master recipt in process order , then u will make a changes of  work center at process order lavel as per you requirement.
    Is it ok suggetion ? or do u have any different idea?
    Kindly let me know
    thx

    Dear,
    There is one more way to incorporate such requirement.
    Create additional master recipes which includes different work center.Then create different production version to incorporate that different master recipe and work centers.
    Now at the time of production release or creation do the selection of required production version as per the work center availability.
    Regards,
    Dhaval

  • User exit/Badi for changing operation work center based on service product

    Hi,
    I have an requirement to change the operation work center based on the service product in IW31/IW32 transaction. I am using the BAdi 'IM_SM_BADI_READT399A' for changing the main work center. It changes all the operation work centers except the first one. But I need to change it all the operations.
    Thanks in Advance.

    I am using the enhancement spot 'IWO1_TL_INTEGRATION2' for changing the first operation work center

Maybe you are looking for

  • Flow Activity Exception Handling Problem

    Hi, I am using Flow Activity in my Bpel Process, i am getting some exception in one of flow, but other flows are working fine. Even i have included Catch block for other flow still i am getting fault response. Please suggest me how to do exception ha

  • Item info gets blanked while creating RFx response

    Hi, I am facing a strange issue while creating the RFx response (SRM 7.0). when I try to create a Bid, the item info (required quantity and Unit) gets blanked and this fields are blocked. Did any one faced any similar issue. Any possible solutions. R

  • How do I alter a sequence in a procedure

    I need to alter sequences in a procedure. I have done this before on an Oracle 8 database using: EXECUTE IMMEDIATE ('ALTER SEQUENCE OFFICIAL_ID_SEQ INCREMENT BY ' ||( v_official_id_high - v_official_id_current)); How do I do this on an Oracle 7 datab

  • Flv file not streaming on my website

    Here is my question: I have design my flash website (www.indypendencyfilms.com) with Flash and I want to add some videos to my portfolio section. I thought it would be pretty straight forward, but it isn't. That's what I've done so far (and it isn't

  • Remote Span NX-OS

    Hi, I need to configure RSPAN between 2 nexus 7000 but i do not understand how to do it on catalyst you configure destination remote vlan but on nexus that options is not available. Could anybody show me with an example please? Best regards. Thanks i