Maintaining a costing version in a costing variant

Hi,
I am creating a costing variant for standard mat. estimation. I have to maintain a costing version.
I don't know how to set all the parameters in costing version in OKYD. Will I have to set variant for transfer price, exchange rate and quantity structure?
Why do all these parameters show under and not beside the name of the element in the Assignment Tab of costing variant.
Best wishes,
karol

Hi karol
For standard costing purpose - costing version 01 is defualt version offered by SAP. 
With costing version u can create different / various cost estimates created for SFG or FG material
You need to enter version 01 in customizing control paramters for costing variant - viz, in valuation variant, costing type etc
The need to create diff costing versions depend on the requirements. 
Ex. Exchange rate is determined thru valuation variant, If you wish to have diff  exchange rate for costing - u can enter diff rate and define it in diff costing version
So, when u do costing for a material with two version u will have diff costs
Version 1   -  say 100 USD
Version 2   - Say 120 USD with diff exchange rate defined
Again in most of the implementations we dont come across using diff versions.  These are considered only when base version costing is stabilized and controls are put in place for entire product cost cycle
System offers quite a lot of options, but everything cannot be chosen at a time to evaluate.  My suggestion would be stabilize with the base and then look for these options.
Hope the above clarifies - Pls assign points as a way to say thanks

Similar Messages

  • Actual costs posted to work order without maintaining costing variant

    hi,
    i havent maintained costing variant for work order(maintenance order) type i used to create the work order. so when i posted goods issue, how does the actual costs get posted with out maintaining the costing variant for work order type. what is the role of costing variant configuration in work order type settings.
    thanks,
    monica

    Hi monica,
    Costing variant forms the link between the application and Customizing, since all cost estimates are carried out and saved with reference to a costing variant. The costing variant contains all the control parameters for costing.
    The configuration parameters are maintained for costing type, valuation variants, date control, and quantity structure control.In costing type we specify which field in the material master must the price be updated,
    In valuation variant we specify in what order the system should go about accessing prices for the material master planned price, standard price, moving average price etc. Further which is the price which should be considered for activity price. How the system should select BOM and routing.
    assign points if useful
    Regards
    Genie

  • Costing variant and production version

    We have two costing variants "C" (used to create current cost estimates) and "F" (Used to create Future cost estimate). All of the production versions in the system have a validity date of 9999. Is there a way to tell the system to use one production version when costing using Variant C and another version when costing is done using variant F.
    Or if that is not possibel than how do we use one production version in 2011 while recosting current standards and another production version in 2012. (Remember the production version that we are using currently in 2011 has a validity date of 9999)
    Regards

    Hi
    In your Costing Variant - You have a tab callled "Qty Structure Control".... Here you can specify BOM Determination and Routing Selection id.... i.e. If the BOM / Routing attached to the prod version can be assigned a specific BOM Determination Class and Routing Selection id, it can work
    OR ELSE
    While doing CK11N, you can manually specify the Prod Version in the "Qty Struct" Tab..... Create an LSMW for CK11N and you can do a mass costing like CK40N.... CK40N does not have this option of specifying Prod Version
    I would prefer 2nd option
    Br, Ajay M

  • Mixed Costing on two different Costing Variants at the same time.

    Dear All,
    I have already configured mixed costing on my Costing variant PPC1, now i need to configure the same on another costing variant ZPSM, i have done all the setting for Costing type, Valuation variant and costing versions for mixed costing for the later costing variant, and maintained the mixing ratios for the product, but the system is not taking into account the mixed costing for the later variant.
    Can anybody help me out on this? or is it not possible to do mixed costing for two costing variants at the same time?
    Regards
    Rashid

    I have done it ...hehehhehehe.

  • Costing Variant authorization Error

    Dear Experts,
    While creating Sale Order (MTO scenario) system is throwing a error "No authorization for Costing Variant XXXX in Company
    Code XXXX. understand that system will calculate Sale Order Costing in this scenario. So, user should have Costing Variant authorization in his user profile.
    Basically SD related users doesn't have authorization for Product Costing Objects.
    And Basis guy has maintained the authrn by costing variants object level not by the T- Codes level.
    How can I allow SD Users to Costing Variant authorizations?
    is this the correct way?
    Please help me.......
    Regards,
    Balaji Bhonsle.

    Dear Ajay,
    Firstly thanks for your help.
    Is this possible to give t-code authorization by without giving costing variant authorization?
    Because Client is not ready to give entire costing variant authorization.
    I strongly hope that, it doesn't work any t.code autr without CV Authn related to PC Object :K_KEKO.
    Is there any possibility to do this t code autrn.
    Regards,
    Balaji Bhonsle.

  • Can we use two costing variants for standards cost estimate release.

    Hi,
    We have 2 plants (plant 5100 and plant 5200) under company code 5000.
    We have run standard cost estimate(CK11N) for material 98001000027 at plant 5100 using costing variant ZG01 and at plant 5200 using costing variant ZG02. First, we released  standard cost estimate (CK24) for this materia at plant 5100 and set (in marking allowance) costing variant ZG01 and costing version 01. Next time when we are trying to release the standard cost estimate for the same material for plant 5200, it is automatically picking ZG01 as costing variant in marking allowance and it is not allowing to change the costing variant to ZG02 saying Company code 5000: Release already carried out, cancellation not possible, Message no. CK797.
    Is it possible to use two different costing variants for release of standard cost estimate for a material at two different plants at the same company code? If so how?
    Please suggest.
    Thanks,
    Bijay

    Hi,
    Thanks for your reply again.
    What is the benefit of assigning "Single Valuation Variant same to different Plants" ? In costing variant also we can assign maximum only one valuation variant and this valuation variant will default for all the plants, and hence I dont think it is necessary to assign same valuation variant to different plants.
    My  issue is :
    Example: ( Standard Cost Estimate for material 98001000027)
    Plant - 1
    Material Cost                                             Rs.100
    Labour Cost                                               Rs.50
    Overheads (10% of Labour Cost)                  Rs.5
    (say ,through costing sheet - 1)
    Total Standard Cost Estimate                      Rs.155
    Plant - 2
    Material Cost                                             Rs.150
    Labour Cost                                               Rs.100
    Overheads (20% of Labour Cost)                  Rs.20
    (say, through costing sheet - 2)
    Total Standard Cost Estimate                      Rs.270
    Now, Please explain why we cannot have two Standard Cost Estimates for a material at two different plants? If it is possible to have two standard cost estimates for a material at two different plants, how to take care of  overheads (rate of which varies) at two different plants (plant - 1 > 10% and plant- 2>20%) as we can assign maximum one costing sheet to a valuation variant variant?
    How to map the system so as to meet the above requirement?
    Thanks,
    Bijay

  • Benefits Cost Variant

    Hi gurus,
    I need to configure a Benefit Cost Variant base on the age of mother or father's employee, but i only can assign employee himself, spouse and domestic partner (subtypes 13, 14).
    What can i do? since I created mother and father as new subtypes for infotype 21.
    Any suggestions?
    Thanks a lot.
    Daniel

    Hi Daniel,
    Further to what Donnie has advised,
    Not sure, but this is what i can think of....
    1. Please check the Node "Define Cost Groupings" under the Define Employee Groupings Node.
    2. Maintain a Cost Grouping as "FAMA" and also the feature CSTV1.
    3. For the Plans; .......
    ............Health Plan ...While maintaining the node "Define Cost Variants"..Maintain a Cost Rule Variant as ESDP (Employee + Spouse + Domestic Partner)....and for the same maintain the Parameter Grouping with the created Cost Grouping "FAMA" and check the cost Grouping box.
    4. Maintain the cost rules & Assign health plan Attributes nodes.
    (Same logic can be applied to Insurance Plan, Misc. Plans)
    Hope this works !!!!!
    Good Luck !!!!!
    Kumarpal Jain.

  • Costing variant in OKKN

    We are implementing SAP best practices. While maintaining costing variant in OKKN I didn't find three fields which need to be entered. These are org level, cost element indicator and currency indicator.
    But when I checked in SE16 for table V_CK03 these fields are there i.e. ORGEB, KOAKNZ, WAEKNZ.
    Could someone tell me why these are not available for maintanance in OKKN.

    When creating a new Costing Variant you might want use the settings that exist in one of the delivered Costing Variants and change just the pieces that you need to change in order to achieve the results that you're looking for.  For instance, you may wish to use a different Date Control from the setting that is delivered with PPC1 (Std Cost Est - Month).  To do so, you would click on the Date Control item found on the 'Control' tab.  The options are then presented to you and you can choose the settings that you would like to use (i.e., in 'Costing Date From' you could change the setting from 'Start of Next Month' to  'Current Date'--you would only make this change, of course, if you wished the current date to default into the 'Costing Date From' field when you create Cost Estimates in CK11N.  Without making the change the first day of the next month will default into the 'Costing Date From' field).

  • Costing Variant not visible in CK24 for my plant.

    Hello Experts,
    Using transaction OKKN, I have created a new costing variant ZPC1 to take the place of PPC1 for updating standard cost in the material master.  I basically copied most of the parameters ( including the Costing Type) from PPC1 but changed to a different Valuation Variant.  Running CK11n successfully generates a cost estimate without error (status KA) that meets our requirements. 
    The trouble is in transaction CK24.  I click the Marking allowance icon and I see both our actual plant, and the dummy preconfigured plant 0010.  For our actual plant, I also see the fields populated for Costing version 1 and Released check mark.  If I drill down on our plant, I get a pop-up for "Permitted std cost est variants", showing only PPC1.  However, if I drill down on the dummy plant 0010, I first get a search pop-up for "Permitted std cost est variants"  with an open field for "Costing Variant".  Drilling down further shows both PPC1 and ZPC1.
    I think maybe a "Costing Version" has been defined for our actual plant, and that is pre-selecting PPC1 and preventing me from using ZPC1, but when I search in config (transaction OKYD), I see nothing defined.
    Any help would be greatly appreciated.

    My problem has been solved.  There was actually nothing wrong with the configuration.
    The problem was that the Marking Allowance had already been activated for costing variant PPC1 in period 11/2009.  This was visible from the marking allowance screen by the population of the fields Costing Version 01 and the check mark in the field Releaded.
    Now that we have moved on to period 12/2009, the Costing Version is blank and I see both Costing Variants available.  When I select a variant to allow marking, the Costing Version gets populated.  After running CK11N again to create a cost estimate for period 12, I was then able to Mark and Release my new estimate and verify that the new Standard Price updated in the Material Master.
    Thanks for your help, and I hope this record may be of value to others.

  • Product Costing - Two Costing Variants - Mark and Release In Same Company Code Same Period

    Hi All,
    We are currently handling a CO-PC project where client has requirement to use two different costing variants in the same period in the same company code. SAP standard does not allow use of two costing variants in the same period for the same company. We can have only One Costing Variant per Co Code for Marking / Releasing Standard Price. 
    There are some materials in Plant 1 or Plant 2 for which cost estimates using costing variant ABC1 calculated and than prices are marked and released (CK24), now same materials are received in Plant3 where mixed costing is used and thus need to have cost estimates from second costing variant ABC3 (second costing variant) marked and released. Object is to have ABC3 cost estimates in material master standard price field, but SAP does not allow to mark and release for second costing variant in the same period for same co code as ABC1 variant already ran for plant1 or Plant2 under same company code,therefore, business is not able update ABC3 prices in Standard price of the material master. 
    Purpose of this second costing variant mark and release run is that for some materials business would like to implement costing at Plant3 level also, where they get same materials from different production sites (Plants). At Plant3 level, business is using mixed costing where the standard price is a weighted Average standard price, taking the different production sites standard cost into consideration in combination of the volume split between those production sites.
    Did any one worked on this kind of requirement? Is there any SAP standard way to handle? Or this will need some ABAP enhancement?
    Kindly advise.

    Hi Atul
    1. You dont need separate Valuation Variant in Plant 3
    2. Use Costing Variant ABC1 and ensure that it has the needed Valuation Strategies in Valuation Variant
    Allow Complete Transfer in the Transfer Control i.e. Cross Plant Transfer in it
    3. Assign the Qty Str Type you have used in ABC3, to ABC1.. i.e. In the Costing Version, assign the Qty Str Type to the Costing Type and Valuation Variant from ABC1
    After this, do CK11N and CK24 for Plant 1
    Then do CK11N and CK24 for Plant 3, using ABC1.. You dont need to change anythiing before doing CK11N for Plant 3
    To make it simple, you can use any one of ABC1 or ABC3 in both the plants.. You only need to ensure that Valuation Variant, TRansfer Control are set up as desired
    Br. Ajay M

  • CK11N Costing variant Repetitive Manufacturing

    Hi ,
    T code : OKKN   we are able to find the Costing variant - PREM -Repetitive Manufacturing Version.
    While costing the productin in CK11N , Costing Variant does not display PREM.
    Could you pls suggest how to find.
    Regards

    If you go to OKKN, you will see that PREM is confiured as a Prem Cost Element.
    Ck11N, looks at planned values for product Costing, therefore this cannot be used.
    You cant use PREM, even if you were to copy it, you cant change the field.
    If you copy a standard one, then it will appear in CK11N, i.e. PPC1, however if you copy PREM it will still not appear.
    it appears to be down to the Valuation Variant, and it seems that 19 is not a recognised value for CK11N.
    Message was edited by:
            Mark Chalfen

  • CK40N Interchanging Costing Variant

    Hello All,
    Can I use two different costing variants to create cost estimates for different set of materials for one company code and costing version?
    Here is an hypothetical example:
    Costing Variants: A & B
    Company code: AB12
    Materials: M1 and M2
    Costing Version: 01
    For Comp. code AB12 can I first use costing variant A to mark and release cost estimate of M1 and than use costing variant B to mark and release Cost estimate of M2 in the same period.
    Our system dosent let us do that. Once I release cost estimate for one costing variant the system dosent let us release it for the other one in the same period. A big red X sign shows up in authorization column for marking.
    Any help will be highly appreciated

    Kim,
    In selecting Parameters we select a different set of materials, the problem is a big red X appears in Authorization column while we try to Mark the cost estimate. In other words The system lets us mark and release for only one costing variant for a company code. We cant use any other costing variant for the materials in different plants that we have.
    In any case I appreciate your participation. Let me know if you know of something that could be done to fix it.
    Regards,
    Nasir Hameed

  • Creation of a new costing variant to cost production orders

    Hi all,
    Currently the business is only able to cost a vehicleu2019s production order at the standard cost value which is determined at the start of the year.
    During the year a number of the purchasing values will be updated with a new contract price, this increase will not be reflected in the standard cost until the end of the year.
    The business would like a new costing variant which will cost an already created vehicle in SAP by its production order at the u201CCurrent Costu201D (current purchasing info record value).
    It will need to be calculated in the following way:
    u2022Purchased material - at purchase cost from info record (see below for applicable exchange rate).
    u2022Manufactured material - child material to be at purchase cost (from info record). Routing cost (labour\overhead, etc) at current criteria.
    u2022No allowance for CPI.               [WHAT_ DOES_CPI_MEAN_?]
    u2022Exchange rate: ideally, fields are provided to input exchange rate. If this is not possible then apply current monthu2019s exchange;
    u2022FRAu2019s - current rate from the info record.
    u2022Summary of total material cost by origin code with ability to drill down to line level.
    u2022The output of the report will need to be similar to the layout of a production order but with only the current value displayed.
    We have some problems to understand this request: we don't know the transaction which is used by the users to costificate a production order and what does it mean "CPI". We are not sure on the feasibility of the costing variant requested because it must consider both actual costs and standard costs.
    It should costificate in this way:
    (Actual Cost of Row Material * Bom's standard qty) + (Standard price * Standard production time (in the routings).
    Could you help us?
    Many thanks to all of you, best regards.
    Alanis

    You can create a new costing variant with  a valuation variant that points to inforecords for material prices. Go to OKKN t-code and create the required configuration and start using the new costing variant to measure the current cost of making vehicles.

  • Contents of new costing variant, valuation variant and costing sheet not getting transported

    In our development client,I have created a new costing variant, a new valuation variant and a new costing sheet in separate transports.
    When I release the transports to move into the Test client, the contents of the configuration are not getting transported at all.
    I tried to do them again manually using  Table view - Transport , but again, if I view the transports in SE10,they don't show the table contents, etc.
    Any help on this will be highly appreciated.

    Ajay,
    Let me make sure I understand.
    Create a new TR using SE01
    Go to transaction OKKN (costing variant)
    Select the costing variant and then choose Table view - transport
    Provide the transport number
    At what point to I say 'include in request'
    If I try to use the menu option Edit-Transport-Include in request in the beginning itself, the 'Include in request' is greyed out.
    This is where I'm stuck

  • Costing Variant & Prod Cost Collector

    I am in the scenario of period costing with a product collector.  Please guide me on the following:
    While configuring for costing/valuation variant, I find that we create a costing / valuation variant under 'Material cost estimate with Qty structure' and also under Cost object controlling - Product Cost Collector, 'Check costing variant for Product Cost Collector' & 'Check valuation variant for Product Cost collector'.
    Do need to configure a costing variant and valuation variant under these paths, viz. under Standard Cost estimate with Qty Structure & also Product Cost collector ?
    Please give your comments ASAP

    closed

Maybe you are looking for

  • Faulting module name: cslibu-3-0.dll, version: 13.0.9.1312

    I developed a C# (Visual Studio) application in .NET Framework 4.0 in conjunction with SAP Crystal Reports Support Pack 9 msi The target platform on which reports creating problem is Windows 7 32-bit When I generate a report it is generating perfectl

  • CS2/CS3/CS4: Cannot get file path in Unicode of the current document on Windows

    Hi All, In my automation plugin I need to have full absolute path of the opened document with any possible non-English letters. Using SDK examples Listener and Getter that come with Photoshop SDK the full absolute path which I obtain is in the defaul

  • Sql query with multiple joins to same table

    I have to write a query for a client to display business officers' names and title along with the business name The table looks like this AcctNumber OfficerTitle OfficerName RecKey 90% of the businesses have exactly 4 officer records, although some h

  • How to Remove Web Dynpro ABAP - Starting Application white banner

    Hi everyone, When I call the Web Dynpro ABAP applicaion, it shows the Login screen, after proper authentication, it shows a SAP NetWeaver Web Dynpro ABAP white screen/banner stating "Starting Application... ", and after sometime it launches the Web D

  • Problems with artwork displaying in iTunes but not on iPod screen

    I have iTunes (7.6) and a 5th gen, 80GB, firmware 1.2.3 iPod. Not infrequently, I find that a song's artwork is visible in iTunes, but not on the iPod itself. Sometimes the artwork is displayed simply as a black rectangle on the iPod. The converse si