MAM Order - Two items having Booking Units with Different Company Code

MAM order created with 2 Line Items
Booking Unit in each Line Item belongs to different Company Code .( Internal Order within each Booking Unit has different Co. Code )
After billing individual Line Items ,Two separate Billing doc. will be created for this Order
Each Billing document should be posted to different Co. Code depending upon Co. Code in Internal Order of respective Booking Unit
TS - 9350801900

Dear Chandramohan ,
Thanks for the reply .
But the solution given by you will just change the message class .I wanted to post Two different Line Items within a single MAM Order to different Co Codes after billing . 
Scenario is that SOrg1 assigned to CCode1 & SOrg2 assigned to CCode2 .
       Booking Unit  BU1 has Internal Order belonging to CCode1 & BU2 has Internal Order belonging to CCode2
Now MAM Order1 created with SOrg1 having Two Line Items with BU1 & BU2
                After Billing ,Two Billing Docs will be created for each Line Item .
                 Both Billing Doc will be posted to CCode1
Now MAM Order2 created with SOrg2 having Two Line Items with BU1 & BU2
                After Billing ,Two Billing Docs will be created for each Line Item .
                 Both Billing Doc will be posted to CCode2
Means even if Two Line Items are created within a single MAM Order having BU of different Co Codes ,after billing both Billing Docs will be posted to Co Code of Sales Org at Header level .
As per the requirement ,irrespective of header Sales org , Line Items needs to be posted to respective Co Code of Booking Units .
Tds ,
TS

Similar Messages

  • Project stock exist in a plant and WBS but with different company code

    Hello,
    As I know I can not create a PO in company A, but was assigned to a WBS maintained in company code B. The system will check if the WBS getting the same company code with the PO, and pop up  the error message if the company code was differect.
    But seems the project stock could exists in a plant  but assign to  WBS was maintained with different company code. For example, A material stock was in plant A assigned to company code A, and it is also assigned to WBS belong to company code B.
    Any one know it is correct?
    Thanks!

    I knew crossing company code to assign WBS element to PO is not allowed since i got the error message, and I think it's reasonable, cause the expense from the project PO should post to the same company code through the WBS element.
    But why for  the inventory crossing company code is allowed?  The stock in plant A belong to company code A, was assigned to WBS element B belong to company code B. That means the inventory is in the GL balance of company A but under the profit center belong to company B.  How to understand it? I think it's wrong

  • EXTERNAL OPERATION in a production order with  different company code plant

    Hi,
    in my case i am having a production order with  4 operations.
      0010 milling
      0020 winding
      0030 cutting
      0040 milling
    among this opearion 0030 i want to do it in a plant which is assigned to different company code than mine.
    in this case whether i should proceed with PP01 Control key  with opearion plant as that plant which is lieing in diffent company code or
    i should specify  PP02 control key saying that plant as an external vendor for me and do PR  and PO for that service .
    which should i follow for my case and how cost gets updated .

    Hi,
          For different company code, u have to specify PP02 in the routing for external vendor. In PP02 control key indicator must be set in external opn.
    Before that create purchase info record.
    Enter subcontract info record in routing.
    after running MRP , convert the PR to PO.
    Send the material by MB1B by 541 mvt
    Receive the material by MIGO  by 101 mvt.
    Regards,
    Raja sd

  • How to prevent settlements from AE to wbs with different company code

    Hi gurus,
    i'm currently facing a problem regarding settlements from activity elements to wbs above.
    we have one controllign areas with various company codes.
    For some projects, we have wbs assigned to company code A and activity elements assigned to Company A and B.
    We have an automatic settlement rule generation so that we settle all activity element costs to wbs. But, for activity elements assigned to company B, we don't want to settle the costs, we want to go through a sd/mm invoicing between the two companies.
    How can we prevent the settlement to take place, apart from manually removing the settlement rule for each activity element?
    can we put a validation rule that check that whenever the company code in the wbs is different from the one in the activity element, then the settlement doesn't take place? or remove the automatic settlement rule generation and use cjb1 to generate settlement rules only when an activity element as the same company code as the wbs above. would it be possible?
    would the WBS_SETTLEMENT_RULE BADI or badi proj be of any help?
    Any help is welcome.
    regards
    tim
    Edited by: Tim Ursulet on Jan 22, 2009 5:29 PM

    Hi Tim,
    The transaction CJB1 or CJB2 creates the settlment rules for WBS only, therefore the transactions and Badi WBS_SETTLEMENT_RULE BADI are NOT relevant for the settlement rules of activity and elements at all.
    For the settlement rules of activity (and elements) the default rule is inserted, as soon as the user navigate to the settlemenent rule overview screen, if the activity do not have the settlement rule at that time. I am not sure, if there is BaDi or substituation to prevent the system apply this default rule in certain case. Other alternative is to specify the objects during settlement,  e.g. using selection variant with the company code.
    Kind regards,
    Zhenbo

  • Update book inventory with NEW company code assignment for the same site

    Hi gurus ,
    Our company have this business scenario:
    the site has run in Company Code A for several month with business of Material Management  function, then the site have to be changed to Company Code B for financial requirement .
    What we want is we change the CC assignment by OX18 for site master without changing the site number (creating a new site master ),except for the open purchasing or  sales document clearance , is there any way we can update the book inventory  with new profit center corresponding to the CC B ?
    Thanks in advance ,
    Ryan

    Actually we have made some discussion with SAP consultant about this requirement ,and they suggest the same thing ,but for many reasons ,we need to make it that way ,and we also made some test for this direct changing by OX18  for new CC assignment .
    All other questions are  under control now , for financial reason ,we need to update the book inventory to new CC assignment (new profit center after site-specific material master changed ) in some batch session or program ,any idea for this?

  • Creating Workflows for a Corporation with Different Company Codes

    Hi,
    We have just done a roll-out for Company A which is part of a big corporation (group of companies).
    The system version implemented  is ECC 6.0 with  modules (HR,MM,FI,DBM)
    I have implemented and rolled out  several workflows (Leave,PR,PO, Payment approval)for Company A and am now expected to do the same workflows for Company B,the business processes as per flowcharts remain the same as for Company A.
    Company A uses company code 1000, while company B will use company code 2000.
    Users in Company B will log in to the same PRD servers.
    Some approvers of workflow in company A will be responsible for some workflow approvals for staff in company B though HR have completed implementing an org structure for company B.
    Is it possible to use the same workflow templates  by saving them in a different name and change the agents to reflect company B org,if so how do I go about it?
    In future we will also roll-out to Company C.
    What is the best way to do it and save time as well.
    Thank you.
    Missa

    Hi
    Consider a scenario like EMPB  who belongs to CMP B has applied a leave and EMPA manager of EMPB who belongs to CMP A,
    Now in order to send the leave request for approval to EMPA you can define or create a rule from PFAC transaction. in such a way that
    1. First try to get the initiator details like his personnel number.
    2. Once you have the Employee number , by using it you can read hi Org Assignment details from PA0001 to get employee sepecifc compnay code.
    3. BAsed on the employee group and sub group you might have to decide who is manager I hope this would be defined already in the org structure.
    4. Once you know who is the manager , get his position details and from it get holder and his communications info from PA0105.
    IN this way if you define a rule by calling a function module. You can make use of the same workflow. but based on the initiator  details you need to dort out the manager.
    The simple way is to define and impement the Rules dynamically to fetch the agents based on the Personel are/sub are and employee group and sub group.
    Regards
    Pavan

  • How to create group bom for multiple plants with different company codes

    Dear all,
    In my current scenario we have 5 Company codes with a plant with each company. The same kind of materials exist in all the 5 plants, so what i want is when i create any BOM, that BOM has to extend in all the company codes, as with GROUP BOM i can able to extend the same in only one company code.
    So how to do this?
    Thanks in Advance
    Bhushan

    For that first extend all the materials to all the plants... In one plant create a BOM for the material..
    In all other polants in CS01,   click COpy from .. There you mention the matreial and the plant in which the BOm is alerady available..
    karthick

  • Intra company transfer with different company code

    Hai gurus,
    i have the following scenario:
    1) i have company 'A' under company code 1000( purchasing plant) and it has 10 depos namely( A1 TO A10).
    2) i have another company 'B' under company code 2000( manufacturing plant) .
    3) under company code 'B' it has three manufacturing plant namely B1,B2 and B3.
    4) Products x,y and Z are produced in all three plants namely B1,B2 and B3.
    5) company 'A' receives the forecast for the year and give the requirement for all the three products(X,Y and Z)
        to company 'B'
    6) Based on the input from company 'A' input company 'B' produce and sell all the final products(X,Y and Z) to
        company 'A'.
    7) company 'A ' and 'B' comes under same management and control area.
    8) How to map into sap and how the requirement will be transferred from company' A' to 'B'.
         ( currently requirement is passed between executives of two company in the meeting).
      9) some times the company 'B' has to deliver the final product to any of the depos( A3 or A6) which is
          situated near Company 'B'  on instruction from company 'A', but the payment is paid only to company
          'A' .This is done to avoid transit delay and transportation cost.
    waiting for positive reply.
    regards,
    sekar chand - pp
    Edited by: sekar chand on Mar 13, 2009 8:07 AM
    Edited by: sekar chand on Mar 13, 2009 8:15 AM

    Hi ,
    For such requirement where there is intercompany transfer , use the standard EDI IDOC . For the documentation Please go through this link http://help.sap.com/saphelp_nw04/helpdata/en/cf/ab3827940311d295e600a0c9306667/frameset.htm .
    The scenario you will be mapping will be
    1. Company A raises PO on Company B and send the PO to comapny B through EDI IDOC output type NEU type 6 (EDI). This will create SO in company B.
    2. Once company confirm the date for delivery then u can pass confirmation to PO using output type BAOO.
    3. Once u do pgi of outbound delivery u can pass this information through output type LAVA. This will create inbound delivery on purchase company A.
    4. Once u relase billing doc u can send this to purchase company using RD04 . this will create vendor invoice on purchase company.
    In the link all the information is given about the partner type , port type, message type and output type .

  • Issue with Cross-Company code transactions and Extended Withholding tax

    Hi Gurus,
    I am having an issue with Cross-company code transaction while posting expense with 2 different company codes.
    In the 2 company codes, one company code is setup for Withholding tax and other was not set.
    While posting in FB50, I am getting the below message and system does not allow to post the invoice.
    Company codes have different settings for withholding tax treatment
    Message no. F5786
    Diagnosis
    You are entering a document containing at least one vendor or customer item and which has line items in several company codes. The extended withholding tax treatment has been set to active in one of these company codes, but not in one of the other company codes.
    System Response
    You cannot enter this kind of document.
    Procedure
    Enter the transaction in two documents.
    For this I tried to test the transaction by activating of extended Withholding tax for both the company codes. Then the invoice is posting correctly now.
    The point is if I activate extended withholding tax for the Company code which is not using the setup, will it face any issues in other areas? and also kindly advice whether is this a right way to set up to fix the current problem.
    Thanks for the Support and early response will be appreciated.
    JBC.

    Hi Mamta,
    Thanks for the Response. I think you misunderstood my scenario.
    For Eg in FB60 with Co code 5065:
    I am debiting the Expenses for Co Code 1000(Witholding tax not active) and crediting the Bank Account of Co Code 5065(Withholding tax setup is done for this co code). When I tried to post with these line items I have getting the error.
    Posting        GL                   Co Code
    Dr          106520(Exp)            1000
    Cr          202020(Bank)           5065
    For this I tried by activating the Withholding tax for Co code 1000 which is not active before and post it. The system allows me to post the invoice.
    I want to know whether is this a right way to solve this issue and will it impact on any other areas by only activating the Withholding tax for a Co code?
    Thanks,
    Bapu

  • Automatically clear the open items for a GL account cross company codes

    Hi FICO experts,
    Can anyone help me on the following issue urgently?
    There are journal entries posted to same GL account with different company code. Is there any way to automatically clear the open items sitting in the GL account in company code A to against the open items for the same GL account in company code B.
    The example is below:
    Journal in company code A
    Dr. 840410      $100
      Cr. 111300       $100
    Journal in company code B
    Dr. 111301   $100
      Cr. 840410      $100
    Now I want to automatically clear account  840410 by using assignment or text in the journal entry.
    It will be highly appreciated for any instructions.
    Adele

    Hello Adele Wang,
    You can enter cross-company code transactions in one step in the General Ledger, Accounts Receivable, and Accounts Payable application components. This function would be used, for example, for centralized procurement or payment.
    Integration:For centralized payments, each individual company code enters its own invoices separately, while a central company code pays them. When you are clearing open items, the system makes clearing entries between the company codes participating in the clearing procedure. These clearing entries represent the receivables and payables that exist between the company codes in centralized payment.
    Prerequisites:You have specified which company codes are to be processed via a single company code. In this specification, you can distinguish between clearing transactions. You can therefore have different combinations of company codes for incoming and outgoing payments.
    You have specified the clearing accounts that record the receivables and payables between the individual company codes. The system posts to these accounts automatically when clearing the open items.
    You need to make  the required settings in the activity Prepare Cross-Company Code Manual Payments in Customizing for Financial Accounting (Accounts Receivable and Accounts Payable->Business Transactions->Outgoing Payments->Manual Outgoing Payments).
    Features:For each company code, the system generates a separate clearing document. A joint transaction number marks these documents as belonging together.
    Example:For a clearing transaction (incoming payment, outgoing payment), you have agreed in Customizing that if company code 0001 is specified, open items are also selected from other company codes (0002 and 0003).
    Hope I had been able to help you. Please assign points.
    Rgds
    manish
    Clearing can then also be carried out if the account to be cleared has not been created in company code 0001. As long as no items have to be posted to this account in company code 0001, it is not necessary to create a master record for the account in company code 0001.
    See also:

  • Can we assign two positios to a person with different CoCode

    Hi,
    We have a requirement where an employee is managing/working on a position under one Co.Code/OrgUnit 'A'. the same employee is managing/working on a position of another Co.Code/OrgUnit 'B'.
    The employees Payroll is genarated by Org.Unit 'A' where as his travel related expences are paid from the resepective Co.Code/ Cost Centre.
    There is NO staffing percentage shared by the company's,(hence in IT0001 only one position is assigned in PA) since the employees payroll is generated from Co.Code/Cost center of 'A' the staffing is assign 100% there where as 'B' staffing is considered as Zero.
    Can this be a correct sollution ??? or  will the solution impact our Payroll or other HR modules.
    I will appreciate your help.
    Thank You
    A Bharath

    Hi, Manikya Raju,
    I appreciate your reply.
    I think we can not use Management of Global employees, here as we are implementing for India public sector and the implementation is for India only. The Mgt of Global employees concept works for global employees not one country, please correct if I am wrong.
    We have thought to use the Concurrent employment as well, but I think it should not be used for time mgt and personal data only - currently payroll is not in our scope of work. 
    Also we use only one employee number, who manages more than one position (where the payroll is generated from one position).
    I am mapping the two positions for an employee in the Org Structure for the Org Chart display purpose, where as in PA I am using only one position of the employee for which the payroll is generated - I am still not confident if the positions are from two different company codes, also how far this mapping is appropriate.
    I will really appreciate any help or suggestion on this.
    Thank you
    A Bharath

  • Creating order with out Company code and plant - just for pricing -possible

    Hi gurus
    Just for creating sales order (let us say no delivery and no billing, client was not intrested in the initial setup) for just pricing thing, does we really need Company code and plant. with out that just with sales org setup(sale org+D.C) can I create an order to full fil the pricing scenario.
    Please I need help on this
    Thanks
    Kris

    hi kris,
            we cannot create a order with out company code and plant , due to the following reasons
          we do not require the company code to create the order , but we require the plant to create a material and use it in the sales order .and we require a company code to create a customer .
    the pricing procedure is determined depending upon the sales area(sales org+distribution channel +division).
    please reward the points if it is helpful
    Regards,
    Murali

  • STO - Two plants within Different Company Codes

    Hello,
    Kindly help me out with this case, i want to create a STO for two plants within DIFFERENT company codes, so i've created all the required configuration and master data including creating the supplying plant as a vendor and the ordering plant as a customer, also all master data is maintained in both plants and i tried the scenario on the IDES system and it works okay so i know i'm on the right procedures. The problem is that i create the PO, but when i go to Transaction Code VL10B to create the delivery it gives me an error ( Delivery with no Line item not allowed ) even though there is more than enough stock in the storage location. Kindly help me out.

    17.01.2010     Stock                            10.500,000      0,000      10.300,000
    13.01.2010     Order     Totals record     100,000-     100,000      10.300,000
    13.01.2010     Deliv.     Totals record     100,000-     100,000      10.300,000
    17.01.2010     StLcSt     SLFR     10.500,000      0,000      10.300,000
    13.01.2010     Order     Totals record     100,000-     100,000      10.300,000
    13.01.2010     Deliv.     Totals record     100,000-     100,000      10.300,000
    17.01.2010     BtchSt     123     10.500,000      0,000      10.400,000
    13.01.2010     Deliv.     Totals record     100,000-     100,000      10.400,000
    17.01.2010     BStLoc     123       /SLFR     10.500,000      0,000      10.400,000
    13.01.2010     Deliv.     Totals record     100,000-     100,000      10.400,000
    This is the whole table.
    This is what i got. i believe that it is an availability check problem, i just can't see what is the solution.
    SLFR is the Storage location of the issuing plant.

  • Billing in Stock Transfer between two plants of two different company codes

    Hi Friends,
    I am doing the scenario of stock transfer between two plants of different  company codes.
    I have some issues in Billing for this..
    What are the settings do i need to to for Pricing in SD point of view.
    Ex:
    Supplying         /         Receiving
    Com.Code:2000     /        CompanyCode:1000
    Plant:2100              /         Plant:1100
    SA:2000/10/00      /          SA:1000/10/00
    I created Customer 5555 w.r.t sales area of supplying company code (2000/10/00)
    I created Vendor  7777 and assigned Supplying Plant 2100 in add purchasing data.
    In IMG Settings:
    Define Shipping Data for Plants: In Receving Plant i assigned customer 5555 and sales area blank
                                                        In Supplying Plant i assigned customer blank and sales area as 2000/10/00
    Create Checking Rule: Standard(B SD Delivery)
    Define Checking Rule: Standard(Avallability-01assigned to checking rule B)
    Assign Delivery Type and Checking rule: Document type(NB)-Supplying Plant(2100)-Delivery Type(NLCC)-Checking Rule-(B)
    Assign Doc Type:Supplying Plant(2100)-Receving Plant(1100)-Doc type(NB)
    What are Pricing settings in SD i have to do?????????
    Process:
    ME21N->VL10B->VL02N(PGI)->VF01(IV)->MIGO->MIRO
    I have gone through many threads in Forum but confusion in Pricing Part..
    Some are mixing with the inter company sales proces..
    Pls guide me..
    With Regards

    Do the following steps for STO Customizing:-
    1. Create a customer master record for the issuing plant.
    2. Create a vendor master record for the issuing plant, and enter customer account number in the Customer field on the Control screen.
    3. Repeat steps 1 and 2 for the receiving plant.
    4. Assign the plants to the customer master record in Customizing for Materials Management (MM), by choosing Purchasing <Purchase Order < Set Up Stock Transport Order< Plants.
    The Process Flow would be as follows :-
    Create a stock transport order, following the standard procedure, and send the order to the issuing plant.
    Issuing plant has processes your order, and when it is ready to ship,the storeperson at the issuing plant issues the goods using a transfer posting. The excise clerk there creates an excise invoice.The excise supervisor verifies and posts the excise invoice.It then sends the goods to you, together with the excise invoice.
    Once the goods arrive, you follow the standard procedure for incoming excise invoices:
    The excise clerk captures the excise invoice, using the stock transport order as the reference document. The storeperson enters the goods receipt, again using the stock transport order as the reference document.Alternatively, you can first enter the goods receipt and then capture the excise invoice.
    The excise supervisor then posts the excise invoice.
    Best Regards,
    Ankur

  • Form-16 ,if employee get transfered with same company code.

    Hi Friends,
    If an employee get ransfered from one personnel subarea to other personnel subarea with same company code, can we get Form-16 seperately for two different periods.
    Thanks in advance.
    Appreciate any help and points will surely be rewarded.
    Thanks & Regards,
    Nanditha

    Hi,
    Pricing configuration for STO: -
    In SPRO > MM > Purchasing > Conditions > Define Price Determination Process > Define Schema Determination > Determine Schema for Stock Transport Orders > Here assign Calculation Schema "RM2000" i.e. Stock Transfer Document to Schema Grp Pur. Org, STO Type (For e.g. UB) and Supplying Plant.
    Calculation Schema "RM2000" has condition type P101 which will pick up the MAP of supplying plant automatically during creation of STO in ME21N ("Conditions" Tab).
    You can create new freight / delivery cost conditions in M/06 for Margin and assign in pricing procedure "RM2000" in M/08 and also assign the Accrual Key to this and do the Account Determination for this Accrual Key in OBYC
    At the time of PGI, following accounting entry will get generated;
    Stock A/c - Dr - 110 INR (Receiving Plant)
    Stock A/c - Cr - 100 INR (Supplying Plant)
    Margin Account - Cr - 10 INR (Supplying Plant)

Maybe you are looking for

  • R.I.P., M.B.P.

    Recently, my 7-year-old MacBook Pro died on me. A friend suggested that I google-search for "sell my macbook pro" or something like that, to sell the old machine for parts. Does anyone here know of a service or web-site where I can sell the machine?

  • How to put "(" and ")" in String

    I need to construct a String like: String a="hello"; String b="John"; String s=a+"("+b+")"; this not working since "(" and ")" doesn't recognized as a string,what is the escape character for "(" and ")"?

  • About iTunes Connect verification Email

    I want to publish an iBook, and enabled the iTunes Connect, but I didn't receive the verification Email. How can I make send the verification Email to me again? Thank you.

  • I downloaded IOS5 but lost my calendar entries. Is there a way to get them back?

    I downloaded IOS5 on my iphone 4 but lost my calendar entries.  Is there a way to get them back?  I did back up info on my Mac.

  • Delete of pages in multipage Tiff

    Hi everyone I'm faced with the task of deleting one or more pages in a multipage tiff -file. The only way I've found is something like this: ImageDecoder dec = ImageCodec.createImageDecoder("tiff", filestream, null); // Pull out pages I want to keep