Material at activity level

Hi,
I created an automatic project with a material which having two child material.
After that i run order BOM. I maintained reference point at activity level and same in BOM transfer.
When we open the project in project builder , child materials should be attached to the activity. But it is not happening.
Please suggest the solution.
Vikas

Gokul,
Yes I'm using CN33. I assigned reference point to child material also.
But still materials are not attached to the activity.
One more thing, System Status  is  CRTD. Should i have to release it first ?
Vikas

Similar Messages

  • CJ20N, auto-defaulted storage location at activity level

    Hi all,
    we have this problem at CJ20N (PS) screen.
    At activity level, componenent overview, if user keys in the material no, a storage location is auto-defaulted
    later we found out that if the material is extended to only 1 storage location,  the storage will be auto-defaulted at componenet overwview, is there any setting to prevent the auto-defaulted storage .. pls advice

    Hi,
    Carry out these IMG steps:
    SPRO 
    Logistic Execution 
    Basic Shipping Functions
    Shipping Point and Goods Receiving Point Determination
    Set Up Storage-Location Dependent Shipping Point Determination
    Assign Shipping Points According to Storage Location,,,,,,,,
    Put in your combination of Shipping Conditions / Loading Group/ Plant/ Storage Location/ Proposed shipping point
    Next time you create a Delivery document,, the system will pick up the above values from the Material/Customer master records and propose a Storage Location at line item number.
    I just tried it and it works, let me know if this works.
    Cheers,
    Mohammed
    Edited by: Mohammed Raheel on Jun 5, 2009 1:09 PM
    Edited by: Mohammed Raheel on Jun 5, 2009 1:11 PM

  • Material ledger activity rate revaluation account determination modification

    Scenario:
    SAP ECC 617
    Material ledger activated with activity rate revaluation (i.e. cost center over/under absorption posts to ML and not to production orders)
    Standard SAP setup has PRV transaction key used to post both multi-level price differences to inventory and to capture the offset to the cost center clearing entries (GBB-AUI) causing the values to get comingled in the same account
    Question:
    For reporting purposes I would like to determine a unique account for the activity rate revaluation entries.  There is no relevant general modifier available for transaction key PRV. Is it possible and practical to modify table T169A for a specific value string / field name combination that represents this material ledger transaction?  If so, what is the combination?  Or will this cause major issues with ML processing?
    I'm trying to find a creative way to fill this gap without account substitution.

    Hi Eric,
    This is an interesting one.
    Modifying value string might be an option but in my opinion is quite a serious "brain surgery" on the system :-).
    You may want to try another option.
    In SPRO -> Controlling -> General Controlling -> Organization -> Maintain Versions
    for version 0, Controlling Area Settings, Settings for Each Fiscal Year in tab Price Calculation there is field Revaluation.
    One of the options there is 'Own business transaction'. With this option posting to sending Cost Centre resulting from actual activity price revaluation will be posted with different Business Transaction (although same secondary cost element as original activity allocation).
    In reports you can separate postings based on Business transaction.
    It definitely works for Activity Update 1 (revaluation of production orders).
    I'm not sure if it works for Activity Udate 2 (no revaluation of production orders).
    Please let us know the results of your investigation.
    Regards,
    Szymon

  • Material Ledger activation (COML) - multiple plants in single company code.

    Hi -
    Material Ledger activation (COML)- multiple plants in single company code.
    In large mfg plant - process industry (proposed to dived into number of production plants), Matrial 'a'  is produced in plant 'a'.Material 'a' is input to procude matl 'B' in plant 'B"..so on and so forth.
    We are activating Material Ledger (COML) for actual costing purpose. Question -During multi level price determination, will the variance of lower level materials ( produced in lowerlevel /other plants in our case) be rolled up to higher level materials (in a different plant). please let me know if it really works, if yes what are the guidelines (if any) .
    Please advise ASAP.
    Thanks
    Chris
    Edited by: Chris Farr on Oct 23, 2008 11:12 AM

    Hi Chris,
    from a business point of view there is a  difference that you might take into consideration: The valauation level will always be on material and plant combination. That means, the division into several virtual plants will usually lead to different actual prices for the same material in each plant. That might happen for example when you carry over stocks from last month into the current month in one plant, while the other plant has only receipts from the current month.
    That might me desired, but often it is not. If the mutiple plants are in reality only one location it might be hard to explain why the prices differ between plants.
    best regards,  Udo

  • Function modules to get wbs level budgets and activity level cost

    hai gurus can any one tell me the function modules or any other bapis to get the wbs level budgets and activity level costs
    thanx in advance
    afzal

    ok

  • Config for Cost & budgeting at activity level and WBS element level in PS

    Dear GURU's,
    please suggest me how to do the spro configuration for budgeting and costing, here my requirement is I need to do cost planning and budgeting at WBS element level and Activity level. We two deferent types of projects.
    Regards,
    Bha

    Hi Bhanu,
    Cost planning in projects can be done through two techinques:
    I.  Manual cost planning (at WBS level)
    1.  Overall planning (Struture-oreiented planning)
    2.  Detailed planning (Cost element planning)
    3.  Unit costing
    4.  Easy cost planning form
    II.  Automatic cost planning using networks and assigned orders
    For customizing:  Use transaction OPUV  and enter the required entries for cost planning.
    Budget can do only at WBS level.  For configuration do the following steps:
    1.  Create Budget profile - OPS9
    2.  Assign Budget profile in Project profile - OPSA
    3.  Then allot budget to your project - CJ30
    hope it will be very clear.  Appreciate with point if it useful.
    Thanks and Regards
    vetrivelan

  • How to do budgeting at activity level and WBS element level in project syst

    Dear GURU's,
    Can any one please suggest me how to do budgeting at activity level and WBS element level in project systems, friends please I required set by step process.
    I need how to do this configuration to map this scenario.
    Regards,
    Bhanu

    Hi Bhanu,
    Use this link :
    http://help.sap.com/saphelp_45b/helpdata/en/86/98853478616434e10000009b38f83b/frameset.htm
    after page opens , click on BUDGET MANAGEMENT , There you will find each and every step you want .
    Thanks ,
    Dhruv Kumar Malhotra

  • Long Text at Activity Level in CJ20N

    Hi all,
    So, I have a typical newbie question. But somehow Im unable to find an answer to this query even by searching.
    I need to print the Long Text Tab at the Activity Level (not at Project/WBS/Network level)  in CJ20N using the Read_Text Function Module.
    Just need info on what's the ID, Object, Name etc.
    pk

    Dzed,
    Thanks for that valuable tip. That was exactly what i was looking for.
    But unfortunately, my internal table is not getting updated even though im able to input the right parameters to the Function Module.
    Here's what I've done:
    DATA: BEGIN OF ist_lines OCCURS 0.
    INCLUDE STRUCTURE TLINE.
    DATA: END OF ist_lines.
    select mandt
           aufpl
           aplzl
           ltxa1
           vornr
           objnr
           projn
           from afvc into corresponding fields of table ist_afvc
           for all entries in ist_prps
           where projn = ist_prps-pspnr.
    loop at ist_afvc into wa_afvc.
    concatenate wa_afvc-mandt wa_afvc-aufpl wa_afvc-aplzl into wa_afvc-con3.
    modify ist_afvc from wa_afvc.
    endloop.
    break br_abap1.
    loop at ist_afvc into wa_afvc.
    CALL FUNCTION 'READ_TEXT'
      EXPORTING
    *   CLIENT                        = SY-MANDT
        ID                            = 'AVOT'
        LANGUAGE                      = 'E'
        NAME                          = 'WA_AFVC-CON3'
        OBJECT                        = 'AUFK'
    *   ARCHIVE_HANDLE                = 0
    *   LOCAL_CAT                     = ' '
    * IMPORTING
    *   HEADER                        =
      TABLES
        LINES                         = ist_lines
    EXCEPTIONS
       ID                            = 1
       LANGUAGE                      = 2
       NAME                          = 3
       NOT_FOUND                     = 4
       OBJECT                        = 5
       REFERENCE_CHECK               = 6
       WRONG_ACCESS_TO_ARCHIVE       = 7
       OTHERS                        = 8
    IF SY-SUBRC <> 0.
    * MESSAGE ID SY-MSGID TYPE SY-MSGTY NUMBER SY-MSGNO
    *         WITH SY-MSGV1 SY-MSGV2 SY-MSGV3 SY-MSGV4.
    ENDIF.
    endloop.
    Im able to pass the right value for the variable 'WA_AFVC-CON3', but unfortunately the Internal table is not updated.
    I know Im missing something here, but obviously Im too blind to notice that.
    pk

  • Commitments at activity level in report S_ALR_87013533 - Plan/Actual/Commit

    Hi All,
    When i executed the report S_ALR_87013533 - Plan/Actual/Commitment/Rem.Plan/Assigned, the commitments are shown at WBS level but not at activity level. Is there any setting required to see the commitments at the activity level?
    Where as the planned costs are shown against the activity in the same report.
    Please suggest the required settings if any?
    Regards,
    Ramana.

    HI Rifaee/Martina,
    In CJI5 the line items are shown under the WBS. But i would like to see the line items in the report.
    Even after running the report cjen the database is not updated for line itemwise commitment in the report.
    How to assign the PR/PO as account assignments to activity? Where do i need to do this setting? Please inform.
    Regards,
    Ramana

  • ECP at activity level not triggered

    Hi All, we are on EHP4 and we activated ECP at activity level in config "view to activate  .  Would appreciate any solution/inputs..

    i tried both the paths you mentioned, but they aren't available in EHP4.  the only option that's available at this path is 'Define CO versions for ECP'
    Besides, we made some progress where we heard from SAP that we need to activate enhancement EA-PLM in SFW5.  However, we are still weighing our options whether to go ahead with it as you can't revert back on this once activated.  so, need more study on this to ensure there are no side effects by implementing this function.
    thanks a lot for your involvement/inputs..
    PSPM

  • Block the Material at Item level in Sales Order automatically for delivery

    Hi!
    My business scenario needs a material to be Ckecked for Inspection after raising the Sales Order by thirdparty person. So, I need to block that particular material at Item level automatically for delivery and rest of the line items can get delivered. I can do this by selecting the reason for Block at Item level manually, but I want the system to get detemine this block. And one more thing is that there is NO Quality Management module for this. So, let me know what I need to configure for this effect.   Thank you.....

    hi,
    pl check the user exit " userexit_save_document_prepare" or "userexit_save_document".
    Take the help of your abaper to see if the logic written here can affect the item level block in the sales order for inspection. Create new reason for the item level block and have it triggered with this exit. Instead of hard coding which might require regular intervention of abaper for code changes for the business to be able to manage it, maintain a master data in the material master against some field with a key.
    now use that key to identify if these materials require to be blocked at the sales order level for inspection. To release this item again the user has to go in VA02 mode to release the block. Let this be done after the inspection of that material.
    regards
    sadhu kishore

  • How to check plan line items for plan cost at network activity level?

    Dear all,
    How to check plan line items for plan cost at network activity level? The plan cost is done in network activity in CJ20N.
    I am not able to check using CJI4 or CJI9 report.
    Kindly advise.
    Thanks and regards,
    Jessie

    Hi Jess,
    Have you checked the navigation part which is being displayed on left hand side of report S_ALR_87013565 and S_ALR_87013533.? There you have option to check transaction currency and object currency when you double click on it.
    In case if it is not being displayed under navigation. Then you can bring them on from transaction code CJE2. For eg: Report group for S_ALR_87013533 is 12KST1C. Double click on it and it will open up to do changes in report layout and many more. There you also have options to bring on transaction currency too. Similarly, you can check for other report groups as well just by checking the report description.
    But I am not sure if suits your requirements. Wait for other experts to comment on this.
    Regards,
    Amit

  • Material Group Hierarchy Level 1 - Description

    Hi,
         We required Material Group Hierarchy Level 1(0RPA_WGH1) DESCRIPTION. we find data source 0MATL_GRP_1_TEXT to
    get description. that standard data source created based on table TVM1T. We did find any data in that table. kindly guide me
    how to acheive this.
    Thanks

    hi rajendra,
    just check table T023T, hope this will help u.
    thanks

  • Fetching conditions at service purchase order activity level.

    Hi All,
    I have a service PO which has activities. At the activity level, there are discount condition types. I would like to know how to read those conditions.
    Is there any function module for the same?
    Thanks in advance.

    All conditions are present in KONP but if u are checking something based on External services u can find the tables in SE11 with ES*

  • EASY COST PLANNING at Network Activity Level

    Hi All
    I am using EHP4 system. I want to do easy cost planning at NWA level for this I already activate ECP for NWA in configuration setting and other necessary settings but still when I create ECP from CJ20N or CJ9ECP I can not able to do ECP on NWA activity level. Please give your inputs on same.
    Regards

    Hi Gokul
    All basic settings for ECP have been maintain. It allow me for ECP on WBS level but it not show me any activity or Network in ECP as I activate Planning for Network Activities with Easy Cost Plan in configuration.
    Regards

Maybe you are looking for

  • Scientific Notation on MID

    having trouble with a parsed out excel file. We import processor files into our application and do so with maybe 20 different processors. However one file is giving us a particular problem, even though the MID colum looks to be  a simple MID like thi

  • Subtitles Work in simulator but are wrong in Apple DVD player

    OK I have used scripts to set one of two subtitle tracks (French or English) and another script to jump to a play once or a looping version of the video track. One menu selects the subtitle language and another menu selects the single or loop play op

  • How to embed images in HTML

    i was wondering if i could embed images into html and end up with a single file

  • How should i set the baseURI when a db file path with a space

    if the db file in a path like c:\program file\myapplication,then i set the baseURI dbxml:c:\program file\myapplication ,some exception occur~what should i do ? thanks a lot

  • Converting merged Word forms.

    Can you convert documents to PDF, that have been "Mail merged" from word as a template  into Access as a completed form. I need to print off 5000+ forms and my print shop needs them to be in .pdf format.