Material availibility in prod  order

Dear all ,
For SFG production order RM required .
In prodction order Storage location for this RM is 0001.
where as in MMBE stock available for this RM at 0002. still prodn order status is MACM ?
Pl guide where to check
regards ,

I have the same issue but the system behaving in a unusual manner:
I have set the system in such a way that the system should post an error to me if material is not available (i.e. it is in unrestricted stock and no reservations are made against this stock). for this purpose i've copied the standard PP Checking rule and created ZP. and have reservations and planned orders removed from it.
along with this i've assigned this to my order type.
The system isnt performing this check at order creation level but carrying it out as required at order release.
i've set the appropriate settings in "opjk" too.. in customizing..
Please help. in my opinion the system should not behave like this..should i raise an OSS note for having SAP look into this issue ?

Similar Messages

  • Incorrect Result of Material Availability in production order

    Hi gurus,
    we have a problem with material availability in production order CO01. When my list of materials is checked OK with option availability material and I modify the quantity of some material. With this modification, e.g. quantity 99.999, the logical result of my material availability would be NO OK, but the system answers is OK. I think he material availability doesn't recalculate the availability.
    I will reward with a lot of points!!!
    Thank you
    Dan

    in the availability check screen of the prod order, find out the which check group is being called. and find out the scope of check,
    then in the custmisation, change the setting of the scope of check.
    Trx code OPJJ, deselect/select the indicator "check without RLT".  if there is tick in ur current system then uncheck it, it the tick is not there then tick it.
    your issue will be solved.
    Regards,
    Pravin Mukkawar

  • Update Material Availability dates during order creation

    Hi,
    We have a requirement to update the material availability in the schedule lines of the order when the order is being created.
    We want the update to happen after the sales order is in the Data base. We tried calling a Function module in Update task. The function module is written in the EXIT_SAVE_DOCUMENT form of sales order user exit.
    The FM is getting called on the commit work , but not updating the sales order. We are getting an error " Material availability date should be less than load date". On debugging we noted that the SD_SALES_SCHEDULE_MAINTAIN is called with a load date of 00/00/0000 since the sales order is not in DB.
    Is there a way to call the FM after the sales order is in the database.
    Regards,
    Prabaharan G

    Worked using the enhancement framework development

  • Material availability chek for order

    Hi
    I created one production order  status is CRTD
    then i release this same order status is REL
    now  i do material avilability by click oncheck availability material
    but statem status is NMAT
    Systm give mesage like... "No material components exist"
    then i check the components through MMBE, stock is there with unrestricted...
    why system give like this message.... "No material components exist"
    where the problem....PLs tell me
    regards
    sesidhar

    i checked  BOM dates and production Order dates both are matches
    actually the the problem happend like..this
    1. i create plannd order with md61 ,then i run MRP..then i go to  MD04 there i select the plaand order then 
        i click this plannd order converted to production order..through this procedure .. the problems
           heppend.like....... which r
                                              1. No material availability check  --status-NMAT
                                               2. master data tab... BOM details not displayed.
                                               3. In assignment tab.. resevation number displayed.
                                                    then i check the reservations with MB23.T.code
                                                    but  system error like ..."Document does not contain any items
    2. i create production by using CO02  ...System does not any problem which r mentioned above
                      resrvation created and displayed, material avilability checked, and BOM details displayed     
                     in Master data tab... every trhing prfect
    PLS analyse the problem .... while creating production order via plannd order..
    regards
    sesidhar

  • Material Availability in Process Order

    Hi Gurus,
    In process order, (scheduled in Current date) before release I was checked availability of in-put materials.
    System thrown a message that Allchecked materials are availble.
    But, in actual  one material is shortage in stocks.
    I checked the controls in COB1 all are OK
    Please any body help me in this
    with regards,
    Anand.M (Hyderabad)

    Hi Anand,
    It depends on  Checking criteria maintain in your  checking rule in T.code OPJJ.
    - First of all select your order type and plant in along with Transaction type (1 creation or 2 Release) and find out which checking rule you have maintain in it.T.code is OPJK
    - Then go to t.code OPJJ and find the checking criteria for that Checking rule.
    Regards,
    Dhaval

  • Backorder rescheduling: when Material available, global Sales order rescheduling

    Dear all,
    As we don't have PP implemented,
    When a Material is out of stock, the Sales order items on this material are not confirmed.
    My worry is to respect the reservation: first ordered, first reserved.
    How would you manage this? V_RA would it be a good solution?
    Or is it necessary to go on change on all these Sales order to confirm it manually?
    Kind regards,
    Sebastien

    You can use V_RA, it can allow users to uncofirm/confirm the quantities for sales orders.
    Regards,

  • Material availability  check for production order

    Hello,
    Is there any functional module to check the material availability of production order. So that it can be used in developments.
    Regards,
    Ganesh

    Hi,
    Following are the available Function Modules for avaibility checks in Production orders,
    BAPI_PRODORD_CHECK_MAT_AVAIL -  BAPI: Execute Material Availability Check for Production Orders
    And for Process Orders,
    BAPI_PROCORD_CHECK_MAT_AVAIL - BAPI: Execute Material Availability Check for Process Orders
    Regards,
    Dhaval

  • Work Order Material Availability Check Customizing

    Hi,
    I am currently trying to set up material availability check in the work order before saving. I am testing it by entering a material in the work order for which there is zero stock. Then clicking on ORDER > FUNCTIONS > AVAILABILITY > CHECK STOCK MATERIAL. However SAP would return 'All checked materials in order 100000317 are available' in status bar.
    My customizing is as follows:
    Define Checking Rules (SPRO):
    PM     Checking rule for plant maintenance
    Define Scope of Check (OPJJ):
       Availability Check: 01 (Daily Requirements)
       Checking Rule: PM (Checking rule for plant maintenance)
       Availability check: 2 (Check availability during order release)
        Stocks
        Include safety stock: X
        StockIn Transfer: X
        Incl. quality insp. stock: X
        Replenishment lead time
        Check without RLT: X
        In/outward movement
        Incl. purchase orders: X
        Incl. purchase requisitions: X
        Incl. dependant reqs: X
        Include reservations: X
        Include sales reqmts: X
        Include deliveries: X
        Incl. planned orders: X (check all planned o)
        Incl. production orders: X (take all production)
    Define Scope of Check (OIOI):
       Plant: (Corresponds to Work Order)
       Order Type: (Corresponds to Work Order)
       Check material availability when saving order: X
       Check rule: 02 (Corresponds to material being used)
       Release Material: 3 (No release if parts are missing)
       PRT Availability: No check
       Capacity Availability: No check
    I would appreciate if you could indicate if I am missing something in the customizing or if there is some sort of error. I would like SAP to display a system message on the status bar stating that this material is not available once the user enters this material.
    Regards,
    Nikolai

    I'am facing the almost the same problem. Could anyone tell me:
    1. How to make material availability check work  during Work Order creation?
    My requirement is Work Order can not be created when it has missing parts. I have set the config to '3' can not created when is has missing parts, but it still does not work.
    I have implemented SAP Notes 1148139 on my system (SAP ECC 6 Ehp 5) also, but still does not have any effect.
    I must not set the config Res./Purch Doc creation to 'immediately', because it does not fit to my user requirement. Is there anyone knows how to solve this requirement?
    2. How to make  information message/ Availability check screen appear when sparepart is missing, without clicking Availability Check button? for example: appear when clicking Save button.
    Thank you
    -amoonra-

  • Status "MANC" Material availability not checked in Production order

    Hello guys,
      During Production order creation, i am manually checking the material availability and its giving message that all checked materials are available.Now i completed the order,released and saved.When i went inside the production order again to see the status of the order, with many status it is also showing the status "MANC - Material availability not checked".But manually i have checked the material availability for the order.
           Plz help me in understanding this problem.

    Hi Jitender,
    In Customization T Code-OPJK, Order Control details, tick or activate Check material availability while saving the order.
    I suppose...
    regards
    Ram Kumar

  • COHVPI Material Availability Check

    Hi All
    I am using COHVPI for collective check of material availability:
    1. For all packaging material it checks and show me the log if there is material shortfall, however for Batch managed semifinish product it does not show shortfall if there is any! ( I am using batch strategy to pick batch automatically, but dont think it makes any difference here)
    2. Also, after the Material Availability check the order status stilt l remains MANC, rather I expect it to change to MACM.
    Can you guys please suggest any solution for this!
    Thanks in advance
    Rahul

    The status MANC suggests that a dynamic availability check is not being executed.
    Check if the same occurs in COR2 as well as COHVPI. If so, you then need to check if availability check is actually switched on for the material;
    First, check if a checking group has been assigned to the material master and ensure "No Check" is not selected in transaction OVZ2.
    Then check the checking rule assigned to the order type in transaction OPJK. Here, you can check if a check is executed during release or during creation. It may be you have only activated a dynamic ATP check at order release for example and the orders being processed in COHVPI are CRTD.
    Also, You should check tranaction OVZ9 to ensure the availability check is checking receipts that you expect it to check.

  • How to stop prod order release without material available?

    Dear Experts,
    Is there any settings to avoid the release of production order if there is no material availability?
    Thanks & Regards,
    Imran
    Edited by: imran  shek on Mar 24, 2009 7:39 AM

    Hi Imran,
    Try the below for not to allow the release of production order when the material is not available.
    1. Goto Tcode : OPJK and select the Plant / Order type for which you want to restrict the order release if the matl is not avaialble.
    2. Click the details tab screen.
    3. System will display the detail screen for the order type / plant combination.
    4. For the Availability Check  put " 1 or 2" i.e. check availability during the Order Creation / Release based on the business requirement.
    5. Under Material Availability tick the check box "Check Material Aval before saving".
    6.For the Collective Conversion use " 3" (No Creation if material is missing)
    Creation control for availability check material :
    Controls whether a planned order can be converted to a production order if one or more material components are not available.
    Dependencies
    This key only relates to the collective conversion and partial conversion planned orders.
    Hope this will help you.
    regards
    radhak mk

  • Production Order Simulation for Material Availability

    Please Help.
    Does anyone know how to run a simulation for a configured material and then do a material availability check? First I need to be able to configure a material, then I need to be able to see if I have the material available to build it. The requirement is coming from Sales or another Plant if the form of a question "Can you fulfill the SO by X date?"  I have tried CO01S but after configuring the material it is not allowing me to then do the availability check. Any ideas would be appreciated.
    Thank you

    Hi,
    Based on further checks i feel the simulation order might not meet your exact need, apologies for the incorrect info.
    Alternatively what i can think of at the moment is,
    1. Create a new order type say ZSIM, assign a new number range (create via co82) for this & maintain all other paramters as a normal order type
    2. Create a user status in BS02, which does not allow for releasing the order & assign this user status to your new order type in OPJH.
    3. Create a order for your material using this new order type & you can then use the material availability functionality.
    The blocking of release for these orders, ensure that even by mistake the user does not release these orders as you want to use it for simulation purpose & thereby ensuring that it does not become relevant for production.
    Hope the above helps.
    Regards,
    Vivek

  • Longer time for Material Availability check while creation of prd order.

    Hi guys,
    I am facing a weird problem while creating production orders thru CO01.
    I enter the component and plant and I am also using the forward scheduling option.
    for some reason, SAP is taking a long time for material availability check when I hit the release button.
    Sometimes its taking more than an hour. Its happening with few specific BOM's, and I have checked the master data but I could hardly find a problem in master data.
    Can someone suggest me some tips ??
    Thanks & Regards,
    Sashivardhan

    Hi,
    Please check the Availability check control maintained for Components it should be 01 or 02. Also check the issue storage location maintained or not. You can maintain issue storage location in BOM in Status/lng text tab in Production Storage Location.
    Hope this will help.
    Regards,
    Navin

  • Material staging indicator not populating in prod order WM pick list item

    Hello,
    I have an issue with material staging in an prod order
    1) PP-WM interface is activated
    2) Control cycle for material is created
    3) Production storage location is created for material
    4) storage type is 100 for production
    5) There is one discontinued material and also the follow up material
    6) stock of discontinued material is zero and requirement are passed to follow up material
    When we confirm the order the stagging indicator for both follow up material as well as discontinued material automatically populates zero (Non relevence to pick list items) where as it should be one (1 - for pick list items).
    One more issue user has manually inserted discontinued material as well as follow up material in production order change mode.
    In the BOM of a main material both discontinued as well as follow up material is there with some quantity as a component.
    For the same work center, control cycle , production storage location the indicator is populating.
    These two material (discontinued as well as follow up) are appearing twice in the WM pick list screen where first two line items are OK and populating indicator "1". But in line item last and second last indicator is not there.
    My question is why the stagging indicator is not automatically populating in the production order WM pick list screen in front of components.

    Unfortunately, WM material staging via production orders is not possible
    from the pull list.  Please see the long text of message RMPU 311
    (WM material staging for production order reservation not possible):
    "You cannot carry out a WM material provision for pick parts from
    production order reservations in the pull list". The reasons for this
    are cleary explained in the SAP on-line documentation via the
    following path :
      Logistics -> Logistics Execution -> Warehouse Management Guide ->
      Goods Issue -> Goods Issue for Production Supply ->
      Material Staging for Repetitive Manufacturing
    See the following under the Selection heading :
    The choice of the selection type influences which types of WM material
    staging are supported in the pull list. However, the pick parts can be
    staged via RS headers/planned orders but not with the current BOM
    explosion. The release order parts, on the other hand, can also be
    staged if the current BOM is used for calculating the dependent
    requirements.
    WM material staging via production orders is not possible from the pull
    list.
    I think you may try in CO02 or COR2 for production order or process order.

  • Material Availability check during work order creation and Release

    Hello All,
    We are checking material availability at creation as well as release
    Say we have Material XYZ=100 in stock MMBE
    Now XYZ =100 is say at normal storage location =75
    and scrap storage location=05 and serviceable =20
    Currently when availability check is performed it checks for 95 (It excludes scrap storage location 05 )
    but we want  Availability check to be only for normal stock =75 and not for Serviceable and Scrap location
    how to do this in configuration or via exits
    Since if the material is under Scrap location it is not counting in Availability check at work order creation this logic is working fine but I do know from where this control is put that when the material is in the stock of scrap it is not counting in Availability check for work orders.Same thing I want to extend it to Serviceable stock .
    Why not it is consider it for Scrap storage location , what is config or any MM enhancement
    So that when Availability check run it will not consider Materials at SCRAP as well as SERVISABLE storage location also.
    Please have your views on this
    Regards
    pratap

    Hello
    There are two option for your requiement
    1. Changing the status of the servisable storage location stock to restricted use stock . You can include or exclude this stock status material in OPJJ. This solution is not storage location dependent. It is stock status dependent.
    2. Please refer the enhancement for the storage location determination. I am not sure about this funtionality:
    For production orders the following enhancement is available:
    PPCO0005 enhancement for storage loc. determination/backflushing
    You can use this enhancement to change the storage location and the indicator 'backflushing' in the reservation.
    The enhancement PPCO0005 contains the following enhancement components:
    Function exit
    EXIT_SAPLCOSD_001 storage location determination/backflushing
    You can find the description in modification text of the function exit.
    You can find an example of the user exit in the function group XC01 in the include LXCO1F05.
    warm regards
    Ramakrishna

Maybe you are looking for

  • Windows 7 64 stuck (keyboard/mouse) but not when reboot my Boot camp

    Hi Guys, After spending more than 3 times 12 hours reading/searching/trying I've decided to seek for your help. My problem is pretty simple, trying to install Windows 7 64bit on MacBook Pro 15 Retins (mid 2014 model - MGXC2LL) gets stuck at language

  • Raise error in an external-function of XSLT-mapping (ABAP)

    Hi, we implemented a xslt-mapping (ABAP) in PI with external-functions. It's a great feature and works fine. Now, we have to implement an error handling: The external-functions are reading data from an abap table. We have to stop the mapping (if a va

  • How to create an index for bi-lingual text column

    I have a column that keeps the full file name of the attachment document file of a record. I need to build an index on the column so that we can search the attachment document file. The content of the file will be in English or French, but we don't k

  • FDM Drill to EBS gets wrong Set of Books

    Hi, We just installed Planning, FDM, ERPI, and ODI. I am testing the drill through from FDM to Oracle EBS. I start in FDM and click on Open Source System. That takes me to ERPI where I click on the amount. Oracle EBS launches in and asks for my User

  • Fact design accumulative snapshot

    This is Loan domain and I am trying to create an accumulative snap shot table at loan level with following columns on 01-jan-2011 this snap shot would be like LOAN_KEY,LOAN_DATE,DEPOSIT_DATE,RETURN_DATE,CLEAR_DATE,WRITEOFF_DATE,LOAN_PAIDOFF_DATE, LOA