Material costed, production order with no target cost

I've a case of production order and I don't where to find information to solve it.
I've a product A costed from March. Standard cost is correct.
I'm creating a production order now. The cost estimate is calculated during the delivery.
I've confirmed order by CO15. I've created a variance by deleting 2 items in bom of order. And confirm less than wanted on other component. But I don't think these variances are linked to my problem.
In CO02 and cost analysis : target cost of my product equals 0.
I've checked my prod cost variant and choices are : std price, L price from PIR, moving average price.
Thanks for your helps
Christophe

How can I see that ? I've checked that material cost has taken the bom during the cost explosion. Components are also costed.
I've noticed that target cost appears after variance calculation for product.

Similar Messages

  • Creation of a new costing variant to cost production orders

    Hi all,
    Currently the business is only able to cost a vehicleu2019s production order at the standard cost value which is determined at the start of the year.
    During the year a number of the purchasing values will be updated with a new contract price, this increase will not be reflected in the standard cost until the end of the year.
    The business would like a new costing variant which will cost an already created vehicle in SAP by its production order at the u201CCurrent Costu201D (current purchasing info record value).
    It will need to be calculated in the following way:
    u2022Purchased material - at purchase cost from info record (see below for applicable exchange rate).
    u2022Manufactured material - child material to be at purchase cost (from info record). Routing cost (labour\overhead, etc) at current criteria.
    u2022No allowance for CPI.               [WHAT_ DOES_CPI_MEAN_?]
    u2022Exchange rate: ideally, fields are provided to input exchange rate. If this is not possible then apply current monthu2019s exchange;
    u2022FRAu2019s - current rate from the info record.
    u2022Summary of total material cost by origin code with ability to drill down to line level.
    u2022The output of the report will need to be similar to the layout of a production order but with only the current value displayed.
    We have some problems to understand this request: we don't know the transaction which is used by the users to costificate a production order and what does it mean "CPI". We are not sure on the feasibility of the costing variant requested because it must consider both actual costs and standard costs.
    It should costificate in this way:
    (Actual Cost of Row Material * Bom's standard qty) + (Standard price * Standard production time (in the routings).
    Could you help us?
    Many thanks to all of you, best regards.
    Alanis

    You can create a new costing variant with  a valuation variant that points to inforecords for material prices. Go to OKKN t-code and create the required configuration and start using the new costing variant to measure the current cost of making vehicles.

  • Production Order with follow-up material unble to save due to error CKBK009

    Dear Expert,
    When we apply discontintion/follow-up material setting, production order is not able to save. <b>Error message "CKBK009 - No price could be determine for material....."</b>.
    <b><u>SAP Help indicates :</u></b>
    "No price could be determined for material .......... Message no. CKBK009
    <b>Diagnosis :</b>
    The system could not determine a price for valuation view 0, because no valuation 
    strategy succeeded from valuation variant 006.
    <b>System Response :</b>
    Since the input quantity is zero for this material item, the costing result is not   
    affected by this error at the pricing stage.
    The standard system defines this message as an error message. However, you
    can use user-defined error management to specify that the message is a warning
    or an information message, or that it is not issed at all.
    <b>However, in Controlling's User-Defined Error Management, CKBK009 is already  warning only.
    What other setting is needed ?</b>
    Thanks for helping !

    Dear all,
            Manage to solve the problem via Note 1008643, per following.
           <b> THANK YOU for all your guidance & Have a nice day !</b>
    <u><b>NOTE 1008643 :</b></u>Symptom
    In a production order error message CKBK-009 is raised during cost calculation.
    This message cannot be modified into a warning or information message.
    Other terms
    CKBK009, CO01, CO02, CO03
    Reason and Prerequisites
    System design
    Solution
    Please make a new entry in TA OPR8 with the following characteristics:
    ErrorManagID    ApplicationArea   MsgNo  MinMsgType    MaxMsgType
    PPCO            CKBK              009
    Then run TA OPR4_PPCO to modify the message type for CKBK009.

  • Error message while creating production order with KMAT material strategy25

    Hi PP Gurus I am running variant configuration cycle...Strategy 25, Custermer Req KEK (KMAT Matrl)
    Sales order & MRP Picked the components correctly as per the dependencies
    written. So Planned order generated against sale order.
    When I tried to convert planned order to Production order...I am getting the
    below error message..
    Error Message:
    You cannot make an assignment to make-to-order stock Message no. CO684
    Diagnosis The component cannot be allocated to an individual stock because
    make-to-order production and engineer-to-order production cannot be executed
    with this order.
    A possible cause is that you are trying to create an order with reference to a
    sales-order/project, where an account assignment to a sales order/project is not
    allowed in the settlement profile that is assigned to the chosen order type.
    This is inconsistant.
    System response The following responses are possible:
    Order processing is cancelled.
    The system resets the special stock indicator back to the original value.
    Procedure Choose another order type.
    I used order type with SD1 as settelement profile.
    OVZG: default 046, settlement profile = SD1
    OPJH: Settlement profile = SD1
    Plz through some light on this if u have worked on Variant Configuration/MTO
    settlements.
    Question:
    1) Is creation of production order with KMAT material supported by SAP?
    2) If yes, why the above error occurs?
    Waiting for Ur reply
    With Best Regards

    Dear R.Brahmankar,
    I have check on the note, but it is not relevant to ecc6. The current system default setting is :
    Standrad setting for reqt class 046
    Special Stock E
    Acct Assgt Cat. M
    Valuation M
    Settlmt Profile SD1
    However if I change the Acct Assgt Cat. from M to E. It resolve the problem. I would like to know is this the right solution?
    Config in Acct Assgt M
    Consumption Posting = E
    Config in Acct Assgt E
    Consumption Posting = '  '
    In F1 key of Consumption Posting field it shown following:
    To flag the sales order item as cost- and revenue-carrying, enter an "E" (settlement via sales order).
    If you do not wish to flag the sales order item as cost- and revenue-carrying, do not enter anything.
    Dependencies
    If you are working with nonvaluated sales order stock, always flag the sales order item as cost- and revenue-carrying.
    If you are working with valuated sales order stock:
      In the case of complex make-to-order production, flag the sales order item as cost- and revenue-carrying
      In the case of sales-order-related mass production, do not flag the sales order item as cost- and revenue-carrying
    Should we change to E?
    Regards,
    Ong

  • Table for Production order planned and Actual cost

    Hi Experts,
    Can anybody please tell me the name of table where Production order planned and Actual cost gets saved ?
    Thanks in advance.
    Regards,
    Bijay

    Table COEP
    don't forget the points

  • EXTERNAL OPERATION in a production order with  different company code plant

    Hi,
    in my case i am having a production order with  4 operations.
      0010 milling
      0020 winding
      0030 cutting
      0040 milling
    among this opearion 0030 i want to do it in a plant which is assigned to different company code than mine.
    in this case whether i should proceed with PP01 Control key  with opearion plant as that plant which is lieing in diffent company code or
    i should specify  PP02 control key saying that plant as an external vendor for me and do PR  and PO for that service .
    which should i follow for my case and how cost gets updated .

    Hi,
          For different company code, u have to specify PP02 in the routing for external vendor. In PP02 control key indicator must be set in external opn.
    Before that create purchase info record.
    Enter subcontract info record in routing.
    after running MRP , convert the PR to PO.
    Send the material by MB1B by 541 mvt
    Receive the material by MIGO  by 101 mvt.
    Regards,
    Raja sd

  • Production order with reference to sales order

    Hi experts,
    I have created one sales order.
    I am getting an error as "sales order has no CO object" while creating production order with reference to that sales order. Can anyone help me on this ?
    Thanks in advance.
    Rgds,
    Parul.

    Dear singh,
    pls check this given by yadav
    T. Code: OKKP - Maintaining Controlloing Area
    Select your Controlling Area and Click: Activate components/control indicators (left-hand Dialog Structure)
    Here, Under Tab: Activate, check Boxes: Sales Order, Cost Objects, etc..
    Check whether Strategy Group is maintained in Material Master (MM02) --> View: MRP3.
    T. Code: VA02/ VA03 --> Tab: Procurement -> Column: RqTy
    There, Check whether requirement type is relevant for MTO.
    More information:
    Req. type: KE (if, Reqmts class: 040 Mke-to-ord.w/o cons. - possible to create Production order)
    Req. type: KEK (If, Reqmts class: 020)
    Req. type: KSV (used for Make to stock - Planning with Assembly Planning Strategy 40 is being used in the MRP3 view of the material)
    Also, Check other relevant settings in:
    SPRO --> IMG --> Sales & Distribution --> Basic Functions --> Availability Check and Transfer of Requirements --> Transfer of Requirements
    Best Regards,
    vraj

  • Error while issue material against production order

    Hi,
      In our development server recently we have created on ecompnay code and plant by copying the one existing company code and plant,  now for this new plant I have created new profit center with KE51  and after that I have create done cost ceneter in that this new profit center is assign   now while goods movment with MB1A with movmen type 201, 202  it works OK system is not giving any error  but while issue the material against production order in MB1A with movement type 261 system is giving error message
    No postings can be made to profit center DUMMYBAOPC in company code MT50
    Message no. KM183
    Diagnosis
    Profit center DUMMYBAOPC cannot receive postings in company code MT50.
    this profit center DUMMYBAOPC we use in old compnay code and for this new company code is not activated  for new we have new profit center  then it is  linking to that  what can be the solution.
    regards,
    zafar

    Hi,
      After asigning new profit center in the Production order problem solve.
    regards,
    zafar

  • Transacciu00F3n MFN1 - Error KA465: Production order with an actual activity up

    Hi Exerts,
    I am executing transaction MFN1 with "Update of Activity Consumption in the Quantity Structure" = 2 and the following error ocurrs: "KA465 Production order with an actual activity update.".
    I changed the customizing "Update of Activity Consumption in the Quantity Structure" to "Activity update not relevant to price determination", after this I exectuted transaction MFN1 again and the error didn't occur.
    I need to understand what is the impact of changing this customizing, and if I set the "Update of Activity Consumption..." equal 2, the activity actual values are revaluated in the CKM3N? If the answer is yes, in what point of the CKMLCP this value is revaluated?.
    Regards

    Hi,
    please check CKM9 for the relevant plant how you define the Activity update. Please note KA465 is justified to avoid posting the credits and debits twice if the indicator is '2'.
    If you are using activity update '2', the differences between planned and actual activity prices are not distributed to the orders but via multilevel price determination directly to the materials.
    The system determines the actual prices by means of the multi-level price determination in the actual calculation.
    In the actual calculation, the system also already debits the materials and credits the cost centers or vice versa.
    In this case, the revaluation must not be executed because otherwise the system posts the debits and credits twice. In this case, the system ought to display error message KA465.
    Note 686588 explains under what circumstances error KA465 may be raised, that is, if you have activated Material Ledger/Actual Costing with Activity Consumption '2'. Please check your Material Ledger settings in relation to note 686588.
    If you use activity update '1' then revaluation is done via the orders and no longer via Material Ledger.
    regards
    Waman

  • Closing the Production Order with status PCNF

    Hi Experts,
    May I kindly ask if I can close an order with status Partially confirmed? If not, how can I cancel the confirmation if I had already reversed the goods movement in the confirmation thereby flagging an error of a deficit in the material quantity during cancellation of the confirmation?
    I really need your help since I need to close the production orders with this case.
    Hoping so much for your replies.
    Many thanks in advance.
    Sincerely,
    Ria

    Ria,
    I am not so clear about the exact situation.
    When you say you have reversed the goods movement with MIGO, is it reversal of the documents posted with confirmation or the individual documents?
    You can only cancle the document with MIGO which are independent of the confirmation.
    The  documents which are with the confirmation can not be reversed in any case with MIGO.
    I suggets you go this way,
    1. Check why system is giving you error as 'Deficit......'. The one thing I suspect that you must have performed auto GR & moved out the stock of FG from that location.
    If it's so then bring back the stock to it's original location & cancel the confirmation.
    While cancelling the confirmation where you might have executed goods issue with backflush this error won't arise as the stock will be bring back to storage location form the order.
    Don't reverse the cancellation of the of the documents youhave performed with MIGO for independent material posting on the order. Keep it as it is.
    This way the cancellation of confirmation & material movement will be done & now cost on the order will be zero.
    You can assign the status CLSD as well as DLFL to the order.
    2. In case you find the above activities can not be carried out for some reason then give status TECO to the order.
    Sttle the order so that the cost on the order will be zero, then give status CLSD.
    As far as possible stick to solution no. 1 only.
    Go for solution no. 2 when you don't have any other option.
    Hope this helps you.
    SmanS

  • Settlement rule auto created in Production Order with Receiver Type as OIT

    Hi,
    I am creating a production order with material number in CO01. The system is automatically putting OIT in receiver category, in settlement rule.
    And its populating the child materials there. I expect the parent material to be populated in the settlement receiver.
    In the settlement profile maintained in order type, I have maitained MAT.
    Please let me know, why system is autopopulating the role like above.
    Regards
    SR

    Hi,
    If you are going to settle the production order to Material, there is no need to enter Allocation structure in Settlement profile unless its used for variance settlement...
    Allocation structure has an option to settle to OIT with a settlement cost element or primary cost element...which is why i wanted you to check for that.
    Anyways, Follow the thread, this should help you
    Change the Settlement Rule
    Thx
    PG

  • Production Order with customer stock & materials

    Hi,
    I have a process of make to order that have the following scenario:
    1-  Supplier buys and sales material to the end costumer upfront.
    2- Supplier uses that material in a production order but wiht no cost addition.
    3- Supplier have to control stock of the material that sold upfront. No valuation required.
    I was thinking making a normal sale and a 501 K to get the material inside doors. But since I have to use it in a production order and consume it of stock have no idea since in the production order I can't make any 502 K or similar.
    Any ideas?
    Thnks
    Mig

    Dear
    Please try the following :
    1.You can goto MM02-material code -Costing1 View -Mark Do not cost Check Box so that it will not be costed
    2. You can create  material with Material Type : UNBW  Non-valuated material
    Regards
    JH

  • Variance calculation for production order with settlement receiver as SDI

    Hi...
    I have one query reference to Variance calculation for production order with settlement receiver as SDI(Sales document item).
    I am working on Varaint configuration with strategy 25(Make-to-order for configurable material) with requirement class 046.
    I have created sales order ref. to configurable material,subsequently created planned order & then converted to production order.
    In production order settlement receiver is SDI(Sales document item).
    While doing production confirmation ,variance has been created.
    Now during variance calculation KKS2, I have got error message as no suitable settlement rule found for object Order no.
    Is there any way to come out of this?Or variance calculation KKS2 is not applicable with settlement receiver as SDI(Sales document item).
    Pl. guide
    Redards
    Tushar

    Hi
    In case of non valuated material, concept of variance does not apply...
    Variance is Actual Cost - Cost of Goods receipt posted in stock.. If the later value is zero, your entire actual cost is variance... That is one way of saying it
    But, in SAP, var not calculated in case of non valuated material and that makes sense as well.. Since you are in MTO scenario, it would make sense to analyse costs vs revenues @ sale order level as each SO will be unique in itself
    Regards
    Ajay M

  • Report for Production orders with name of Customers

    Dear Expert,
    Kindly suggest to view the production orders with customer numbers for which the sales orders is created.
    I tried in MB51 with layout settings but the customer number comes out be blank despite the sales order number is populated for an production order.
    Kindly suggst a way or any report in the system  to get the corresponding information of production order number and corresponding customer name mentioned in the sales order .
    Thanks in advance for your help and inputs..
    Best regards,
    Nitish jain

    Nitish,
    MB51 is a Material Document list.  Many production orders exist that have no entries in this report, so it would be an unlikely candidate to be a solution for your requirement..
    The standard production order reporting tool is COOIS.  The output for MTO orders can be configured to display Sales order and Item and Soldto.
    Obviously, displaying even the customer order number in COOIS is impossible in a MTS scenario.
    In addition, a user experienced in using SAP Query  (SQVI or SQ01/SQ02/SQ03) could also create a production order report without having to know ABAP, by properly linking tables AFKO, AUFK, AFPO (production order data) with VBAK (sales order header data) to get customer number, and KNA1 to get customer name..
    If you are not expert in SAP Query, I suggest you discuss this requirement with a local ABAPer.
    If you are feeling like educating yourself in the wonders of SAP query, try this doc.  Although old, SAP query hasn't changed very much since this document was written.
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/BCSRVQUE/BCSRVQUE.pdf
    Rgds,
    DB49
    Edited by: Dogboy49 on Apr 20, 2010 10:47 PM

  • Creation of production order with reference to sales order

    dear all guru's,
                       i m having a requirement of creating production order with ref to sales order but without changing my old strategy of make to stock.
    regards
    ujwal

    Hi,
    For the purpose of creation of production order with reference to sales order while maintaing MTS strategy you need to maintain Make to stock strategy 40 in strategy group in MRP-3 View of Material Master.
    This is the only Make-to-Stock Strategy which enables you create Production Order against both Sales order as well as Demand / PIR.
    So if your strategy group is already 40 then you need not change it.
    However if you are using any other Make-to - Stock strategy like 10, 11 etc. then it is not possible to create Production Order against Sales Order since they dont consider Sales Order in planning.So you need to change them and set strategy group as 40.
    Hope this helps.
    Revert if you have any doubt.
    Regards,
    Tejas
    Edited by: Tejas  Pujara on Sep 27, 2008 8:50 AM

Maybe you are looking for

  • How can I make a bootable disk with some third party applications to use?

    My Macbook's performance has slowed WAY down and I want to try running a couple of different tools on it to optimize it. Thing is, some if not all of them require you to boot from a different disk, and since I got them online, I don't have bootable C

  • How can i add custom attributes to a new Class Object using the API ?

    Hello everyone, Here is my problem. I just created a subclass of Document using the API (not XML), by creating a ClassObjectDefinition and a ClassObject. Here is the code : // doc is an instance of Document ClassObject co = doc.getClassObject(); Clas

  • Installing Adobe Reader error code 1328

    Installed what I thought to be Adobe Reader but it was not.  It was a paid site displaying Adobe Reader. Now when down loading and attempting to install the correct Adobe Reader I receive an error code 1328.  Error applying patch to file C:\config.Ms

  • Format of the verizon email page

    The email page is cluttered with headers and tabs and miscellaneous junk. The actual text that I receive and send is given extremely little space at the bottom of the window. See the picture here. Can I change the format to see more text area??

  • TS1307 Mail tends to forget that it viable smtp servers.

    I have a brand new Mac Mini, running 10.8.2.  Problem: Mail tends to forget that it has one or more viable smtp servers.  It, periodically, will not send unless I manually run the connection doctor, which shows that all the servers are indeed there,