Material staging time in Schedule line of Sales order for GATP material

Hi Experts,
In a sales order for a material on GATP, there is time 23:57 coming as material staging time.
Can any body explain how is this time calculated.
For the shipping point there is no working time maintained.

Hi,'
The following link
http://help.sap.com/saphelp_scm70/helpdata/EN/3a/92e217b3f54a5eae7a4ac8a99e5e87/frameset.htm
details on material staging in GATP.
Regards,
Mrinal

Similar Messages

  • Calculation of Material staging time in Schedule line of Sales order

    Hi Experts,
         In a sales order for a material on GATP, there is time 23:57 coming as material staging time.
    Can any body explain how is this time calculated. 
    For the shipping point there is no working time maintained.

    Biswajit,
    Material staging time is calculated based on the GR time which u mention in the material master QM view.
    Please check the link, hope it will help.
    [Material Staging|http://help.sap.com/saphelp_47x200/helpdata/en/c6/f840fb4afa11d182b90000e829fbfe/frameset.htm]
    Thanks,
    Raja

  • Material Staging time in Schedule Lines (Shipping Tab) of Sales order

    Hi Gurus,
    I would like to know how the time is arrived at, in the Schedule line of a sales order.
    I have maintained the Working times in the Factory Calendar. via Route Dependent with Pick Pack time as 3 Hrs 30 Min.
    and working time in Shipping point is from 08:00 to 20:00 hours.
    When i create a sales order now, i could see that material staging time is determined.
    But now i would like to know, what time should be determined here.
    Thanks in Advance,
    Regards,
    Vasim.

    Hi,'
    The following link
    http://help.sap.com/saphelp_scm70/helpdata/EN/3a/92e217b3f54a5eae7a4ac8a99e5e87/frameset.htm
    details on material staging in GATP.
    Regards,
    Mrinal

  • Ignore the number of schedule lines in sale order item when run MRP

    Dear All,
    I have a problem when I create production order (discrete manufacturing)
    When I create a sale order with one sale order item and 3 schedule lines for this sale order item.
    After that, I run MRP for this sale order, what I get is 3 planned orders for 3 schedule lines. It means that I will have 3 production orders for 1 sale order item.
    I want  create one production order for one sale order item whatever the number of schedule lines in sale order item.
    I think I have to config in MRP. Please help me.
    Thanks in advance

    Dear
    Check in OPPQ then look in Master data Availability Check & strategy for material also check whether u have maintained strategy for same material and see did u extended sales views for other material
    As u said 3 schedule lines for this sale order item check whether u have extended sales views for next material
    With Regards
    Pushpalas

  • How to deactivate schedule line in sales order

    hi friends,
    how can i deactivate the schedule line in sales order so that we can deliver the sales order after the schedule date. i can uderstand that system is not allowing before schedule date. but what if i want to deliver after that.
    Thanks in advance.
    Regards,
    Solomon

    hi,
    this is to inform you that,
    here you need to switch off:
    schedule lines allowed
    in schedule lines control data - remove or un check - availability/TOR
    In SPRO - Availability Check settings.
    but i have a question here:
    what is the business logic.
    do you want to do the same with all the sales orders or not.
    please update the forum
    then answer will be different
    balajia

  • Sales order for pipeline material type..

    Hi All,
    How can we raise the sales order for pipeline material..
    Is schedule lines will be there for the sales order raised for pipeline material???
    Rgds,
    Pavan

    Hi
    Seems you working on  IS Utilities, please corerct if Wrong and if I am wrong to guess you are working on IS Utilities then the next story dosn't make any sence.
    PIPEline material type is used for Materials such as oil, power, or water that flow into the production process directly from a pipeline, line, or other type of conduit. Since pipeline materials are always available, they are not planned.
    To answer specifically what you asked would be as follows:
    1. The fact that material type is PIPE from an SD standpoint is irrelevant
    2. lets consider your PIPEline material is power, your UOM should be Kilowatt hours and establish price for it.
    3. "deliver" the material and bill it.
    However, taking the whole business context of sale of electricity into account why you want to sell PIPEline material without using IS Utilities. Typically electrical utiltity requirements have some unique challenges not easily met by SD:
    1. Amount to be billed to the customer is from meter readings.
    2. The bill to the customer ( at least in North America) is not so much of an invoice as opposed to statement of accounts that includes meter readings, consumption history etc.
    I will suggest to look into IS Utilties first before getting into SD.

  • Issue in schedule lines on sales order

    Hi all,
    While creating a sales order, system is creating schedule lines after two days of order creation. I want that schedule lines should be created for the same date.
    Please suggest that what should I do for this?
    Please respond.
    Best Regards,
    AI.

    hi,
    check whether any delivery scheduling is been maintained
    IMG>SALES AND DISTRIBUTION>BASIC FUNCTION>DELIVERY SCHEDULING AND TRANSPORTATION SCHEDULING>MAINTAIN DURATION
    choose shipping point and remove the "Loading time w.days" and "Pick/pack time wrkdys" if maintained any
    choose route and remove "transit lead time"
    now try with new sales order
    regards
    senya

  • Material variant replacement in sales order for Configurable Material

    HI
    I am using variant configuration. In this i have created material A as configurable material and have Preconfigured Material B as its variant by assigning configurable material in MRP 3 view.
    Now when i am creating Order for material A i.e. Configurable material and the characteristics values are same as that of Preconfigured material system is not replacing Configurable material with Preconfigured material.
    Please help me out.
    Regards,
    Anand.

    Even after maintaining the item category MTAC(Mills Make to order config at mat level), the configurable material is not getting replaced in the sales order (va02). It is just showing material variant exists for the configurable material.
    The setting in item category for configuration is.
    Config. Strategy     01(Sales Order Strategy (TAC, TAM))
    Mat. Variant Action  4 (Replace configurable material (Append and change))
    ATP material variant 2 (Do not substitute if not completely available)
    Structure scope      D (Configuration, poss. with BOM explosion)
    I have maintained the stock for material variant as well to take care of ATP material varinat setting shown above.
    Please suggest if missing something.

  • Problem creating a sales order for configurable material in SAP ECC

    I have a Variant Configurable material named X.
    The structure of this VC material is
    Material X has charatcertics CHARCTERISTIC1 and CHARCTERISTIC2.
    CHARCTERISTIC1 has values VALUE1
    CHARCTERISTIC2 has values VALUE2
    I created a sales order manually from VA01 using configurable material and read the values of all configuration tables to be filled from BAPISDORDER_GETDETAILEDLIST. With the help of this data i got an idea how to fill the tables of BAPI BAPI_SALESORDER_CREATEFROMDAT2. But still i am able to create a sales order but the configuration data that i give is not getting populated in the sales order.
    Where am i missing. please some body suggest. I am unable to debug and searched the forums
    for this information but dint find solution for my problem. some body please tell me where am i missing?
    Any help would be highly appreciated
    Edited by: jessica sam on Jan 12, 2009 2:59 PM

    Even after maintaining the item category MTAC(Mills Make to order config at mat level), the configurable material is not getting replaced in the sales order (va02). It is just showing material variant exists for the configurable material.
    The setting in item category for configuration is.
    Config. Strategy     01(Sales Order Strategy (TAC, TAM))
    Mat. Variant Action  4 (Replace configurable material (Append and change))
    ATP material variant 2 (Do not substitute if not completely available)
    Structure scope      D (Configuration, poss. with BOM explosion)
    I have maintained the stock for material variant as well to take care of ATP material varinat setting shown above.
    Please suggest if missing something.

  • Regarding Schedule lines in Sales Order

    Dear Friends,
    While Creating Sales Order the Order Quantity gets Confirmed and Schedule Lines created even though there is NO STOCK.
    Kindly suggest me for this.
    Thanks & Regards
    T.Arulvanan.

    Hi
    It is because the replinishment time is maintained in MRP 3 view in material master  as also blank and because you havent made the tick there the system assumes the quantity is available in 0 days and hence it is confirmig
    You have kept check without RLT as blank it means the system is checking with RLT and the RLT Time is 0 that means system assumes at the end of end of 0 days the stocks are available and finally it will hit you in PGI if stocks are not there
    Pls maintain rep lead time as two days in MMR in the MRP3 view and see
    While creating sales order the availability check pop up will come confirming the delivery after 2 days
    You can check and see
    Regards
    raja

  • Schedule Lines in Sales Order

    Hi Experts,
      We have an indent for material X with Qty 1200,Progressive monthly dispatch plan from customer for an Year.
    Material X 
    Delivery Date       Qty           CumulativeQty Planned              Actual Delivered Qty
    01.01.2011         100           100                                             100
    01.02.2011         100            200                                             50
         If I could able to deliver Qty 50 only in month 01.02.2011, Undelired qty of 50 has to automatically distribute to remaining months .
    Also wanted to get the report of Total Planned Qty, Actually Dispatched Qty and Remaining qty to be dispatched for the current month and whole Year. Please help me how can give solution to my client..
    Thank You
    Saravana

    Hi,
    As pe rthe client requirement, this process is not allowed in standard SAP, in this scenario you have to use the user exit as mentioned below-
    USEREXIT_MOVE_FIELD_TO_VBEP - Use this user exit to assign values to new fields at the level of the sales document schedule lines. The user exit is called up at the end of the FORM routine VBEP_FUELLEN.
    Thanks & Regards,
    Rahul Verulkar

  • Regarding multiple schedule lines in sales order with same date

    Hi All,
    we create the Orders from RFC and the orders are going to Multiple Schedule lines for the same date.
    period       delivery date          ordered quan       confirmed quantity
    D     10/11/2007                10                    0
    D     10/11/2007                 0                     10
    here for the same date in first line it is not confirming and in the second line it is confirming the quantity for the same date.
    On what conditions it is possible??????
    Any one have the solution for this Please send it to me [email protected]
    Regards,
    Prasad

    Just check the schedule line details i.e go to schedule line---shipping. You will find that although the del. date is same in both the case but the timings were different e.g material availability time etc will be different in both these lines. So though the dates may be same its time difference that's causing the second schedule line.
    Reward points if useful

  • Schedule line in sales order

    Hello Friends,
    While creating sales order, a line item in sales order creates schedule line with delivery date and quantity. How does this happen and what are the criteria to be met to enable this to happen?
    Thanks

    The schedule line represents the customer intended delivery date and quantity to be delivered.
    This information is transferred to material requirements planning. This is known as Transfer of Requirements or TOR.
    MRP will then determine if there is enough quantity of stock available for the scheduled delivery date.
    If there is stock, then system would confirm schedule lines.
    For TOR to be carried out, the following criteria are to be met:
    A plant must be assigned to the sales document line item level.
    The schedule line category must be switched on for the TOR.
    The TOR must be switched on at the requirements class level.
    A checking group must be defined and allocated to the material master record in the sales/plant view in the availability check field.

  • Schedule Line Category - sales order

    Hi All,
    I have 2 sales orders with the same material in the item shows 2 different schedule line categories.
    For example:
    Sales order 1 with Item A  - Schedule line category - CB
    Sales order 2 with Item A - Schedule line category - CN
    What could be causing this? Nothing has changed in the material master.
    Any input would be helpful.
    Thanks,
    Meghna

    In both the sales orders--- is the delivering plant is same or not??(pl check)
    Apart from the above suggestions--pl check whether this material has been maintained with different MRP types in different plants.
    Yes it is possible-
    1.a same item can contain two different schedule line categories either in one sales order if maintained in different line items or
    2. In different sales orders...
    If a item has been maintained with two different MRP types in different plants--then different schedule line categories can be determined.
    Pl update us.
    Phanikumar

  • Quantity clubbed for two schedule lines in sales order

    Hi,
    One finished item F1 having strategy 20. special procurement key as 40( to get from another plant) Its sales order is created for 20 EA on 6 nov.So one line item in sales order.
    Item availability check is done.in schedule line I can see system proposes available date as 9 Nov. I manually split the quantity as 13 EA on 10 Nov and rest 7 EA on 18 Nov.
    Now in schedule lines tab I can see three line items:
    date      confirmed qty
    6 Nov      zero
    10 Nov      13 ea
    18 Nov        7 ea
    MRP is run. system generated Stock Transport Purchase requisition of 20 ea dated 6 Nov.Qty and date both is wrong. Why quantity gets clubbed?? Why date is picked as 6 Nov?? I expected system to create two Stock transport purchase requisition of qty 13 dated 10Nov and qty 7 dated 18th Nov.
    Please guide if there is any config mistake in PP or SD side.
    Regards.

    PP,
    That is pretty standard.  If you do not meet the customer's requested date when you confirm the sales order, the system assumes that you sitll intend to make the attempt.  MRP will produce a proposal based upon the customer's requested date and requested quantity.
    If you want MRP to consider the confirmed dates/quantities, set the Fix Date Qty flag in the sales order item.
    http://help.sap.com/erp2005_ehp_05/helpdata/EN/93/744bcb546011d1a7020000e829fd11/frameset.htm
    If your standard business process is that you always wish to plan based on the confirmed date(s) rather than the requested date, you can configure to have the Fix Date Qty flag defaulted; in OVZJ.
    Best Regards,
    DB49

Maybe you are looking for

  • Warning on Sun

    I was having trouble since long time removing some of the warnings from my file which was builted on Solaris 9 using C++ compiler 5.0.3. Your help would be highly appreciated. Warning message is : Warning (Anachronism): Formal argument destroy_value_

  • List of new features in update?

    It would have been nice if Apple posted a feature list of what came with the new upgrade. I'm a little worried that a new feature such as buying ringtones came before contact search, contact categories, cut and paste or synchronization of notes. Does

  • PC Suite bluetooth problems

    I want to know, why can't i connect my N6230 with the PC using bluetooth? I'm using bluesoleil and there is no problem while using the problem that goes with it, but the PC Suite does not recognize the device. I tried the PC Connectivity solution (us

  • In the Aurora "about" window it notes it automatically sends Mozilla info like usage and performance, etc. Does disabling telemetry etc in options disable this?

    As the questions says, does disabling the telemetry options in the browser settings disable any information, usage, and performance sharing as it does in Firefox proper, in spite of the blurb in the Aurora "about" window?

  • Updating Cs3 to ACR 5.7

    I am running windows Vista and want to update ACR to 5.7 I have downloaded the update following instructions for windows XP but this did not work. I have the 5.7 folder on my desktop, How do I get it into cs3 ? Easy to follow instuctions would be app