Materials for Single wbs Element from project/Plant stock

Hi to all,
I would like to have the following scenarios for the single Project.
1) Some  Activities  in the single WBS Element will be using the Materials for specific to the Project. So MRP will be generated for the Project and PR,PO,Goods receipt will be done.
2) In the same WBS Element of some activity, wants to consume materials from the Plant stock. For  this we donu2019t want to run MRP. From the reservation no, we want to take the materials for project use.
I have a single Network profile and I donu2019t want to create anymore.
Understand from movement type 411, we can take the materials from unrestricted Plant stock to project.  Is there any other way/any config I need to check in account assignment category to fulfill the requirement to consume from Plant stock and also to use Project stock in a single profile.
Regards
N.Raju

Hi,
that is the only option, Std. SAP does not support for unrestricted plant stock ( for Project MRP or availability check).
same option-
1) transfer free stock( plant stock)  to respective WBSE
2) Run MRP
3) Consume material.
Venkatesh

Similar Messages

  • How to carry forward budget next year for single wbs element

    Hi,
    i want to carry forward budget next year for single wbs element.
    pl suggest me.
    Thanks & Regards
    Purna.M

    Hi,
    Go to CJCO click on Dynamic Selection and in master data of WBS element select No of person responsible and give the person responsible and execute.before that maintain no of person responsible in that specific WBS element.
    hope it will solve ur problem.
    Regards
    Avinash

  • Exit for replacing WBS element characters while copying from Project

    Hi All,
    While copying a Project from other Project/template in CJ01, we are getting only first 10 letters of a WBS element are getting replaced.
    The requirement is to have replacement of letters even after 10th character in WBS element.
    The SAP Note 502322 suggests to have user specific (custom) replacement logic in the user exit CNEX0033.
    Anyone has worked around such requirements?? If so can you share it,,,?????
    Regards
    Pavan

    Hi,
    While creating a Project in CJ01 by giving a template, the new Project will get created with all WBS elements from the template Project.
    In standard system, the WBS Element which has more than 10 characters will get copied till 10th character only.
    Now we need to work on user exit CNEX0033, so that entire WBS element name should get copied in the new Project.
    Anyone has worked on such requirement???
    When i create new Project in CJ01, the exit CNEXX0033 will trigger..
    If so can you suggest me how to move further??
    Regards
    Pavan

  • How to capture the different sold-to party for a single WBS Element

    Hello,
    The client wants to automatically populate the Partner field in the WBSE. The Sold-to party that is indicated in the Sales Order will be the same with the Partner Field in the WBSE. I would like to ask regarding on how can we capture the different sold-to party for a single wbs element, since in our project there is a system constraint where it is not possible to have multiple u2018sold tou2019 rows assigned to partner field in the WBSE.
    Hoping for your suggestions and comments. Thanks in advance.
    - Irica
    Edited by: Irica Vaile Dalisay on May 25, 2011 3:45 PM

    Try using the Customer Enhancement

  • How to populate WBS element and Project definition in Additional Tab

    Hi,
    I have a 2 requirements
    1) we need to populate WBS element and Project definition of an order in PM
    IW 32 trasnaction (Additional data tab).
    2)Also i need to program settlement rules in CJ02 for WBS elements .
    How do i approach ?  when i do manually it is taking the values in IW 32 when the status is released.
    So i think first we need to chnage the Status from Created to released and then start working on step 1 and Step 2
    Kindly suggest.
    Thanks,
    Pradeep.

    Problem one solved ......
    Basically we need to put the status of WBS elememnts and then write a BDC for additional data tab.
    Looking into issue 2......

  • Header WBS for two WBS elements

    Dear All,
    Is it is possible to create a Header WBS for two WBS elements which were
    triggered by Two different line items in a sales document.Please detail the process
    if a possibilty for the same exists.
    Award points are assured for valuable replies.
    thanking you
    Best regards,
    R.Srinivasan

    Dear Sunil,
    I am using the Standard project with same structures only.I am not able to get the header WBS for Two WBS elements triggered from the same sales order.what are other possibilities for this problem.
    Can you please elobrate your reply
    Thankingyou,
    Best regards,
    R.Srinivasan

  • System is not picking up the WBS element from Asset in PO.

    Hi,
    While creating Purchase Order with account assignment category
    as "A"(i.e.Asset), system is not picking up the WBS element from Asset
    Master, even though it is defined in the asset master.
    Please help.
    Thanks,
    Ninad

    Hello Ninad,
    Please, see the SAP Note 21583. I think it might be of help for your case.
    Best regards,
    Esther.

  • Vendor wise/Invoice wise consumption for each WBS element

    Any standard report from SAP, which provide details of Vendor Purchase order / Contract, details of SES with WBS no. and details of Vendor invoice in columnar form.
    SAP system can not generate standard reports giving vendor wise/Invoice wise consumption for each WBS element of particular asset.
    Please help me to get this report.
    Thanks in Advance.

    Hi
    Your starting point should be CJI3 report or any PS report... Here you get the FI Doc no
    If this FI Doc No is generated from MM, check the Header segment of the document.. It would have MM Doc NO + Fisc Yr populated in the ref key... This gives you the link between FI & MM
    From here on, you can take it forward... You can look up this doc no in MSEG Table and find the PO no... Then go to EKBE table for other PO details....
    br, Ajay M

  • Reversing TECO status for Multiple WBS elements

    Hi,
    Question on setting and then reversing TECO status for a WBS element.
    When a project is closed technically in project builder, all underlaying items (wbs, network/activity) are technically closed as well.
    When you try to undo this, only the status of the top element is changed, not the underlaying items.
    Is there any way in which we get the underlaying items changed as well (mass change is not an option)
    Regards,
    Jatinder Bansal

    You can try two methods :-
    1.  Open project in project builder, Select project definition and then go to WBS Overview under project definition, now select all WBS Element and then undo TECO status. Now all the WBS status will be updated. But, this will not have any effect on network and its activities.
    2. Open the project in planning board, now select all the objects, now undo the TECO status. This will change the status of all selected objects like WBS,Network and activites....

  • WBS element AND project

    All,
    This is my question.
    1 WBS Element can be assigned to multiple projects ?
    I have seen in table PRPS table WBS Element is only the key field , But it related PROJ using the field PSPHI .
    In that case it means there will 1 WBS Element can be assigned to multiple projects ?

    Dzed,
    Thanks for your reply.
    I am little confused in that,
    I have custom table that only one key as WBS, and i need to link WBS element to project . So this part i little confused about the Multiple project thing.
    You cleared my doubts
    Thanks

  • Unable to edit WBS element once Project is released

    Hi,
    I am unable to edit the WBS element once Project has been released. Is this SAP standard behaviour? Is yes, is there a way we can make this editable and is it advisable?
    Please advice.
    Regards,
    Sophia Xavier

    Hi,
    The point is I am able to edit the WBS element before I have released the Project. But, once I have released the project the WBS element is blocked for changes.
    Infact the WBS element is editable until the higher level WBS element is released. But finally when I release the Project and system status changes to REL, the WBS element is blocked for changes i.e., it is not editable.I am just trying to understand if this is standard behaviour of SAP that WBS element becomes ineditable only overall Project is released. If the WBS element has to be changed after release, is there a way out?
    Regards,
    Sophia Xavier

  • How do we get complete hierarchy for a WBS element??

    Hi All,
    Is there any FM to get complete hierarchy for a WBS element??
    Or any other method that would achieve this requirement ??
    Eg:
    C.00103.1
    C.00103.1.1
    C.00103.1.2.3
    C.00103.2
    C.00103.2.1 etc
    If i give C.00103.1, all the WBS elements in the hierarchy should be displayed.
    Any pointers are of  great help.
    Regards
    Prathima

    Hi,
    Available Methods
    Getinfo : Read detailed information about WBS [ BAPI_PROJECT_GETINFO ]
    Maintain : BAPI: Project maintenance [ BAPI_PROJECT_MAINTAIN ]
    SaveReplica : Replicate work breakdown structure (ALE) [ BAPI_PROJECT_SAVEREPLICA ]
    The WBS hierarchy object type defines the hierarchy of the WBSelements. A project definition always has exactly one hierarchy. If theposition of a WBS element changes, the whole hierarchy has to berebuilt. Therefore, the WBS hierarchy object type has only one command:
    Create. Every WBS element receives exactly one entry in the table parameter IWbsHierarchieTable with which it defines its position.
    Command: Create
    Use this command to create or change a WBS element hierarchy for aproject definition. Enter the WBS hierarchy object type and the Create
    command in the table of the IMethodProject parameter. The commandrefers to all entries in the table of the IWbsHierarchieTable parameterthat contains the data for the data for the hierarchy. Each entry inthe IWbsHierarchieTable refers to a WBS element that describes its position relative to the other WBS elements.
    Example
    - Positioning WBS elements TRAINING , TRAINING.1 and TRAINING.2 . (WBS elements TRAINING.1 and TRAINING.2 are subordinate toWBS element TRAINING. WBS element TRAINING1 is positioned on the left of TRAINING.2.)
    IMethodProject
    OBJECTTYPE = WBS-Hierarchy
    METHOD = Create
    OBJECTKEY =
    REFNUMBER =
    OBJECTTYPE =
    METHOD = Save
    OBJECTKEY =
    REFNUMBER = I
    ProjectDefinition
    PROJECT_DEFINITION = PD-TRAINING
    IWbsHierarchieTable
    WBS_ELEMENT = TRAINING
    PROJECT_DEFINITION = PD-TRAINING
    UP =
    DOWN = TRAINING.1
    LEFT =
    RIGHT =
    WBS_ELEMENT = TRAINING.1
    PROJECT_DEFINITION = PD-TRAINING
    UP = TRAINING
    DOWN =
    LEFT =
    RIGHT = TRAINING.2
    WBS_ELEMENT = TRAINING.2
    PROJECT_DEFINITION = PD-TRAINING
    UP = TRAINING
    DOWN =
    LEFT = TRAINING.1
    RIGHT =
    Notes
    Further Information
    For more information, see the R/3 Library under PS Project System -> Structures -> EPS Interface
    Regards,
    Vijetha.

  • Where do the raw materials for the iphone come from?

    I'm doing a school project and I need to know where the raw materials for the iphone come from in order to explain it's role in globalization.
    Thanks!

    "did you ever figure this out?"
    No, he wants people uninvolved with his school project to "figure it out".

  • 2 boms for same wbs element

    hi all
    is it possile to create 2 separate bom of same material for one wbs element ?
    e.g.
    i have material " M " and wbs element is " W "
    so now i want to create 2 boms for this wbs .

    Hi,
    You can't create more than one WBSE BOM for a Unique conmination of WBS Element/Material/Plant/Usage.
    Hope this clears you.
    Regards,
    Hari.

  • Tables for Budget allocated and spent for a WBS element

    Dear experts,
    I am new to PS domain, kindly tell me the table names where I can find the Budget allocated to a WBS element and Open budget for a WBS element.
    Thanks & Regards,
    Murthy.

    Hi,
    I think by conversion cost you mean Production cost of the turbine.
    Since you do both the actvities Material procurement and production under the same WBS. The budget cannot be tracked separelty.
    Have 2 different WBS strucute one for procurement and one for production. However you can add the existing Nwk activities to these WBS.
    Regards,
    Ramesh-

Maybe you are looking for

  • Re-install Elements 11

    I had to do a complete system restore on my computer which of course means I lost all programs. I tried to re-install using my original CD but it says "invalid serial number" even though it is in fact the number on the original box. Why doesn't it ac

  • Reg : Box issue in sap script

    Hi Guru's, I have got requirement to show 2 boxes in main window so initially i wrote the BOX command in maindow and it was working fine for first page when it goes to more than one page box was not displaying in the output so that i reallized when i

  • Working with Raw Files: Workflow question

    I am seriously a novice and need some advice. I have a Nikon D40x and I'm using Aperture software. I am shooting in raw (nef)+ jpg. I have uploaded the pics via aperture. When I import, a pop-up import menu says RAW + JPEG PAIRS: BOTH (JPG as master)

  • Oracle 9i and Database Release 2

    Hi, I was wondering if anybody knows approximately when the Oracle 9i Database Release 2 (w/ XDB) is said to be available. Also, I was wondering how it will be available, such as a download (patch), the whole product or some other way. If possible, c

  • Java.lang.OutOfMemoryError: PermGen space in OC4J 10.1.3 Standalone

    Hello All, please help me to increase memory. I found many answer how it do on OAS 10.1.3 but I'can't find how it do on OC4J Standalone. I have'n opmn.xml file to increase memory. Please give me advice or solution. Thank you.